These are construction drawings for an asbestos pipe insulation abatement project at Building 76 for the Department of Veterans Affairs (VA) located in Bath, NY. The project number is 528A6-26-611. The drawings include a site location map, site plan, and a first floor plan highlighting the specific areas requiring asbestos removal. The plan shows multiple rooms and a detailed floor layout, with photographs documenting the existing asbestos-covered pipes. General notes and asbestos abatement notes provide technical guidance for the removal process, emphasizing safety protocols, environmental compliance, and proper handling of asbestos-containing materials.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B
C
D
E
Bath VAMC
FIREPLACE
SHED
SHED
GARDEN PLOT
FI
RE
P
IT
SHED
EMPTY TRANSFORMER
BLOCK BUILDING
DUGOUT
CONCRETE WALL
DUGOUT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
G001
Cover Sheet
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Bath, NY
528A6-26-611
Issue Date AAA MCCRevisions: Date:
Project Director NOTE:
USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR VERIFYING
EXISTING DIMENSIONS AND CONDITIONS IN THE FIELD
o n e e ig h th in ch o n e f o o t th re e in ch e s o n e f o o t o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t
Construction Drawings Abate Asbestos Pipe Insulation - B76
DRAWING INDEX
DISCIPLINE/
SHEET NO. DESCRIPTION
G001 COVER SHEET & DRAWING INDEX
AD101 BUILDING 76_PLAN
AutoCAD SHX Text
ABATE ASBESTOS PIPE
AutoCAD SHX Text
DEPARTMENT OF VETERANS AFFAIRS PROJECT NO. 528A6-26-611 BUILDING 76 BATH, NY
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text
SITE PLAN
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text
SITE LOCATION
AutoCAD SHX Text
AutoCAD SHX Text
COHOCTON RIVER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 29A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
COHOCTON RIVER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
INSULATION - B76
213C
213A
213B
214A
2H A2
-7
212C
212F
208 207 206
212E
205 204 211A
2HA4-76
2HA3-76
212D
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
AD101
Building 76_Plan
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Bath, NY
528A6-26-611
Issue Date AAA MCCRevisions: Date:
Project Director NOTE:
USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR VERIFYING
EXISTING DIMENSIONS AND CONDITIONS IN THE FIELD
o n e e ig h th in ch o n e f o o t th re e in ch e s o n e f o o t o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t
Construction Drawings Abate Asbestos Pipe Insulation - B76
FIREPLACE
SHED
SHED
GARDEN PLOT
FI
RE
P
IT
SHED
EMPTY TRANSFORMER
BLOCK BUILDING
DUGOUT
CONCRETE WALL
DUGOUT
GENERAL NOTES
ASBESTOS ABATEMENT NOTES
Revision 01 12/9/25
AutoCAD SHX Text
PROPOSED DECON LOCATION
AutoCAD SHX Text
AA-2
AutoCAD SHX Text
PROPOSED NEGATIVE AIR EXHAUST LOCATION
AutoCAD SHX Text
ABATEMENT LOCATION
AutoCAD SHX Text
2ND FLOOR PLAN
AutoCAD SHX Text
SCALE: N.T.S.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
COHOCTON RIVER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 29A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
COHOCTON RIVER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONSTRUCTION STAGING AREA
AutoCAD SHX Text A. CONTRACTOR IS RESPONSIBLE FOR PERFORMING ALL WORK IN ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL RULES, REGULATIONS, CONTRACTOR IS RESPONSIBLE FOR PERFORMING ALL WORK IN ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL RULES, REGULATIONS, GUIDELINES, AND THE CONTRACT DOCUMENTS. B. IF ANY PREVIOUSLY-UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL (SUSPECT ACM, PCBS, ETC.) IS IDENTIFIED DURING CONSTRUCTION, CEASE IF ANY PREVIOUSLY-UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL (SUSPECT ACM, PCBS, ETC.) IS IDENTIFIED DURING CONSTRUCTION, CEASE OPERATIONS AND NOTIFY THE OWNER OR THEIR REPRESENTATIVE FOR FURTHER DIRECTION. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT AND/OR ANALYZE BULK SAMPLES OF SUSPECT MATERIALS WITHOUT THE APPROVAL OF THE OWNER OR THEIR REPRESENTATIVE. C. THE DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL OR SUSPECT MATERIAL SHALL BE PERFORMED BY A LICENSED ASBESTOS ABATEMENT CONTRACTOR. THE DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL OR SUSPECT MATERIAL SHALL BE PERFORMED BY A LICENSED ASBESTOS ABATEMENT CONTRACTOR. D. MATERIAL MEASUREMENTS AND/OR QUANTITIES AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY. MATERIAL MEASUREMENTS AND/OR QUANTITIES AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY. E. THE LOCATION OF SITE STORAGE OF MATERIAL, EQUIPMENT, WASTE TRAILER/DUMPSTER(S), AS WELL AS CONTRACTOR PARKING, ETC. SHALL BE COORDINATED WITH THE LOCATION OF SITE STORAGE OF MATERIAL, EQUIPMENT, WASTE TRAILER/DUMPSTER(S), AS WELL AS CONTRACTOR PARKING, ETC. SHALL BE COORDINATED WITH AND APPROVED BY THE OWNER OR THEIR REPRESENTATIVE. F. CONTRACTOR IS RESPONSIBLE FOR ALL TOOLS, EQUIPMENT, DECONTAMINATION UNITS AND SUPPLIES. THE OWNER OR THEIR REPRESENTATIVE WILL NOT BE CONTRACTOR IS RESPONSIBLE FOR ALL TOOLS, EQUIPMENT, DECONTAMINATION UNITS AND SUPPLIES. THE OWNER OR THEIR REPRESENTATIVE WILL NOT BE DECONTAMINATION UNITS AND SUPPLIES. THE OWNER OR THEIR REPRESENTATIVE WILL NOT BE AND SUPPLIES. THE OWNER OR THEIR REPRESENTATIVE WILL NOT BE RESPONSIBLE FOR LOST OR STOLEN ITEMS. G. ALL ASBESTOS-CONTAINING MATERIAL (ACM) SHALL BE PROPERLY PACKAGED AND LABELED PRIOR TO BEING REMOVED FROM THE WORK AREA(S). ALL ALL ASBESTOS-CONTAINING MATERIAL (ACM) SHALL BE PROPERLY PACKAGED AND LABELED PRIOR TO BEING REMOVED FROM THE WORK AREA(S). ALL ASBESTOS-CONTAINING AND ASBESTOS-CONTAMINATED MATERIALS THAT ARE REMOVED FROM THE SITE SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORD. COMPLETED WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE OWNER AS PART OF THE CLOSEOUT DOCUMENTATION. ALL ORIGINAL WASTE SHIPMENT RECORDS MUST BE PROVIDED WITHIN 35 DAYS OF THE WASTE LEAVING THE SITE. H. CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA IN A CLEAN AND SAFE CONDITION, PROVIDING TEMPORARY PROTECTION, MAINTAINING THE BUILDING CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA IN A CLEAN AND SAFE CONDITION, PROVIDING TEMPORARY PROTECTION, MAINTAINING THE BUILDING IN A WATERTIGHT CONDITION, PROTECTING BUILDING MATERIALS SCHEDULED TO REMAIN, AND PREVENTING UNAUTHORIZED ACCESS DURING THE DURATION OF THE PROJECT. REPAIR OF DAMAGE CAUSED AS A RESULT OF INADEQUATE TEMPORARY PROTECTION AND/OR CONTRACTOR ACTIVITIES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. I. NON-ACM BUILDING MATERIALS SCHEDULED FOR REMOVAL AND SALVAGE DURING ABATEMENT ACTIVITIES SHALL BE THOROUGHLY DECONTAMINATED BY THE NON-ACM BUILDING MATERIALS SCHEDULED FOR REMOVAL AND SALVAGE DURING ABATEMENT ACTIVITIES SHALL BE THOROUGHLY DECONTAMINATED BY THE ABATEMENT CONTRACTOR. THE PROJECT MONITOR SHALL VISUALLY INSPECT ALL SUCH MATERIALS TO ENSURE PROPER DECONTAMINATION HAS OCCURRED PRIOR TO BEING REMOVED FROM THE REGULATED ABATEMENT WORK AREA. J. REFER TO THE COMPLETE SET OF CONTRACT DOCUMENTS FOR MORE INFORMATION AND COORDINATION. COORDINATE ALL WORK ACTIVITIES WITH THE REFER TO THE COMPLETE SET OF CONTRACT DOCUMENTS FOR MORE INFORMATION AND COORDINATION. COORDINATE ALL WORK ACTIVITIES WITH THE OWNER/OWNER'S REPRESENTATIVE TO ENSURE ONSITE ACTIVITIES ARE ACCEPTABLE TO THE OWNER, AND THAT ABATEMENT ACTIVITIES ARE SUFFICIENT TO ACCOMMODATE THE PROJECT ACTIVITIES. AA-1 REMOVE AND DISPOSE ALL ASBESTOS-CONTAMINATED SOIL AND PLASTIC SHEETING IN THE AREAS INDICATED. SOIL SHALL BE REMOVED TO A DEPTH OF REMOVE AND DISPOSE ALL ASBESTOS-CONTAMINATED SOIL AND PLASTIC SHEETING IN THE AREAS INDICATED. SOIL SHALL BE REMOVED TO A DEPTH OF APPROXIMATELY 6” INCHES IN AREAS IMMEDIATELY BELOW THE PIPING EXTENDING TWO FEET ON EACH SIDE. SOIL IN EACH DESIGNATED AREA SHALL BE INCHES IN AREAS IMMEDIATELY BELOW THE PIPING EXTENDING TWO FEET ON EACH SIDE. SOIL IN EACH DESIGNATED AREA SHALL BE REMOVED WITHIN A REGULATED ASBESTOS ABATEMENT WORK AREA AND DISPOSED OF AS ASBESTOS WASTE. AA-2 REMOVE AND DISPOSE ASBESTOS-CONTAINING PIPE INSULATION AND PIPING IN DESIGNATED AREAS. THE PIPING CONSISTS OF ASBESTOS-CONTAINING REMOVE AND DISPOSE ASBESTOS-CONTAINING PIPE INSULATION AND PIPING IN DESIGNATED AREAS. THE PIPING CONSISTS OF ASBESTOS-CONTAINING MAG-TYPE INSULATION AND PIPE HANGAR INSULATION MIXED WITH FIBERGLASS INSULATION. PIPE INSULATION IN EACH DESIGNATED AREA SHALL BE REMOVED WITHIN A REGULATED ASBESTOS ABATEMENT WORK AREA AND DISPOSED OF AS ASBESTOS WASTE.
| Sheets and Views |
| G001 - Cover Sheet |
File details come from the government source that posted it. Updated .