Z2DA-- 657-22-112JC, Phase1: Prepare Site For New Cath Labs, Rooms B510 and B516
Solicitation number
36C25526R0095
Issued by

About this file

This is a Release for Bidding architectural drawing set for a federal healthcare construction project at the VA St. Louis Health Care System, John Cochran Division. The project (Number 657-22-112JC) involves preparing the site for new Cathology Laboratories in Rooms B510 and B516, located at 915 North Grand Boulevard, St. Louis, Missouri 63106. The drawings are dated February 17, 2026, and represent the 100% design phase following an earlier 35% and 95% review set.

The project is phased into three sequential components: a UPS (Uninterruptible Power Supply) Room, Lab 1 (FlexArm Laboratory in Room B510), and Lab 2 (Catalyst Laboratory in Room B516). The UPS Room should be priced separately as an emergency project, with all work within the interstitial 5th floor space to be priced separately. The scope includes demolition of existing conditions, site preparation with ICRA (Infection Control Risk Assessment) containment measures, installation of new Philips medical equipment (Azurion 7 systems with AD7 floor plates), mechanical modifications including VAV box relocation and ductwork changes, plumbing modifications including medical gas panel relocation, electrical work, lighting and ceiling systems, and flooring preparation with epoxy finish and cove base. Key requirements include floor grinding and leveling to accommodate equipment per manufacturer specifications (±1/16" tolerance), fire-rated partition coordination throughout the project, and coordination with building occupancy and existing operations. The project utilizes the 2018 International Building Code, with construction Type II(222) and Business Occupancy classification, fully sprinklered design. Architect: Fox Architects; Engineer: SSC Engineering.

View the file

Other files

File Type Posted
S06-657-22-112JC Pre-bid Meeting Sign in Sheet.pdf PDF
36C25526R0095 0003.docx DOCX document
S06 Questions response 657-22-112JC 26.05.14.pdf PDF
S06-657A4-24-305 - Pre-Bid Sign In 07212025.pdf PDF
36C25526R0095 0002.docx DOCX document
S06 657-22-112JC Pre-bid Meeting Sign in Sheet.pdf PDF
36C25526R0095 0001.docx DOCX document
36C25526R0095_1.docx DOCX document
36C25526R0095 04082026 Final 02.docx DOCX document
P09 657-22-112JC Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2T

2T2 1A

1B

6 6A7

8B11

1T

5T 14 3

E

G

H

J

BELL AVE.

ENRIGHT AVE.

DELMAR AVE.

SP

R

IN

G

S T.

G R

AN

D

A

VE

EMPLOYEE PARKING

YELLOW

VALET PARKING

PURPLE

BUILDING SCHEDULE

1 MAIN HOSPITAL & CLINICAL ADDITION

1A EMERGENCY GENERATOR VAULT

1B EMERGENCY GENERATOR VAULT

1T MODULAR BUILDING

2 EDUC., MED. MEDIA, CHAPEL & RESRCH.

2T METHADONE CLINIC

2T2 OATP CLINIC

3 IRM & RESEARCH

4 NON-VA CARE / AFGE

5T OEF/OIF

6 RESEARCH

6A RESEARCH

7 RESEARCH

7A RESEARCH

8 BOILER PLANT

8A CHILLER PLANT

8B EMERGENCY GENERATOR

8C CHILLER BUILDING

9 PARKING GARAGE - UNDER CONST.

10 FLAG POLE

11 GAS METER HOUSE

12 BRINE TANKS

14 GARAGE

16 ENGINEERING / TRANSITION CARE TEAM

17 SWITCH GEAR BUILDING

24 WASTE STORAGE FACILITY

29 UNDER CONSTRUCTION

DEC DECON TRAILER

8A 7A

29BUILDING

(NON VA)

DEC

0' 200'

300'

400'

500'100'

SCALE REFERENCE

P

EMPLOYEE PARKING

YELLOW

L

PATIENT PARKING

BLUE

VACANT LOT

(NON VA)

UNDER

CONSTRUCTION

AMEREN MISSOURI

SUBSTATION

UP

DOWN

UP

F

PHYSICIAN PARKING

RED

EMPLOYEE PARKING

YELLOW

R Q

PATIENT PARKING

BLUE

A

A

PATIENT PARKING

BLUE

PATIENT PARKING

BLUE

8C

EMPLOYEE PARKING

YELLOW

SALT

STORAGE

N M

S

TO

IN

TE

R

ST

AT

E

JOHN COCHRAN DIVISION

PREPARE SITE FOR

CATHOLOGY LABORATORIES,

ROOMS B510 AND B516

US DEPARTMENT OF VETERANS AFFAIRS

VA ST. LOUIS HEALTH CARE SYSTEM

VA PROJECT NUMBER: 657-22-112JC

OVERALL CAMPUS SITE PLAN

PROJECT LOCATOR

TO

IN

TE

R

ST

AT

E

DRAWING INDEX LEGEND

BUILDING NUMBER SHEET TYPE DESIGNATORS

0 = GENERAL

1 = PLANS

2 = ELEVATIONS

3 = SECTIONS

4 = LARGE-SCALE VIEWS

5 = DETAILS

6 = SCHEDULES & DIAGRAMS

7 = USER DEFINED

8 = USER DEFINED

9 = 3D REPRESENTATIONS

DISCIPLINE DESIGNATORS EXAMPLES

GI = GENERAL INFORMATION

GC = GENERAL CONTRACT

GJ = ICRA

CS = CIVIL SITE

AD = ARCHITECTURAL DEMOLITION

AS = ARCHITECTURAL SITE

AE = ARCHITECTURAL ELEMENTS

FLOOR PLANS, ELEVATIONS, DETAILS

AI = ARCHITECTURAL INTERIORS

AG = ARCHITECTURAL GRAPHICS

AF = ARCHITECTURAL FINISHES

AC = ARCHITECTURAL CEILING PLAN

AW = ARCHITECTURAL WAYFINDING

AP = ARCHITECTURAL SPACE PLANNING

FLOOR PLANS & SCHEDULES

AL = ARCHITECTURAL LIFE SAFETY

DRAWINGS

SG = STRUCTURAL GENERAL

SF = STRUCTURAL FRAMING

MG = MECHANICAL GENERAL

MH = MECHANICAL HVAC

PG = PLUMBING MEDICAL GAS

PL = PLUMBING FIXTURES

EG = ELECTRICAL GENERAL

EL = ELECTRICAL LIGHTING

EP = ELECTRICAL POWER

EK = EQUIPMENT INSTALLATION

FLOOR NUMBER ON PLAN SHEETS

SHEET NUMBER

##-XX-###

COVER SHEET

01-GI-001

CONSULTANTS: ENGINEER:

Revisions: Date:

Drawing Title

VA Health Care System Approval:

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Veterans Health

Administration

PREPARE SITE FOR CATHOLOGY

LABORATORIES, ROOMS B510 AND B516

657-22-112JC

JOHN COCHRAN DIVISION

915 NORTH GRAND BLVD - ST. LOUIS, MO 63106

1 S. Memorial Dr.

Suite 1800 St. Louis, MO 63102

(314) 621 - 4343 Bob Dunn bdunn@fox-arch.com

2707 Rand Rd Indianapolis, IN 46241

(317) 646 - 9090St. Louis - Chicago

(636) 262 - 8532 Richard Kwiatkowski rkwiatkowski@sscengineering.com 02/17/2026

WJS DAE

RELEASE FOR BIDDING

FULLY SPRINKLERED

STAMP:

Drawing # of 961

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text

FH

AutoCAD SHX Text

FH

AutoCAD SHX Text

LOADING DOCK PAD

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text No.

AutoCAD SHX Text

STATE OF

AutoCAD SHX Text 17006

AutoCAD SHX Text W

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text J

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text D

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

KEYPLAN

N.T.S.

N

UP

DN

ST O RAG E

D502L CART

EL EVAT O R

EQ UI PMENT

D50 2A

Ro o m

D50 2K

CART

EL EVAT O R

EQ UI PMENT

D50 2B

Ro o m

D50 2N

I HCG SHO P

D502M

MASO N SHO P

D502J

ST AI RW EL L NO .

S508

CARP ENT RY

SHO P

D502I

EL ECT RI C SHO P

D50 2H

CO RRI DO R

H517

CO RRI DO R

H518

A/ C SHO P

D50 2D

PI PE SHO P

D502F

Ro o m

D50 5A

MECH. RM.

D505

MECH. RM.

B538

EXAM /

T REAT MENT

A550

TO IL ET

A54 9A

WAI T I NG RM.

A549

WAI T I NG RM.

A548

TO IL ET

A54 8A

OF F I CE

A572

MED. PREP.

A573

NURSE ST AT I O N

A571

OF F ICE,

DI ET I CI AN

A547

NO UR.

A57 1A

EXAM /

T REAT MENT

A570

ANT E RM.

A57 0A

TO IL ET

A57 0B

OF F I CE

A569

TO IL ET

A56 9A

OF F I CE

A568

CO RRI DO R

H504

CRAS H C ART

A56 4A

SO I L ED

A564

CL EAN RM.

A562

EXAM /

T REAT MENT

A561

EXAM /

T REAT MENT

A566

ANT E RM.

A56 5A

TO IL ET

A56 5B

TO IL ET

A56 6A

EXAM /

T REAT MENT

A567

OF F I CE

A56 7B

OF F I CE

A56 8B

EL EC. CL O SET

A563

ST AI RW EL L NO .

S505

L O UNG E

A552

TO IL ET

A55 9A

TO IL ET

A55 5A

EXAM /

T REAT MENT

A555

EXAM /

T REAT MENT

A553

EXAM /

T REAT MENT

A559

HAC

A560

ST RET CH

A55 2A

TO IL ET

A55 3A

EXAM /

T REAT MENT

A558

CO RRI DO R

H505

EXAM /

T REAT MENT

A556

HAL L W AY

A55 6A

TO IL ET

A55 8A

CO NF ERE NCE

RM.

A557

Ro o m

A55 6B

TO IL ET

A578

TO IL ET

A57 7A

OF F I CE

A576

TO IL ET

A574

OF F I CE

A575

TO IL ET

A54 4C

SERVI CE

EL EVAT O R

L O BBY

H507

CO RRI DO R

H503

L O CKER RM.

A54 4B

PHYSI CI AN

W O RK RM.

A544

OF F I CE / EXAM

A50 1A

OF F I CE / EXAM

A501

CO NF ERE NCE

RM.

A502

OF F I CE / EXAM

A509

OF F I CE / EXAM

A510

OF F I CE / EXAM

A511

TO IL ET

A51 0A

OF F I CE / EXAM

A512

OF F I CE / EXAM

A513

TO IL ET

A51 2A

L AB

A542

O XYG EN

ST O RAG E

A541

OF F I CE

B546

OF F I CE

B544

TO IL ET

B54 4A

EL EC. CL O SET

A53 6B

CL O SET

A54 4A

EL EVAT O R

L O BBY

H506

OF F I CE

B501

L O CKER RM.

A54 0A

OF F I CE

B502

ST O RAG E

A539

ST O RAG E

A53 9A

ST O RAG E

A540

OF F I CE

A535

ST AI RW EL L NO .

S501

PHYSI CI AN

W O RK RM.

