P09 96 pgs 657-22-112JC_Release_for_Bidding_Drawings R1.pdf
PDF 24 MB Posted
- Solicitation number
- 36C25526R0095
About this file
This is a Release for Bidding architectural drawing set for a federal healthcare construction project at the VA St. Louis Health Care System, John Cochran Division. The project (Number 657-22-112JC) involves preparing the site for new Cathology Laboratories in Rooms B510 and B516, located at 915 North Grand Boulevard, St. Louis, Missouri 63106. The drawings are dated February 17, 2026, and represent the 100% design phase following an earlier 35% and 95% review set.
The project is phased into three sequential components: a UPS (Uninterruptible Power Supply) Room, Lab 1 (FlexArm Laboratory in Room B510), and Lab 2 (Catalyst Laboratory in Room B516). The UPS Room should be priced separately as an emergency project, with all work within the interstitial 5th floor space to be priced separately. The scope includes demolition of existing conditions, site preparation with ICRA (Infection Control Risk Assessment) containment measures, installation of new Philips medical equipment (Azurion 7 systems with AD7 floor plates), mechanical modifications including VAV box relocation and ductwork changes, plumbing modifications including medical gas panel relocation, electrical work, lighting and ceiling systems, and flooring preparation with epoxy finish and cove base. Key requirements include floor grinding and leveling to accommodate equipment per manufacturer specifications (±1/16" tolerance), fire-rated partition coordination throughout the project, and coordination with building occupancy and existing operations. The project utilizes the 2018 International Building Code, with construction Type II(222) and Business Occupancy classification, fully sprinklered design. Architect: Fox Architects; Engineer: SSC Engineering.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S06-657-22-112JC Pre-bid Meeting Sign in Sheet.pdf | ||
| 36C25526R0095 0003.docx | DOCX document | |
| S06 Questions response 657-22-112JC 26.05.14.pdf | ||
| S06-657A4-24-305 - Pre-Bid Sign In 07212025.pdf | ||
| 36C25526R0095 0002.docx | DOCX document | |
| S06 657-22-112JC Pre-bid Meeting Sign in Sheet.pdf | ||
| 36C25526R0095 0001.docx | DOCX document | |
| 36C25526R0095_1.docx | DOCX document | |
| 36C25526R0095 04082026 Final 02.docx | DOCX document | |
| P09 657-22-112JC Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2T
2T2 1A
1B
6 6A7
8B11
1T
5T 14 3
E
G
H
J
BELL AVE.
ENRIGHT AVE.
DELMAR AVE.
SP
R
IN
G
S T.
G R
AN
D
A
VE
EMPLOYEE PARKING
YELLOW
VALET PARKING
PURPLE
BUILDING SCHEDULE
1 MAIN HOSPITAL & CLINICAL ADDITION
1A EMERGENCY GENERATOR VAULT
1B EMERGENCY GENERATOR VAULT
1T MODULAR BUILDING
2 EDUC., MED. MEDIA, CHAPEL & RESRCH.
2T METHADONE CLINIC
2T2 OATP CLINIC
3 IRM & RESEARCH
4 NON-VA CARE / AFGE
5T OEF/OIF
6 RESEARCH
6A RESEARCH
7 RESEARCH
7A RESEARCH
8 BOILER PLANT
8A CHILLER PLANT
8B EMERGENCY GENERATOR
8C CHILLER BUILDING
9 PARKING GARAGE - UNDER CONST.
10 FLAG POLE
11 GAS METER HOUSE
12 BRINE TANKS
14 GARAGE
16 ENGINEERING / TRANSITION CARE TEAM
17 SWITCH GEAR BUILDING
24 WASTE STORAGE FACILITY
29 UNDER CONSTRUCTION
DEC DECON TRAILER
8A 7A
29BUILDING
(NON VA)
DEC
0' 200'
300'
400'
500'100'
SCALE REFERENCE
P
EMPLOYEE PARKING
YELLOW
L
PATIENT PARKING
BLUE
VACANT LOT
(NON VA)
UNDER
CONSTRUCTION
AMEREN MISSOURI
SUBSTATION
UP
DOWN
UP
F
PHYSICIAN PARKING
RED
EMPLOYEE PARKING
YELLOW
R Q
PATIENT PARKING
BLUE
A
A
PATIENT PARKING
BLUE
PATIENT PARKING
BLUE
8C
EMPLOYEE PARKING
YELLOW
SALT
STORAGE
N M
S
TO
IN
TE
R
ST
AT
E
JOHN COCHRAN DIVISION
PREPARE SITE FOR
CATHOLOGY LABORATORIES,
ROOMS B510 AND B516
US DEPARTMENT OF VETERANS AFFAIRS
VA ST. LOUIS HEALTH CARE SYSTEM
VA PROJECT NUMBER: 657-22-112JC
OVERALL CAMPUS SITE PLAN
PROJECT LOCATOR
TO
IN
TE
R
ST
AT
E
DRAWING INDEX LEGEND
BUILDING NUMBER SHEET TYPE DESIGNATORS
0 = GENERAL
1 = PLANS
2 = ELEVATIONS
3 = SECTIONS
4 = LARGE-SCALE VIEWS
5 = DETAILS
6 = SCHEDULES & DIAGRAMS
7 = USER DEFINED
8 = USER DEFINED
9 = 3D REPRESENTATIONS
DISCIPLINE DESIGNATORS EXAMPLES
GI = GENERAL INFORMATION
GC = GENERAL CONTRACT
GJ = ICRA
CS = CIVIL SITE
AD = ARCHITECTURAL DEMOLITION
AS = ARCHITECTURAL SITE
AE = ARCHITECTURAL ELEMENTS
FLOOR PLANS, ELEVATIONS, DETAILS
AI = ARCHITECTURAL INTERIORS
AG = ARCHITECTURAL GRAPHICS
AF = ARCHITECTURAL FINISHES
AC = ARCHITECTURAL CEILING PLAN
AW = ARCHITECTURAL WAYFINDING
AP = ARCHITECTURAL SPACE PLANNING
FLOOR PLANS & SCHEDULES
AL = ARCHITECTURAL LIFE SAFETY
DRAWINGS
SG = STRUCTURAL GENERAL
SF = STRUCTURAL FRAMING
MG = MECHANICAL GENERAL
MH = MECHANICAL HVAC
PG = PLUMBING MEDICAL GAS
PL = PLUMBING FIXTURES
EG = ELECTRICAL GENERAL
EL = ELECTRICAL LIGHTING
EP = ELECTRICAL POWER
EK = EQUIPMENT INSTALLATION
FLOOR NUMBER ON PLAN SHEETS
SHEET NUMBER
##-XX-###
COVER SHEET
01-GI-001
CONSULTANTS: ENGINEER:
Revisions: Date:
Drawing Title
VA Health Care System Approval:
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Veterans Health
Administration
PREPARE SITE FOR CATHOLOGY
LABORATORIES, ROOMS B510 AND B516
657-22-112JC
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
1 S. Memorial Dr.
Suite 1800 St. Louis, MO 63102
(314) 621 - 4343 Bob Dunn bdunn@fox-arch.com
2707 Rand Rd Indianapolis, IN 46241
(317) 646 - 9090St. Louis - Chicago
(636) 262 - 8532 Richard Kwiatkowski rkwiatkowski@sscengineering.com 02/17/2026
WJS DAE
RELEASE FOR BIDDING
FULLY SPRINKLERED
STAMP:
Drawing # of 961
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text
FH
AutoCAD SHX Text
FH
AutoCAD SHX Text
LOADING DOCK PAD
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text No.
AutoCAD SHX Text
STATE OF
AutoCAD SHX Text 17006
AutoCAD SHX Text W
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text J
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text D
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
KEYPLAN
N.T.S.
N
UP
DN
ST O RAG E
D502L CART
EL EVAT O R
EQ UI PMENT
D50 2A
Ro o m
D50 2K
CART
EL EVAT O R
EQ UI PMENT
D50 2B
Ro o m
D50 2N
I HCG SHO P
D502M
MASO N SHO P
D502J
ST AI RW EL L NO .
S508
CARP ENT RY
SHO P
D502I
EL ECT RI C SHO P
D50 2H
CO RRI DO R
H517
CO RRI DO R
H518
A/ C SHO P
D50 2D
PI PE SHO P
D502F
Ro o m
D50 5A
MECH. RM.
D505
MECH. RM.
B538
EXAM /
T REAT MENT
A550
TO IL ET
A54 9A
WAI T I NG RM.
A549
WAI T I NG RM.
A548
TO IL ET
A54 8A
OF F I CE
A572
MED. PREP.
A573
NURSE ST AT I O N
A571
OF F ICE,
DI ET I CI AN
A547
NO UR.
A57 1A
EXAM /
T REAT MENT
A570
ANT E RM.
A57 0A
TO IL ET
A57 0B
OF F I CE
A569
TO IL ET
A56 9A
OF F I CE
A568
CO RRI DO R
H504
CRAS H C ART
A56 4A
SO I L ED
A564
CL EAN RM.
A562
EXAM /
T REAT MENT
A561
EXAM /
T REAT MENT
A566
ANT E RM.
A56 5A
TO IL ET
A56 5B
TO IL ET
A56 6A
EXAM /
T REAT MENT
A567
OF F I CE
A56 7B
OF F I CE
A56 8B
EL EC. CL O SET
A563
ST AI RW EL L NO .
S505
L O UNG E
A552
TO IL ET
A55 9A
TO IL ET
A55 5A
EXAM /
T REAT MENT
A555
EXAM /
T REAT MENT
A553
EXAM /
T REAT MENT
A559
HAC
A560
ST RET CH
A55 2A
TO IL ET
A55 3A
EXAM /
T REAT MENT
A558
CO RRI DO R
H505
EXAM /
T REAT MENT
A556
HAL L W AY
A55 6A
TO IL ET
A55 8A
CO NF ERE NCE
RM.
A557
Ro o m
A55 6B
TO IL ET
A578
TO IL ET
A57 7A
OF F I CE
A576
TO IL ET
A574
OF F I CE
A575
TO IL ET
A54 4C
SERVI CE
EL EVAT O R
L O BBY
H507
CO RRI DO R
H503
L O CKER RM.
A54 4B
PHYSI CI AN
W O RK RM.
A544
OF F I CE / EXAM
A50 1A
OF F I CE / EXAM
A501
CO NF ERE NCE
RM.
A502
OF F I CE / EXAM
A509
OF F I CE / EXAM
A510
OF F I CE / EXAM
A511
TO IL ET
A51 0A
OF F I CE / EXAM
A512
OF F I CE / EXAM
A513
TO IL ET
A51 2A
L AB
A542
O XYG EN
ST O RAG E
A541
OF F I CE
B546
OF F I CE
B544
TO IL ET
B54 4A
EL EC. CL O SET
A53 6B
CL O SET
A54 4A
EL EVAT O R
L O BBY
H506
OF F I CE
B501
L O CKER RM.
A54 0A
OF F I CE
B502
ST O RAG E
A539
ST O RAG E
A53 9A
ST O RAG E
A540
OF F I CE
A535
ST AI RW EL L NO .
S501
PHYSI CI AN
W O RK RM.
