This document is a justification for single source awards for a construction project at the Department of Veterans Affairs Medical Center in Brockton, Massachusetts. The project involves the relocation of the police service and requires certain proprietary construction materials and systems, including Best door lock cylinders, Innerface interior signage, Siemens building management controls, GE/EST3 fire alarm systems, and existing Hirsch/ExacqVision electronic security and video monitoring systems. These items are needed to interface with or extend current standardized systems already installed across the medical center campus. The justification cites the existing campus-wide use, inventory considerations, compatibility, warranty, and security risks associated with introducing alternate manufacturers. The overall procurement will be competed as a Service-Disabled Veteran-Owned Small Business set-aside, with the single source justification posted along with solicitation 36C24124B0033 for the Z1DA--523A5-19-003 Police Service Relocation project. Estimated costs for the proprietary components total $450,000.

View the file

Other files

File Type Posted
S06 36C24124B0033 0003.pdf PDF
S02 WD MA20240012 - 3-1-24.pdf PDF
S06 Site Visit Sign in Sheet 2pages.pdf PDF
Bid Opening 36C24124B0033 523A5-19-003 28 March 1400.pdf PDF
S02 ID3.0_Schedules Details_20240319.pdf PDF
S06 RFI Questions-Answers from COR 36C24124B0033 v3 Final.pdf PDF
S02 ID1.1_Floor Plan_20240319.pdf PDF
RFIs Amendment 2 36C24124B0033.pdf PDF
DIRTT Power - VA Brockton FL4 MH Offices.pdf PDF
Pages from Site Security As-Builts B25.pdf PDF
2024-03-06_Rev1 Elec ID1.3.pdf PDF
2024-03-06_Rev1 Demo ID1.0.pdf PDF
25-S3.PDF PDF
Br-25-basement.pdf PDF
2024-03-06_Rev1 Finishes ID1.4.pdf PDF
25-H1.PDF PDF
25-S2.PDF PDF
36C24124B0033 0002.pdf PDF
25-P1.PDF PDF
25-S4.PDF PDF
Pages from VA BHS Crawlspace Soil Sampling - B25.pdf PDF
2024-03-06_Rev1 RCP ID1.2.pdf PDF
25-H2.PDF PDF
25-S1.PDF PDF
Br-25-01.pdf PDF
36C24124B0033 0001.pdf PDF
WD MA202400112 03012024.pdf PDF
S02 Specs - Police Service Reloation -.pdf PDF
S02 PCRA - Police Service Relcation.pdf PDF
S07 WD MA20240012 01-19-2024.pdf PDF
S02 ICRA Police Service Relocation.pdf PDF
S02 Bid Set - Police Service Relocation.pdf PDF
36C24124B0033 Solicitation.docx DOCX document
SOW - 523A5-19-003 - Police Service Relocation.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF VETERANS AFFAIRS

Justification for Single Source Awards For

Over Micro-Purchase Threshold but Not Exceeding the SAT ($250K)

Acquisition Plan Action ID: 36C241-23-AP-5991

1. Contracting Activity: Department of Veterans Affairs, VISN 01, Station 523, Facilities

Management Service, VA Medical Center Brockton, 940 Belmont St, Brockton, MA 02301. The proposed procurement, Invitation for Bids (IFB) 36C24124B0033, 523A5- 19-003 Police Service Relocation.

2. Brief Description of Supplies/ Services required and the intended use/Estimated

Amount: The Justification is to support project 523A5‐19‐003 Police Service at the VA Medical Center Brockton, MA. This justification is for other than full and open competition for the procurement of certain construction materials. The use of a particular brand for the items listed below is s a small portion of the construction materials requested to accommodate standardization of these items throughout the facility.

The select proprietary products to be used on 523A5‐19‐003 Police Service Relocation Project are as follows:

a) Door Lock Cylinders with Removable Cores: BEST 7‐Pin Removable Door Lock

Cylinders with Removable Cores from Stanley Security Solutions with Schlage Mortise Locks. VA Brockton Engineering Building Standard for Keyed Security System.

Estimated Cost: $15,000

b) Interior Signage: Innerface Sign System

Estimated Cost: $5,000

c) Direct Digital Control Building Management System including components: Siemens

Building Technology Direct Digital Control HVAC Building Management. This system is VA Brockton Engineering’s Building Standard for the Direct Digital Control HVAC Building Management System.

Estimated Cost: $80,000

d) Fire Alarm System including components: General Electric/EST‐3 Fire Alarm

System as assembled and bench tested by the manufacturer of record, Signet Electronic Systems, Inc. This system is VA Brockton Engineering’s Building Standard for the Fire Alarm System.

Estimated Cost: $50,000

e) Electronic Safety & Security: Hirsh Electronics, Red Hawk Fire and Security

Company, Electronic security installation requirements for Hirsch Electronics Card Access System is the sole manufacturer and Red Hawk is the local representative.

Estimated Cost: $100,000

f) Video Monitoring System: ExacqVision Video Management System (VMS) Solutions, ExacqVision Software and Hardware Systems; Axis Cameras: The entire VA Boston Healthcare System (all three campuses) is on an ExacqVision video management system. The system provides video monitoring to the complex and is connected directly to monitors in the Police headquarters at all three campuses.

Estimated Cost: $100,000

3. Unique characteristics that limit availability to only one source, with the reason no other supplies or services can be used:

a) BEST 7‐Pin Door Lock Cylinders with Removable Cores from Stanley Security Solutions: BEST 7‐Pin Door Lock Cylinders with Removable Cores from Stanley Security Solutions is the existing VA Brockton Engineering building standard for door lock cylinders that is installed and operating for the keyed security system campus wide at the Brockton VAMC. Other manufacturer’s cannot make the Best lock cylinder and would not be compatible with the existing keyed security system.

The Brockton campus has an existing locksmith with inventory of BEST 7‐pin cores from Stanley Security Solutions; in order for the new door lock cylinders with removable cores on this project be coordinated with the existing locksmith and inventory, the door lock cylinders with removable cores must be BEST 7‐Pin door lock cylinders with removable cores from Stanley Security Solutions. Therefore, only this manufacturer’s products are acceptable; no substitutions.

b) Innerface Interior Signage: Innerface is the existing VA Brockton Engineering building standard for signage that is installed and operating campus wide at the Brockton VAMC. The Brockton campus has an existing inventory of spare parts; it would be uneconomical for VA to create additional inventories of other manufacturer’s signage. Therefore, only this manufacturer’s products are acceptable;

no substitutions.

c) Siemens Building Technology Direct Digital Control HVAC Building Management System including components: Siemens Building Technology Direct Digital Control (DDC) HVAC Building Management System is the existing building management control system installed and operating campus wide at the Brockton VAMC. Any products to be used on the existing HVAC Building Management System must interface with the existing system. To minimize the technical risks of ensuring compatibility among the component parts and integration of the entire DDC system with the campus wide system, the system and components installed in this project should be provided by the same manufacturer as that of the campus wide system;

other manufacturer’s components may not operate properly or operate at all on the existing system. The VA has existing service contracts with Siemens. It is cost effective for the new DDC system and components to be installed and maintained under the existing service contracts with Siemens. Introducing other manufacturer’s products may void the existing DDC system’s manufacturer’s warranty. Therefore, only this manufacturer’s products are acceptable; no substitutions.

d) General Electric/EST‐3 Fire Alarm System as assembled and bench tested by the manufacturer of record, Signet Electronic Systems, Inc.: General Electric/EST‐3 Fire Alarm System as assembled and bench tested by the manufacturer of record (Signet Electronic Systems, Inc.) is the existing fire alarm system installed and operating campus wide at the Brockton VAMC. National Fire Protection Association (NFPA), Building Code, Life Safety Code and VA Standard require Fire Alarm systems to be the product of one manufacturer to maintain UL listing, NFPA compliance testing and hospital certification. This project will include fire alarm system installation that is an extension of the existing campus wide code compliant and certified fire alarm system. Any products to be used on the existing fire alarm system must be the existing system’s products In order to ensure system compatibility and to maintain manufacturer’s warranty; other manufacturer’s components may not operate properly or operate at all on the existing system. Therefore, only this manufacturer’s products are acceptable; no substitutions.

e) and f) Electronic Safety and Security/Video Monitoring Systems – The entire Medical Center Complex (all three divisions) is on a Hirsch Electronics card access system with ExacqVision Monitoring System. The system provides security to the complex and is connected directly to monitors in the Police headquarters at all three divisions. The nodes of the system are in controlled spaces throughout the facility.

Access to the spaces is strictly controlled to assure the security of this system and the other critical Information Systems in these spaces. The system as a whole, over $3,500,000 of installed equipment, is an essential part of assuring Safety and Security of patients and staff at the Medical Center with monitoring capabilities. Accordingly as we look toward adding small new pieces to the system it is essential that we safeguard our investment and the systems overall integrity. The recommended source has demonstrated both the ability to install the system properly and to troubleshoot problems when they occur. The workmen have shown that they are reliable and can be trusted. This is essential because of the spaces they will be working in. No other contractor has the information, nor does the VA have an adequate inventory and description in order to allow others to provide proposals. Moreover, if another contractor performed work on the system and the VA had problems after the fact with the system, the government could end up in a dispute not easily resolvable as each vendor could blame the other for the problems with the system and the VA, even with the devotion of a lot of time, would be hard pressed to determine who was at fault.

Engineering Service believes that a critical system like this one need to be taken care of and modified by a single company so that when there are problems a single source can be contacted for immediate correction.

4. Description of market research conducted and results or statement why it was not conducted: The purpose of the Police Relocation is to relocate the police, the equipment that is being requested must be used in order for the Police to effectively do their jobs around campus. In accordance with the Competition in Contracting Act (CICA), the components listed above are identified as brandname; however, the overall procurement will be competed as a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set Aside.This justification for Other Than Full and Open Competition for brand name only will be posted to Contracting Opportunities with the solicitation.

5. Contracting Officer's Certification: I certify that the foregoing justification is accurate and complete to the best of my knowledge and belief. The items for which brand name approval is being requested are subsequent components to the overall construction project. This procurement will be competed and based on competition; the Contracting Officer will make a determination of fair and reasonable pricing prior to award.

Heather Libiszewski-Gallien

Contracting Officer

2024-02-05T09:07:44-0500
HEATHER LIBISZEWSKI-GALLIEN

File details come from the government source that posted it. Updated .