P01 - Drawings - 528A6-26-611 Abate Asbestos Pipe Insulation.pdf

PDF 1 MB Posted

Attached to
Y1DA--528A6-26-611 Abate Asbestos Pipe Insulation - B76
Solicitation number
36C24226B0021
Issued by

About this file

This document is a design development drawing set for an asbestos pipe insulation abatement project at Building 76, located in Bath, NY, for the Department of Veterans Affairs (VA). The project number is 528A6-26-611, and the drawings include site location and site plan maps, as well as floor plans for the 1st floor, 2nd floor, and basement, with specific areas marked for asbestos pipe insulation removal. The drawings are part of the Office of Construction and Facilities Management's project, with detailed annotations indicating the precise locations of asbestos abatement, including red-highlighted zones on multiple floor plans. The document provides technical guidance for contractors on the scope and location of asbestos removal within the VA facility.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

B

C

D

E

Bath VAMC

FIREPLACE

SHED

SHED

GARDEN PLOT

FI

RE

P

IT

SHED

EMPTY TRANSFORMER

BLOCK BUILDING

DUGOUT

CONCRETE WALL

DUGOUT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

G001

Cover Sheet

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Bath, NY

528A6-26-611

Issue Date AAA MCCRevisions: Date:

Project Director NOTE:

USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR VERIFYING

EXISTING DIMENSIONS AND CONDITIONS IN THE FIELD

o n e e ig h th in ch o n e f o o t th re e in ch e s o n e f o o t o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t

Design Development Abate Asbestos Pipe Insulation - B76

DRAWING INDEX

DISCIPLINE/

SHEET NO. DESCRIPTION

G001 COVER SHEET & DRAWING INDEX

AD101 BUILDING 76_PLAN

AutoCAD SHX Text

ABATE ASBESTOS PIPE

AutoCAD SHX Text

DEPARTMENT OF VETERANS AFFAIRS PROJECT NO. 528A6-26-611 BUILDING 76 BATH, NY

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text

SITE PLAN

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text

SITE LOCATION

AutoCAD SHX Text

AutoCAD SHX Text

COHOCTON RIVER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 29A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

COHOCTON RIVER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

INSULATION - B76

1HA1-76

134B

123A

125 126

120A

O125

109110

O121

213C

213A

213B

214A

2H A2

-7

212C

212F

212E

211A

2HA3-76

212D

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

AD101

Building 76_Plan

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Bath, NY

528A6-26-611

Issue Date AAA MCCRevisions: Date:

Project Director NOTE:

USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR VERIFYING

EXISTING DIMENSIONS AND CONDITIONS IN THE FIELD

o n e e ig h th in ch o n e f o o t th re e in ch e s o n e f o o t o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t

Design Development Abate Asbestos Pipe Insulation - B76

FIREPLACE

SHED

SHED

GARDEN PLOT

FI

RE

P

IT

SHED

EMPTY TRANSFORMER

BLOCK BUILDING

DUGOUT

CONCRETE WALL

DUGOUT

GENERAL NOTES

ASBESTOS ABATEMENT NOTES

AutoCAD SHX Text

PROPOSED DECON LOCATION (APPROXIMATE)

AutoCAD SHX Text

AA-2

AutoCAD SHX Text

PROPOSED NEGATIVE AIR EXHAUST LOCATION

AutoCAD SHX Text

TO CRAWL SPACE BELOW

AutoCAD SHX Text

PROPOSED DECON LOCATION (APPROXIMATE)

AutoCAD SHX Text

AA-2

AutoCAD SHX Text

PROPOSED NEGATIVE AIR EXHAUST LOCATION

AutoCAD SHX Text

PROPOSED DECON LOCATION (APPROXIMATE)

AutoCAD SHX Text

AA-2

AutoCAD SHX Text

AA-1

AutoCAD SHX Text

PROPOSED NEGATIVE AIR EXHAUST LOCATION

AutoCAD SHX Text

ABATEMENT LOCATION

AutoCAD SHX Text

PATH TO DECON SITE

AutoCAD SHX Text

1ST FLOOR PLAN

AutoCAD SHX Text

SCALE: N.T.S.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

COHOCTON RIVER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 29A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