A538

EL EC. CL O SET

A536

OI &T

A53 6A

TO IL ET

A53 5A

EL EC. CL O SET

A53 7A

CO RRI DO R

H501

TO IL ET

A50 8A

OF F I CE / EXAM

A508

TO IL ET

A50 7A

OF F I CE / EXAM

A507

ST O RAG E

A504

HAC

A503

TO I L ET , F EMAL E

A50 6A

NO UR.

A505

OF F I CE

A506

OF F I CE / EXAM

A517

OF F I CE / EXAM

A516

OF F I CE / EXAM

A515

OF F I CE / EXAM

A514

TO IL ET

A51 6A

TO IL ET

A51 4A

ST O RAG E

A521

SO I L ED UT IL I T Y

A519

EL EC. CL O SET

A520

TO IL ET

A51 7A

ST O RAG E

A518

TO I LET , STAF F

A532

OF F I CE

A531

OF F I CE

A533

EXAM

B52 4D

EXAM

A52 4C

EXAM

A52 4A

EXAM

A52 4B

WAI T I NG RM.

B524

RECEPT I O N

B524E

EXAM

A522

EXAM

A52 3A

HAL L W AY

A523

EXAM

A52 3B

HAC

A527

ST AI RW EL L NO .

S502

TO I LET , MAL E

A525

OF F I CE / EXAM

A526

F. E . CL OSET

H50 2A

OF F I CE

A530

MEDI CAT I O N

RM.

A529

CO RRI DO R

H502

PUL MO NARY

RESPI RAT O RY

T HER APY

A543

OF F I CE

A54 3B

OF F I CE

B542OF F I CE

B541

CO RRI DO R

H508

BRO N CHO SCO PY

SUI T E

B503

CO RRI DO R

H508

ST O RAG E

B520

TO I LET , MAL E

B521

TO I L ET , F EMAL E

B522

PREP /

RECO V ERY

B51 9B

MECH. RM.

B52 0A

CO NT RO L

B51 9C

VEST I BUL E

B51 9A

CO RRI DO R

H516

EL ECT RO -

PHYSI O L O G Y

B519

ST ERI L I Z ER

C527

HAC

C528

TO IL ET

B52 3A

HAC

B529

TO IL ET

B52 8A

L O CKER RM,

F EMAL E

B528

OF F I CE

B524

CAT H. READI NG

B525

SO I L ED UT IL I T Y

B527

EL EC. CL O SET

B526

ST AI RW EL L NO .

S503

F. E . CL OSET

H50 8A

BREAK RM.

B503

TO IL ET

B51 6A

WAI T I NG RM.

B518

HO L DI NG

B516

CO NSUL T

B517

CO NT RO L 1

B509

CO NT RO L 2

B50 9A

SCR UB

B50 8A

EL EC. CL O SET

H510

CARDI AC CAT H.

L AB 1

B508

PREP

B507

ST O RAG E

B504

MECH. RM.

B50 4A

OI &T

B506

Ro o m

B50 4B

CO RRI DO R

H509

CO RRI DO R

H509

EL EVAT O R

L O BBY

H510

L O CKER RM,

MAL E

B523

L O CKER RM.

C520

TO IL ET

C52 0A

I CU L O UNG E

C519

TO IL ET

C51 8A

L O CKER RM.

C518SO I L ED UT IL I T Y

C516

SUPPL Y

H51 2A

CO RRI DO R

H513

CO RRI DO R

H51 3A

ST O RAG E

C50 0B

OF F I CE

C50 0C

HAC

C50 0D

ANT E RM.

C50 1A

RECO V ERY

ISO L AT I O N

C501

CO RRI DO R

H510

ST O RAG E

C500

RECO V ERY

C504

RECO V ERY

C503

RECO V ERY

C502

ANT E RM.

C51 0A

ISO L AT I O N

RECO V ERY

C510

RECO V ERY

C509

CO RRI DO R

H511

RECO V ERY

C507 RECO V ERY

C506

RECO V ERY

C505

TO IL ET

C51 1A

TO IL ET

C511

CO RRI DO R

H512

O. R. - 02

C512

OI &T

C524

SCR UB

C51 4A

OI &T

C522

EL EC. CL O SET

C521

CL EAN RM.

C515

O. R. - 01

C514

TO IL ET

B543

CARDI AC C AT H

L AB 2

B511

HAC

B514

HAL L W AY

A56 8A

HAL L W AY

A56 7A

EXAM /

T REAT MENT

A565

EL EC. CL O SET

A554

F. E . CL OSET

H50 6A

SCR UB

H50 9A

RECO V ERY

C508

CO RRI DO R

H509

CO RRI DO R

H51 0A

ST AI RW EL L NO .

S506

MECH. RM.

D502

ST O RAG E

D502E

MECH.

ST O RAG E

D50 2C

ST AI RW EL L NO .

S507

EL EVAT O R NO .

E1

EL EVAT O R NO .

E2

EL EVAT O R NO .

E3

EL EVAT O R NO .

E4

EL EVAT O R NO .

E5

EL EVAT O R NO .

E6

EL EVAT O R NO .

E7 EL EVAT O R NO .

E8

EL EVAT O R NO .

E9

FE

FE

FE

FE

FE

FE

FE

DF

ST AI RW EL L NO .

S509

DF

FAP

FEC

FAP

CHA SE

CH- D- 1

CHA SE

CH- C- 2

CHA SE

CH- A- 1

CHA SE

CH- A- 2

CHA SE

CH- A- 3

ROOF

FEC

WG

WG

WG

ENT RY

C51 2A

AP

WG

WG

FEC

FAP

WG

AP

AP

AP AP

AP

AP

AP

AP

AP

AP

AP

APFAP

AP

AP

ST O RAG E

A577

CHA SE

CH- A- 4

CL O SET

A54 4D

CHA SE

CH- C- 1

CHA SE

CH- C- 3

CHA SE

CH- C- 4

CHA SE

CH- B- 1

CHA SE

CH- B- 2

CHA SE

CH- B- 3

CHA SE

CH- B- 4

CHA SE

CH- B- 5

CHA SE

CH- B- 6

CHA SE

CH- B- 7

CHA SE

CH- A- 5

CHA SE

CH- A- 6

CHA SE

CH- A- 7

CHA SE

CH- A- 8

CHA SE

CH- A- 9

CHA SE

CH- A- 10

CHA SE

CH- A- 11

CHA SE

CH- A- 12

CHA SE

CH- A- 13

CHA SE

CH- A- 14

CHA SE

CH- A- 15

CHA SE

CH- A- 16

CHA SE

CH- A- 17

MECH. RM.

A52 5A

CHA SE

CH- A- 19

CHA SE

CH- A- 18

DN

1. AREAS SHOWN IN LS SHEETS ARE DIAGRAMMATIC ONLY AND

SHOULD NOT BE USED AS THE BASIS OF MATERIAL

CALCULATIONS OR QUANTITIES.

2. ALL FIRE RATINGS SHOWN IN LS SHEETS ARE TO BE

COORDINATED WITH PARTITION TYPE TAGS IN FLOOR PLANS.

CONTRACTOR TO NOTIFY ARCHITECT OF ANY DESCREPANCIES

BETWEEN TAGS AND LS SHEETS. IF THE CONTRACTOR CHOOSES

TO PROCEED WITHOUT NOTIFYING THE ARCHITECT AND

RECEIVING DIRECTION FOR ANY CLARIFICATION OR

DISCREPANCY, THE CONTRACTOR DOES SO AT THEIR OWN RISK.

3. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL

SUB-CONTRACTORS, INCLUDING THOSE HIRED BY THE OWNER,

TO PROVIDE ALL FIRE RATED REQUIREMENTS ASSOCIATED WITH

ELEMENTS INCLUDING BUT NOT LIMITED TO MECHANICAL,

ELECTRICAL & PLUMBING PENETRATIONS, DOORS AND OTHER

OPENINGS.

4. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING SAFE

EGRESS PATHS THROUGHOUT THE DURATION OF DEMOLITION

AND CONSTRUCTION, MAINTAINING REQUIRED MEANS OF

EGRESS FREE OF DEBRIS AND OTHER OBSTRUCTION.

5. EXIT SIGNS NOT SHOWN ON THIS PLAN - COORDINATE WITH RCP

& ELECTRICAL DRAWINGS IF APPLICABLE.

Occupied Spaces Not In Contract

Project Area, B Business

Demo Area Outside Labs C219 and C317 (Refer to Sheet 1-AE-100 for full extent of Demo Scope)

Occupancy Use Groups

EGRESS DOOR TAG

EXIT

MAXIMUM ACTUAL

A101.1

231 000

DOOR NUMBER

EXISTING 2-HOUR RATED PARTITION

NEW 1-HOUR RATED PARTITION (REFER TO SHEET

1-AE-101)

EXISTING 20 MIN PARTITION

ANTICIPATED OCCUPANT CAPACITY

MAXIMUM OCCUPANT CAPACITY

PATH OF TRAVEL TO EXIT

CODE DATA

Primary Structural Frame

Bearing Walls - Exterior

Bearing Walls - Interior

Nonbearing Walls & Partitions - Exterior

Nobearing Walls & Partitions - Interior

Floor Construction & Associated Secondary Members

Roof Construction & Associated Secondary Members

Building Code 2018 International Existing Building Code (IEBC)

2018 International Mechanical CodeMechanical Code

2021 Uniform Plumbing CodePlumbing Code

2017 NFPA 70 National Electrical CodeElectrical Code

B-BusinessUse Group

Fully SprinkleredFire Suppression

IIBConstruction Type

302.1

901.6

602.1

Notes:

1. No changes to egress.

2. No changes to occupancy.

3. Renovations per IEBC 2018; Alterations Level 2 (801).

4. NFPA referenced sections are based on 2018 NFPA 101 Existing Business Occupancy 39.1 and as referenced In IEBC 2018

Fire Resistance Rating Chart

Building Element TYPE I

A B

2018 International Energy Conservation CodeEnergy Code

2018 International Fire CodeFire Protection Code

IBC

Reference

NFPA STATE

6.1.11

9.11.4.1

II(222)

1. THE CONTRACTOR SHALL CAREFULLY STUDY AND

COMPARE THE CONTRACT DOCUMENTS WITH EACH

OTHER AND WITH AS-BUILT DRAWINGS PROVIDED

BY THE OWNER AND SHALL AT ONCE REPORT TO

THE ARCHITECT ERRORS, INCONSISTENCIES, OR

OMISSIONS. THE CONTRACTOR SHALL TAKE FIELD

MEASUREMENTS AND VERIFY FIELD CONDITIONS.

2. CONFIRM ALL NEW AND EXISTING CONDITIONS WITH

THE CONTRACT DOCUMENTS. NOTIFY ARCHITECT

IMMEDIATELY IN WRITING OF ALL DISCREPANCIES

OR CONFLICTS. DO NOT PROCEED WITH WORK IN

THE AREA OF DISCREPANCY OR CONFLICT UNTIL

DIRECTION IS GIVEN BY ARCHITECT. IF

CONTRACTOR PROCEEDS WITHOUT DIRECTION

FROM ARCHITECT, IT SHALL BE AT CONTRACTORS

RISK AND CONTRACTOR SHALL BE RESPONSIBLE

FOR ALL REQUIRED CORRECTIVE ACTION.

3. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR

AND HAS CONTROL OVER CONSTRUCTION MEANS,

METHODS, TECHNIQUES, SEQUENCES, AND

PROCEDURES, AND FOR COORDINATING ALL

PORTIONS OF THE WORK.

4. REVIEW THE ARCHITECTURAL DRAWINGS BEFORE

THE INSTALLATION OF SYSTEMS SHOWN ON

CONSULTING ENGINEER'S DOCUMENTS.

DISCREPANCIES BETWEEN THE ARCHITECTURAL

AND CONSULTING ENGINEER;S DOCUMENTS SHALL

BE BROUGHT TO THE ARCHITECT'S ATTETION FOR

DIRECTION. CONSTRUCTION INSTALLED IN

CONFLICT WITH THE ARCHITECTURAL DRAWINGS

SHALL BE CORRECTED BY CONTRACTOR AT NO

EXPENSE TO THE OWNER.

5. THE INTENT OF THE CONTRACT DOCUMENTS IS TO

ALLOW FOR THE PERFORMANCE OF THE WORK.

EVERY ITEM NECESSARILY REQUIRED MAY NOT BE

SPECIFICALLY MENTIONED OR SHOWN. UNLESS

EXPRESSLY STATED, ALL SYSTEMS AND EQUIPMENT

SHALL BE COMPLETED AND APPROPRIATELY

OPERABLE. FURNISH AND INSTALL ALL SPECIFIED

AND APPROPRIATE ITEMS, AND ALL INCIDENTAL,

ACCESSORY, AND OTHER ITEMS NOT SPECIFIED

BUT REQUIRED FOR A COMPLETE AND FINISHED

ASSEMBLY.

6. FOR APPLICABLE CODES AND STANDARDS REFER

TO LS SHEETS.

7. THE CONTRACTOR SHALL ESTABLISH CLEAR

UNDERSTANDING OF REQUIREMENTS OF THE

PROJECT, SYSTEMS AND THEIR COMPONENTS

PRIOR TO ORDERING MATERIALS OR COMMENCING

WORK.

8. THE CONTRACTOR SHALL PROVIDE SHORING,

BRACING, SUPPORT AND PROTECTION AS

REQUIRED.

9. THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS

AND METHODS OF CONSTRUCTION AND SHALL

COORDINATE ALL CONSTRUCTION EFFORTS WITH

THE OWNER'S REQUIREMENTS.

10. THE CONTRACTOR SHALL COORDINATE ALL WORK

WITH THE OWNER AND OWNER PROVIDED

CONTRACTORS, IF ANY, AS REQUIRED TO

IMPLEMENT THE SCOPE OF WORK.

11. THE ARCHITECT SHALL NOT BE RESPONSIBLE FOR

LOCATING, IDENTIFYING OR SPECIFYING MEANS OF

REMOVAL OF ANY HAZARDOUS MATERIALS.

HAZARDOUS MATERIAL TESTING SHALL BE

COMPLETED BY OWNER CONTRACTED

CONSULTANT.

12. CONTRACTOR TO COORDINATE FLOOR, WALL AND

CEILING FIRE RATINGS WITH CODE COMPLIANCE

SHEETS. ALL PENETRATIONS THROUGH RATED

ASSEMBLIES TO BE SEALED WITH AN APPROPRIATE

FIRESTOP SYSTEM WITH AN EQUAL OR GREATER

RATING THAN THE PENETRATED ASSEMBLY.

13. NON-COMPLIANT DEFECTIVE WORKMANSHIP OR

QUALITY WILL BE REJECTED DESPITE THE

ARCHITECT'S FAILURE TO DISCOVER OR POINT OUT

DEFECTS OR DEFICIENCIES DURING

CONSTRUCTION. DEFECTIVE WORK REVEALED

WITHIN THE TIME REQUIRED BY GUARANTEES

SHALL BE REPLACED BY WORK CONFORMING TO

THE INTENT OF THE CONTRACT. NO PAYMENT,

EITHER PARTIAL OR FINAL, SHALL BE CONSTRUED

AS AN ACCEPTANCE OF DEFECTIVE WORK OR

IMPROPER MATERIALS.

14. CONTRACTOR SHALL PREPARE AS-BUILT DRAWINGS

BASED ON THE ARCHITECTS RECORD DRAWINGS

AND DISTRIBUTE ELECTRONICALLY TO THE OWNER

AT THE CONCLUSION OF THE PROJECT.

15. THROUGHOUT THE DURATION OF THE PROJECT,

THE CONTRACTOR SHALL REFRAIN FROM ACTIONS

THAT COULD LEAD TO THE FILING OF CLAIMS OF

LIEN BY SUBCONTRACTORS, SUPPLIERS OF

MATERIALS, LABOR, SERVICE, EQUIPMENT, OR ANY

OTHER INDIVIDUAL OR COMPANY SO ENTITLED

UNDER GOVERNING LAWS AND REGULATIONS,

UNLESS REASONABLE AND JUSTIFIABLE CAUSE CAN

BE SHOWN. APPROVAL FOR PAYMENT SHALL BE

CONTINGENT UPON THE CONTRACTOR'S OBTAINING

AND FURNISHING TO THE ARCHITECT SIGNED

RELEASES FROM SUCH INDIVIDUALS OR

COMPANIES.

25. COORDINATE ALL WORK WITH BUILDING OWNER SO

AS NOT TO DISTURB OR CAUSE DAMAGE TO ANY

TENANT IN THE BUILDING. AVOID CONFLICT AND

INTERFERENCE WITH NORMAL BUILDING

OPERATIONS BY COMPLYING WITH THE BUILDING'S

REGULATIONS REGARDING SCHEDULING AND USE

OF ELEVATORS AND LOADING DOCKS FOR

DELIVERIES, HANDLING OF MATERIALS, EQUIPMENT,

AND DEBRIS.

26. ALL SIGNAGE IS NIC UNLESS NOTED OTHERWISE.

16. EXECUTE WORK IN ACCORDANCE WITH ANY AND

ALL APPLICABLE LOCAL, STATE, AND FEDERAL

CODES, MANUFACTURER'S RECOMMENDATIONS,

AND TRADE AND REFERENCED STANDARDS,

INCLUDING BUT NOT LIMITED TO: IBC, NEC AND NFPA

(LATEST APPLICABLE ENFORCED EDITIONS

REFERENCED).

17. DO NOT SCALE DRAWINGS; DIMENSIONS SHALL

GOVERN. DETAILS SHALL GOVERN OVER PLANS

AND ELEVATIONS. LARGE SCALE DETAILS SHALL

GOVERN OVER SMALL SCALE DETAILS. WRITTEN

SPECIFICATIONS SHALL GOVERN OVER ALL.

18. THERE SHALL BE NO SUBSTITUTION OF MATERIALS

WHERE A MANUFACTURER IS SPECIFIED. WHERE

THE TERM "OR EQUAL" IS USED, THE ARCHITECT

ALONE SHALL DETERMINE EQUALITY BASED UPON

INFORMATION SUBMITTED BY THE CONTRACTOR,

INCLUDING THE ARCHITECTS SUBSTITUTION FORM

CLEARLY IDENTIFIED AS A "REQUEST FOR

SUBSTITUTION". CONTRACTOR SHALL ALSO LIST

CREDIT TO THE CLIENT FOR USE OF SUBSTITUTION.

19. DO NOT PROCEED WITH ANY WORK REQUIRING

ADDITIONAL COMPENSATION BEYOND THE

CONTRACT AMOUNT WITHOUT WRITTEN

AUTHORIZATION FROM THE OWNER. FAILURE TO

OBTAIN AUTHORIZATION SHALL INVALIDATE ANY

CLAIM FOR EXTRA COMPENSATION.

20. UPON COMPLETION OF THE WORK BY THE

CONTRACTOR, THE CONTRACTOR SHALL NOTIFY

THE ARCHITECT IN WRITING OF SUCH COMPLETION.

THE ARCHITECT SHALL ATTEND THE PUNCH LIST

WALK THROUGH CONDUCTED BY THE GENERAL

CONTRACTOR. THE GENERAL CONTRACTOR SHALL

PREPARE AND DISTRIBUTE A LIST OF ITEMS TO BE

FINISHED OR COMPLETED PRIOR TO THIS WALK

THROUGH. THE GENERAL CONTRACTOR SHALL

TAKE NOTES AND PREPARE A LIST OF FINAL PUNCH

ITEMS TO BE COMPLETED OR CORRECTED AS A

RESULT OF THIS WALK THROUGH. THIS PUNCH LIST

IS TO BE PROMPTLY DISTRIBUTED BY THE GENERAL

CONTRACTOR TO THE TENANT, OWNER AND

ARCHITECT.

21. IT IS THE RESPONSIBILITY OF THE GENERAL

CONTRACTOR TO REVIEW ALL SUBMITTALS AND

SHOP DRAWINGS FOR APPROPRIATENESS AND

COMPLIANCE WITH THE CONTRACT DOCUMENTS

PRIOR TO SENDING SHOP DRAWINGS TO THE

ARCHITECT OR ENGINEER FOR REVIEW. A STAMP

OR STATEMENT TESTIFYING THE CONTRACTOR HAS

REVIEWED THE SHOP DRAWINGS, INCLUDING THE

DATE REVIEWED, MUST BE AFFIXED TO THE FIRST

PAGE OF EACH SUBMITTAL.

22. PROVIDE METAL OR FIRE RETARDANT WOOD

BLOCKING FOR ALL SIGNS, HOOKS, TOILET ROOM

ACCESSORIES, AND ANY OTHER CEILING OR WALL

MOUNTED EQUIPMENT. COORDINATE ALL BLOCKING

REQUIREMENTS REQUIRED WITH ARCHITECT.

23. COORDINATE WORK OF VARIOUS TRADES IN

INSTALLATION OF INTERRELATED WORK BEFORE

INSTALLATION OF WORK BY ANY TRADE, INCLUDING

VENDORS. GENERAL CONTRACTOR TO MAKE

PROPER PROVISIONS TO AVOID INTERFERENCE.

24. GENERAL CONTRACTOR TO PROVIDE PORTABLE

FIRE EXTINGUISHERS AT THE JOB SITE FOR THE

DURATION OF DEMOLITION AND CONSTRUCTION AS

REQUIRED BY THE LOCAL FIRE DEPARTMENT.

