This document is a set of drawings and specifications related to a federal contract opportunity to replace roofs at the VA Puget Sound Healthcare System in Seattle, Washington. The contract will be issued as a SVOSB set-aside under NAICS code 236220 with a planned solicitation date of November 10, 2023.
The drawings provide detailed information on the construction containment requirements, air filter schedules, and repair notes for various roof areas, including critical air intakes that will require temporary MERV-8 carbon pre-filters. The work includes renewing curb flashings, vent penetrations, and roof drains, as well as reinstalling temporarily removed rooftop equipment. Access to the roof will be limited to after-hours work due to the proximity of sensitive radiology equipment. Safety and fall protection requirements are emphasized. The Statement of Work and Wage Determination are provided as attachments to the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P01 Wage Determination-WA20240108.pdf | ||
| P01 663-18-102 Construction SOW v2.pdf | ||
| 36C26024R0027.docx | DOCX document | |
| P01 663-18-102.2 Phase IIa Roofs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DHHALK
GI001
COVER SHEET, DRAWING SHEET INDEX,
SITE MAPS
REPLACE ROOFS - PIII
SEATTLE VA MEDICAL CENTER
VA PUGET SOUND HEALTHCARE SYSTEM (VAPSHCS)
1660 SOUTH COLUMBIAN WAY
SEATTLE, WASHINGTON 98108
SO. SNOQUALMIE ST.
SO. ALASKA ST.
COLUMBIAN WAY SO.
BEAC
O
N
AVE SO
BOUNDARY LINE
B100-A B100-B B100-C
B100-D
CORE
B100-F
B100-H B100-J
B20
B22
B33
NURSING
TOWER
EQUIPMENT
SETUP AREA
EQUIPMENT
SETUP AREA
EQUIPMENT
SETUP AREA
NURSING HOME
EQUIPMENT
SETUP AREA
DHH DHH
NORTH
SHEET NOTES:
1. CONTRACTOR WILL NOT BE ALLOWED A LAYDOWN AREA ON THE VA PUGET SOUND
PREMISES. MATERIALS WILL BE BROUGHT TO THE SITE EACH DAY.
2. PHASING PLANS ARE INCLUDED IN SPECIFICATION SECTION 01 00 00. PROVIDE
WORK PLAN FOR EACH ROOF TO COR 30 DAYS PRIOR TO START OF WORK.
3. DUMPSTERS AND EQUIPMENT MAY BE SETUP IN THE HATCHED AREAS SHOWN ON
THE SITE PLAN.
4. TEMPORARY VEHICLE LOADING AND UNLOADING WILL BE ALLOWED. ACCESS
ROADS MUST REMAIN OPEN FOR EMERGENCY VEHICLES.
5. NO CONTRACTOR PARKING IS AVAILABLE ON THE VA PREMISES. COORDINATE
PARKING REQUIREMENTS WITH THE COR.
6. VERIFY ALL EQUIPMENT STAGING AND SETUP AREAS WITH COR.
GI002
PROJECT SITE PLAN
LEGEND:
ROOF AREA INCLUDED IN PHASE III PROJECT
EQUIPMENT SETUP AREA
ROOF AREA COMPLETED IN PHASE I PROJECT
BUILDING 100 - AIR FILTERS
FILTER NO. SYSTEM
CARTRIDGES
NO. SIZE ARRANGEMENT
100-PF-1 AC-1 18 24"x24"x30" 6 WIDE X 3 HIGH
6 24"x12"x30" 6 WIDE X 1 HIGH
100-PF-2 AC-2 18 24"x12"x30" 6 WIDE X 3 HIGH
6 24"x12"x30" 6 WIDE X 1 HIGH
100-PF-3 AC-3 24 24"x24"x30" 6 WIDE X 4 HIGH
100-PF-4 AC-4 24 24"x24"x30" 6 WIDE X 4 HIGH
100-PF-5 AC-5 24 24"x24"x30" 6 WIDE X 4 HIGH
100-PF-6 AC-6 8 24"x24"x30" 4 WIDE X 2 HIGH
100-PF-7 AC-7 8 24"x24"x30" 4 WIDE X 2 HIGH
100-PF-8 AC-8 3 24"x24"x30" 3 WIDE X 1 HIGH
3 24"x12"x30" 3 WIDE X 1 HIGH
100-PF-9 AC-9 4 24"x24"x30" 4 WIDE X 1 HIGH
4 24"x12"x30" 4 WIDE X 1 HIGH
100-PF-10 AC-10 10 24"x24"x30" 5 WIDE X 2 HIGH
100-PF-11 AC-11 8 24"x24"x30" 4 WIDE X 2 HIGH
100-PF-12 AC-12 3 24"x24"x30" 3 WIDE X 1 HIGH
3 24"x12"x30" 3 WIDE X 1 HIGH
100-PF-13 AC-13 15 24"x24"x30" 5 WIDE X 3 HIGH
100-PF-13a AC-13 10 24"x24"x30" 5 WIDE X 2 HIGH
100-PF-14 AC-14 12 24"x24"x30" 4 WIDE X 3 HIGH
100-PF-14a AC-14 8 24"x24"x30" 4 WIDE X 2 HIGH
100-PF-15 AC-15 8 24"x24"x30" 4 WIDE X 2 HIGH
100-PF-16 AC-16 8 24"x24"x30" 4 WIDE X 2 HIGH
100-PF-17 AC-17 5 24"x24"x30" 5 WIDE X 1 HIGH
5 24"x12"x30" 5 WIDE X 1 HIGH
100-PF-18 AC-18 10 24"x24"x30" 5 WIDE X 2 HIGH
5 24"x12"x30" 5 WIDE X 1 HIGH
100-PF-19 AC-19 8 24"x24"x30" 4 WIDE X 2 HIGH
100-PF-19a AC-19 8 24"x24"x30" 4 WIDE X 2 HIGH
100-PF-20 AC-20 10 24"x24"x30" 5 WIDE X 2 HIGH
100-PF-21 AC-21 4 24"x24"x30" 4 WIDE X 1 HIGH
4 24"x12"x30" 4 WIDE X 1 HIGH
100-PF-22 AC-22 8 24"x24"x30" 4 WIDE X 2 HIGH
4 24"x12"x30" 4 WIDE X 1 HIGH
100-PF-23 AC-23 4 24"x24"x30" 4 WIDE X 1 HIGH
4 24"x12"x30" 4 WIDE X 1 HIGH
100-PF-24 AC-24 15 24"x24"x30" 5 WIDE X 3 HIGH
100-PF-24a AC-24 15 24"x24"x30" 5 WIDE X 3 HIGH
100-PF-25 AC-25 8 24"x24"x30" 4 WIDE X 2 HIGH
100-PF-26 AC-26 4 24"x24"x30" 4 WIDE X 1 HIGH
4 24"x12"x30" 4 WIDE X 1 HIGH
100-PF-27 AC-27 1 24"x24"x30" 1 WIDE X 1 HIGH
100-PF-28 ELEC RM 2 20"x25" 2 WIDE X 1 HIGH
100-PF-29 AC-12 1 20"x25" 1 WIDE X 1 HIGH
100-PF-30 AC-1,2 4 16"x25" 2 WIDE X 2 HIGH
100-PF-31 AC-3,4 4 16"x25" 2 WIDE X 2 HIGH
100-PF-32 AC-5 4 16"x25" 2 WIDE X 2 HIGH
100-PF-33 AC-25,26 4 16"x25" 2 WIDE X 2 HIGH
100-PF-35 AC-23,24 4 16"x20" 2 WIDE X 2 HIGH
2 20"x25" 2 WIDE X 1 HIGH
100-PF-36 AC-20 2 20"x25" 2 WIDE X 1 HIGH
100-PF-37 AC-21,22 4 16"x20" 2 WIDE X 2 HIGH
100-PF-38 AC-15,16 2 20"x25" 2 WIDE X 1 HIGH
100-PF-39 AC-16 2 20"x25" 2 WIDE X 1 HIGH
100-PF-40 AC-18 2 20"x25" 2 WIDE X 1 HIGH
100-PF-41 AC-19 1 20"x25" 1 WIDE X 1 HIGH
100-PF-42 AC-13 2 20"x25" 2 WIDE X 1 HIGH
100-PF-43 AC-14 2 20"x25" 2 WIDE X 1 HIGH
100-PF-44 AC-11 2 20"x25" 2 WIDE X 1 HIGH
100-PF-45 AC-10 4 16"x25" 2 WIDE X 2 HIGH
100-PF-48 AC-6 4 16"x20" 2 WIDE X 2 HIGH
100-PF-49 AC-7 1 20"x25" 1 WIDE X 1 HIGH
100-PF-50 AC-10 4 16"x25" 2 WIDE X 2 HIGH
100-PF-53 PLUMBING 7 16"x20" 7 WIDE X 1 HIGH
7 16"x25" 7 WIDE X 1 HIGH
100-PF-54 AC-18 2 20"x25" 2 WIDE X 1 HIGH
100-PF-55 AC-21,22 2 20"x25" 2 WIDE X 1 HIGH
100-PF-56 AC-10 4 16"x25" 2 WIDE X 2 HIGH
100-PF-70 AC-70 1 24"x24"x4" 1 WIDE X 1 HIGH
BUILDING 1 - AIR FILTERS
FILTER NO. SYSTEM
CARTRIDGES
NO. SIZE ARRANGEMENT
1-PF1 1-AH1 20 24"x24"x4" 4 WIDE x 5 HIGH
1-PF2 1-AH2 12 24"x24"x4" 4 WIDE x 3 HIGH
1-PF3 1-AH3 16 24"x24"x4" 4 WIDE x 4 HIGH
1-PF4 1-AH4 16 24"x24"x4" 4 WIDE x 4 HIGH
1-PF5 1-AH5 20 24"x24"x4" 4 WIDE x 5 HIGH
1-PF6 1-AH6 6 24"x24"x4" 3 WIDE x 2 HIGH
1-PF7 1-AH7 12 24"x24"x4" 4 WIDE x 3 HIGH
1-PF8 1-AH8 6 24"x24"x4" 3 WIDE x 2 HIGH
1-PF9 1-AH9 6 24"x24"x4" 3 WIDE x 2 HIGH
1-PF10 1-AH10 12 24"x24"x4" 4 WIDE x 3 HIGH
GI004
ALK JWV
AIR FILTER NOTES:
1. VERIFY SIZING IN FIELD PRIOR TO PURCHASING AIR FILTERS.
2. COORDINATE INTAKE SYSTEMS AND LOCATIONS WITH COR.
3. FOR AIR INTAKES NOT SHOWN IN THE SCHEDULE LISTED ON THIS SHEET, VERIFY
FILTER REQUIREMENTS IN THE FIELD.
4. PROVIDE MERV 8 RATED CARBON IMPREGNATED FILTERS, DISPOSE OF REMOVED
PRE-FILTERS PRIOR TO BEGINNING WORK. MARK INSTALL DATE ON FILTERS.
5. REPLACE MERV 8 CARBON IMPREGNATED FILTERS EVERY 60 DAYS.
6. MERV 8 CARBON IMPREGNATED FILTERS MAY BE REMOVED 7 DAYS AFTER
COMPLETION OF ROOF CONSTRUCTION, FOLLOWING FINAL COR ACCEPTANCE.
AIR INTAKE FILTER SCHEDULES
THE FOLLOWING ROOFS (AS SCREENED OUT ABOVE) ARE NOT INCLUDED
IN THIS PROJECT, FIELD VERIFY AND COORDINATE WITH COR TO
DETERMINE IF THESE FILTERS WILL REQUIRE REPLACEMENT DURING
PHASE III CONSTRUCTION.
B1
-B
A D
DHH BAJ
SCALE: 18" = 1'-0"
0 4' 8' 24'16'
NORTH
SCALE:
GC101
B100-A CONSTRUCTION CONTAINMENT OVER EIGHTH FLOOR
1/8" = 1'-0"
ROOF AREA ≈ 5,698 GSF
GC101
B100-A CONSTRUCTION CONTAINMENT
OVER EIGHTH FLOOR
KEY NOTES:
1. CRITICAL AIR INTAKE, LOUVER ON EXTERIOR WALL. PROVIDE MERV-8 RATED
CARBON PRE-FILTER FOR ODOR CONTROL. CARBON PRE-FILTER MUST BE IN-PLACE
BEFORE BEGINNING WORK AND MUST REMAIN IN PLACE FOR 7 DAYS AFTER THE
COMPLETION OF ROOF CONSTRUCTION. COORDINATE INSTALLATION AND REMOVAL
OF CARBON PRE-FILTER WITH COR. SEE SHEET GI004 FOR AIR INTAKE FILTER
SCHEDULE AND ADDITIONAL INFORMATION.
-A
B1
-C
DHH BAJ
SCALE: 18" = 1'-0"
0 4' 8' 24'16'
NORTH
SCALE:
GC102
B100-B CONSTRUCTION CONTAINMENT OVER EIGHTH FLOOR
1/8" = 1'-0"
ROOF AREA ≈ 6,215 GSF
GC102
B100-B CONSTRUCTION CONTAINMENT
OVER EIGHTH FLOOR
KEY NOTES:
1. CRITICAL AIR INTAKE, VENT HOOD ON ROOF. PROVIDE MERV-8 RATED CARBON
PRE-FILTER FOR ODOR CONTROL. CARBON PRE-FILTER MUST BE IN-PLACE BEFORE
BEGINNING WORK AND MUST REMAIN IN PLACE FOR 7 DAYS AFTER THE COMPLETION
OF ROOF CONSTRUCTION. COORDINATE INSTALLATION AND REMOVAL OF CARBON
PRE-FILTER WITH COR. SEE SHEET GI004 FOR AIR INTAKE FILTER SCHEDULE AND
ADDITIONAL INFORMATION.
-B
HAZARDOUS
EXHAUST
DHH BAJ
SCALE: 18" = 1'-0"
0 4' 8' 24'16'
NORTH
SCALE:
GC103
B100-C CONSTRUCTION CONTAINMENT OVER EIGHTH FLOOR
1/8" = 1'-0"
ROOF AREA ≈ 5,730 GSF
GC103
B100-C CONSTRUCTION CONTAINMENT
OVER EIGHTH FLOOR
KEY NOTES:
1. CRITICAL AIR INTAKE, LOUVER ON EXTERIOR WALL. PROVIDE MERV-8 RATED
CARBON PRE-FILTER FOR ODOR CONTROL. CARBON PRE-FILTER MUST BE IN-PLACE
BEFORE BEGINNING WORK AND MUST REMAIN IN PLACE FOR 7 DAYS AFTER THE
COMPLETION OF ROOF CONSTRUCTION. COORDINATE INSTALLATION AND REMOVAL
OF CARBON PRE-FILTER WITH COR. SEE SHEET GI004 FOR AIR INTAKE FILTER
SCHEDULE AND ADDITIONAL INFORMATION.
2. HAZARDOUS EXHAUST. COORDINATE WORK AND SAFETY PLAN WITH COR 30 DAYS
PRIOR TO THE START OF WORK.
DHH BAJ
SCALE: 18" = 1'-0"
0 4' 8' 24'16'
NORTH
SCALE:
GC104
B100-D CONSTRUCTION CONTAINMENT OVER EIGHTH FLOOR
1/8" = 1'-0"
UPPER ROOF AREA ≈ 3,624 GSF
NORTH CONNECTOR ROOF AREA ≈ 600 GSF
SOUTH CONNECTOR ROOF AREA ≈ 851 GSF
GC104
B100-D CONSTRUCTION CONTAINMENT
OVER EIGHTH FLOOR
KEY NOTES:
1. CRITICAL AIR INTAKE, VENT HOOD ON ROOF. PROVIDE MERV-8 RATED CARBON
PRE-FILTER FOR ODOR CONTROL. CARBON PRE-FILTER MUST BE IN-PLACE BEFORE
BEGINNING WORK AND MUST REMAIN IN PLACE FOR 7 DAYS AFTER THE COMPLETION
OF ROOF CONSTRUCTION. COORDINATE INSTALLATION AND REMOVAL OF CARBON
PRE-FILTER WITH COR. SEE SHEET GI004 FOR AIR INTAKE FILTER SCHEDULE AND
ADDITIONAL INFORMATION.
2. CRITICAL AIR INTAKE, LOUVER ON EXTERIOR WALL. PROVIDE MERV-8 RATED
CARBON PRE-FILTER FOR ODOR CONTROL. CARBON PRE-FILTER MUST BE IN-PLACE
BEFORE BEGINNING WORK AND MUST REMAIN IN PLACE FOR 7 DAYS AFTER THE
COMPLETION OF ROOF CONSTRUCTION. COORDINATE INSTALLATION AND REMOVAL
OF CARBON PRE-FILTER WITH COR. SEE SHEET GI004 FOR AIR INTAKE FILTER
SCHEDULE AND ADDITIONAL INFORMATION.
E S
H
EE
T
AD
DHH BAJ
SCALE: 18" = 1'-0"
0 4' 8' 24'16'
NORTH
SCALE:
GC106
B100-F CONSTRUCTION CONTAINMENT OVER FIRST FLOOR
1/8" = 1'-0"
UPPER ROOF AREA ≈ 3,341 GSF
LOWER ROOF AREA ≈ 10,246 GSF
GC106
B100-F CONSTRUCTION CONTAINMENT
OVER FIRST FLOOR
KEY NOTES:
1. CRITICAL AIR INTAKE, AIR HANDLER ON ROOF. PROVIDE MERV-8 RATED CARBON
PRE-FILTER FOR ODOR CONTROL. CARBON PRE-FILTER MUST BE IN-PLACE BEFORE
BEGINNING WORK AND MUST REMAIN IN PLACE FOR 7 DAYS AFTER THE COMPLETION
OF ROOF CONSTRUCTION. COORDINATE INSTALLATION AND REMOVAL OF CARBON
PRE-FILTER WITH COR. SEE SHEET GI004 FOR AIR INTAKE FILTER SCHEDULE AND
INFORMATION.
DHH BAJ
SCALE: 18" = 1'-0"
0 4' 8' 24'16'
NORTH
SCALE:
GC108
B100-H CONSTRUCTION CONTAINMENT OVER FIRST FLOOR
1/8" = 1'-0"
ROOF AREA ≈ 1,470 GSF
GC108
B100-H CONSTRUCTION CONTAINMENT
OVER FIRST FLOOR
KEY NOTES:
1. CRITICAL AIR INTAKE, VENT HOOD ON ROOF. PROVIDE MERV-8 RATED CARBON
PRE-FILTER FOR ODOR CONTROL. CARBON PRE-FILTER MUST BE IN-PLACE BEFORE
BEGINNING WORK AND MUST REMAIN IN PLACE FOR 7 DAYS AFTER THE COMPLETION
OF ROOF CONSTRUCTION. COORDINATE INSTALLATION AND REMOVAL OF CARBON
PRE-FILTER WITH COR. SEE SHEET GI004 FOR AIR INTAKE FILTER SCHEDULE AND
ADDITIONAL INFORMATION.
J1 J1
J2
DHH BAJ
SCALE: 18" = 1'-0"
0 4' 8' 24'16'
NORTH
SCALE:
GC109
B100-J CONSTRUCTION CONTAINMENT OVER FIRST FLOOR
1/8" = 1'-0"
ROOF AREA J1 #1 ≈ 344 GSF
ROOF AREA J1 #2 ≈ 1,225 GSF
ROOF AREA J2 #3 ≈ 688 GSF
GC109
B100-J CONSTRUCTION CONTAINMENT
OVER FIRST FLOOR
KEY NOTES:
1. CRITICAL AIR INTAKE, AIR HANDLER ON ROOF. PROVIDE MERV-8 RATED CARBON
PRE-FILTER FOR ODOR CONTROL. CARBON PRE-FILTER MUST BE IN-PLACE BEFORE
BEGINNING WORK AND MUST REMAIN IN PLACE FOR 7 DAYS AFTER THE COMPLETION
OF ROOF CONSTRUCTION. COORDINATE INSTALLATION AND REMOVAL OF CARBON
PRE-FILTER WITH COR. SEE SHEET GI004 FOR AIR INTAKE FILTER SCHEDULE AND
B20 ROOF AREA B1 CONNECTION ROOF AREA
B22 CONNECTION ROOF AREA
DHH BAJ
SCALE: 18" = 1'-0"
0 4' 8' 24'16'
NORTH
SCALE:
GC122
B20 CONSTRUCTION CONTAINMENT OVER FIRST FLOOR
1/8" = 1'-0"
BUILDING 20 ROOF AREA ≈ 3,818 GSF
BUILDING 1 CONNECTION ROOF AREA ≈ 859 GSF
BUILDING 22 CONNECTION ROOF AREA ≈ 2,188 GSF
GC122
B20 CONSTRUCTION CONTAINMENT
OVER FIRST FLOOR
KEY NOTES:
1. CRITICAL AIR INTAKE, AIR HANDLER ON ROOF. PROVIDE MERV-8 RATED CARBON
PRE-FILTER FOR ODOR CONTROL. CARBON PRE-FILTER MUST BE IN-PLACE BEFORE
BEGINNING WORK AND MUST REMAIN IN PLACE FOR 7 DAYS AFTER THE COMPLETION
OF ROOF CONSTRUCTION. COORDINATE INSTALLATION AND REMOVAL OF CARBON
PRE-FILTER WITH COR. SEE SHEET GI004 FOR AIR INTAKE FILTER SCHEDULE AND
1 1
B20 CONNECTION ROOF AREA
DHH BAJ
SCALE: 18" = 1'-0"
0 4' 8' 24'16'
NORTH
SCALE:
GC123
B22 CONSTRUCTION CONTAINMENT OVER FIRST FLOOR
1/8" = 1'-0"
ROOF AREA ≈ 10,592 GSF
GC123
B22 CONSTRUCTION CONTAINMENT
OVER FIRST FLOOR
KEY NOTES:
1. CRITICAL AIR INTAKE, AIR HANDLER ON ROOF. PROVIDE MERV-8 RATED CARBON
PRE-FILTER FOR ODOR CONTROL. CARBON PRE-FILTER MUST BE IN-PLACE BEFORE
BEGINNING WORK AND MUST REMAIN IN PLACE FOR 7 DAYS AFTER THE COMPLETION
OF ROOF CONSTRUCTION. COORDINATE INSTALLATION AND REMOVAL OF CARBON
PRE-FILTER WITH COR. SEE SHEET GI004 FOR AIR INTAKE FILTER SCHEDULE AND
RADIOLOGY AREA BELOW: COORDINATE WORK W/ COR
RADIOLOGY LAB BELOW:
COORD WORK W/ COR
REPAIR NOTES:
1. RENEW CURB FLASHING.
2. VENT PENETRATION THROUGH ROOF TO REMAIN. RENEW PIPE FLASHING.
3. N/A TO THIS SHEET.
4. MULTIPLE PIPE PENETRATIONS THROUGH ROOF. RENEW PIPE FLASHINGS.
5. RENEW CURB FLASHING FOR AHU.
6. FLUSH OUT ROOF DRAINS AND PROVIDE CAST IRON DOME STRAINERS.
7. RENEW BASE FLASHING AT EQUIPMENT CURB.
DHH BAJ
SCALE: 18" = 1'-0"
0 4' 8' 24'16'
NORTH
SCALE:
AE124
B33 ROOF PLAN OVER FIRST FLOOR
1/8" = 1'-0"
ROOF AREA ≈ 12,700 GSF
SHEET NOTES:
1. PROVIDE REPAIRS TO EPDM ROOF MEMBRANE AND COMPONENTS AS INDICATED.
2. RE-INSTALL TEMPORARILY REMOVED, RELOCATED OR RAISED EXISTING ROOF
TOP EQUIPMENT TO REMAIN, SUCH AS: VENTILATORS, EXHAUST FANS, LIGHTNING
PROTECTION, LIGHT FIXTURES, LADDERS/CAGES, EXPANDED METAL WALKWAYS,
CONDENSING UNITS, CABLES AND OTHER MISCELLANEOUS ITEMS. VERIFY AND
COORDINATE LOCATIONS WITH COR.
3. ACCESS TO ROOF IS NOT AVAILABLE DURING NORMAL WORKING HOURS. WORK
WILL TYPICALLY BE PERFORMED AFTER 5 PM. COORDINATE WITH THE COR TO
PERFORM WORK WHEN RADIOLOGY EQUIPMENT IS NOT IN SERVICE.
4. PROVIDE CARBON FILTERS AT ALL AIR INTAKES.
5. PROVIDE OSHA COMPLIANT FALL PROTECTION FOR ALL WORKERS ON ROOF.
SAFETY WATCH IS NOT ALLOWED. FALL PROTECTION MUST BE INCLUDED IN
SAFETY PLAN AND COORDINATED WITH COR BEFORE STARTING WORK.
AE124
B33 ROOF PLAN
OVER FIRST FLOOR
LEGEND:
INDICATES LOCATION OF EXISTING ROOF DRAIN
File details come from the government source that posted it. Updated .