COHOCTON RIVER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CONSTRUCTION STAGING AREA

AutoCAD SHX Text A. CONTRACTOR IS RESPONSIBLE FOR PERFORMING ALL WORK IN ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL RULES, REGULATIONS, CONTRACTOR IS RESPONSIBLE FOR PERFORMING ALL WORK IN ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL RULES, REGULATIONS, GUIDELINES, AND THE CONTRACT DOCUMENTS. B. IF ANY PREVIOUSLY-UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL (SUSPECT ACM, PCBS, ETC.) IS IDENTIFIED DURING CONSTRUCTION, CEASE IF ANY PREVIOUSLY-UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL (SUSPECT ACM, PCBS, ETC.) IS IDENTIFIED DURING CONSTRUCTION, CEASE OPERATIONS AND NOTIFY THE OWNER OR THEIR REPRESENTATIVE FOR FURTHER DIRECTION. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT AND/OR ANALYZE BULK SAMPLES OF SUSPECT MATERIALS WITHOUT THE APPROVAL OF THE OWNER OR THEIR REPRESENTATIVE. C. THE DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL OR SUSPECT MATERIAL SHALL BE PERFORMED BY A LICENSED ASBESTOS ABATEMENT CONTRACTOR. THE DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL OR SUSPECT MATERIAL SHALL BE PERFORMED BY A LICENSED ASBESTOS ABATEMENT CONTRACTOR. D. MATERIAL MEASUREMENTS AND/OR QUANTITIES AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY. MATERIAL MEASUREMENTS AND/OR QUANTITIES AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY. E. THE LOCATION OF SITE STORAGE OF MATERIAL, EQUIPMENT, WASTE TRAILER/DUMPSTER(S), AS WELL AS CONTRACTOR PARKING, ETC. SHALL BE COORDINATED WITH THE LOCATION OF SITE STORAGE OF MATERIAL, EQUIPMENT, WASTE TRAILER/DUMPSTER(S), AS WELL AS CONTRACTOR PARKING, ETC. SHALL BE COORDINATED WITH AND APPROVED BY THE OWNER OR THEIR REPRESENTATIVE. F. CONTRACTOR IS RESPONSIBLE FOR ALL TOOLS, EQUIPMENT, DECONTAMINATION UNITS AND SUPPLIES. THE OWNER OR THEIR REPRESENTATIVE WILL NOT BE CONTRACTOR IS RESPONSIBLE FOR ALL TOOLS, EQUIPMENT, DECONTAMINATION UNITS AND SUPPLIES. THE OWNER OR THEIR REPRESENTATIVE WILL NOT BE DECONTAMINATION UNITS AND SUPPLIES. THE OWNER OR THEIR REPRESENTATIVE WILL NOT BE AND SUPPLIES. THE OWNER OR THEIR REPRESENTATIVE WILL NOT BE RESPONSIBLE FOR LOST OR STOLEN ITEMS. G. ALL ASBESTOS-CONTAINING MATERIAL (ACM) SHALL BE PROPERLY PACKAGED AND LABELED PRIOR TO BEING REMOVED FROM THE WORK AREA(S). ALL ALL ASBESTOS-CONTAINING MATERIAL (ACM) SHALL BE PROPERLY PACKAGED AND LABELED PRIOR TO BEING REMOVED FROM THE WORK AREA(S). ALL ASBESTOS-CONTAINING AND ASBESTOS-CONTAMINATED MATERIALS THAT ARE REMOVED FROM THE SITE SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORD. COMPLETED WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE OWNER AS PART OF THE CLOSEOUT DOCUMENTATION. ALL ORIGINAL WASTE SHIPMENT RECORDS MUST BE PROVIDED WITHIN 35 DAYS OF THE WASTE LEAVING THE SITE. H. CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA IN A CLEAN AND SAFE CONDITION, PROVIDING TEMPORARY PROTECTION, MAINTAINING THE BUILDING CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA IN A CLEAN AND SAFE CONDITION, PROVIDING TEMPORARY PROTECTION, MAINTAINING THE BUILDING IN A WATERTIGHT CONDITION, PROTECTING BUILDING MATERIALS SCHEDULED TO REMAIN, AND PREVENTING UNAUTHORIZED ACCESS DURING THE DURATION OF THE PROJECT. REPAIR OF DAMAGE CAUSED AS A RESULT OF INADEQUATE TEMPORARY PROTECTION AND/OR CONTRACTOR ACTIVITIES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. I. NON-ACM BUILDING MATERIALS SCHEDULED FOR REMOVAL AND SALVAGE DURING ABATEMENT ACTIVITIES SHALL BE THOROUGHLY DECONTAMINATED BY THE NON-ACM BUILDING MATERIALS SCHEDULED FOR REMOVAL AND SALVAGE DURING ABATEMENT ACTIVITIES SHALL BE THOROUGHLY DECONTAMINATED BY THE ABATEMENT CONTRACTOR. THE PROJECT MONITOR SHALL VISUALLY INSPECT ALL SUCH MATERIALS TO ENSURE PROPER DECONTAMINATION HAS OCCURRED PRIOR TO BEING REMOVED FROM THE REGULATED ABATEMENT WORK AREA. J. REFER TO THE COMPLETE SET OF CONTRACT DOCUMENTS FOR MORE INFORMATION AND COORDINATION. COORDINATE ALL WORK ACTIVITIES WITH THE REFER TO THE COMPLETE SET OF CONTRACT DOCUMENTS FOR MORE INFORMATION AND COORDINATION. COORDINATE ALL WORK ACTIVITIES WITH THE OWNER/OWNER'S REPRESENTATIVE TO ENSURE ONSITE ACTIVITIES ARE ACCEPTABLE TO THE OWNER, AND THAT ABATEMENT ACTIVITIES ARE SUFFICIENT TO ACCOMMODATE THE PROJECT ACTIVITIES. AA-1 REMOVE AND DISPOSE ALL ASBESTOS-CONTAMINATED SOIL AND PLASTIC SHEETING IN THE AREAS INDICATED. SOIL SHALL BE REMOVED TO A DEPTH OF REMOVE AND DISPOSE ALL ASBESTOS-CONTAMINATED SOIL AND PLASTIC SHEETING IN THE AREAS INDICATED. SOIL SHALL BE REMOVED TO A DEPTH OF APPROXIMATELY 6” INCHES IN AREAS IMMEDIATELY BELOW THE PIPING EXTENDING TWO FEET ON EACH SIDE. SOIL IN EACH DESIGNATED AREA SHALL BE INCHES IN AREAS IMMEDIATELY BELOW THE PIPING EXTENDING TWO FEET ON EACH SIDE. SOIL IN EACH DESIGNATED AREA SHALL BE REMOVED WITHIN A REGULATED ASBESTOS ABATEMENT WORK AREA AND DISPOSED OF AS ASBESTOS WASTE. AA-2 REMOVE AND DISPOSE ASBESTOS-CONTAINING PIPE INSULATION AND PIPING IN DESIGNATED AREAS. THE PIPING CONSISTS OF ASBESTOS-CONTAINING REMOVE AND DISPOSE ASBESTOS-CONTAINING PIPE INSULATION AND PIPING IN DESIGNATED AREAS. THE PIPING CONSISTS OF ASBESTOS-CONTAINING MAG-TYPE INSULATION AND PIPE HANGAR INSULATION MIXED WITH FIBERGLASS INSULATION. PIPE INSULATION IN EACH DESIGNATED AREA SHALL BE REMOVED WITHIN A REGULATED ASBESTOS ABATEMENT WORK AREA AND DISPOSED OF AS ASBESTOS WASTE.

AutoCAD SHX Text

2ND FLOOR PLAN

AutoCAD SHX Text

SCALE: N.T.S.

AutoCAD SHX Text

AutoCAD SHX Text

BASEMENT FLOOR PLAN

AutoCAD SHX Text

SCALE: N.T.S.

AutoCAD SHX Text

Sheets and Views
G001 - Cover Sheet

File details come from the government source that posted it. Updated .