Z

Z

LEVEL

#'-##" AFF

A2.3 A1

123A

X X

Door Tag

Window Tag

Keyed Note

Ceiling Tag ACT = Material

Floor Transition Tag X = Material

Revision Tag

Centerline Mark

Existing Construction shown Halftone

Demolished Items shown Dashed

New Construction shown Solid

Exterior Elevation Mark X = Elevation Number Y#.## = Sheet Number

North Arrow & True North Indicator

Wall Section Mark X = Elevation Number Y#.## = Sheet Number

Detail Mark X = Elevation Number Y#.## = Sheet Number

Room Tag A100 = Room Number

Detail / Plan Callout X = Elevation Number Y#.# = Sheet Number

Elevation Datum

New Column Line

Existing Column Line

02.03

Partition Type:

Refer to Partition Type Sheet

X Y#.##

X Y#.##

Y#.##

X

SIM

X

SIM

X

SIM

X

SIM

Y#.##

X

SIM

X

SIM

X

SIM

X

SIM

X Y#.##

X Y#.##

Building Section Mark X = Elevation Number Y#.## = Sheet Number

Interior Elevation Mark X = Elevation Number Y#.## = Sheet Number xxx Corner Guard

[L###] Millwork Tag Refer to Millwork Elevation Types Sheet(s)

Fixture / Accessory Tag

ALIGN

Align Items

Survey PointWork Point

Exit Sign (Arrows = Direction to Exit)

TRUE

NORTH

ROOM NAME

A100

150 SF

Volume

X

ACTX'-X"

BRICK & TILE (CUT)

ASPHALT (CUT)

CMU (CUT)

CONCRETE (CUT)

EARTH: COMPACTED FILL

EARTH: UNDISTURBED

GLASS (CUT)

GRAVEL: CRUSHED

GROUT / MORTAR

GYSPUM BOARD: INTERIOR (CUT)

INSULATION: BATT

INSULATION: RIGID (CUT)

INSULATION: SPRAY FOAM

INSULATION: MINERAL

FIBER BOARD

INSULATION: DENSE

PACK CELLULOSE

STEEL

WOOD FRAMING / BLOCKING

WOOD FINISH (FACE)

WOOD FINISH (CUT)

WOOD SHEATHING (FACE)

WOOD SHEATHING (CUT)

ALUMINUM (CUT)

CONTINUOUS NOT CONTINUOUS

GYSPUM BOARD: EXTERIOR (CUT)

STEEL

Drawing # of

FULLY SPRINKLERED

35 % REVIEW SET

1 S. Memorial Dr.

B

A

C

D

E

F

VA FORM 08-6231 1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

PREPARE SITE FOR CATHOLOGY

LABORATORIES, ROOMS B510 AND B516

657-22-102JC

JOHN COCHRAN DIVISION

915 NORTH GRAND BLVD - ST. LOUIS, MO 63106

CONSULTANTS: ENGINEER:

Revisions: Date:

Drawing Title

VA Health Care System Approval:

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Veterans Health

Administration Suite 1800 St. Louis, MO 63102

(314) 621 - 4343 Bob Dunn bdunn@fox-arch.com

2707 Rand Rd Indianapolis, IN 46241

(317) 646 - 9090St. Louis - Chicago

(636) 262 - 8532 Richard Kwiatkowski rkwiatkowski@sscengineering.com

01/08/2024 Checker Author

1-AE-100

ARCHITECTURAL

GENERAL-CODE INFORMATION

LIFE SAFETY LEGEND:

TRUE

NORTH

SCALE: 1/32" = 1'-0"1-AE-100

7F LIFE SAFETY PLAN - THIRD FLOOR

GENERAL L.S. PLAN NOTES:

No. Name

00-ARCHITECTURAL SHEETS

1-AE-100 ARCHITECTURAL GENERAL-CODE

INFORMATION

40-ARCHITECTURAL DEMOLITION (AD)

1-AE-101 ARCHITECTURAL LIFT SITE PLAN

45-ARCHITECTURAL (A)

1-AE-102 ARCHITECTURAL DEMO AND

FLOOR PLAN

1-AE-103 ARCHITECTURAL DEMO AND RCP

INDEX TO DRAWINGS:

Fox, Inc. dba Fox Architects 1 S Memorial Dr., Suite 1800

St. Louis, MO 63102

& AND

AB ACOUSTICAL BAFFLE

AC ACOUSTICAL CEILING TILE

ADJ ADJUSTABLE

ADJC ADJACENT

AFF ABOVE FINISHED FLOOR

ALT ALTERNATE

ALUM ALUMINUM

ANOD ANODIZED

AP ACOUSTICAL PANEL

APPL APPLIANCE

ARCH ARCHITECT(URAL)

ASSY ASSEMBLY

AUTO AUTOMATIC

AVG AVERAGE

BD BOARD

BL BLINDS

BLDG BUILDING

BLKG BLOCKING

BOD BOTTOM OF DECK

BR BRICK

BTWN BETWEEN

BU BUILT UP

C CARPET

CAB CABINET

CEM CEMENT(ITIOUS)

CER CERAMIC

CIP CAST-IN-PLACE

CL CENTERLINE

CLG CEILING

CMU CONCRETE MASONRY UNIT

CN CONCRETE

CO CLEANOUT

COILG COILING

COL COLUMN

COMM COMMUNICATION

CONSTR CONSTRUCTION

CONT CONTINUOUS(ATION)

CONTR CONTRACT(OR)

CSJ CONSTRUCTION JOINT

CSWK CASEWORK

CT CERAMIC TILE

D DEEP, DEPTH

DEMO DEMOLISH

DEPT DEPARTMENT

DET DETAIL

DIA DIAMETER

DIM DIMENSION

DIV DIVISION, DIVIDE

DN DOWN

DP DRAPERY

DR DOOR

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING

EA EACH

EF EPOXY FLOOR

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR

ENGR ENGINEER(ED)

ENTR ENTRANCE

EPB ELECTRICAL PANEL BOARD

EQ EQUAL

EQUIP EQUIPMENT

ETC ETCETERA

EWC ELECTRIC WATER COOLER

EXIST EXISTING

EXT EXTERIOR

F FABRIC

FD FLOOR DRAIN

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER AND CABINET

FHC FIRE HOSE AND CABINET

FIN FINISH

FLR FLOOR(ING)

FP FIRE PROTECTION, FIRE PROOFING

FR FIRE RAT(ING)(ED)

FRMG FRAMING

FRP FIBERGLASS REINFORCED PANEL

FTG FOOTING

FTWD FIRE TREATED WOOD

FURN FURNITURE

FWC FABRIC WALL COVERING

FWP FABRIC WRAPPED PANEL

FXD FIXED

FXTR FIXTURE

GA GAUGE

GALV GALVANIZED

GC GENERAL CONTRACTOR

GF GLASS FILM

GFRC GLASS FIBER REINFORCED CONCRETE

GL GLASS

GP GRAPHIC

GR GRAD(E)(ING)

GSB GYPSUM SHEATHING BOARD

GT GROUT

GWB GYPSUM WALL BOARD

GYP GYPSUM

HB HOSE BIBB

HD HEAD

HDW HARDWARE

HDWD HARDWOOD

HM HOLLOW METAL

HO HOLD OPEN

HOR HORIZONTAL

HT HEIGHT

HVAC HEATING, VENTILATIING, AND AIR CONDITIONING

ID INSIDE DIAMETER

IF INSIDE FACE

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

INV INVERT

JAN JANITOR

JT JOINT

KB KNEE BRACE

KIT KITCHEN

LAB LABORATORY

LAV LAVATORY

LB POUND

LF LINEAR FEET

LP LOW POINT

LT LIGHT

LVR LOUVER

MATL MATERIAL

MAX MAXIMUM

MB MARKER BOARD

MD METAL DECK

MDF MEDIUM DENSITY FIBERBOARD

MECH MECHANICAL

MED MEDIUM

MEMB MEMBRANE

MEZZ MEZZANINE

MFD MANUFACTURED

MFR MANUFACTURER

MGT MANAGEMENT

MIN MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MLWK MILLWORK

MO MASONRY OPENING

MTD MOUNTED

MTL METAL

MW MICROWAVE

NA NOT APPLICABLE

NIC NOT IN CONTRCT

NO NUMBER

NOM NOMINAL

NOMINAL

NS NARROW STILE

NTS NOT TO SCALE

OA OVERALL

OC ON CENTER

OF OUTSIDE FACE

OHD OVERHEAD DOOR

OPNG OPENING(S)

OPP OPPOSITE

OPT OPTIONAL

ORD OVERFLOW ROOF DRAIN

OVFL OVERVLOW

PBD PARITICLE BOARD

PC PRIVACY CURTAIN

PL PLASTIC LAMINATE

PLAS PLASTER

PLYWD PLYWOOD

PNL PANEL

PORT PORTABLE

PREFAB PREFABRICATED

PREFIN PREFINISHED

PROP PROPERTY

PT PAINT

PTN PARTITION

PTWD PRESSURE TREATED WOOD

PV PAVER

QTR QUARTER

QTY QUANTITY

R RADIUS

RB RESILIENT BASE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

RDR READER

RECES RECESSED

RECT RECTANG(LE)(ULAR)

REF REFER(ENCE)

REFL REFLECTED

REFR REFRIGERATOR

REINF REINFORCED(D)(ING)(MENT)

REQD REQUIRED

REV REVISION

RF RESILIENT FLOORING

RFG ROOFING

RL ROOF LEADER

RLG RAILING

RM ROOM

RO ROUGH OPENING

RS ROLLER SHADES

RTU ROOF TOP UNIT

SC SOLID CORE

SCHED SCHEDULE

SCR SCRIBE

SECUR SECURITY

SF SQUARE FEET

SG SINGLE

SHTHG SHEATHING

SIM SIMILAR

SK SINK

SLNT SEALANT

SM SHEET METAL

SPEC SPECIFICATIONS

SQ SQUARE

SS STAINLESS STEEL

SSM SOLID SURFACE MATERIAL

ST STONE

STD STANDARD

STL STEEL

STRUCT STRUCTURAL

SURF SURFACE

SUSP SUSPENDED

SYS SYSTEM(S)

T TILE

T&G TOUNGUE AND GROOVE

TB TACK BOARD

TD TRENCH DRAIN

TEL TELECOM

TGL TEMPERED GLASS

THK THICK

TLT TOILET

TOC TOP OF CONCRETE

TOJ TOP OF JOIST

TOS TOP OF STEEL

TOW TOP OF WALL

TR TREAD

TRTD TREATED

TYP TYPICAL

UNFIN UNDERLAYMENT

UNO UNLESS NOTED OTHERWISE

UP UPHOLSTERY

UR URINAL

UTIL UTILITY

VAR VARI(ES)(ATION)

VB VINYL BASE

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VIF VERIFY IN FIELD

VTR VENT THROUGH ROOF

W WIDTH

W/ WITH

W/O WITHOUT

WB WOOD BASE

WBL WOOD BLOCKING

WC WATER CLOSET

WC WALL COVERING

WD WOOD

WDW WINDOW

WO WHERE OCCURS

WP WALL PROTECTION

WT WEIGHT

WTPR WATERPROOFING

YD YARD

ABBREVIATIONS:MATERIAL HATCHES: SYMBOLS LEGEND:GENERAL PROJECT NOTES:

Catalyst Lab 2 B516

FlexArm Lab 1 B510

FIFTH FLOOR

1-AE-104 ARCHITECTURAL UPS FLOOR PLAN

AND RCP

10/29/2025

I-2 Hospital

I-2 Hospital

1-AE-104

1F

UPS

M501

SITE PLAN

, ALL CORRIDOR WALLS

1-AE-102

1F

11/03/2025

ARCHITECTURAL LOGISTICS PLAN

01/09/2026

Unoccupied Spaces Not In Contract, existing 2-hr rated enclosure

100%

657-22-112JC

Drawing # 2 of 96

RELEASE FOR BIDDING

02/04/202602/14/202602/17/2026

WASTE WILL HAVE TO BE TAKEN OUT ON A CART,

ALONE THE PATHWAY NOTED. RE; SHEET 1-AE-101

FOR MORE INFORMATION AND KEYED NOTE 00.06

WASTE WILL HAVE TO BE TAKEN OUT ON A CART,

ALONE THE PATHWAY NOTED. RE; SHEET 1-AE-101

FOR MORE INFORMATION AND KEYED NOTE 00.06

PROJECT LOCATION

02.08

02.03 02.0102.01

02.04 02.02

02.06 02.06

02.05

02.07

02.05 NO ACCESS TO THE EXISTING STAIR DURING LIFT, GC TO POST

SAFETY PERSONNEL TO DIRECT TO ALTERNATE STAIRS PER

KEYED NOTE 02.06

02.06 ALTERNATE STAIRS NOTED IN KEYED NOTE 02.05, IN CASE OF FIRE

SAFETY PERSONNEL TO NOTIFY CRANE OPERATOR PER SPEC.

02.07 PROVIDE FLOOR PROTECTION TO DISTRIBUTE POINT LOAD WHEEL

WEIGHT. TBD BY INSTALLER.

02.08 PROVIDE TEMP OPENING IN THE EXISTING EXTERIOR WALL PER

WALL SECTION AND GENERAL NOTES.

1-AE-101

ARCHITECTURAL LIFT SITE PLAN

02.04

02.03

02.02

02.01

1/32" = 1'-0"

1/32" = 1'-0"

PARTIAL EXISTING 5TH FLOOR PLAN

PARTIAL EXISTING BASEMENT PLAN

LOGISTICS PLAN

PARTIAL EXISTING BASEMENT PLAN

PARTIAL EXISTING 5TH FLOOR PLAN

10/29/2025

100'

200'0'

400'

600'

800'

SITE LOCATION PLAN

AS REFERENCED ABOVE

TRUE

NORTH

TRUE

NORTH

TRUE

NORTH

PROJECT

LOCATION

1-AE-001

1F

1-AE-001

1C

1-AE-001

1-AE-001

C

LA

SS

IV

II

BUILDING 1

I

I

II

I

II

II

II

II

III

III

III

III

III

IV

IV

IV

A

A

1-AE-001

11/03/2025

01.06

01.03

01.03

01.04

01.04

01.06

01.06

01.06

01.06

01.06

35 % 95100%

01/08/202410/29/202511/03/202501/09/2026

EF EPOXY FLOOR

F FABRIC

FRP FIBERGLASS REINFORCED

SHEET NOTES:KEYED NOTES:

00.01 BUILDING ACCESS POINT; DOCK.

00.02 STORAGE OF MATERIALS, OR CONSTRUCTION WORK IS THE RESPONSIBILITY OF

THE GENERAL CONTRACTOR. PHOTO DOCUMENT AND REPORT ANY EXISTING

DAMAGE TO COR PRIOR TO START OF CONSTRUCTION. OFF-SITE STORAGE OF

BUILDING MATERIALS MUST BE APPROVED BY VA COR PRIOR TO REMOVAL.

SUGGESTED DUMPSTER LOCATIONS. PRIOR TO START OF ON-SITE

MOBILIZATION THE CONTRACTOR IS REQUIRED TO OBTAIN A CITY OF ST. LOUIS

PERMIT OF DUMPSTER ON THE STREET; OR ANY OTHER ON STREET PARKING.

LOCATION OF MAIN PROJECT WORK IN BUILDING.

APPROXIMATE LOCATION OF CONSTRUCTION TRAILER, VERIFY WITH COR.

WASTE WILL HAVE TO BE TAKEN OUT ON A CART. ALONE THE PATHWAY NOTED.

00.03

00.04

00.05

00.06

00.01

00.04

00.04

00.02 00.05 00.03

00.06

00.06

GWB-2.1 GYPSUM BOARD CEILING (PAINTED)SHEET NOTES:

REMOVE SHEET NOT

IF NOT APPLICABLE

SEE SHEET 1-AE-102 FOR FLOOR PLAN LEGENDA.

C. SEE SHEETS 1-AE-102 AND 1-AE-104 FOR KEYED NOTES.THRU

PARTIAL ICRA PLANS & RCP

SCALE: 1/8" = 1'-0"

01.06

01.05

01.07

01.07

01.03

01.07

01.03

01.03

01.03

01.07

01.08

01.08

LAB 1

LAB 2

LAB 1

LAB 2

UPS

THE PROJECT, AS DOCUMENTED IN THESE DRAWINGS, WILL BE

PHASED INTO THREE PHASES: UPS ROOM, LAB 1, AND LAB 2.

THE LAB PHASING ORDER COULD CHANGE, BUT THE SCOPE AND

LOGISTICS OF EACH LAB ARE SIMILAR, SO THAT VAJC NEEDS

WILL DETERMINE THEIR CONSTRUCTION ORDER; THE LAB

PHASING WILL BE SEQUENTIAL.

THE UPS ROOM SHOULD BE PRICED SEPARATELY AS AN

EMERGENCY PROJECT. ALL WORK WITHIN THE INTERSTITIAL 5TH

FLOOR SPACE SHOULD BE PRICED, REFER TO THE ENGINEERING

DRAWINGS AND SPECIFICATIONS FOR MORE INFORMATION. THE

UPS ROOM MAY OR MAY NOT BE SEQUENTIAL TO THE LAB

PHASES.

IV

IV

IV

IVIV

IVIV

ICRA

VESTIBULE

ICRA

VESTIBULE

ICRA

VESTIBULE

ICRA

VESTIBULE

IV

IV

IV

01.04

01.06

01.05

01.07

01.03

01.08

LAB 1

IV

ICRA

VESTIBULE

6 02.06

02.05

02.07

01.03

01.06

01.06

01.07

01.03

LAB 2

IV

ICRA

VESTIBULE

02.0302.01

02.04 02.02

400'

600'

800'

1-AE-001

1F

1-AE-001

1C

01.03

01.04

01.06

01.06

01.07

01.03

LAB 2

IV

ICRA

VESTIBULE

01.06

01.03

01.07

01.08

LAB 1

IV

ICRA

VESTIBULE

02.01

LDING 1

01.06

UPS

THE PROJECT, AS DOCUMENTED IN THESE DRAWINGS, WILL BE

PHASED INTO THREE PHASES: UPS ROOM, LAB 1, AND LAB 2.

THE LAB PHASING ORDER COULD CHANGE, BUT THE SCOPE AND

LOGISTICS OF EACH LAB ARE SIMILAR, SO THAT VAJC NEEDS

WILL DETERMINE THEIR CONSTRUCTION ORDER; THE LAB

PHASING WILL BE SEQUENTIAL.

THE UPS ROOM SHOULD BE PRICED SEPARATELY AS AN

EMERGENCY PROJECT. ALL WORK WITHIN THE INTERSTITIAL 5TH

FLOOR SPACE SHOULD BE PRICED, REFER TO THE ENGINEERING

DRAWINGS AND SPECIFICATIONS FOR MORE INFORMATION. THE

UPS ROOM MAY OR MAY NOT BE SEQUENTIAL TO THE LAB

PHASES.

8'- 1"

IV

IV

LINE OF TEMPORARY ICRA

PARTITION ON 4TH FLOOR

BELOW

LINE OF TEMPORARY ICRA

PARTITION ON 4TH FLOOR

BELOW

DOT PATTERN AREA

DENOTES POTENTIAL WORK

ON THE 4TH FLOOR BELOW

DOT PATTERN AREA

DENOTES POTENTIAL WORK

ON THE 4TH FLOOR BELOW

LINE OF TEMPORARY ICRA

PARTITION ON 4TH FLOOR

LINE OF TEMPORARY ICRA

PARTITION ON 4TH FLOOR

DOT PATTERN AREA

DENOTES POTENTIAL WORK

ON THE 4TH FLOOR, ABOVE

CEILING

DOT PATTERN AREA

DENOTES POTENTIAL WORK

ON THE 4TH FLOOR, ABOVE

CEILING

Drug Receiving

B406

Corridor H414

Break Room B413

Drug Information

B412

FlexArm Lab 1 B510

FlexArm Lab 1 B510

Catalyst Lab 2 B515

Catalyst Lab 2 B515 Drug

Receiving B406

RELEASE FOR BIDDING

02/04/2026

RCP BELOW

LAB 1

LAB 2

RCP BELOW

Drawing # 3 of 96

6 6

02/14/202602/17/2026

PROJECT LOCATION

Catalyst Lab 2 B516

FlexArm Lab 1 B510

Catalyst Lab 2 B516

FlexArm Lab 1 B510

ROOM NAME

F

B

C

R

W A

L

LS

CONFERENCE ROOM

VCT-1/CT-2

RB-1

N: P-X/P-X E: P-X/P-X S: P-X/P-X W: P-X/P-X1, 2

ACT1

ROOM NUMBER

FLOOR FINISH

WALL BASE

CEILING FINISH

ROOM FINISH REMARKS

WALL FINISHES

(N = NORTH, E = EAST, S = SOUTH, W = WEST)

AB ACOUSTICAL BAFFLE

AC ACOUSTICAL CEILING TILE

AP ACOUSTICAL PANEL

BL BLINDS

BR BRICK

C CARPET

CN CONCRETE

DP DRAPERY

EF EPOXY FLOOR

F FABRIC

FRP FIBERGLASS REINFORCED

PANEL

FWP FABRIC WRAPPED PANEL /

STRETCHED FABRIC WALL

SYSTEM

GF GLASS FILM

GL GLASS

GP

GT GROUT

MB MARKER BOARD

MTL METAL

ROOM FINISH TAG LEGEND:

MATERIAL ABBREVIATIONS

PC PRIVACY CURTAIN

PL PLASTIC LAMINATE

PT PAINT

PV PAVER

RB BASE (RESILIENT, RUBBER,

ETC.)

RF RESILIENT FLOORING

RS ROLLER SHADES

SM SOLID SURFACE MATERIAL

/ QUARTZ

SS STAINLESS STEEL

ST STONE

SVT SHEET VINYL TILE

T TILE

TB TACK BOARD

TR TREAD

UP UPHOLSTERY

WC WALLCOVERING

WD WOOD

WF WOOD FLOOR

WP WALL PROTECTION

LAB B515

F B C R

W

AL

LS

EPY-1

EPY-1

ACT-1

N : PT-1

E : PT-1

S : PT-1

W : PT-1

F B C R

W

AL

LS

N : PT-1

E : PT-1

S : PT-1

W : PT-1

10/29/202511/03/2025

02.01

02.02

02.03

LAB B510

EPY-1

EPY-1

ACT-1

01.01

02.04

01.02

02.05

02.04

01.02

01.02

01.02 02.04

01.02

02.01

02.02

02.03 01.01

01.02

01.02

ROOM NAME

F

B

C

R

W A

L

LS

CONFERENCE ROOM

VCT-1/CT-2

RB-1

N: P-X/P-X E: P-X/P-X S: P-X/P-X W: P-X/P-X1, 2

ACT1

ROOM NUMBER

FLOOR FINISH

WALL BASE

CEILING FINISH

ROOM FINISH REMARKS

WALL FINISHES

(N = NORTH, E = EAST, S = SOUTH, W = WEST)

AB ACOUSTICAL BAFFLE

AC ACOUSTICAL CEILING TILE

AP ACOUSTICAL PANEL

BL BLINDS

BR BRICK

C CARPET

CN CONCRETE

DP DRAPERY

EF EPOXY FLOOR

F FABRIC

FRP FIBERGLASS REINFORCED

PANEL

FWP FABRIC WRAPPED PANEL /

STRETCHED FABRIC WALL

SYSTEM

GF GLASS FILM

GL GLASS

GP

GT GROUT

MB MARKER BOARD

MTL METAL

ROOM FINISH TAG LEGEND:

MATERIAL ABBREVIATIONS

PC PRIVACY CURTAIN

PL PLASTIC LAMINATE

PT PAINT

PV PAVER

RB BASE (RESILIENT, RUBBER,

ETC.)

RF RESILIENT FLOORING

RS ROLLER SHADES

SM SOLID SURFACE MATERIAL

/ QUARTZ

SS STAINLESS STEEL

ST STONE

SVT SHEET VINYL TILE

T TILE

TB TACK BOARD

TR TREAD

UP UPHOLSTERY

WC WALLCOVERING

WD WOOD

WF WOOD FLOOR

WP WALL PROTECTION

ROOM NAME

F

B

C

R

W A

L

LS

CONFERENCE ROOM

VCT-1/CT-2

RB-1

N: P-X/P-X E: P-X/P-X S: P-X/P-X W: P-X/P-X1, 2

ACT1

ROOM NUMBER

FLOOR FINISH

WALL BASE

CEILING FINISH

ROOM FINISH REMARKS

WALL FINISHES

(N = NORTH, E = EAST, S = SOUTH, W = WEST)

AB ACOUSTICAL BAFFLE

AC ACOUSTICAL CEILING TILE

AP ACOUSTICAL PANEL

BL BLINDS

BR BRICK

C CARPET

CN CONCRETE

DP DRAPERY

EF EPOXY FLOOR

F FABRIC

FRP FIBERGLASS REINFORCED

ROOM FINISH TAG LEGEND:

MATERIAL ABBREVIATIONS

PC PRIVACY CURTAIN

PL PLASTIC LAMINATE

PT PAINT

PV PAVER

RB BASE (RESILIENT, RUBBER,

ETC.)

RF RESILIENT FLOORING

RS ROLLER SHADES

SM SOLID SURFACE MATERIAL

/ QUARTZ

SS STAINLESS STEEL

AB ACOUSTICAL BAFFLE

AC ACOUSTICAL CEILING TILE

AP ACOUSTICAL PANEL

BL BLINDS

BR BRICK

C CARPET

CN CONCRETE

DP DRAPERY

PC PRIVACY CURTAIN

PL PLASTIC LAMINATE

PT PAINT

PV PAVER

RB BASE (RESILIENT, RUBBER,

ETC.)

RF RESILIENT FLOORING

RS ROLLER SHADES

AC ACOUSTICAL CEILING TILE

AP ACOUSTICAL PANEL

PL PLASTIC LAMINATE

PT PAINT

BR BRICK

C CARPET

CN CONCRETE

RB BASE (RESILIENT, RUBBER,

ETC.)

RF RESILIENT FLOORING

PV PAVER

RB BASE (RESILIENT, RUBBRF RESILIENT FLOORING

EF EPOXY FLOOR

F FABRIC

FRP FIBERGLASS REINFORCED

SM SOLID SURFACE MATERIAL

/ QUARTZ

SS STAINLESS STEEL

ST STONE

SM SOLID SURFACE MATERIAL

/ QUARTZ

SS STAINLESS STEELUP UPHOLSTERY

WC WALLCOVERING

SS STAINLESS STEEL

BR BRICK

C CARPET

CN CONCRETE

DP DRAPERY

EF EPOXY FLOOR

CN CONCRETE

EF EPOXY FLOOR

F FABRIC

FRP FIBERGLASS REINFORCED

PANEL

SEE SHEET 1-AE-103 FOR MORE INFORMATION.A.

SEE SHEET 1-AE-101 FOR MORE INFORMATION ON ICRA

PARTITION REQUIREMENT.

B.

SEE SHEET 1-AE-103 FOR KEYED NOTES.C.

01.02

FLEXARM LAB 1

B510

B515

LAB 1

B510

LAB 2

B515

CATALYST LAB 2

01.0301.0401.0501.06 01.07

01.06

01.06

01.05

01.03

01.07

01.04

01.09

01.09

01.08

01.08 01.08

01.08

01.08

01.08

01.08 01.08

01.08

01.08

TEMPORARY CONSTRUCTION BARRIER, ICRA I

PRIMAERY CONSTRUCTION BARRIER, ICRA IV

SHEET NOTES:

RE

IF NKEYED NOTES:

01.01

01.02

01.03

01.04

01.05

01.06

01.07

01.08

01.09

01.10

02.01

02.02

LINE OF EXISTING CEILING FRAMING ABOVE FOR REFERENCE.

LINE OF EXISTING COVE FLOORING UNDER BASE CABINET. SEE NOTE 09.01 FOR

MORE INFORMATION.

PRIMARY ICRA PARTITION, EXACT LOCATION TO BE DETERMINED IN THE FIELD,

COORDINATED WITH SAFETY AND COR PER SPEC AND AS NOTED ON SHEET

1-AE-101.

THE EXISTING DOOR MAY BE USED AS PART OF THE ICRA BARRIER OR REMOVED

AND REINSTALLED AS DETERMINED ABOVE.

NEW DOOR AT PRIMARY ICRA BARRIER PER KEYED NOTE 01.03.

TEMPORARY ICRA BARRIER FOR PHASED OVERNIGHT OR SHORT-TERM WORK

OUTSIDE THE MAIN PROJECT AREA. SHOWN ARE PRE-MANUFACTURED

PARTITIONS WITH SLIDING DOORS. THE TEMPORARY BARRIER DOES NOT NEED

TO BE FIRE-RATED.

ALTERNATE ICRA FILTRATION FOR LEVEL IV, SEE SHEET 1-AE-101.

SEAL EXISTING DOOR OPENING PER ICRA SPECS.

SEE DEMO PLAN 1F/1-AE-102 FOR ICRA NOTES.

SEE PHILIPS DRAWINGS FOR REQUIRED ROUGH-IN BELOW AND ABOVE CEILING.

MINIMUM EXTENT OF EXISTING FLOOR GRINDING AND FILL TO LEVEL THE FLOOR

TO PHILIPS SPEC TO +/- 1/16" (2MM) FOR EVERY 39" (1M) WITHIN THE AREA

DIMENSIONED ON THE PHILIPS EQUIPMENT DRAWINGS. THE AREA SHOWN IN

HATCHED IS FOR REFERENCE.

REMOVE EXISTING PHILIPS AD5 FLOOR PLATE, SEE KEYED NOTE 02.01FOR FLOOR

LEVEL REQUIREMENT.

01.10 09.01

09.01

Catalyst Lab 2 B516

FlexArm Lab 1 B510

Catalyst Lab 2 B516

FlexArm Lab 1 B510

LAB B515

F B C R

W

AL

LS

EPY-1

EPY-1

ACT-1

N : PT-1

E : PT-1

S : PT-1

W : PT-1

F B C R

W

AL

LS

N : PT-1

E : PT-1

S : PT-1

W : PT-1

10/29/202511/03/2025

02.01

02.02

02.03

LAB B510

EPY-1

EPY-1

ACT-1

01.01

02.04

01.02

02.05

02.04

01.02

01.02

01.02 02.04

01.02

02.01

02.02

02.03 01.01

01.02

01.02

01.10

A3'-8"

MIN

3' -0

M

IN

09.02

09.02

12.01

N.I.C.

N.I.C.

N.I.C.

N.I.C.

HATCHED AREA NOTED AS N.I.C.

DENOTES AREA NOT IN DIRECT

CONTRACT BUT MAY OR MAY NOT BE

IMPACTED BY ICRA OR OTHER MEP

SCOPE. ALL AREAS DISRUPTED BY

OTHER SCOPE TO BE RETURNED TO

ITS ORIGINAL CONDITION PER SPEC.

09.03

09.03

NEW EXTG

NEW EXTG

09.03

35 % 95100%

01/08/202410/29/202511/03/202501/09/2026

12.01

01.09 01.09

01.09

01.09

01.09

01.09

01.09

01.09

9 01.09

SEE ICRA PLANS 3F/1-AE-001 FOR MORE INFO.

RF-1

N/A

RF-1

N/A

657-22-112JC

C

RELEASE FOR BIDDING

02/04/2026 Drawing # 4 of 96

B516

Scrub B508A

Corridor H509

Control 2 B509A

Control 1 B509

Equip Rm B504A

Storage B504

Equip Rm H510

Scrub H509A

Scrub B508A

Corridor H509

Control 2 B509A

Control 1 B509

Equip Rm B504A

Storage B504

Equip Rm H510

Scrub H509A

SYMBOL MARK DESCRIPTION

F1

2' x 2' LED LAY-IN FIXTUREF3

6" RECESSED LED DOWNLIGHT

1. LIGHT FIXTURES SHOWN ON ARCHITECTURAL REFLECTED

CEILING PLAN ARE FOR REFERENCE/DESIRED LOCATION ONLY.

SEE ELECTRICAL DRAWINGS FOR MORE INFORMATION

REGARDING FIXTURE TYPES, ELECTRICAL REQUIREMENTS, ETC.

2. CONTRACTOR SHALL BECOME FAMILIAR WITH THE PROJECT AND

VERIFY ALL CONDITIONS, MATERIALS, AND DIMENSIONS WHICH

WILL AFFECT THE WORK.

3. GENERAL CONTRACTOR TO PROVIDE CONTROL JOINTS IN ALL

GYPSUM BOARD CEILING BASED ON USG STANDARDS AND

RECOMMENDATION.

4. REFER TO SPECIFICATIONS FOR GENERAL CONDITIONS AND

ADDITIONAL INFORMATION.

5. COORDINATE ALL DEVICE LOCATIONS WITH EXISTING

CONDITIONS AND WITH PROJECT DESIGN INTENT - CLARIFY

INTENT WITH THE OWNER. ALL LIFE SAFETY DEVICE LOCATIONS

ARE TO BE REVIEWED WITH OWNER FOR DESIGN INTENT, BUT

FINAL LOCATIONS ARE TO BE COORDINATED WITH INSPECTOR

OR OTHER AUTHORITIES HAVING JURISDICTION.

6. ALL CEILING HEIGHTS ARE FROM TOP OF FINISH FLOOR TO

UNDERSIDE OF FINISH CEILING OR LIGHT FIXTURE, U.N.O.

7. PROVIDE LATERAL BRACING FOR SUSPENDED CEILING SYSTEMS

AND ADDITIONAL HANGERS AND SAFETY WIRES FOR LIGHT

FIXTURES, DUCTWORK, SPEAKERS, ETC. SEE TYPICAL BRACING

DETAILS FOR MORE INFORMATION.

8. ARCHITECTURAL DRAWINGS DETERMINE THE LOCATION OF

LUMINARIES AND SUPERSEDE ALL OTHERS, TYP.

9. PROVIDE NON COMBUSTIBLE BLOCKING AND BRACING REQUIRED

FOR FIXTURE INSTALLATION AND ALL ELECTRICAL COMPONENTS.

10. GYPSUM BOARD CEILING FRAMING MEMBERS MAY BE MODIFIED

AT DIFFUSERS TO ACCOMMODATE REQUIRED ROUGH OPENING

FOR HVAC DIFFUSERS. ALL OTHER FRAMING TO ACCOMMODATE

PROPOSED LIGHTING LAYOUT.

11. ANY AND ALL CEILING DEVICES SHALL BE PLACES IN CENTER OF

THE CEILING TILE UNO.

12. ALL SUSPENDED CEILING GRIDS TO BE CENTERED BETWEEN THE

WALLS UNO. DO NOT CUT ACOUSTICAL CEILING TILES LESS THAN

4" WIDE.

13. FIRESTOP/FIRESEAL ALL PENETRATIONS THROUGH RATED

PARTITIONS TO MAINTAIN SCHEDULED FIRE RESISTANCE RATING

OF ALL FLOORS, WALL AND CEILING ASSEMBLIES.

14. PARTIAL REMOVAL/ DEMOLITION OF THE EXISTING CEILINGS TO

REMAIN DEEMED NECESSARY BY CONTRACTOR AS A RESULT OF

STRUCTURAL OR MEP/FP INSTALLATION SHALL BE COORDINATED

WITH THE OWNER. CONTRACTOR TO REPLACE AND REPAIR ALL

CEILING DAMAGED AS A RESULT OF REQUIRED INSTALLATION.

PATTERN MARK DESCRIPTION

GWB-2.1 GYPSUM BOARD CEILING (PAINTED)

ACT48 ACOUSTIC CEILING TILE 24'' X 48''

CEILING TAG

ACT = MATERIAL

ACTX'-X"

FINISHED HEIGHT

NOTE: REFER TO MATERIAL SCHEDULE FOR MORE INFO

Drawing # of

FULLY SPRINKLERED

35 % REVIEW SET

1 S. Memorial Dr.

B

A

C

D

E

F

VA FORM 08-6231 1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

PREPARE SITE FOR CATHOLOGY

LABORATORIES, ROOMS B510 AND B516

657-22-102JC

JOHN COCHRAN DIVISION

915 NORTH GRAND BLVD - ST. LOUIS, MO 63106

CONSULTANTS: ENGINEER:

Revisions: Date:

Drawing Title

VA Health Care System Approval:

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Veterans Health

Administration Suite 1800 St. Louis, MO 63102

(314) 621 - 4343 Bob Dunn bdunn@fox-arch.com

2707 Rand Rd Indianapolis, IN 46241

(317) 646 - 9090St. Louis - Chicago

(636) 262 - 8532 Richard Kwiatkowski rkwiatkowski@sscengineering.com

01/08/2024 Checker Author

1-AE-103

ARCHITECTURAL DEMO AND RCP

TRUE

NORTH

SCALE: 1/4" = 1'-0"1-AE-103

1F Demolition Reflected Ceiling Plan

TRUE

NORTH

SCALE: 1/4" = 1'-0"1-AE-103

5F Reflected Ceiling Plan

KEYED NOTES:

SHEET NOTES:

GENERAL RCP NOTES:

REMOVE SHEET NOTES

IF NOT APPLICABLE

LIGHTING FIXTURE LEGEND:

CEILING TYPE LEGEND:

Catalyst Lab 2 B516

FlexArm Lab 1 B510

Catalyst Lab 2 B516

FlexArm Lab 1 B510

SEE SHEET 1-AE-102 FOR FLOOR PLAN LEGENDA.

24" X 48", GRID 25" X 49"

10/29/2025

SHEET NOTES:

REMOVE SHEET NOT

IF NOT APPLICABLE

SEE SHEET 1-AE-102 FOR FLOOR PLAN LEGENDA.

KEYED NOTES:

PHILIPS CEILING SPEAKER, RE; EQUIPMENT

DRAWINGS

PHILIPS CEILING LIGHT STRIP, RE; EQUIPMENT

DRAWINGS

11/03/2025

01.09

01.09

01.09

01.09

02.03

02.04

02.05

09.01

GRIND AND FILL THE EXISTING CONCRETE SLAB TO ACCOMMODATE THE NEW

PHILIPS' AD7 FLOOR PLATE PER PHILIPS SPEC. NOTE THAT THE EXISTING AND

NEW FLOOR PLATE LOCATIONS SHOWN IN LABS 1 AND 2 MAY OR MAY NOT BE

REUSABLE, BUT THE OLD AD5 FLOOR PLATE SHOULD BE REPLACED WITH THE

NEW AD7 FLOOR PLATE. FIELD VERIFY WITH PHILIPS IF THE EXISTING LOCATIONS

CAN BE REUSED.

AREA OF EXISTING FLOOR UNDER FREE-STANDING EQUIPMENT, BASE, OR WALL

CABINET.

FREE-STANDING CASEWORK ON CASTERS.

LINE OF NEW OR MODIFIED EXISTING CEILING FRAMING.

C. SEE SHEETS 1-AE-102 AND 1-AE-104 FOR KEYED NOTES.

1 X 4 SUSPENDED LED SHOP LIGHTF4

F1 F1

F1 F1 F1 F1

F1 F1F1 F1

F1 F1 F1 F1 F1 F1

F1 F1F1 F1

F1

CATALYST LAB 2

B515

FLEXARM LAB 1

B51026.01

01.08

01.08 01.08

01.08

01.08

01.08

01.08 01.08

01.08

01.08

09.01

09.01

26.0126.01

26.01

26.01 26.01

26.02

26.03

LAB 2

B515

LAB 1

B510

26.01 26.0126.01

26.01 26.01 26.01

26.01

N.I.C.

N.I.C.

N.I.C.

N.I.C.

HATCHED AREA NOTED AS N.I.C.

DENOTES AREA NOT IN DIRECT

CONTRACT BUT MAY OR MAY NOT BE

IMPACTED BY ICRA OR OTHER MEP

SCOPE. ALL AREAS DISRUPTED BY

OTHER SCOPE TO BE RETURNED TO

ITS ORIGINAL CONDITION PER SPEC.

09.01

09.01

23.03

23.03

23.03

23.03

23.01 23.01

23.02 23.02

NEW ALL

EXTG NEW

12.03

12.02

26.02

26.03

SHEET NOTES:

REMOVE SHEET NOTES

IF NOT APPLICABLE

SEE SHEET 1-AE-102 FOR FLOOR PLAN LEGENDA.

KEYED NOTES:

02.03 GRIND AND FILL THE EXISTING CONCRETE SLAB TO ACCOMMODATE THE NEW02.03 GRIND AND FILL THE EXISTING CONCRETE SLAB TO ACCOMMODATE THE NEW

SYMBOL MARK DESCRIPTION

F1

2' x 2' LED LAY-IN FIXTUREF3

6" RECESSED LED DOWNLIGHT

SHEET NOTES:

REMOVE SHEET NOTES

IF NOT APPLICABLE

LIGHTING FIXTURE LEGEND:

KEYED NOTES:

PHILIPS CEILING SPEAKER, RE; EQUIPMENT

DRAWINGS

PHILIPS CEILING LIGHT STRIP, RE; EQUIPMENT

DRAWINGS

1 X 4 SUSPENDED LED SHOP LIGHTF4

SHEET NOTES:

REMOVE SHEET NOTES

IF NOT APPLICABLE

SEE SHEET 1-AE-102 FOR FLOOR PLAN LEGENDA.

KEYED NOTES:

02.03 GRIND AND FILL THE EXISTING CONCRETE SLAB TO ACCOMMODATE THE NEW02.03 GRIND AND FILL THE EXISTING CONCRETE SLAB TO ACCOMMODATE THE NEW02.03

02.04

02.05

09.01

09.02

09.03

12.01

12.02

12.03

23.01

23.02

23.03

26.01

26.02

26.03

GRIND AND FILL THE EXISTING CONCRETE SLAB TO ACCOMMODATE THE NEW

PHILIPS' AD7 FLOOR PLATE PER PHILIPS SPEC. NOTE THAT THE EXISTING AND

NEW FLOOR PLATE LOCATIONS SHOWN IN LABS 1 AND 2 MAY OR MAY NOT BE

REUSABLE, BUT THE OLD AD5 FLOOR PLATE SHOULD BE REPLACED WITH THE

NEW AD7 FLOOR PLATE. FIELD VERIFY WITH PHILIPS IF THE EXISTING LOCATIONS

CAN BE REUSED.

AREA OF EXISTING FLOOR UNDER FREE-STANDING EQUIPMENT, BASE, OR WALL

CABINET.

FREE-STANDING CASEWORK ON CASTERS.

LINE OF NEW OR MODIFIED EXISTING CEILING FRAMING.

LINE OF NEW-TO-EXISTING FLOORING TRANSITION. THE EXISTING SHEET VINYL

FLOOR HAS A 4”-6” H, (1” R) COVE BASE UP EXISTING WALLS AND CASEWORK

BASE. G.C. TO REMOVE EXISTING FLOORING TO THE NEAREST EXISTING SEAM

(APPROX. 8”-12” FROM THE COVE). INSTALL NEW HEAT-WELD SHEET VINYL

FLOORING.

EXISTING CASEWORK TO REMAIN, HOWEVER 2-3 NEW 2" GROMMETS MAY BE

NEEDED AT CONTROL ROOM CASEWORK, COORDINATE IN THE FIELD.

NEW AZURION 7 AD7 FLOOR PLATE PER PHILIPS SPEC.

NEW PHILIPS AZURON 7, CATALYST C12, SEE EQUIPMENT SPECS.

NEW PHILIPS AZURON 7, FLEXARM C20, SEE EQUIPMENT SPECS.

DEMO / RELOCATE EXISTING MEDICAL SERVICE LINES.

EXISTING MEDICAL SERVICE LINES REUSED.

NEW / EXTG MECHANICAL SUPPLY MODIFIED.

REPLACE EXISTING CAN LIGHTS WITH NEW PER E-SERIES DRAWINGS.

REPLACE EXISTING LINEAR LIGHTING WITH NEW, TIED TO NEW PHILIPS LIGHTING

CONTROLS.

OTHER PHILIPS IN-CEILING DEVICES.

35 % 95100%

01/08/202410/29/202511/03/202501/09/2026

26.09

SYMBOL MARK DESCRIPTION

F1

2' x 2' LED LAY-IN FIXTUREF3

6" RECESSED LED DOWNLIGHT

LIGHTING FIXTURE LEGEND:

PHILIPS CEILING SPEAKER, RE; EQUIPMENT

DRAWINGS

PHILIPS CEILING LIGHT STRIP, RE; EQUIPMENT

DRAWINGS

SYMBOL MARK DESCRIPTION

F1

2' x 2' LED LAY-IN FIXTUREF3

6" RECESSED LED DOWNLIGHT

PHILIPS CEILING SPEAKER, RE; EQUIPMENT

DRAWINGS

PHILIPS CEILING LIGHT STRIP, RE; EQUIPMENT

DRAWINGS

1 X 4 SUSPENDED LED SHOP LIGHTF4

26.09

REPLACEMENT STRIP LIGHT FIXTURE RE;

KEYED NOTE 26.02

REPLACE / RELOCATE NEW LED DOWN LIGHT

RE; KEYED NOTE 26.01

7C

1-AE-104

7C

1-AE-104

657-22-112JC

RELEASE FOR BIDDING

02/04/2026 Drawing # 5 of 96

B516B516

Scrub B508A

Corridor H509

Control 2 B509A

Control 1 B509

Equip Rm B504A Storage

B504

Equip Rm H510

Scrub H509A

Scrub B508A

Corridor H509

Control 2 B509A

Control 1 B509

Equip Rm B504A Storage

B504

Equip Rm H510

Scrub H509A

Catalyst Lab 2 B516

FlexArm Lab 1 B510

Catalyst Lab 2 B516

FlexArm Lab 1 B510

Floor Plan

104 104

ACT-1 Acoustical Ceiling Tile

Armstrong Calla Health Zone - AirAssure Square Lay-In Smooth Texture 24x48 15/16" Clean Room Grid System

Code Item Manufacturer Description Remarks

MATERIAL SCHEDULE

PT-1 Paint Benjamin Moore Product: OC - 17 Color: White Dove Finish: Walls - Scrub-able Eggshell Door Frames - Scrub-able Semi-Gloss

All Walls and Door Frames

EPY-1 Epoxy Resin Desco Rime Flooring and Integral Cove Base 4" High

PT-2 Paint Benjamin Moore Product: OC - 152 Color: Super White Finish: Ceilings - Scrub-able Eggshell Flat

GWB Ceilings

General Notes - Door & Frame:

A. ALL NEW DOORS ARE TO MATCH EXISTING

DOOR/OPENING SCHEDULE

NO. ROOM NAME

DOOR LEAF / OPENING FRAME HDW

GROUP

FIRE

RATING COMMENTSTYPE WIDTH HEIGHT THICK MATL FINISH TYPE MATL FINISH

2C19 LAB 3' - 6" 7' - 0" 1 3/4" 3/4 HR

3C17 LAB 3' - 6" 7' - 0" 1 3/4" 3/4 HR

M501 UPS

10/29/2025

SEE SHEETS 1-AE-102 AND 1-AE-103 FOR FLOOR PLAN AND RCP

LEGENDS.

A.

UPS M501

F B C R

W

AL

LS

EPY-1

EPY-1

PT-1

N : PT-1

E : PT-1

S : PT-1

W : PT-1

M501

UPS

M501

UPS

RCP

H O

LL

O

W M

ET

AL

F R

AM

E

AN

D

D O

O R

H O

LL

O

W M

ET

AL

F R

AM

E

D

ET

AI

LS

SU

SP

EN

D

ED

C

EI

LI

N G

D

ET

AI

LS

F HM PT-1 F1 HM PT-1 1 SEE SPECS

PA

R

TI

TI

O N

T

YP

E

F1F

FLUSH

A1

11/03/2025

M501

F4

F4

F4

F4

09.04

23.04

26.04

26.05

26.06

26.07

NEW GWB CEILING WITHIN THE NEW UPS ROOM.

LINE OF EXISTING PLUMBING LINE TO REMAIN IN PLACE.

NEW 1X4 LIGHT FIXTURE PER E-SERIES DRAWINGS AND SPECS.

PROVIDE A NEW ACCESS PANEL FOR THE EXISTING LOW-VOLTAGE PULL BOX.

NEW ELECTRICAL DEVICES PER E-SERIES DRAWINGS.

PHILIPS LIGHTING SUPPLIED BY EQUIPMENT VENDOR AND INSTALLED BY G.C.

G.C. TO PROVIDE GWB HEADER PER DETAILS ON THIS SHEET.

SHEET NOTES:

R

KEYED NOTES:SHEET NOTES:

R

IKEYED NOTES:

SHEET NOTES:

R

I

SEE SHEET 1-AE-102 FOR FLOOR A.

KEYED NOTES:

02.03 GRIND AND FILL THE EXISTING CONCRET02.03 GRIND AND FILL THE EXISTING CONCRET02.03 GRIND AND FILL THE EXISTING CONCRET

26.04

23.04

26.05

26.06

26.06

26.06

09.04

35 % 95100%

01/08/202410/29/202511/03/202501/09/2026

7C

1-AE-104 SCALE :1 1/2" = 1'-0"

LIGHT FIXTURE

PT-1 Paint Benjamin Moore Product: OC - 17 Color: White Dove Finish: Walls - Scrub-able Eggshell Door Frames - Scrub-able Semi-Gloss

All Walls and Door Frames

PT-2 Paint Benjamin Moore Product: OC - 152 Color: Super White Finish: Ceilings - Scrub-able Eggshell Flat

GWB Ceilings

RF-1 Resilient Flooring TBD Match Existing Chemical Seamed Sheet Flooring, except install with welded seam;

at transition to new and existing chemical seam can be used if welded seam cannot.

Lab 1 and Lab 2

25x49 1 1/2" CO-Extruded Clean Room Grid to match existing spacing.

657-22-112JC

RELEASE FOR BIDDING

02/04/2026

7C

1-AE-104 SCALE :1 1/2" = 1'-0"

LIGHT FIXTURE2

RE; 2C/1-AE-104

Drawing # 6 of 96

TELY AS AN

TERSTITIAL 5TH

E ENGINEERING

ORMATION. THE

TO THE LAB

THE UPS ROOM SHOULD BE PRICED SEPARATELY AS AN

EMERGENCY PROJECT. ALL WORK WITHIN THE INTERSTITIAL 5TH

FLOOR SPACE SHOULD BE PRICED, REFER TO THE ENGINEERING

DRAWINGS AND SPECIFICATIONS FOR MORE INFORMATION. THE

UPS ROOM MAY OR MAY NOT BE SEQUENTIAL TO THE LAB

PHASES.

RCP DETAILS ASSOCIATED WITH LABS 1 AND 2

CONSULTANTS: ENGINEER:

Revisions: Date:

Drawing Title

VA Health Care System Approval:

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Veterans Health

Administration

PREPARE SITE FOR CATHOLOGY

LABORATORIES, ROOMS B510 AND B516

657-22-112JC

JOHN COCHRAN DIVISION

915 NORTH GRAND BLVD - ST. LOUIS, MO 63106

1 S. Memorial Dr.

Suite 1800 St. Louis, MO 63102

(314) 621 - 4343 Bob Dunn bdunn@fox-arch.com

2707 Rand Rd Indianapolis, IN 46241

(317) 646 - 9090St. Louis - Chicago

(636) 262 - 8532 Richard Kwiatkowski rkwiatkowski@sscengineering.com 02/17/2026

WJS DAE

KEYPLAN

N.T.S.

RELEASE FOR BIDDING

FULLY SPRINKLERED

N

STAMP:

Drawing # of 96

PROGRESSIVE

CARE UNIT

BONE SURGERY

CHASE

CH-B-7

TELECOM

B507

MEDICINE

STORAGE

B504B

CHASE

CH-C-1

CHASE

CH-B-6

STAFF

TOILET

B545

STAFF

TOILET

B543

CHASE

CHASE CH-B-5

CH-B-4

FEC

H508A

ELECTRICAL

CLOSET

B536

CHASE

CH-B-3

CHASE

CH-A-5

FEC

H506A

TELECOM

A536A

ELECTRICAL

A536

TELECOM

A537A

STAFF

TOILET

A535A

FEC

H502A

CHASE

CH-A-17

MECH

A525A

CHASE

CH-A-15

ELECTRICAL

A536B

SURGICAL

STORAGE

A544A

SURGICAL

STORAGE

A544D

CHASE

CH-A-7

CHASE

CH-A-9

ELECTRICAL

CLOSET

A554

CHASE

CH-A-10

LINEN

CHUTE

CH-A-2

ELECTRICAL

CLOSET

A563

CRASH CART

A564A CHASE

CH-A-11

NOURISHMENT

A571A

CHASE

CH-A-12

SURGICAL

STORAGE

A577

STAFF

TOILET

A577A

STAFF

TOILET

A506A

CHASE

CH-A-13

STAFF TOILET

A507A

STAFF TOILET

A508A

STAFF TOILET

A510A

STAFF TOILET

A512A

STAFF TOILET

A514A

STAFF TOILET

A516A

STORAGE

CHASE A518

CH-A-4

ELECTRICAL

CLOSET

A520

CHASE

CH-A-19

CHASE

CH-A-18

SOILED

UTILITY

MEDICINE

STORAGE

C500B

CART

ELEVATOR

EQUIP

D502B

CART

ELEVATOR

EQUIP

D502A

CORRIDOR

H511

RECOVERY

C508

RECOVERY

C507 RECOVERY

C506

RECOVERY

C505

RECOVERY

C504

RECOVERY

C503

RECOVERY

C502

CORRIDOR

H510B

RECOVERY

(ISOLATION)

C501

OFFICE

C500C

RECOVERY

C509

RECOVERY

(ISOLATION)

C510

MECH

B538

ANTE

RM

C510A

UNISEX

TOILET

C511

UNISEX

TOILET

C511A

CORRIDOR

H512

BRONCHOSCOPY

SUITE

C512

CORRIDOR

H513A

ENTRY

C512A CHASE

CH-C-2

CLEAN

UTILITY

H512A

HAC

C528

ANTE RM

C501A

HAC

C500D

CORRIDOR

H510A

CORRIDOR

H510

MEDICINE

STORAGE

C500A

CORRIDOR

H509

SOILED

UTILITY

C516 LOCKERS

C518

UNISEX

TOILET

C518A

BREAK RM

C519

LOCKERS

UNISEX C520

TOILET

C520A

CLEAN

UTILITY

C515

CHASE

CH-C-4

SCM

STORAGE

C514

SCRUB

B514

CORRIDOR

H513

CHASE

CH-C-3

TELECOM

C522

ELECTRICAL

C521

TELECOM

ROOM

C514A

TELECOM

C524

STORAGE

B513

CORRIDOR

H508

CORRIDOR

H515

ELEVATOR

LOBBY

H514

EP LAB

B523

CONTROL RM

B525

PREP /

RECOVERY

B526

FEMALE

TOILET

B530

MALE

TOILET

B529

ELEVATOR

E9

ELEVATOR

E8

ELEVATOR

E7

CONSULT

B519

MEDICINE

STORAGE

B520

UNISEX

TOILET

B522

HOLDING

B521

HAC

B518

OFFICE

B515 MEDICINE

STORAGE

B517

CARDIAC CATH

B516

CONTROL

RM 2

B512

CONTROL

RM 1

B511

SCRUB

B509

CARDIAC CATH

LAB 1

B510

PREP RM

B508 MECH

B506

MEDICINE

STORAGE

B505 BREAK RM

B504

MECH

D502

INTERSTITIAL

D502

CORRIDOR

H516

CORRIDOR

H517

STAIR 07

S507

STERILIZER

C513

CHASE

CH-B-1

EP LAB

B524

MEDICINE

STORAGE

B528

MECH

B527

CORRIDOR

H502

CORRIDOR

H501

CORRIDOR

H503

CORRIDOR

H504

CORRIDOR

H505

CORRIDOR

H508

ELEVATOR

LOBBY

H506

PULMONARY

RESPIRATORY

THERAPY

A543

OFFICE

A543B

LAB-CLINICAL

A542

CHASE

CH-A-1

OXYGEN

STORAGE

A541

PULMONARY

PHYSICIAN

OFFICE

B546

PULMONARY

PHYSICIAN

OFFICE

B544

PULMONARY

PHYSICIAN

OFFICE

B542

PULMONARY

PHYSICIAN

OFFICE

B541

FEMALE

TOILET

B538A

HAC

B540

FEMALE

LOCKERS

B538

SOILED

UTILITY

B537

STAIR 03

CHASE S503

CH-B-2

CATHETER

READING

B534

OFFICE

B533

MALE

LOCKERS

B532

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .