This is an Amendment to Solicitation adding pre-bid conference materials to the federal contract opportunity for Phase 1 preparation of new Catheterization Lab Rooms B510 and B516 at a Department of Veterans Affairs facility. The amendment, issued April 8, 2026, incorporates the pre-bid conference agenda and attendance roster for a meeting scheduled April 22, 2026 at 10:00 AM CDT.

The underlying solicitation (36C25526R0095) is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with a cost range of $500,000 to $1,000,000 and a 210-day completion timeline from notice to proceed. Proposals are due May 14, 2026 at 2:00 PM CDT via email only to Abby.Monroe2@va.gov and Matthew.Finley@va.gov. Award will be made using the Lowest Price Technically Acceptable (LPTA) source selection process. Critical submission requirements include: acknowledgment of all amendments, labor and material cost breakdowns by division for each bid item, contractor safety plan documentation addressing minimum compliance standards, self-performed versus subcontracted work calculations, pre-award safety and environmental record evaluation forms, and a 20% bid bond. Post-award requirements include 100% performance and payment bonds prior to notice to proceed. The project is subject to the Buy American Act and Davis-Bacon Act wage requirements. Site visit questions are due by May 7, 2025 at 2:00 PM CDT. The Department of Veterans Affairs Network Contracting Office in Leavenworth, Kansas administers the solicitation with Matt Finley as Contracting Officer.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25526R0095 0001 Attachments 657-22-112JC Phase 1 New Cath Labs Rooms B510 & B516 The purpose of this amendment is to add the pre-bid conference agenda and pre-bid conference attendance roster.

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

04-22-2026

657-22-112JC

36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway

Leavenworth KS 66048

36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway

Leavenworth KS 66048 To all Offerors/Bidders

36C25526R0095 04-08-2026

X

657-22-112JC, Phase1: Prepare Site For New Cath Labs, Rooms B510 and B516 The above solicitation is hereby amended as follows:

A. To add the Pre-bid Conference Agenda.

B. To add the Pre-bid Conference Attendance Roster.

All Terms and Conditions of this solicitation remain the same.

Matt Finley Contracting Officer

PRE-PROPOSAL CONFERENCE OUTLINE

657-22-112JC, Phase1: Prepare Site For New Cath Labs, Rooms B510 and B516 April 22, 2026 @ 10:00am CDT

Introduction

(a) Good morning, thank you for taking the time to attend this pre-bid conference. Please sign in on the attendance sheet and indicate if you are a prime or subcontractor.

(b) Today we will first discuss contractual issues, then we will discuss technical issues, entertain questions, and finally conduct a walkthrough of the areas.

(c) Before we cover the issues, let me first introduce myself and the Government staff.

CO –Matt Finley CS – Abby Monroe COR – Ayele Belayneh Alternate COR-Walter Staas Other VA staff – The COR is responsible for day-to-day technical oversight of the project. Quality Control is the responsibility of the prime contractor.

I. Contractual Issues

1. General:

(a) Project Title: 657-22-112JC, Phase1: Prepare Site For New Cath Labs, Rooms B510 and B516

(b) Cost Range: $500,000.00 and $1,000,000 (VAAR 836.204)

(c) Completion Time: 210 days after receipt of notice to proceed for the base bid.

(d) Site Visit Questions are due in writing to the Contracting Officer & Contract Specialist by 2:00 pm central time on May 7, 2025. The email address is listed below and in the solicitation. Proposals are due, May 14, 2026 at 2:00 PM via email to Abby.Monroe2@va.gov and Matthew.Finley@va.gov If the proposal is delivered to the Leavenworth VA Medical Center, it cannot be accepted.

(e) Fax or hard copies of bids are not acceptable.

(f) The project is 100% set aside for Service-Disabled Veteran Owned Small Business. IAW VAAR 852.219-75, the contractor will not pay more than 75% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219-73. Any work that a similarly situated certified SDBOSB subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

(g) Award will be made using the LOWEST PRICE TECHNICALLY ACCEPTABLE (LPTA) Source selection process outlined in FAR Part 15. Please pay attention to the proposal submittal instructions of the solicitation package. The Government plans to award without discussions, but reserve the right to open discussions if necessary. Note that offers that are not technically acceptable cannot be selected, regardless of price.

(h) Offerors must provide a breakdown of labor and material costs by applicable division for each bid item in the solicitation. Failure to provide a breakdown of labor and materials with the proposal will render the proposal technically unacceptable.

(i) Failure to acknowledge any, and all amendments issued to this solicitation shall be cause for rejection of the offer.

(j) Failure to provide information is the most common reason for a proposal to fail technically. Offerors are encouraged to read the Factors for technical acceptability carefully. For example: Under Factor 5, with regards to the Safety Officer, the minimum standard for a Safety Officer includes: Life Safety, Scaffold Safety, OSHA 30, Fall Protection Training, Crane/Rigging Safety and the individual must have a minimum of 5 years of experience as a Safety Officer. If Offerors fail to mention one of these standards (OSHA 30 as an example), the proposal will fail technically. Offerors are responsible for providing the information requested in the solicitation for both price and technical factors.

(k) Failure to provide an adequate Contractor Safety Plan which addresses the minimum standards for compliance under Factor 5 can be a technical failure.

(l) The calculation of Self-Performed and/or Subcontracted Work must be provided with the Contractor proposal (bid) for each bid item (including alternates). Failure to provide this will be a technical failure.

(m) The pre-award Contractor Safety and Environmental Record Evaluation Form must be provided with the proposal (bid). Failure to provide this information will be a technical failure.

2. Disclaimer Statements:

(a) Remarks and explanations at the conference shall not qualify the terms of the solicitation. Specific questions must be submitted in writing to the CO & CS via email. Please number the questions so we can keep them organized.

(b) Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. The amendments that provide answers to questions and clarifications will be published to SAM.gov.

3. Bonds:

(a) A bid Bond in the amount of 20% must accompany your BID.

(b) After award of the contract a Payment Bond and a Performance Bond in the amount of 100% of the contract value are due prior to a Notice to Proceed Letter being issued.

4. Buy American Act: The solicitation is subject to the Buy American Act, and it generally requires the use of American made products. Please keep this in mind when you are providing product submittal data.

5. Davis-Bacon Act/ Service Contract Act: All labor performed under this contract is subject to the Davis-Bacon Act and related labor laws, to include the payment of at least the amounts shown in the wage determination in the solicitation.

6. Other Contracting Topics:

(a) The contractor is expected to maintain insurance coverage during the contract period as directed in the specifications.

(b) Progress payments will be made no later than 14 days after receipt of an acceptable invoice.

(c) There are 2 important submittals that we need at contract start-up. They are the Schedule of Values, and a Construction Schedule.

Special Note regarding FAR 52.229-3: Federal, State and Local Taxes: Offerors are hereby notified that all state and local sales or use taxes for construction materials must be included in their bid or proposal price. It is solely the responsibility of the offeror to include all other applicable taxes in their bid or proposal price as well. The Government has determined that for this acquisition it cannot take advantage of any sales or use tax exemptions that may be available to it under applicable state law. Under no circumstances will any Contractor be designated as an agent of the Government for purposes of any tax exemption, nor will the Government authorize any Contractor’s use of any tax exemption directly applicable to the Government under this procurement.

A price change request upon award relating to the inclusion of state and local sales or use taxes will not be accepted.

II. Technical Issues – The Project Engineer (COR) and Design Team will provide an overview of the project, to include limited laydown areas. After this, a walkthrough of the areas will be held. Please keep side-bar conversations to a minimum and try to stay together as a group. Pictures may only be taken while being escorted, cannot be taken with people in them and no photos of anything that could be considered VA “sensitive information”.

Abby Monroe Contract Specialist

See attached document: S06 657-22-112JC Pre-bid Meeting Sign in Sheet.