A538
EL EC. CL O SET
A536
OI &T
A53 6A
TO IL ET
A53 5A
EL EC. CL O SET
A53 7A
CO RRI DO R
H501
TO IL ET
A50 8A
OF F I CE / EXAM
A508
TO IL ET
A50 7A
OF F I CE / EXAM
A507
ST O RAG E
A504
HAC
A503
TO I L ET , F EMAL E
A50 6A
NO UR.
A505
OF F I CE
A506
OF F I CE / EXAM
A517
OF F I CE / EXAM
A516
OF F I CE / EXAM
A515
OF F I CE / EXAM
A514
TO IL ET
A51 6A
TO IL ET
A51 4A
ST O RAG E
A521
SO I L ED UT IL I T Y
A519
EL EC. CL O SET
A520
TO IL ET
A51 7A
ST O RAG E
A518
TO I LET , STAF F
A532
OF F I CE
A531
OF F I CE
A533
EXAM
B52 4D
EXAM
A52 4C
EXAM
A52 4A
EXAM
A52 4B
WAI T I NG RM.
B524
RECEPT I O N
B524E
EXAM
A522
EXAM
A52 3A
HAL L W AY
A523
EXAM
A52 3B
HAC
A527
ST AI RW EL L NO .
S502
TO I LET , MAL E
A525
OF F I CE / EXAM
A526
F. E . CL OSET
H50 2A
OF F I CE
A530
MEDI CAT I O N
RM.
A529
CO RRI DO R
H502
PUL MO NARY
RESPI RAT O RY
T HER APY
A543
OF F I CE
A54 3B
OF F I CE
B542OF F I CE
B541
CO RRI DO R
H508
BRO N CHO SCO PY
SUI T E
B503
CO RRI DO R
H508
ST O RAG E
B520
TO I LET , MAL E
B521
TO I L ET , F EMAL E
B522
PREP /
RECO V ERY
B51 9B
MECH. RM.
B52 0A
CO NT RO L
B51 9C
VEST I BUL E
B51 9A
CO RRI DO R
H516
EL ECT RO -
PHYSI O L O G Y
B519
ST ERI L I Z ER
C527
HAC
C528
TO IL ET
B52 3A
HAC
B529
TO IL ET
B52 8A
L O CKER RM,
F EMAL E
B528
OF F I CE
B524
CAT H. READI NG
B525
SO I L ED UT IL I T Y
B527
EL EC. CL O SET
B526
ST AI RW EL L NO .
S503
F. E . CL OSET
H50 8A
BREAK RM.
B503
TO IL ET
B51 6A
WAI T I NG RM.
B518
HO L DI NG
B516
CO NSUL T
B517
CO NT RO L 1
B509
CO NT RO L 2
B50 9A
SCR UB
B50 8A
EL EC. CL O SET
H510
CARDI AC CAT H.
L AB 1
B508
PREP
B507
ST O RAG E
B504
MECH. RM.
B50 4A
OI &T
B506
Ro o m
B50 4B
CO RRI DO R
H509
CO RRI DO R
H509
EL EVAT O R
L O BBY
H510
L O CKER RM,
MAL E
B523
L O CKER RM.
C520
TO IL ET
C52 0A
I CU L O UNG E
C519
TO IL ET
C51 8A
L O CKER RM.
C518SO I L ED UT IL I T Y
C516
SUPPL Y
H51 2A
CO RRI DO R
H513
CO RRI DO R
H51 3A
ST O RAG E
C50 0B
OF F I CE
C50 0C
HAC
C50 0D
ANT E RM.
C50 1A
RECO V ERY
ISO L AT I O N
C501
CO RRI DO R
H510
ST O RAG E
C500
RECO V ERY
C504
RECO V ERY
C503
RECO V ERY
C502
ANT E RM.
C51 0A
ISO L AT I O N
RECO V ERY
C510
RECO V ERY
C509
CO RRI DO R
H511
RECO V ERY
C507 RECO V ERY
C506
RECO V ERY
C505
TO IL ET
C51 1A
TO IL ET
C511
CO RRI DO R
H512
O. R. - 02
C512
OI &T
C524
SCR UB
C51 4A
OI &T
C522
EL EC. CL O SET
C521
CL EAN RM.
C515
O. R. - 01
C514
TO IL ET
B543
CARDI AC C AT H
L AB 2
B511
HAC
B514
HAL L W AY
A56 8A
HAL L W AY
A56 7A
EXAM /
T REAT MENT
A565
EL EC. CL O SET
A554
F. E . CL OSET
H50 6A
SCR UB
H50 9A
RECO V ERY
C508
CO RRI DO R
H509
CO RRI DO R
H51 0A
ST AI RW EL L NO .
S506
MECH. RM.
D502
ST O RAG E
D502E
MECH.
ST O RAG E
D50 2C
ST AI RW EL L NO .
S507
EL EVAT O R NO .
E1
EL EVAT O R NO .
E2
EL EVAT O R NO .
E3
EL EVAT O R NO .
E4
EL EVAT O R NO .
E5
EL EVAT O R NO .
E6
EL EVAT O R NO .
E7 EL EVAT O R NO .
E8
EL EVAT O R NO .
E9
FE
FE
FE
FE
FE
FE
FE
DF
ST AI RW EL L NO .
S509
DF
FAP
FEC
FAP
CHA SE
CH- D- 1
CHA SE
CH- C- 2
CHA SE
CH- A- 1
CHA SE
CH- A- 2
CHA SE
CH- A- 3
ROOF
FEC
WG
WG
WG
ENT RY
C51 2A
AP
WG
WG
FEC
FAP
WG
AP
AP
AP AP
AP
AP
AP
AP
AP
AP
AP
APFAP
AP
AP
ST O RAG E
A577
CHA SE
CH- A- 4
CL O SET
A54 4D
CHA SE
CH- C- 1
CHA SE
CH- C- 3
CHA SE
CH- C- 4
CHA SE
CH- B- 1
CHA SE
CH- B- 2
CHA SE
CH- B- 3
CHA SE
CH- B- 4
CHA SE
CH- B- 5
CHA SE
CH- B- 6
CHA SE
CH- B- 7
CHA SE
CH- A- 5
CHA SE
CH- A- 6
CHA SE
CH- A- 7
CHA SE
CH- A- 8
CHA SE
CH- A- 9
CHA SE
CH- A- 10
CHA SE
CH- A- 11
CHA SE
CH- A- 12
CHA SE
CH- A- 13
CHA SE
CH- A- 14
CHA SE
CH- A- 15
CHA SE
CH- A- 16
CHA SE
CH- A- 17
MECH. RM.
A52 5A
CHA SE
CH- A- 19
CHA SE
CH- A- 18
DN
1. AREAS SHOWN IN LS SHEETS ARE DIAGRAMMATIC ONLY AND
SHOULD NOT BE USED AS THE BASIS OF MATERIAL
CALCULATIONS OR QUANTITIES.
2. ALL FIRE RATINGS SHOWN IN LS SHEETS ARE TO BE
COORDINATED WITH PARTITION TYPE TAGS IN FLOOR PLANS.
CONTRACTOR TO NOTIFY ARCHITECT OF ANY DESCREPANCIES
BETWEEN TAGS AND LS SHEETS. IF THE CONTRACTOR CHOOSES
TO PROCEED WITHOUT NOTIFYING THE ARCHITECT AND
RECEIVING DIRECTION FOR ANY CLARIFICATION OR
DISCREPANCY, THE CONTRACTOR DOES SO AT THEIR OWN RISK.
3. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL
SUB-CONTRACTORS, INCLUDING THOSE HIRED BY THE OWNER,
TO PROVIDE ALL FIRE RATED REQUIREMENTS ASSOCIATED WITH
ELEMENTS INCLUDING BUT NOT LIMITED TO MECHANICAL,
ELECTRICAL & PLUMBING PENETRATIONS, DOORS AND OTHER
OPENINGS.
4. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING SAFE
EGRESS PATHS THROUGHOUT THE DURATION OF DEMOLITION
AND CONSTRUCTION, MAINTAINING REQUIRED MEANS OF
EGRESS FREE OF DEBRIS AND OTHER OBSTRUCTION.
5. EXIT SIGNS NOT SHOWN ON THIS PLAN - COORDINATE WITH RCP
& ELECTRICAL DRAWINGS IF APPLICABLE.
Occupied Spaces Not In Contract
Project Area, B Business
Demo Area Outside Labs C219 and C317 (Refer to Sheet 1-AE-100 for full extent of Demo Scope)
Occupancy Use Groups
EGRESS DOOR TAG
EXIT
MAXIMUM ACTUAL
A101.1
231 000
DOOR NUMBER
EXISTING 2-HOUR RATED PARTITION
NEW 1-HOUR RATED PARTITION (REFER TO SHEET
1-AE-101)
EXISTING 20 MIN PARTITION
ANTICIPATED OCCUPANT CAPACITY
MAXIMUM OCCUPANT CAPACITY
PATH OF TRAVEL TO EXIT
CODE DATA
Primary Structural Frame
Bearing Walls - Exterior
Bearing Walls - Interior
Nonbearing Walls & Partitions - Exterior
Nobearing Walls & Partitions - Interior
Floor Construction & Associated Secondary Members
Roof Construction & Associated Secondary Members
Building Code 2018 International Existing Building Code (IEBC)
2018 International Mechanical CodeMechanical Code
2021 Uniform Plumbing CodePlumbing Code
2017 NFPA 70 National Electrical CodeElectrical Code
B-BusinessUse Group
Fully SprinkleredFire Suppression
IIBConstruction Type
302.1
901.6
602.1
Notes:
1. No changes to egress.
2. No changes to occupancy.
3. Renovations per IEBC 2018; Alterations Level 2 (801).
4. NFPA referenced sections are based on 2018 NFPA 101 Existing Business Occupancy 39.1 and as referenced In IEBC 2018
Fire Resistance Rating Chart
Building Element TYPE I
A B
2018 International Energy Conservation CodeEnergy Code
2018 International Fire CodeFire Protection Code
IBC
Reference
NFPA STATE
6.1.11
9.11.4.1
II(222)
1. THE CONTRACTOR SHALL CAREFULLY STUDY AND
COMPARE THE CONTRACT DOCUMENTS WITH EACH
OTHER AND WITH AS-BUILT DRAWINGS PROVIDED
BY THE OWNER AND SHALL AT ONCE REPORT TO
THE ARCHITECT ERRORS, INCONSISTENCIES, OR
OMISSIONS. THE CONTRACTOR SHALL TAKE FIELD
MEASUREMENTS AND VERIFY FIELD CONDITIONS.
2. CONFIRM ALL NEW AND EXISTING CONDITIONS WITH
THE CONTRACT DOCUMENTS. NOTIFY ARCHITECT
IMMEDIATELY IN WRITING OF ALL DISCREPANCIES
OR CONFLICTS. DO NOT PROCEED WITH WORK IN
THE AREA OF DISCREPANCY OR CONFLICT UNTIL
DIRECTION IS GIVEN BY ARCHITECT. IF
CONTRACTOR PROCEEDS WITHOUT DIRECTION
FROM ARCHITECT, IT SHALL BE AT CONTRACTORS
RISK AND CONTRACTOR SHALL BE RESPONSIBLE
FOR ALL REQUIRED CORRECTIVE ACTION.
3. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR
AND HAS CONTROL OVER CONSTRUCTION MEANS,
METHODS, TECHNIQUES, SEQUENCES, AND
PROCEDURES, AND FOR COORDINATING ALL
PORTIONS OF THE WORK.
4. REVIEW THE ARCHITECTURAL DRAWINGS BEFORE
THE INSTALLATION OF SYSTEMS SHOWN ON
CONSULTING ENGINEER'S DOCUMENTS.
DISCREPANCIES BETWEEN THE ARCHITECTURAL
AND CONSULTING ENGINEER;S DOCUMENTS SHALL
BE BROUGHT TO THE ARCHITECT'S ATTETION FOR
DIRECTION. CONSTRUCTION INSTALLED IN
CONFLICT WITH THE ARCHITECTURAL DRAWINGS
SHALL BE CORRECTED BY CONTRACTOR AT NO
EXPENSE TO THE OWNER.
5. THE INTENT OF THE CONTRACT DOCUMENTS IS TO
ALLOW FOR THE PERFORMANCE OF THE WORK.
EVERY ITEM NECESSARILY REQUIRED MAY NOT BE
SPECIFICALLY MENTIONED OR SHOWN. UNLESS
EXPRESSLY STATED, ALL SYSTEMS AND EQUIPMENT
SHALL BE COMPLETED AND APPROPRIATELY
OPERABLE. FURNISH AND INSTALL ALL SPECIFIED
AND APPROPRIATE ITEMS, AND ALL INCIDENTAL,
ACCESSORY, AND OTHER ITEMS NOT SPECIFIED
BUT REQUIRED FOR A COMPLETE AND FINISHED
ASSEMBLY.
6. FOR APPLICABLE CODES AND STANDARDS REFER
TO LS SHEETS.
7. THE CONTRACTOR SHALL ESTABLISH CLEAR
UNDERSTANDING OF REQUIREMENTS OF THE
PROJECT, SYSTEMS AND THEIR COMPONENTS
PRIOR TO ORDERING MATERIALS OR COMMENCING
WORK.
8. THE CONTRACTOR SHALL PROVIDE SHORING,
BRACING, SUPPORT AND PROTECTION AS
REQUIRED.
9. THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS
AND METHODS OF CONSTRUCTION AND SHALL
COORDINATE ALL CONSTRUCTION EFFORTS WITH
THE OWNER'S REQUIREMENTS.
10. THE CONTRACTOR SHALL COORDINATE ALL WORK
WITH THE OWNER AND OWNER PROVIDED
CONTRACTORS, IF ANY, AS REQUIRED TO
IMPLEMENT THE SCOPE OF WORK.
11. THE ARCHITECT SHALL NOT BE RESPONSIBLE FOR
LOCATING, IDENTIFYING OR SPECIFYING MEANS OF
REMOVAL OF ANY HAZARDOUS MATERIALS.
HAZARDOUS MATERIAL TESTING SHALL BE
COMPLETED BY OWNER CONTRACTED
CONSULTANT.
12. CONTRACTOR TO COORDINATE FLOOR, WALL AND
CEILING FIRE RATINGS WITH CODE COMPLIANCE
SHEETS. ALL PENETRATIONS THROUGH RATED
ASSEMBLIES TO BE SEALED WITH AN APPROPRIATE
FIRESTOP SYSTEM WITH AN EQUAL OR GREATER
RATING THAN THE PENETRATED ASSEMBLY.
13. NON-COMPLIANT DEFECTIVE WORKMANSHIP OR
QUALITY WILL BE REJECTED DESPITE THE
ARCHITECT'S FAILURE TO DISCOVER OR POINT OUT
DEFECTS OR DEFICIENCIES DURING
CONSTRUCTION. DEFECTIVE WORK REVEALED
WITHIN THE TIME REQUIRED BY GUARANTEES
SHALL BE REPLACED BY WORK CONFORMING TO
THE INTENT OF THE CONTRACT. NO PAYMENT,
EITHER PARTIAL OR FINAL, SHALL BE CONSTRUED
AS AN ACCEPTANCE OF DEFECTIVE WORK OR
IMPROPER MATERIALS.
14. CONTRACTOR SHALL PREPARE AS-BUILT DRAWINGS
BASED ON THE ARCHITECTS RECORD DRAWINGS
AND DISTRIBUTE ELECTRONICALLY TO THE OWNER
AT THE CONCLUSION OF THE PROJECT.
15. THROUGHOUT THE DURATION OF THE PROJECT,
THE CONTRACTOR SHALL REFRAIN FROM ACTIONS
THAT COULD LEAD TO THE FILING OF CLAIMS OF
LIEN BY SUBCONTRACTORS, SUPPLIERS OF
MATERIALS, LABOR, SERVICE, EQUIPMENT, OR ANY
OTHER INDIVIDUAL OR COMPANY SO ENTITLED
UNDER GOVERNING LAWS AND REGULATIONS,
UNLESS REASONABLE AND JUSTIFIABLE CAUSE CAN
BE SHOWN. APPROVAL FOR PAYMENT SHALL BE
CONTINGENT UPON THE CONTRACTOR'S OBTAINING
AND FURNISHING TO THE ARCHITECT SIGNED
RELEASES FROM SUCH INDIVIDUALS OR
COMPANIES.
25. COORDINATE ALL WORK WITH BUILDING OWNER SO
AS NOT TO DISTURB OR CAUSE DAMAGE TO ANY
TENANT IN THE BUILDING. AVOID CONFLICT AND
INTERFERENCE WITH NORMAL BUILDING
OPERATIONS BY COMPLYING WITH THE BUILDING'S
REGULATIONS REGARDING SCHEDULING AND USE
OF ELEVATORS AND LOADING DOCKS FOR
DELIVERIES, HANDLING OF MATERIALS, EQUIPMENT,
AND DEBRIS.
26. ALL SIGNAGE IS NIC UNLESS NOTED OTHERWISE.
16. EXECUTE WORK IN ACCORDANCE WITH ANY AND
ALL APPLICABLE LOCAL, STATE, AND FEDERAL
CODES, MANUFACTURER'S RECOMMENDATIONS,
AND TRADE AND REFERENCED STANDARDS,
INCLUDING BUT NOT LIMITED TO: IBC, NEC AND NFPA
(LATEST APPLICABLE ENFORCED EDITIONS
REFERENCED).
17. DO NOT SCALE DRAWINGS; DIMENSIONS SHALL
GOVERN. DETAILS SHALL GOVERN OVER PLANS
AND ELEVATIONS. LARGE SCALE DETAILS SHALL
GOVERN OVER SMALL SCALE DETAILS. WRITTEN
SPECIFICATIONS SHALL GOVERN OVER ALL.
18. THERE SHALL BE NO SUBSTITUTION OF MATERIALS
WHERE A MANUFACTURER IS SPECIFIED. WHERE
THE TERM "OR EQUAL" IS USED, THE ARCHITECT
ALONE SHALL DETERMINE EQUALITY BASED UPON
INFORMATION SUBMITTED BY THE CONTRACTOR,
INCLUDING THE ARCHITECTS SUBSTITUTION FORM
CLEARLY IDENTIFIED AS A "REQUEST FOR
SUBSTITUTION". CONTRACTOR SHALL ALSO LIST
CREDIT TO THE CLIENT FOR USE OF SUBSTITUTION.
19. DO NOT PROCEED WITH ANY WORK REQUIRING
ADDITIONAL COMPENSATION BEYOND THE
CONTRACT AMOUNT WITHOUT WRITTEN
AUTHORIZATION FROM THE OWNER. FAILURE TO
OBTAIN AUTHORIZATION SHALL INVALIDATE ANY
CLAIM FOR EXTRA COMPENSATION.
20. UPON COMPLETION OF THE WORK BY THE
CONTRACTOR, THE CONTRACTOR SHALL NOTIFY
THE ARCHITECT IN WRITING OF SUCH COMPLETION.
THE ARCHITECT SHALL ATTEND THE PUNCH LIST
WALK THROUGH CONDUCTED BY THE GENERAL
CONTRACTOR. THE GENERAL CONTRACTOR SHALL
PREPARE AND DISTRIBUTE A LIST OF ITEMS TO BE
FINISHED OR COMPLETED PRIOR TO THIS WALK
THROUGH. THE GENERAL CONTRACTOR SHALL
TAKE NOTES AND PREPARE A LIST OF FINAL PUNCH
ITEMS TO BE COMPLETED OR CORRECTED AS A
RESULT OF THIS WALK THROUGH. THIS PUNCH LIST
IS TO BE PROMPTLY DISTRIBUTED BY THE GENERAL
CONTRACTOR TO THE TENANT, OWNER AND
ARCHITECT.
21. IT IS THE RESPONSIBILITY OF THE GENERAL
CONTRACTOR TO REVIEW ALL SUBMITTALS AND
SHOP DRAWINGS FOR APPROPRIATENESS AND
COMPLIANCE WITH THE CONTRACT DOCUMENTS
PRIOR TO SENDING SHOP DRAWINGS TO THE
ARCHITECT OR ENGINEER FOR REVIEW. A STAMP
OR STATEMENT TESTIFYING THE CONTRACTOR HAS
REVIEWED THE SHOP DRAWINGS, INCLUDING THE
DATE REVIEWED, MUST BE AFFIXED TO THE FIRST
PAGE OF EACH SUBMITTAL.
22. PROVIDE METAL OR FIRE RETARDANT WOOD
BLOCKING FOR ALL SIGNS, HOOKS, TOILET ROOM
ACCESSORIES, AND ANY OTHER CEILING OR WALL
MOUNTED EQUIPMENT. COORDINATE ALL BLOCKING
REQUIREMENTS REQUIRED WITH ARCHITECT.
23. COORDINATE WORK OF VARIOUS TRADES IN
INSTALLATION OF INTERRELATED WORK BEFORE
INSTALLATION OF WORK BY ANY TRADE, INCLUDING
VENDORS. GENERAL CONTRACTOR TO MAKE
PROPER PROVISIONS TO AVOID INTERFERENCE.
24. GENERAL CONTRACTOR TO PROVIDE PORTABLE
FIRE EXTINGUISHERS AT THE JOB SITE FOR THE
DURATION OF DEMOLITION AND CONSTRUCTION AS
REQUIRED BY THE LOCAL FIRE DEPARTMENT.
Z
Z
LEVEL
#'-##" AFF
A2.3 A1
123A
X X
Door Tag
Window Tag
Keyed Note
Ceiling Tag ACT = Material
Floor Transition Tag X = Material
Revision Tag
Centerline Mark
Existing Construction shown Halftone
Demolished Items shown Dashed
New Construction shown Solid
Exterior Elevation Mark X = Elevation Number Y#.## = Sheet Number
North Arrow & True North Indicator
Wall Section Mark X = Elevation Number Y#.## = Sheet Number
Detail Mark X = Elevation Number Y#.## = Sheet Number
Room Tag A100 = Room Number
Detail / Plan Callout X = Elevation Number Y#.# = Sheet Number
Elevation Datum
New Column Line
Existing Column Line
02.03
Partition Type:
Refer to Partition Type Sheet
X Y#.##
X Y#.##
Y#.##
X
SIM
X
SIM
X
SIM
X
SIM
Y#.##
X
SIM
X
SIM
X
SIM
X
SIM
X Y#.##
X Y#.##
Building Section Mark X = Elevation Number Y#.## = Sheet Number
Interior Elevation Mark X = Elevation Number Y#.## = Sheet Number xxx Corner Guard
[L###] Millwork Tag Refer to Millwork Elevation Types Sheet(s)
Fixture / Accessory Tag
ALIGN
Align Items
Survey PointWork Point
Exit Sign (Arrows = Direction to Exit)
TRUE
NORTH
ROOM NAME
A100
150 SF
Volume
X
ACTX'-X"
BRICK & TILE (CUT)
ASPHALT (CUT)
CMU (CUT)
CONCRETE (CUT)
EARTH: COMPACTED FILL
EARTH: UNDISTURBED
GLASS (CUT)
GRAVEL: CRUSHED
GROUT / MORTAR
GYSPUM BOARD: INTERIOR (CUT)
INSULATION: BATT
INSULATION: RIGID (CUT)
INSULATION: SPRAY FOAM
INSULATION: MINERAL
FIBER BOARD
INSULATION: DENSE
PACK CELLULOSE
STEEL
WOOD FRAMING / BLOCKING
WOOD FINISH (FACE)
WOOD FINISH (CUT)
WOOD SHEATHING (FACE)
WOOD SHEATHING (CUT)
ALUMINUM (CUT)
CONTINUOUS NOT CONTINUOUS
GYSPUM BOARD: EXTERIOR (CUT)
STEEL
Drawing # of
FULLY SPRINKLERED
35 % REVIEW SET
1 S. Memorial Dr.
B
A
C
D
E
F
VA FORM 08-6231 1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
PREPARE SITE FOR CATHOLOGY
LABORATORIES, ROOMS B510 AND B516
657-22-102JC
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
CONSULTANTS: ENGINEER:
Revisions: Date:
Drawing Title
VA Health Care System Approval:
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Veterans Health
Administration Suite 1800 St. Louis, MO 63102
(314) 621 - 4343 Bob Dunn bdunn@fox-arch.com
2707 Rand Rd Indianapolis, IN 46241
(317) 646 - 9090St. Louis - Chicago
(636) 262 - 8532 Richard Kwiatkowski rkwiatkowski@sscengineering.com
01/08/2024 Checker Author
1-AE-100
ARCHITECTURAL
GENERAL-CODE INFORMATION
LIFE SAFETY LEGEND:
TRUE
NORTH
SCALE: 1/32" = 1'-0"1-AE-100
7F LIFE SAFETY PLAN - THIRD FLOOR
GENERAL L.S. PLAN NOTES:
No. Name
00-ARCHITECTURAL SHEETS
1-AE-100 ARCHITECTURAL GENERAL-CODE
INFORMATION
40-ARCHITECTURAL DEMOLITION (AD)
1-AE-101 ARCHITECTURAL LIFT SITE PLAN
45-ARCHITECTURAL (A)
1-AE-102 ARCHITECTURAL DEMO AND
FLOOR PLAN
1-AE-103 ARCHITECTURAL DEMO AND RCP
INDEX TO DRAWINGS:
Fox, Inc. dba Fox Architects 1 S Memorial Dr., Suite 1800
St. Louis, MO 63102
& AND
AB ACOUSTICAL BAFFLE
AC ACOUSTICAL CEILING TILE
ADJ ADJUSTABLE
ADJC ADJACENT
AFF ABOVE FINISHED FLOOR
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
AP ACOUSTICAL PANEL
APPL APPLIANCE
ARCH ARCHITECT(URAL)
ASSY ASSEMBLY
AUTO AUTOMATIC
AVG AVERAGE
BD BOARD
BL BLINDS
BLDG BUILDING
BLKG BLOCKING
BOD BOTTOM OF DECK
BR BRICK
BTWN BETWEEN
BU BUILT UP
C CARPET
CAB CABINET
CEM CEMENT(ITIOUS)
CER CERAMIC
CIP CAST-IN-PLACE
CL CENTERLINE
CLG CEILING
CMU CONCRETE MASONRY UNIT
CN CONCRETE
CO CLEANOUT
COILG COILING
COL COLUMN
COMM COMMUNICATION
CONSTR CONSTRUCTION
CONT CONTINUOUS(ATION)
CONTR CONTRACT(OR)
CSJ CONSTRUCTION JOINT
CSWK CASEWORK
CT CERAMIC TILE
D DEEP, DEPTH
DEMO DEMOLISH
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIM DIMENSION
DIV DIVISION, DIVIDE
DN DOWN
DP DRAPERY
DR DOOR
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
EA EACH
EF EPOXY FLOOR
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
ENGR ENGINEER(ED)
ENTR ENTRANCE
EPB ELECTRICAL PANEL BOARD
EQ EQUAL
EQUIP EQUIPMENT
ETC ETCETERA
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXT EXTERIOR
F FABRIC
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER AND CABINET
FHC FIRE HOSE AND CABINET
FIN FINISH
FLR FLOOR(ING)
FP FIRE PROTECTION, FIRE PROOFING
FR FIRE RAT(ING)(ED)
FRMG FRAMING
FRP FIBERGLASS REINFORCED PANEL
FTG FOOTING
FTWD FIRE TREATED WOOD
FURN FURNITURE
FWC FABRIC WALL COVERING
FWP FABRIC WRAPPED PANEL
FXD FIXED
FXTR FIXTURE
GA GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GF GLASS FILM
GFRC GLASS FIBER REINFORCED CONCRETE
GL GLASS
GP GRAPHIC
GR GRAD(E)(ING)
GSB GYPSUM SHEATHING BOARD
GT GROUT
GWB GYPSUM WALL BOARD
GYP GYPSUM
HB HOSE BIBB
HD HEAD
HDW HARDWARE
HDWD HARDWOOD
HM HOLLOW METAL
HO HOLD OPEN
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING, VENTILATIING, AND AIR CONDITIONING
ID INSIDE DIAMETER
IF INSIDE FACE
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INV INVERT
JAN JANITOR
JT JOINT
KB KNEE BRACE
KIT KITCHEN
LAB LABORATORY
LAV LAVATORY
LB POUND
LF LINEAR FEET
LP LOW POINT
LT LIGHT
LVR LOUVER
MATL MATERIAL
MAX MAXIMUM
MB MARKER BOARD
MD METAL DECK
MDF MEDIUM DENSITY FIBERBOARD
MECH MECHANICAL
MED MEDIUM
MEMB MEMBRANE
MEZZ MEZZANINE
MFD MANUFACTURED
MFR MANUFACTURER
MGT MANAGEMENT
MIN MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MLWK MILLWORK
MO MASONRY OPENING
MTD MOUNTED
MTL METAL
MW MICROWAVE
NA NOT APPLICABLE
NIC NOT IN CONTRCT
NO NUMBER
NOM NOMINAL
NOMINAL
NS NARROW STILE
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OF OUTSIDE FACE
OHD OVERHEAD DOOR
OPNG OPENING(S)
OPP OPPOSITE
OPT OPTIONAL
ORD OVERFLOW ROOF DRAIN
OVFL OVERVLOW
PBD PARITICLE BOARD
PC PRIVACY CURTAIN
PL PLASTIC LAMINATE
PLAS PLASTER
PLYWD PLYWOOD
PNL PANEL
PORT PORTABLE
PREFAB PREFABRICATED
PREFIN PREFINISHED
PROP PROPERTY
PT PAINT
PTN PARTITION
PTWD PRESSURE TREATED WOOD
PV PAVER
QTR QUARTER
QTY QUANTITY
R RADIUS
RB RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RDR READER
RECES RECESSED
RECT RECTANG(LE)(ULAR)
REF REFER(ENCE)
REFL REFLECTED
REFR REFRIGERATOR
REINF REINFORCED(D)(ING)(MENT)
REQD REQUIRED
REV REVISION
RF RESILIENT FLOORING
RFG ROOFING
RL ROOF LEADER
RLG RAILING
RM ROOM
RO ROUGH OPENING
RS ROLLER SHADES
RTU ROOF TOP UNIT
SC SOLID CORE
SCHED SCHEDULE
SCR SCRIBE
SECUR SECURITY
SF SQUARE FEET
SG SINGLE
SHTHG SHEATHING
SIM SIMILAR
SK SINK
SLNT SEALANT
SM SHEET METAL
SPEC SPECIFICATIONS
SQ SQUARE
SS STAINLESS STEEL
SSM SOLID SURFACE MATERIAL
ST STONE
STD STANDARD
STL STEEL
STRUCT STRUCTURAL
SURF SURFACE
SUSP SUSPENDED
SYS SYSTEM(S)
T TILE
T&G TOUNGUE AND GROOVE
TB TACK BOARD
TD TRENCH DRAIN
TEL TELECOM
TGL TEMPERED GLASS
THK THICK
TLT TOILET
TOC TOP OF CONCRETE
TOJ TOP OF JOIST
TOS TOP OF STEEL
TOW TOP OF WALL
TR TREAD
TRTD TREATED
TYP TYPICAL
UNFIN UNDERLAYMENT
UNO UNLESS NOTED OTHERWISE
UP UPHOLSTERY
UR URINAL
UTIL UTILITY
VAR VARI(ES)(ATION)
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VIF VERIFY IN FIELD
VTR VENT THROUGH ROOF
W WIDTH
W/ WITH
W/O WITHOUT
WB WOOD BASE
WBL WOOD BLOCKING
WC WATER CLOSET
WC WALL COVERING
WD WOOD
WDW WINDOW
WO WHERE OCCURS
WP WALL PROTECTION
WT WEIGHT
WTPR WATERPROOFING
YD YARD
ABBREVIATIONS:MATERIAL HATCHES: SYMBOLS LEGEND:GENERAL PROJECT NOTES:
Catalyst Lab 2 B516
FlexArm Lab 1 B510
FIFTH FLOOR
1-AE-104 ARCHITECTURAL UPS FLOOR PLAN
AND RCP
10/29/2025
I-2 Hospital
I-2 Hospital
1-AE-104
1F
UPS
M501
SITE PLAN
, ALL CORRIDOR WALLS
1-AE-102
1F
11/03/2025
ARCHITECTURAL LOGISTICS PLAN
01/09/2026
Unoccupied Spaces Not In Contract, existing 2-hr rated enclosure
100%
657-22-112JC
Drawing # 2 of 96
RELEASE FOR BIDDING
02/04/202602/14/202602/17/2026
WASTE WILL HAVE TO BE TAKEN OUT ON A CART,
ALONE THE PATHWAY NOTED. RE; SHEET 1-AE-101
FOR MORE INFORMATION AND KEYED NOTE 00.06
WASTE WILL HAVE TO BE TAKEN OUT ON A CART,
ALONE THE PATHWAY NOTED. RE; SHEET 1-AE-101
FOR MORE INFORMATION AND KEYED NOTE 00.06
PROJECT LOCATION
02.08
02.03 02.0102.01
02.04 02.02
02.06 02.06
02.05
02.07
02.05 NO ACCESS TO THE EXISTING STAIR DURING LIFT, GC TO POST
SAFETY PERSONNEL TO DIRECT TO ALTERNATE STAIRS PER
KEYED NOTE 02.06
02.06 ALTERNATE STAIRS NOTED IN KEYED NOTE 02.05, IN CASE OF FIRE
SAFETY PERSONNEL TO NOTIFY CRANE OPERATOR PER SPEC.
02.07 PROVIDE FLOOR PROTECTION TO DISTRIBUTE POINT LOAD WHEEL
WEIGHT. TBD BY INSTALLER.
02.08 PROVIDE TEMP OPENING IN THE EXISTING EXTERIOR WALL PER
WALL SECTION AND GENERAL NOTES.
1-AE-101
ARCHITECTURAL LIFT SITE PLAN
02.04
02.03
02.02
02.01
1/32" = 1'-0"
1/32" = 1'-0"
PARTIAL EXISTING 5TH FLOOR PLAN
PARTIAL EXISTING BASEMENT PLAN
LOGISTICS PLAN
PARTIAL EXISTING BASEMENT PLAN
PARTIAL EXISTING 5TH FLOOR PLAN
10/29/2025
100'
200'0'
400'
600'
800'
SITE LOCATION PLAN
AS REFERENCED ABOVE
TRUE
NORTH
TRUE
NORTH
TRUE
NORTH
PROJECT
LOCATION
1-AE-001
1F
1-AE-001
1C
1-AE-001
1-AE-001
C
LA
SS
IV
II
BUILDING 1
I
I
II
I
II
II
II
II
III
III
III
III
III
IV
IV
IV
A
A
1-AE-001
11/03/2025
01.06
01.03
01.03
01.04
01.04
01.06
01.06
01.06
01.06
01.06
35 % 95100%
01/08/202410/29/202511/03/202501/09/2026
EF EPOXY FLOOR
F FABRIC
FRP FIBERGLASS REINFORCED
SHEET NOTES:KEYED NOTES:
00.01 BUILDING ACCESS POINT; DOCK.
00.02 STORAGE OF MATERIALS, OR CONSTRUCTION WORK IS THE RESPONSIBILITY OF
THE GENERAL CONTRACTOR. PHOTO DOCUMENT AND REPORT ANY EXISTING
DAMAGE TO COR PRIOR TO START OF CONSTRUCTION. OFF-SITE STORAGE OF
BUILDING MATERIALS MUST BE APPROVED BY VA COR PRIOR TO REMOVAL.
SUGGESTED DUMPSTER LOCATIONS. PRIOR TO START OF ON-SITE
MOBILIZATION THE CONTRACTOR IS REQUIRED TO OBTAIN A CITY OF ST. LOUIS
PERMIT OF DUMPSTER ON THE STREET; OR ANY OTHER ON STREET PARKING.
LOCATION OF MAIN PROJECT WORK IN BUILDING.
APPROXIMATE LOCATION OF CONSTRUCTION TRAILER, VERIFY WITH COR.
WASTE WILL HAVE TO BE TAKEN OUT ON A CART. ALONE THE PATHWAY NOTED.
00.03
00.04
00.05
00.06
00.01
00.04
00.04
00.02 00.05 00.03
00.06
00.06
GWB-2.1 GYPSUM BOARD CEILING (PAINTED)SHEET NOTES:
REMOVE SHEET NOT
IF NOT APPLICABLE
SEE SHEET 1-AE-102 FOR FLOOR PLAN LEGENDA.
C. SEE SHEETS 1-AE-102 AND 1-AE-104 FOR KEYED NOTES.THRU
PARTIAL ICRA PLANS & RCP
SCALE: 1/8" = 1'-0"
01.06
01.05
01.07
01.07
01.03
01.07
01.03
01.03
01.03
01.07
01.08
01.08
LAB 1
LAB 2
LAB 1
LAB 2
UPS
THE PROJECT, AS DOCUMENTED IN THESE DRAWINGS, WILL BE
PHASED INTO THREE PHASES: UPS ROOM, LAB 1, AND LAB 2.
THE LAB PHASING ORDER COULD CHANGE, BUT THE SCOPE AND
LOGISTICS OF EACH LAB ARE SIMILAR, SO THAT VAJC NEEDS
WILL DETERMINE THEIR CONSTRUCTION ORDER; THE LAB
PHASING WILL BE SEQUENTIAL.
THE UPS ROOM SHOULD BE PRICED SEPARATELY AS AN
EMERGENCY PROJECT. ALL WORK WITHIN THE INTERSTITIAL 5TH
FLOOR SPACE SHOULD BE PRICED, REFER TO THE ENGINEERING
DRAWINGS AND SPECIFICATIONS FOR MORE INFORMATION. THE
UPS ROOM MAY OR MAY NOT BE SEQUENTIAL TO THE LAB
PHASES.
IV
IV
IV
IVIV
IVIV
ICRA
VESTIBULE
ICRA
VESTIBULE
ICRA
VESTIBULE
ICRA
VESTIBULE
IV
IV
IV
01.04
01.06
01.05
01.07
01.03
01.08
LAB 1
IV
ICRA
VESTIBULE
6 02.06
02.05
02.07
01.03
01.06
01.06
01.07
01.03
LAB 2
IV
ICRA
VESTIBULE
02.0302.01
02.04 02.02
400'
600'
800'
1-AE-001
1F
1-AE-001
1C
01.03
01.04
01.06
01.06
01.07
01.03
LAB 2
IV
ICRA
VESTIBULE
01.06
01.03
01.07
01.08
LAB 1
IV
ICRA
VESTIBULE
02.01
LDING 1
01.06
UPS
THE PROJECT, AS DOCUMENTED IN THESE DRAWINGS, WILL BE
PHASED INTO THREE PHASES: UPS ROOM, LAB 1, AND LAB 2.
THE LAB PHASING ORDER COULD CHANGE, BUT THE SCOPE AND
LOGISTICS OF EACH LAB ARE SIMILAR, SO THAT VAJC NEEDS
WILL DETERMINE THEIR CONSTRUCTION ORDER; THE LAB
PHASING WILL BE SEQUENTIAL.
THE UPS ROOM SHOULD BE PRICED SEPARATELY AS AN
EMERGENCY PROJECT. ALL WORK WITHIN THE INTERSTITIAL 5TH
FLOOR SPACE SHOULD BE PRICED, REFER TO THE ENGINEERING
DRAWINGS AND SPECIFICATIONS FOR MORE INFORMATION. THE
UPS ROOM MAY OR MAY NOT BE SEQUENTIAL TO THE LAB
PHASES.
8'- 1"
IV
IV
LINE OF TEMPORARY ICRA
PARTITION ON 4TH FLOOR
BELOW
LINE OF TEMPORARY ICRA
PARTITION ON 4TH FLOOR
BELOW
DOT PATTERN AREA
DENOTES POTENTIAL WORK
ON THE 4TH FLOOR BELOW
DOT PATTERN AREA
DENOTES POTENTIAL WORK
ON THE 4TH FLOOR BELOW
LINE OF TEMPORARY ICRA
PARTITION ON 4TH FLOOR
LINE OF TEMPORARY ICRA
PARTITION ON 4TH FLOOR
DOT PATTERN AREA
DENOTES POTENTIAL WORK
ON THE 4TH FLOOR, ABOVE
CEILING
DOT PATTERN AREA
DENOTES POTENTIAL WORK
ON THE 4TH FLOOR, ABOVE
CEILING
Drug Receiving
B406
Corridor H414
Break Room B413
Drug Information
B412
FlexArm Lab 1 B510
FlexArm Lab 1 B510
Catalyst Lab 2 B515
Catalyst Lab 2 B515 Drug
Receiving B406
RELEASE FOR BIDDING
02/04/2026
RCP BELOW
LAB 1
LAB 2
RCP BELOW
Drawing # 3 of 96
6 6
02/14/202602/17/2026
PROJECT LOCATION
Catalyst Lab 2 B516
FlexArm Lab 1 B510
Catalyst Lab 2 B516
FlexArm Lab 1 B510
ROOM NAME
F
B
C
R
W A
L
LS
CONFERENCE ROOM
VCT-1/CT-2
RB-1
N: P-X/P-X E: P-X/P-X S: P-X/P-X W: P-X/P-X1, 2
ACT1
ROOM NUMBER
FLOOR FINISH
WALL BASE
CEILING FINISH
ROOM FINISH REMARKS
WALL FINISHES
(N = NORTH, E = EAST, S = SOUTH, W = WEST)
AB ACOUSTICAL BAFFLE
AC ACOUSTICAL CEILING TILE
AP ACOUSTICAL PANEL
BL BLINDS
BR BRICK
C CARPET
CN CONCRETE
DP DRAPERY
EF EPOXY FLOOR
F FABRIC
FRP FIBERGLASS REINFORCED
PANEL
FWP FABRIC WRAPPED PANEL /
STRETCHED FABRIC WALL
SYSTEM
GF GLASS FILM
GL GLASS
GP
GT GROUT
MB MARKER BOARD
MTL METAL
ROOM FINISH TAG LEGEND:
MATERIAL ABBREVIATIONS
PC PRIVACY CURTAIN
PL PLASTIC LAMINATE
PT PAINT
PV PAVER
RB BASE (RESILIENT, RUBBER,
ETC.)
RF RESILIENT FLOORING
RS ROLLER SHADES
SM SOLID SURFACE MATERIAL
/ QUARTZ
SS STAINLESS STEEL
ST STONE
SVT SHEET VINYL TILE
T TILE
TB TACK BOARD
TR TREAD
UP UPHOLSTERY
WC WALLCOVERING
WD WOOD
WF WOOD FLOOR
WP WALL PROTECTION
LAB B515
F B C R
W
AL
LS
EPY-1
EPY-1
ACT-1
N : PT-1
E : PT-1
S : PT-1
W : PT-1
F B C R
W
AL
LS
N : PT-1
E : PT-1
S : PT-1
W : PT-1
10/29/202511/03/2025
02.01
02.02
02.03
LAB B510
EPY-1
EPY-1
ACT-1
01.01
02.04
01.02
02.05
02.04
01.02
01.02
01.02 02.04
01.02
02.01
02.02
02.03 01.01
01.02
01.02
ROOM NAME
F
B
C
R
W A
L
LS
CONFERENCE ROOM
VCT-1/CT-2
RB-1
N: P-X/P-X E: P-X/P-X S: P-X/P-X W: P-X/P-X1, 2
ACT1
ROOM NUMBER
FLOOR FINISH
WALL BASE
CEILING FINISH
ROOM FINISH REMARKS
WALL FINISHES
(N = NORTH, E = EAST, S = SOUTH, W = WEST)
AB ACOUSTICAL BAFFLE
AC ACOUSTICAL CEILING TILE
AP ACOUSTICAL PANEL
BL BLINDS
BR BRICK
C CARPET
CN CONCRETE
DP DRAPERY
EF EPOXY FLOOR
F FABRIC
FRP FIBERGLASS REINFORCED
PANEL
FWP FABRIC WRAPPED PANEL /
STRETCHED FABRIC WALL
SYSTEM
GF GLASS FILM
GL GLASS
GP
GT GROUT
MB MARKER BOARD
MTL METAL
ROOM FINISH TAG LEGEND:
MATERIAL ABBREVIATIONS
PC PRIVACY CURTAIN
PL PLASTIC LAMINATE
PT PAINT
PV PAVER
RB BASE (RESILIENT, RUBBER,
ETC.)
RF RESILIENT FLOORING
RS ROLLER SHADES
SM SOLID SURFACE MATERIAL
/ QUARTZ
SS STAINLESS STEEL
ST STONE
SVT SHEET VINYL TILE
T TILE
TB TACK BOARD
TR TREAD
UP UPHOLSTERY
WC WALLCOVERING
WD WOOD
WF WOOD FLOOR
WP WALL PROTECTION
ROOM NAME
F
B
C
R
W A
L
LS
CONFERENCE ROOM
VCT-1/CT-2
RB-1
N: P-X/P-X E: P-X/P-X S: P-X/P-X W: P-X/P-X1, 2
ACT1
ROOM NUMBER
FLOOR FINISH
WALL BASE
CEILING FINISH
ROOM FINISH REMARKS
WALL FINISHES
(N = NORTH, E = EAST, S = SOUTH, W = WEST)
AB ACOUSTICAL BAFFLE
AC ACOUSTICAL CEILING TILE
AP ACOUSTICAL PANEL
BL BLINDS
BR BRICK
C CARPET
CN CONCRETE
DP DRAPERY
EF EPOXY FLOOR
F FABRIC
FRP FIBERGLASS REINFORCED
ROOM FINISH TAG LEGEND:
MATERIAL ABBREVIATIONS
PC PRIVACY CURTAIN
PL PLASTIC LAMINATE
PT PAINT
PV PAVER
RB BASE (RESILIENT, RUBBER,
ETC.)
RF RESILIENT FLOORING
RS ROLLER SHADES
SM SOLID SURFACE MATERIAL
/ QUARTZ
SS STAINLESS STEEL
AB ACOUSTICAL BAFFLE
AC ACOUSTICAL CEILING TILE
AP ACOUSTICAL PANEL
BL BLINDS
BR BRICK
C CARPET
CN CONCRETE
DP DRAPERY
PC PRIVACY CURTAIN
PL PLASTIC LAMINATE
PT PAINT
PV PAVER
RB BASE (RESILIENT, RUBBER,
ETC.)
RF RESILIENT FLOORING
RS ROLLER SHADES
AC ACOUSTICAL CEILING TILE
AP ACOUSTICAL PANEL
PL PLASTIC LAMINATE
PT PAINT
BR BRICK
C CARPET
CN CONCRETE
RB BASE (RESILIENT, RUBBER,
ETC.)
RF RESILIENT FLOORING
PV PAVER
RB BASE (RESILIENT, RUBBRF RESILIENT FLOORING
EF EPOXY FLOOR
F FABRIC
FRP FIBERGLASS REINFORCED
SM SOLID SURFACE MATERIAL
/ QUARTZ
SS STAINLESS STEEL
ST STONE
SM SOLID SURFACE MATERIAL
/ QUARTZ
SS STAINLESS STEELUP UPHOLSTERY
WC WALLCOVERING
SS STAINLESS STEEL
BR BRICK
C CARPET
CN CONCRETE
DP DRAPERY
EF EPOXY FLOOR
CN CONCRETE
EF EPOXY FLOOR
F FABRIC
FRP FIBERGLASS REINFORCED
PANEL
SEE SHEET 1-AE-103 FOR MORE INFORMATION.A.
SEE SHEET 1-AE-101 FOR MORE INFORMATION ON ICRA
PARTITION REQUIREMENT.
B.
SEE SHEET 1-AE-103 FOR KEYED NOTES.C.
01.02
FLEXARM LAB 1
B510
B515
LAB 1
B510
LAB 2
B515
CATALYST LAB 2
01.0301.0401.0501.06 01.07
01.06
01.06
01.05
01.03
01.07
01.04
01.09
01.09
01.08
01.08 01.08
01.08
01.08
01.08
01.08 01.08
01.08
01.08
TEMPORARY CONSTRUCTION BARRIER, ICRA I
PRIMAERY CONSTRUCTION BARRIER, ICRA IV
SHEET NOTES:
RE
IF NKEYED NOTES:
01.01
01.02
01.03
01.04
01.05
01.06
01.07
01.08
01.09
01.10
02.01
02.02
LINE OF EXISTING CEILING FRAMING ABOVE FOR REFERENCE.
LINE OF EXISTING COVE FLOORING UNDER BASE CABINET. SEE NOTE 09.01 FOR
MORE INFORMATION.
PRIMARY ICRA PARTITION, EXACT LOCATION TO BE DETERMINED IN THE FIELD,
COORDINATED WITH SAFETY AND COR PER SPEC AND AS NOTED ON SHEET
1-AE-101.
THE EXISTING DOOR MAY BE USED AS PART OF THE ICRA BARRIER OR REMOVED
AND REINSTALLED AS DETERMINED ABOVE.
NEW DOOR AT PRIMARY ICRA BARRIER PER KEYED NOTE 01.03.
TEMPORARY ICRA BARRIER FOR PHASED OVERNIGHT OR SHORT-TERM WORK
OUTSIDE THE MAIN PROJECT AREA. SHOWN ARE PRE-MANUFACTURED
PARTITIONS WITH SLIDING DOORS. THE TEMPORARY BARRIER DOES NOT NEED
TO BE FIRE-RATED.
ALTERNATE ICRA FILTRATION FOR LEVEL IV, SEE SHEET 1-AE-101.
SEAL EXISTING DOOR OPENING PER ICRA SPECS.
SEE DEMO PLAN 1F/1-AE-102 FOR ICRA NOTES.
SEE PHILIPS DRAWINGS FOR REQUIRED ROUGH-IN BELOW AND ABOVE CEILING.
MINIMUM EXTENT OF EXISTING FLOOR GRINDING AND FILL TO LEVEL THE FLOOR
TO PHILIPS SPEC TO +/- 1/16" (2MM) FOR EVERY 39" (1M) WITHIN THE AREA
DIMENSIONED ON THE PHILIPS EQUIPMENT DRAWINGS. THE AREA SHOWN IN
HATCHED IS FOR REFERENCE.
REMOVE EXISTING PHILIPS AD5 FLOOR PLATE, SEE KEYED NOTE 02.01FOR FLOOR
LEVEL REQUIREMENT.
01.10 09.01
09.01
Catalyst Lab 2 B516
FlexArm Lab 1 B510
Catalyst Lab 2 B516
FlexArm Lab 1 B510
LAB B515
F B C R
W
AL
LS
EPY-1
EPY-1
ACT-1
N : PT-1
E : PT-1
S : PT-1
W : PT-1
F B C R
W
AL
LS
N : PT-1
E : PT-1
S : PT-1
W : PT-1
10/29/202511/03/2025
02.01
02.02
02.03
LAB B510
EPY-1
EPY-1
ACT-1
01.01
02.04
01.02
02.05
02.04
01.02
01.02
01.02 02.04
01.02
02.01
02.02
02.03 01.01
01.02
01.02
01.10
A3'-8"
MIN
3' -0
M
IN
09.02
09.02
12.01
N.I.C.
N.I.C.
N.I.C.
N.I.C.
HATCHED AREA NOTED AS N.I.C.
DENOTES AREA NOT IN DIRECT
CONTRACT BUT MAY OR MAY NOT BE
IMPACTED BY ICRA OR OTHER MEP
SCOPE. ALL AREAS DISRUPTED BY
OTHER SCOPE TO BE RETURNED TO
ITS ORIGINAL CONDITION PER SPEC.
09.03
09.03
NEW EXTG
NEW EXTG
09.03
35 % 95100%
01/08/202410/29/202511/03/202501/09/2026
12.01
01.09 01.09
01.09
01.09
01.09
01.09
01.09
01.09
9 01.09
SEE ICRA PLANS 3F/1-AE-001 FOR MORE INFO.
RF-1
N/A
RF-1
N/A
657-22-112JC
C
RELEASE FOR BIDDING
02/04/2026 Drawing # 4 of 96
B516
Scrub B508A
Corridor H509
Control 2 B509A
Control 1 B509
Equip Rm B504A
Storage B504
Equip Rm H510
Scrub H509A
Scrub B508A
Corridor H509
Control 2 B509A
Control 1 B509
Equip Rm B504A
Storage B504
Equip Rm H510
Scrub H509A
SYMBOL MARK DESCRIPTION
F1
2' x 2' LED LAY-IN FIXTUREF3
6" RECESSED LED DOWNLIGHT
1. LIGHT FIXTURES SHOWN ON ARCHITECTURAL REFLECTED
CEILING PLAN ARE FOR REFERENCE/DESIRED LOCATION ONLY.
SEE ELECTRICAL DRAWINGS FOR MORE INFORMATION
REGARDING FIXTURE TYPES, ELECTRICAL REQUIREMENTS, ETC.
2. CONTRACTOR SHALL BECOME FAMILIAR WITH THE PROJECT AND
VERIFY ALL CONDITIONS, MATERIALS, AND DIMENSIONS WHICH
WILL AFFECT THE WORK.
3. GENERAL CONTRACTOR TO PROVIDE CONTROL JOINTS IN ALL
GYPSUM BOARD CEILING BASED ON USG STANDARDS AND
RECOMMENDATION.
4. REFER TO SPECIFICATIONS FOR GENERAL CONDITIONS AND
ADDITIONAL INFORMATION.
5. COORDINATE ALL DEVICE LOCATIONS WITH EXISTING
CONDITIONS AND WITH PROJECT DESIGN INTENT - CLARIFY
INTENT WITH THE OWNER. ALL LIFE SAFETY DEVICE LOCATIONS
ARE TO BE REVIEWED WITH OWNER FOR DESIGN INTENT, BUT
FINAL LOCATIONS ARE TO BE COORDINATED WITH INSPECTOR
OR OTHER AUTHORITIES HAVING JURISDICTION.
6. ALL CEILING HEIGHTS ARE FROM TOP OF FINISH FLOOR TO
UNDERSIDE OF FINISH CEILING OR LIGHT FIXTURE, U.N.O.
7. PROVIDE LATERAL BRACING FOR SUSPENDED CEILING SYSTEMS
AND ADDITIONAL HANGERS AND SAFETY WIRES FOR LIGHT
FIXTURES, DUCTWORK, SPEAKERS, ETC. SEE TYPICAL BRACING
DETAILS FOR MORE INFORMATION.
8. ARCHITECTURAL DRAWINGS DETERMINE THE LOCATION OF
LUMINARIES AND SUPERSEDE ALL OTHERS, TYP.
9. PROVIDE NON COMBUSTIBLE BLOCKING AND BRACING REQUIRED
FOR FIXTURE INSTALLATION AND ALL ELECTRICAL COMPONENTS.
10. GYPSUM BOARD CEILING FRAMING MEMBERS MAY BE MODIFIED
AT DIFFUSERS TO ACCOMMODATE REQUIRED ROUGH OPENING
FOR HVAC DIFFUSERS. ALL OTHER FRAMING TO ACCOMMODATE
PROPOSED LIGHTING LAYOUT.
11. ANY AND ALL CEILING DEVICES SHALL BE PLACES IN CENTER OF
THE CEILING TILE UNO.
12. ALL SUSPENDED CEILING GRIDS TO BE CENTERED BETWEEN THE
WALLS UNO. DO NOT CUT ACOUSTICAL CEILING TILES LESS THAN
4" WIDE.
13. FIRESTOP/FIRESEAL ALL PENETRATIONS THROUGH RATED
PARTITIONS TO MAINTAIN SCHEDULED FIRE RESISTANCE RATING
OF ALL FLOORS, WALL AND CEILING ASSEMBLIES.
14. PARTIAL REMOVAL/ DEMOLITION OF THE EXISTING CEILINGS TO
REMAIN DEEMED NECESSARY BY CONTRACTOR AS A RESULT OF
STRUCTURAL OR MEP/FP INSTALLATION SHALL BE COORDINATED
WITH THE OWNER. CONTRACTOR TO REPLACE AND REPAIR ALL
CEILING DAMAGED AS A RESULT OF REQUIRED INSTALLATION.
PATTERN MARK DESCRIPTION
GWB-2.1 GYPSUM BOARD CEILING (PAINTED)
ACT48 ACOUSTIC CEILING TILE 24'' X 48''
CEILING TAG
ACT = MATERIAL
ACTX'-X"
FINISHED HEIGHT
NOTE: REFER TO MATERIAL SCHEDULE FOR MORE INFO
Drawing # of
FULLY SPRINKLERED
35 % REVIEW SET
1 S. Memorial Dr.
B
A
C
D
E
F
VA FORM 08-6231 1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
PREPARE SITE FOR CATHOLOGY
LABORATORIES, ROOMS B510 AND B516
657-22-102JC
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
CONSULTANTS: ENGINEER:
Revisions: Date:
Drawing Title
VA Health Care System Approval:
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Veterans Health
Administration Suite 1800 St. Louis, MO 63102
(314) 621 - 4343 Bob Dunn bdunn@fox-arch.com
2707 Rand Rd Indianapolis, IN 46241
(317) 646 - 9090St. Louis - Chicago
(636) 262 - 8532 Richard Kwiatkowski rkwiatkowski@sscengineering.com
01/08/2024 Checker Author
1-AE-103
ARCHITECTURAL DEMO AND RCP
TRUE
NORTH
SCALE: 1/4" = 1'-0"1-AE-103
1F Demolition Reflected Ceiling Plan
TRUE
NORTH
SCALE: 1/4" = 1'-0"1-AE-103
5F Reflected Ceiling Plan
KEYED NOTES:
SHEET NOTES:
GENERAL RCP NOTES:
REMOVE SHEET NOTES
IF NOT APPLICABLE
LIGHTING FIXTURE LEGEND:
CEILING TYPE LEGEND:
Catalyst Lab 2 B516
FlexArm Lab 1 B510
Catalyst Lab 2 B516
FlexArm Lab 1 B510
SEE SHEET 1-AE-102 FOR FLOOR PLAN LEGENDA.
24" X 48", GRID 25" X 49"
10/29/2025
SHEET NOTES:
REMOVE SHEET NOT
IF NOT APPLICABLE
SEE SHEET 1-AE-102 FOR FLOOR PLAN LEGENDA.
KEYED NOTES:
PHILIPS CEILING SPEAKER, RE; EQUIPMENT
DRAWINGS
PHILIPS CEILING LIGHT STRIP, RE; EQUIPMENT
DRAWINGS
11/03/2025
01.09
01.09
01.09
01.09
02.03
02.04
02.05
09.01
GRIND AND FILL THE EXISTING CONCRETE SLAB TO ACCOMMODATE THE NEW
PHILIPS' AD7 FLOOR PLATE PER PHILIPS SPEC. NOTE THAT THE EXISTING AND
NEW FLOOR PLATE LOCATIONS SHOWN IN LABS 1 AND 2 MAY OR MAY NOT BE
REUSABLE, BUT THE OLD AD5 FLOOR PLATE SHOULD BE REPLACED WITH THE
NEW AD7 FLOOR PLATE. FIELD VERIFY WITH PHILIPS IF THE EXISTING LOCATIONS
CAN BE REUSED.
AREA OF EXISTING FLOOR UNDER FREE-STANDING EQUIPMENT, BASE, OR WALL
CABINET.
FREE-STANDING CASEWORK ON CASTERS.
LINE OF NEW OR MODIFIED EXISTING CEILING FRAMING.
C. SEE SHEETS 1-AE-102 AND 1-AE-104 FOR KEYED NOTES.
1 X 4 SUSPENDED LED SHOP LIGHTF4
F1 F1
F1 F1 F1 F1
F1 F1F1 F1
F1 F1 F1 F1 F1 F1
F1 F1F1 F1
F1
CATALYST LAB 2
B515
FLEXARM LAB 1
B51026.01
01.08
01.08 01.08
01.08
01.08
01.08
01.08 01.08
01.08
01.08
09.01
09.01
26.0126.01
26.01
26.01 26.01
26.02
26.03
LAB 2
B515
LAB 1
B510
26.01 26.0126.01
26.01 26.01 26.01
26.01
N.I.C.
N.I.C.
N.I.C.
N.I.C.
HATCHED AREA NOTED AS N.I.C.
DENOTES AREA NOT IN DIRECT
CONTRACT BUT MAY OR MAY NOT BE
IMPACTED BY ICRA OR OTHER MEP
SCOPE. ALL AREAS DISRUPTED BY
OTHER SCOPE TO BE RETURNED TO
ITS ORIGINAL CONDITION PER SPEC.
09.01
09.01
23.03
23.03
23.03
23.03
23.01 23.01
23.02 23.02
NEW ALL
EXTG NEW
12.03
12.02
26.02
26.03
SHEET NOTES:
REMOVE SHEET NOTES
IF NOT APPLICABLE
SEE SHEET 1-AE-102 FOR FLOOR PLAN LEGENDA.
KEYED NOTES:
02.03 GRIND AND FILL THE EXISTING CONCRETE SLAB TO ACCOMMODATE THE NEW02.03 GRIND AND FILL THE EXISTING CONCRETE SLAB TO ACCOMMODATE THE NEW
SYMBOL MARK DESCRIPTION
F1
2' x 2' LED LAY-IN FIXTUREF3
6" RECESSED LED DOWNLIGHT
SHEET NOTES:
REMOVE SHEET NOTES
IF NOT APPLICABLE
LIGHTING FIXTURE LEGEND:
KEYED NOTES:
PHILIPS CEILING SPEAKER, RE; EQUIPMENT
DRAWINGS
PHILIPS CEILING LIGHT STRIP, RE; EQUIPMENT
DRAWINGS
1 X 4 SUSPENDED LED SHOP LIGHTF4
SHEET NOTES:
REMOVE SHEET NOTES
IF NOT APPLICABLE
SEE SHEET 1-AE-102 FOR FLOOR PLAN LEGENDA.
KEYED NOTES:
02.03 GRIND AND FILL THE EXISTING CONCRETE SLAB TO ACCOMMODATE THE NEW02.03 GRIND AND FILL THE EXISTING CONCRETE SLAB TO ACCOMMODATE THE NEW02.03
02.04
02.05
09.01
09.02
09.03
12.01
12.02
12.03
23.01
23.02
23.03
26.01
26.02
26.03
GRIND AND FILL THE EXISTING CONCRETE SLAB TO ACCOMMODATE THE NEW
PHILIPS' AD7 FLOOR PLATE PER PHILIPS SPEC. NOTE THAT THE EXISTING AND
NEW FLOOR PLATE LOCATIONS SHOWN IN LABS 1 AND 2 MAY OR MAY NOT BE
REUSABLE, BUT THE OLD AD5 FLOOR PLATE SHOULD BE REPLACED WITH THE
NEW AD7 FLOOR PLATE. FIELD VERIFY WITH PHILIPS IF THE EXISTING LOCATIONS
CAN BE REUSED.
AREA OF EXISTING FLOOR UNDER FREE-STANDING EQUIPMENT, BASE, OR WALL
CABINET.
FREE-STANDING CASEWORK ON CASTERS.
LINE OF NEW OR MODIFIED EXISTING CEILING FRAMING.
LINE OF NEW-TO-EXISTING FLOORING TRANSITION. THE EXISTING SHEET VINYL
FLOOR HAS A 4”-6” H, (1” R) COVE BASE UP EXISTING WALLS AND CASEWORK
BASE. G.C. TO REMOVE EXISTING FLOORING TO THE NEAREST EXISTING SEAM
(APPROX. 8”-12” FROM THE COVE). INSTALL NEW HEAT-WELD SHEET VINYL
FLOORING.
EXISTING CASEWORK TO REMAIN, HOWEVER 2-3 NEW 2" GROMMETS MAY BE
NEEDED AT CONTROL ROOM CASEWORK, COORDINATE IN THE FIELD.
NEW AZURION 7 AD7 FLOOR PLATE PER PHILIPS SPEC.
NEW PHILIPS AZURON 7, CATALYST C12, SEE EQUIPMENT SPECS.
NEW PHILIPS AZURON 7, FLEXARM C20, SEE EQUIPMENT SPECS.
DEMO / RELOCATE EXISTING MEDICAL SERVICE LINES.
EXISTING MEDICAL SERVICE LINES REUSED.
NEW / EXTG MECHANICAL SUPPLY MODIFIED.
REPLACE EXISTING CAN LIGHTS WITH NEW PER E-SERIES DRAWINGS.
REPLACE EXISTING LINEAR LIGHTING WITH NEW, TIED TO NEW PHILIPS LIGHTING
CONTROLS.
OTHER PHILIPS IN-CEILING DEVICES.
35 % 95100%
01/08/202410/29/202511/03/202501/09/2026
26.09
SYMBOL MARK DESCRIPTION
F1
2' x 2' LED LAY-IN FIXTUREF3
6" RECESSED LED DOWNLIGHT
LIGHTING FIXTURE LEGEND:
PHILIPS CEILING SPEAKER, RE; EQUIPMENT
DRAWINGS
PHILIPS CEILING LIGHT STRIP, RE; EQUIPMENT
DRAWINGS
SYMBOL MARK DESCRIPTION
F1
2' x 2' LED LAY-IN FIXTUREF3
6" RECESSED LED DOWNLIGHT
PHILIPS CEILING SPEAKER, RE; EQUIPMENT
DRAWINGS
PHILIPS CEILING LIGHT STRIP, RE; EQUIPMENT
DRAWINGS
1 X 4 SUSPENDED LED SHOP LIGHTF4
26.09
REPLACEMENT STRIP LIGHT FIXTURE RE;
KEYED NOTE 26.02
REPLACE / RELOCATE NEW LED DOWN LIGHT
RE; KEYED NOTE 26.01
7C
1-AE-104
7C
1-AE-104
657-22-112JC
RELEASE FOR BIDDING
02/04/2026 Drawing # 5 of 96
B516B516
Scrub B508A
Corridor H509
Control 2 B509A
Control 1 B509
Equip Rm B504A Storage
B504
Equip Rm H510
Scrub H509A
Scrub B508A
Corridor H509
Control 2 B509A
Control 1 B509
Equip Rm B504A Storage
B504
Equip Rm H510
Scrub H509A
Catalyst Lab 2 B516
FlexArm Lab 1 B510
Catalyst Lab 2 B516
FlexArm Lab 1 B510
Floor Plan
104 104
ACT-1 Acoustical Ceiling Tile
Armstrong Calla Health Zone - AirAssure Square Lay-In Smooth Texture 24x48 15/16" Clean Room Grid System
Code Item Manufacturer Description Remarks
MATERIAL SCHEDULE
PT-1 Paint Benjamin Moore Product: OC - 17 Color: White Dove Finish: Walls - Scrub-able Eggshell Door Frames - Scrub-able Semi-Gloss
All Walls and Door Frames
EPY-1 Epoxy Resin Desco Rime Flooring and Integral Cove Base 4" High
PT-2 Paint Benjamin Moore Product: OC - 152 Color: Super White Finish: Ceilings - Scrub-able Eggshell Flat
GWB Ceilings
General Notes - Door & Frame:
A. ALL NEW DOORS ARE TO MATCH EXISTING
DOOR/OPENING SCHEDULE
NO. ROOM NAME
DOOR LEAF / OPENING FRAME HDW
GROUP
FIRE
RATING COMMENTSTYPE WIDTH HEIGHT THICK MATL FINISH TYPE MATL FINISH
2C19 LAB 3' - 6" 7' - 0" 1 3/4" 3/4 HR
3C17 LAB 3' - 6" 7' - 0" 1 3/4" 3/4 HR
M501 UPS
10/29/2025
SEE SHEETS 1-AE-102 AND 1-AE-103 FOR FLOOR PLAN AND RCP
LEGENDS.
A.
UPS M501
F B C R
W
AL
LS
EPY-1
EPY-1
PT-1
N : PT-1
E : PT-1
S : PT-1
W : PT-1
M501
UPS
M501
UPS
RCP
H O
LL
O
W M
ET
AL
F R
AM
E
AN
D
D O
O R
H O
LL
O
W M
ET
AL
F R
AM
E
D
ET
AI
LS
SU
SP
EN
D
ED
C
EI
LI
N G
D
ET
AI
LS
F HM PT-1 F1 HM PT-1 1 SEE SPECS
PA
R
TI
TI
O N
T
YP
E
F1F
FLUSH
A1
11/03/2025
M501
F4
F4
F4
F4
09.04
23.04
26.04
26.05
26.06
26.07
NEW GWB CEILING WITHIN THE NEW UPS ROOM.
LINE OF EXISTING PLUMBING LINE TO REMAIN IN PLACE.
NEW 1X4 LIGHT FIXTURE PER E-SERIES DRAWINGS AND SPECS.
PROVIDE A NEW ACCESS PANEL FOR THE EXISTING LOW-VOLTAGE PULL BOX.
NEW ELECTRICAL DEVICES PER E-SERIES DRAWINGS.
PHILIPS LIGHTING SUPPLIED BY EQUIPMENT VENDOR AND INSTALLED BY G.C.
G.C. TO PROVIDE GWB HEADER PER DETAILS ON THIS SHEET.
SHEET NOTES:
R
KEYED NOTES:SHEET NOTES:
R
IKEYED NOTES:
SHEET NOTES:
R
I
SEE SHEET 1-AE-102 FOR FLOOR A.
KEYED NOTES:
02.03 GRIND AND FILL THE EXISTING CONCRET02.03 GRIND AND FILL THE EXISTING CONCRET02.03 GRIND AND FILL THE EXISTING CONCRET
26.04
23.04
26.05
26.06
26.06
26.06
09.04
35 % 95100%
01/08/202410/29/202511/03/202501/09/2026
7C
1-AE-104 SCALE :1 1/2" = 1'-0"
LIGHT FIXTURE
PT-1 Paint Benjamin Moore Product: OC - 17 Color: White Dove Finish: Walls - Scrub-able Eggshell Door Frames - Scrub-able Semi-Gloss
All Walls and Door Frames
PT-2 Paint Benjamin Moore Product: OC - 152 Color: Super White Finish: Ceilings - Scrub-able Eggshell Flat
GWB Ceilings
RF-1 Resilient Flooring TBD Match Existing Chemical Seamed Sheet Flooring, except install with welded seam;
at transition to new and existing chemical seam can be used if welded seam cannot.
Lab 1 and Lab 2
25x49 1 1/2" CO-Extruded Clean Room Grid to match existing spacing.
657-22-112JC
RELEASE FOR BIDDING
02/04/2026
7C
1-AE-104 SCALE :1 1/2" = 1'-0"
LIGHT FIXTURE2
RE; 2C/1-AE-104
Drawing # 6 of 96
TELY AS AN
TERSTITIAL 5TH
E ENGINEERING
ORMATION. THE
TO THE LAB
THE UPS ROOM SHOULD BE PRICED SEPARATELY AS AN
EMERGENCY PROJECT. ALL WORK WITHIN THE INTERSTITIAL 5TH
FLOOR SPACE SHOULD BE PRICED, REFER TO THE ENGINEERING
DRAWINGS AND SPECIFICATIONS FOR MORE INFORMATION. THE
UPS ROOM MAY OR MAY NOT BE SEQUENTIAL TO THE LAB
PHASES.
RCP DETAILS ASSOCIATED WITH LABS 1 AND 2
CONSULTANTS: ENGINEER:
Revisions: Date:
Drawing Title
VA Health Care System Approval:
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Veterans Health
Administration
PREPARE SITE FOR CATHOLOGY
LABORATORIES, ROOMS B510 AND B516
657-22-112JC
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
1 S. Memorial Dr.
Suite 1800 St. Louis, MO 63102
(314) 621 - 4343 Bob Dunn bdunn@fox-arch.com
2707 Rand Rd Indianapolis, IN 46241
(317) 646 - 9090St. Louis - Chicago
(636) 262 - 8532 Richard Kwiatkowski rkwiatkowski@sscengineering.com 02/17/2026
WJS DAE
KEYPLAN
N.T.S.
RELEASE FOR BIDDING
FULLY SPRINKLERED
N
STAMP:
Drawing # of 96
PROGRESSIVE
CARE UNIT
BONE SURGERY
CHASE
CH-B-7
TELECOM
B507
MEDICINE
STORAGE
B504B
CHASE
CH-C-1
CHASE
CH-B-6
STAFF
TOILET
B545
STAFF
TOILET
B543
CHASE
CHASE CH-B-5
CH-B-4
FEC
H508A
ELECTRICAL
CLOSET
B536
CHASE
CH-B-3
CHASE
CH-A-5
FEC
H506A
TELECOM
A536A
ELECTRICAL
A536
TELECOM
A537A
STAFF
TOILET
A535A
FEC
H502A
CHASE
CH-A-17
MECH
A525A
CHASE
CH-A-15
ELECTRICAL
A536B
SURGICAL
STORAGE
A544A
SURGICAL
STORAGE
A544D
CHASE
CH-A-7
CHASE
CH-A-9
ELECTRICAL
CLOSET
A554
CHASE
CH-A-10
LINEN
CHUTE
CH-A-2
ELECTRICAL
CLOSET
A563
CRASH CART
A564A CHASE
CH-A-11
NOURISHMENT
A571A
CHASE
CH-A-12
SURGICAL
STORAGE
A577
STAFF
TOILET
A577A
STAFF
TOILET
A506A
CHASE
CH-A-13
STAFF TOILET
A507A
STAFF TOILET
A508A
STAFF TOILET
A510A
STAFF TOILET
A512A
STAFF TOILET
A514A
STAFF TOILET
A516A
STORAGE
CHASE A518
CH-A-4
ELECTRICAL
CLOSET
A520
CHASE
CH-A-19
CHASE
CH-A-18
SOILED
UTILITY
MEDICINE
STORAGE
C500B
CART
ELEVATOR
EQUIP
D502B
CART
ELEVATOR
EQUIP
D502A
CORRIDOR
H511
RECOVERY
C508
RECOVERY
C507 RECOVERY
C506
RECOVERY
C505
RECOVERY
C504
RECOVERY
C503
RECOVERY
C502
CORRIDOR
H510B
RECOVERY
(ISOLATION)
C501
OFFICE
C500C
RECOVERY
C509
RECOVERY
(ISOLATION)
C510
MECH
B538
ANTE
RM
C510A
UNISEX
TOILET
C511
UNISEX
TOILET
C511A
CORRIDOR
H512
BRONCHOSCOPY
SUITE
C512
CORRIDOR
H513A
ENTRY
C512A CHASE
CH-C-2
CLEAN
UTILITY
H512A
HAC
C528
ANTE RM
C501A
HAC
C500D
CORRIDOR
H510A
CORRIDOR
H510
MEDICINE
STORAGE
C500A
CORRIDOR
H509
SOILED
UTILITY
C516 LOCKERS
C518
UNISEX
TOILET
C518A
BREAK RM
C519
LOCKERS
UNISEX C520
TOILET
C520A
CLEAN
UTILITY
C515
CHASE
CH-C-4
SCM
STORAGE
C514
SCRUB
B514
CORRIDOR
H513
CHASE
CH-C-3
TELECOM
C522
ELECTRICAL
C521
TELECOM
ROOM
C514A
TELECOM
C524
STORAGE
B513
CORRIDOR
H508
CORRIDOR
H515
ELEVATOR
LOBBY
H514
EP LAB
B523
CONTROL RM
B525
PREP /
RECOVERY
B526
FEMALE
TOILET
B530
MALE
TOILET
B529
ELEVATOR
E9
ELEVATOR
E8
ELEVATOR
E7
CONSULT
B519
MEDICINE
STORAGE
B520
UNISEX
TOILET
B522
HOLDING
B521
HAC
B518
OFFICE
B515 MEDICINE
STORAGE
B517
CARDIAC CATH
B516
CONTROL
RM 2
B512
CONTROL
RM 1
B511
SCRUB
B509
CARDIAC CATH
LAB 1
B510
PREP RM
B508 MECH
B506
MEDICINE
STORAGE
B505 BREAK RM
B504
MECH
D502
INTERSTITIAL
D502
CORRIDOR
H516
CORRIDOR
H517
STAIR 07
S507
STERILIZER
C513
CHASE
CH-B-1
EP LAB
B524
MEDICINE
STORAGE
B528
MECH
B527
CORRIDOR
H502
CORRIDOR
H501
CORRIDOR
H503
CORRIDOR
H504
CORRIDOR
H505
CORRIDOR
H508
ELEVATOR
LOBBY
H506
PULMONARY
RESPIRATORY
THERAPY
A543
OFFICE
A543B
LAB-CLINICAL
A542
CHASE
CH-A-1
OXYGEN
STORAGE
A541
PULMONARY
PHYSICIAN
OFFICE
B546
PULMONARY
PHYSICIAN
OFFICE
B544
PULMONARY
PHYSICIAN
OFFICE
B542
PULMONARY
PHYSICIAN
OFFICE
B541
FEMALE
TOILET
B538A
HAC
B540
FEMALE
LOCKERS
B538
SOILED
UTILITY
B537
STAIR 03
CHASE S503
CH-B-2
CATHETER
READING
B534
OFFICE
B533
MALE
LOCKERS
B532
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .