P01 663-18-102.2 Phase IIa Roofs.pdf
PDF 1 MB Posted
- Solicitation number
- 36C26024R0027
About this file
This document is a set of technical drawings and specifications for a federal contract opportunity to replace roofs at the VA Puget Sound Healthcare System in Seattle, Washington. The contract is for Phase II of the roof replacement project, with Phase I already completed.
The key details are:
- The solicitation number is 36C26024R0027, with the contract name "Y1DA--CON-NRM-663-18-102 Replace Roofs Phase 2 FY 24 Tier 2".
- This is an advanced notice for an upcoming Request for Proposals, expected to be posted around November 10, 2023.
- The contract will be a Small Veteran-Owned Small Business (SVOSB) set-aside, under NAICS code 236220.
- The work includes replacing roofs on multiple buildings and floors at the VA medical center, with detailed requirements and drawings provided.
- Critical air intake locations are identified, requiring installation of temporary MERV-8 carbon pre-filters during construction.
- No contractor laydown areas will be provided on the VA premises, and noise/air quality controls are required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P01 Wage Determination-WA20240108.pdf | ||
| P01 663-18-102 Construction SOW v2.pdf | ||
| 36C26024R0027.docx | DOCX document | |
| P01 663-18-102.3 Phase IIb Roofs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DHHALK
GI001
COVER SHEET, DRAWING SHEET INDEX,
SITE MAPS
REPLACE ROOFS - PII
SEATTLE VA MEDICAL CENTER
VA PUGET SOUND HEALTHCARE SYSTEM (VAPSHCS)
1660 SOUTH COLUMBIAN WAY
SEATTLE, WASHINGTON 98108
SO. SNOQUALMIE ST.
SO. ALASKA ST.
COLUMBIAN WAY SO.
BEAC
O
N
AVE SO
BOUNDARY LINE
B1-B
B1-A
B1-C
B1-D
B1-E (W)
B1-E (E)
B1-F (W)
B1-F (E)
B1-G B1-H/J
NURSING
TOWER
EQUIPMENT
SETUP AREA
EQUIPMENT
SETUP AREA
EQUIPMENT
SETUP AREA
F
NURSING HOME
EQUIPMENT
SETUP AREA
DHH DHH
NORTH
SHEET NOTES:
1. CONTRACTOR WILL NOT BE ALLOWED A LAYDOWN AREA ON THE VA PUGET SOUND
PREMISES. MATERIALS WILL BE BROUGHT TO THE SITE EACH DAY.
2. PHASING PLANS ARE INCLUDED IN SPECIFICATION SECTION 01 00 00. PROVIDE
WORK PLAN FOR EACH ROOF TO COR 30 DAYS PRIOR TO START OF WORK.
3. DUMPSTERS AND EQUIPMENT MAY BE SETUP IN THE HATCHED AREAS SHOWN ON
THE SITE PLAN.
4. TEMPORARY VEHICLE LOADING AND UNLOADING WILL BE ALLOWED. ACCESS
ROADS MUST REMAIN OPEN FOR EMERGENCY VEHICLES.
5. NO CONTRACTOR PARKING IS AVAILABLE ON THE VA PREMISES. COORDINATE
PARKING REQUIREMENTS WITH THE COR.
6. VERIFY ALL EQUIPMENT STAGING AND SETUP AREAS WITH COR.
GI002
PROJECT SITE PLAN
LEGEND:
ROOF AREA INCLUDED IN PHASE II PROJECT
EQUIPMENT SETUP AREA
ROOF AREA COMPLETED IN PHASE I PROJECT
BUILDING 100 - AIR FILTERS
FILTER NO. SYSTEM
CARTRIDGES
NO. SIZE ARRANGEMENT
100-PF-1 AC-1 18 24"x24"x30" 6 WIDE X 3 HIGH
6 24"x12"x30" 6 WIDE X 1 HIGH
100-PF-2 AC-2 18 24"x12"x30" 6 WIDE X 3 HIGH
6 24"x12"x30" 6 WIDE X 1 HIGH
100-PF-3 AC-3 24 24"x24"x30" 6 WIDE X 4 HIGH
100-PF-4 AC-4 24 24"x24"x30" 6 WIDE X 4 HIGH
100-PF-5 AC-5 24 24"x24"x30" 6 WIDE X 4 HIGH
100-PF-6 AC-6 8 24"x24"x30" 4 WIDE X 2 HIGH
100-PF-7 AC-7 8 24"x24"x30" 4 WIDE X 2 HIGH
100-PF-8 AC-8 3 24"x24"x30" 3 WIDE X 1 HIGH
3 24"x12"x30" 3 WIDE X 1 HIGH
100-PF-9 AC-9 4 24"x24"x30" 4 WIDE X 1 HIGH
4 24"x12"x30" 4 WIDE X 1 HIGH
100-PF-10 AC-10 10 24"x24"x30" 5 WIDE X 2 HIGH
100-PF-11 AC-11 8 24"x24"x30" 4 WIDE X 2 HIGH
100-PF-12 AC-12 3 24"x24"x30" 3 WIDE X 1 HIGH
3 24"x12"x30" 3 WIDE X 1 HIGH
100-PF-13 AC-13 15 24"x24"x30" 5 WIDE X 3 HIGH
100-PF-13a AC-13 10 24"x24"x30" 5 WIDE X 2 HIGH
100-PF-14 AC-14 12 24"x24"x30" 4 WIDE X 3 HIGH
100-PF-14a AC-14 8 24"x24"x30" 4 WIDE X 2 HIGH
100-PF-15 AC-15 8 24"x24"x30" 4 WIDE X 2 HIGH
100-PF-16 AC-16 8 24"x24"x30" 4 WIDE X 2 HIGH
100-PF-17 AC-17 5 24"x24"x30" 5 WIDE X 1 HIGH
5 24"x12"x30" 5 WIDE X 1 HIGH
100-PF-18 AC-18 10 24"x24"x30" 5 WIDE X 2 HIGH
5 24"x12"x30" 5 WIDE X 1 HIGH
100-PF-19 AC-19 8 24"x24"x30" 4 WIDE X 2 HIGH
100-PF-19a AC-19 8 24"x24"x30" 4 WIDE X 2 HIGH
100-PF-20 AC-20 10 24"x24"x30" 5 WIDE X 2 HIGH
100-PF-21 AC-21 4 24"x24"x30" 4 WIDE X 1 HIGH
4 24"x12"x30" 4 WIDE X 1 HIGH
100-PF-22 AC-22 8 24"x24"x30" 4 WIDE X 2 HIGH
4 24"x12"x30" 4 WIDE X 1 HIGH
100-PF-23 AC-23 4 24"x24"x30" 4 WIDE X 1 HIGH
4 24"x12"x30" 4 WIDE X 1 HIGH
100-PF-24 AC-24 15 24"x24"x30" 5 WIDE X 3 HIGH
100-PF-24a AC-24 15 24"x24"x30" 5 WIDE X 3 HIGH
100-PF-25 AC-25 8 24"x24"x30" 4 WIDE X 2 HIGH
100-PF-26 AC-26 4 24"x24"x30" 4 WIDE X 1 HIGH
4 24"x12"x30" 4 WIDE X 1 HIGH
100-PF-27 AC-27 1 24"x24"x30" 1 WIDE X 1 HIGH
100-PF-28 ELEC RM 2 20"x25" 2 WIDE X 1 HIGH
100-PF-29 AC-12 1 20"x25" 1 WIDE X 1 HIGH
100-PF-30 AC-1,2 4 16"x25" 2 WIDE X 2 HIGH
100-PF-31 AC-3,4 4 16"x25" 2 WIDE X 2 HIGH
100-PF-32 AC-5 4 16"x25" 2 WIDE X 2 HIGH
100-PF-33 AC-25,26 4 16"x25" 2 WIDE X 2 HIGH
100-PF-35 AC-23,24 4 16"x20" 2 WIDE X 2 HIGH
2 20"x25" 2 WIDE X 1 HIGH
100-PF-36 AC-20 2 20"x25" 2 WIDE X 1 HIGH
100-PF-37 AC-21,22 4 16"x20" 2 WIDE X 2 HIGH
100-PF-38 AC-15,16 2 20"x25" 2 WIDE X 1 HIGH
100-PF-39 AC-16 2 20"x25" 2 WIDE X 1 HIGH
100-PF-40 AC-18 2 20"x25" 2 WIDE X 1 HIGH
100-PF-41 AC-19 1 20"x25" 1 WIDE X 1 HIGH
100-PF-42 AC-13 2 20"x25" 2 WIDE X 1 HIGH
100-PF-43 AC-14 2 20"x25" 2 WIDE X 1 HIGH
100-PF-44 AC-11 2 20"x25" 2 WIDE X 1 HIGH
100-PF-45 AC-10 4 16"x25" 2 WIDE X 2 HIGH
100-PF-48 AC-6 4 16"x20" 2 WIDE X 2 HIGH
100-PF-49 AC-7 1 20"x25" 1 WIDE X 1 HIGH
100-PF-50 AC-10 4 16"x25" 2 WIDE X 2 HIGH
100-PF-53 PLUMBING 7 16"x20" 7 WIDE X 1 HIGH
7 16"x25" 7 WIDE X 1 HIGH
100-PF-54 AC-18 2 20"x25" 2 WIDE X 1 HIGH
100-PF-55 AC-21,22 2 20"x25" 2 WIDE X 1 HIGH
100-PF-56 AC-10 4 16"x25" 2 WIDE X 2 HIGH
100-PF-70 AC-70 1 24"x24"x4" 1 WIDE X 1 HIGH
BUILDING 1 - AIR FILTERS
FILTER NO. SYSTEM
CARTRIDGES
NO. SIZE ARRANGEMENT
1-PF1 1-AH1 20 24"x24"x4" 4 WIDE x 5 HIGH
1-PF2 1-AH2 12 24"x24"x4" 4 WIDE x 3 HIGH
1-PF3 1-AH3 16 24"x24"x4" 4 WIDE x 4 HIGH
1-PF4 1-AH4 16 24"x24"x4" 4 WIDE x 4 HIGH
1-PF5 1-AH5 20 24"x24"x4" 4 WIDE x 5 HIGH
1-PF6 1-AH6 6 24"x24"x4" 3 WIDE x 2 HIGH
1-PF7 1-AH7 12 24"x24"x4" 4 WIDE x 3 HIGH
1-PF8 1-AH8 6 24"x24"x4" 3 WIDE x 2 HIGH
1-PF9 1-AH9 6 24"x24"x4" 3 WIDE x 2 HIGH
1-PF10 1-AH10 12 24"x24"x4" 4 WIDE x 3 HIGH
GI004
ALK JWV
AIR FILTER NOTES:
1. VERIFY SIZING IN FIELD PRIOR TO PURCHASING AIR FILTERS.
2. COORDINATE INTAKE SYSTEMS AND LOCATIONS WITH COR.
3. FOR AIR INTAKES NOT SHOWN IN THE SCHEDULE LISTED ON THIS SHEET, VERIFY
FILTER REQUIREMENTS IN THE FIELD.
4. PROVIDE MERV 8 RATED CARBON IMPREGNATED FILTERS, DISPOSE OF REMOVED
PRE-FILTERS PRIOR TO BEGINNING WORK. MARK INSTALL DATE ON FILTERS.
5. REPLACE MERV 8 CARBON IMPREGNATED FILTERS EVERY 60 DAYS.
6. MERV 8 CARBON IMPREGNATED FILTERS MAY BE REMOVED 7 DAYS AFTER
COMPLETION OF ROOF CONSTRUCTION, FOLLOWING FINAL COR ACCEPTANCE.
AIR INTAKE FILTER SCHEDULES
THE FOLLOWING ROOFS (AS SCREENED OUT ABOVE) ARE NOT
INCLUDED IN THIS PROJECT, FIELD VERIFY AND COORDINATE WITH COR
TO DETERMINE IF THESE FILTERS WILL REQUIRE REPLACEMENT
DURING PHASE II CONSTRUCTION.
WEST ROOF AREA
CENTER ROOF AREA EAST ROOF AREA
DHH BAJ
SCALE: 18" = 1'-0"
0 4' 8' 24'16'
NORTH
WEST ROOF AREA ≈ 390 GSF
CENTER ROOF AREA ≈ 1,590 GSF
EAST ROOF AREA ≈ 302 GSF
GC113
B1-A CONSTRUCTION CONTAINMENT
OVER FIRST FLOOR
SHEET NOTES:
1. PRIOR TO STARTING WORK, COORDINATE AN ACTIVITY HAZARD ANALYSIS, SAFETY
PLAN AND WORK PLAN WITH THE COR. SEE SPECIFICATION SECTIONS: 01 00 00,
01 35 26 AND 01 57 19.
2. PROTECT OPENINGS THROUGH THE ROOF CREATED DURING CONSTRUCTION WITH
45 MIL REINFORCED FLEXIBLE EPDM MEMBRANE.
3. ROOF AREAS WERE SURVEYED TO IDENTIFY HAZARDOUS MATERIAL. REFER TO
MABBETT & ASSOCIATES REGULATED BUILDING MATERIALS SURVEY REPORT DATED
SEPTEMBER 16, 2019 FOR ESTIMATED QUANTITIES AND ADDITIONAL INFORMATION.
NOT ALL AREAS MAY HAVE BEEN ACCESSIBLE AND HAZARDOUS MATERIALS MIGHT
EXIST WHICH HAVE NOT BEEN IDENTIFIED. IF SUSPECT MATERIALS ARE DISCOVERED
WHICH HAVE NOT BEEN PREVIOUSLY IDENTIFIED, THE CONTRACTOR SHALL NOT
DISTURB THOSE MATERIALS AND SHALL IMMEDIATELY NOTIFY THE COR.
4. INSTALL CARBON PRE-FILTERS ON ALL AIR INTAKES PRIOR TO DEMOLITION. CARBON
PRE-FILTERS MUST REMAIN IN PLACE UNTIL 7 DAYS AFTER INSTALLATION OF NEW
ROOF. REMOVE AND REPLACE FILTER WITH MANUFACTURER'S SPECIFIED FILTER
AFTER CONSTRUCTION.
5. KEEP THE FIRE LANES, HYDRANTS AND FIRE DEPARTMENT CONNECTIONS CLEAR AT
ALL TIMES.
6. PROVIDE AND MAINTAIN DIRECTIONAL SIGNS AROUND CONSTRUCTION FENCES,
BARRICADES AND AT BLOCKED EXITS.
7. MAINTAIN PEDESTRIAN WALKWAY PROTECTION NEAR THE PROJECT. WALKWAYS
MUST BE PROTECTED FROM OVERHEAD FALLING DEBRIS OR OBJECTS, PROJECTILES
AND CONSTRUCTION MATERIAL WHICH MAY PROTRUDE THROUGH THE FENCE.
8. PROVIDE COVERED CHEMICAL SECONDARY CONTAINMENT AND MAINTAIN SPILL
RESPONSE EQUIPMENT ON-SITE DAILY.
9. CONSTRUCTION NOISE SHALL NOT EXCEED 60dB. NOISE CONTROL MEASURES
SHALL BE SUBMITTED WITH A WORK PLAN 30 DAYS PRIOR TO THE START OF WORK.
10. ALL DEMOLITION SHALL BE PERFORMED IN ACCORDANCE WITH SPECIFICATION
SECTIONS: 02 41 00, 02 82 13.21 AND 02 83 33.13. PROVIDE INDUSTRIAL HYGIENIST TO
MONITOR ON-SITE ACTIVITIES DURING DEMOLITION.
11. ALL WELDING, CUTTING AND TORCHING SHALL BE LOCATED AWAY FROM BUILDING
AIR INTAKES.
12. TAR POTS ARE NOT ALLOWED ON THE VA CAMPUS.
13. ALL VEHICLES AND EQUIPMENT SHALL BE TURNED OFF WHEN NOT IN USE, IDLING IS
NOT ALLOWED. COMBUSTION TYPE ENGINES MUST BE KEPT AWAY FROM AIR
INTAKES.
14. PROVIDE OSHA COMPLIANT FALL PROTECTION FOR ALL WORKERS ON ROOF.
SAFETY WATCH IS NOT ALLOWED. FALL PROTECTION MUST BE INCLUDED IN SAFETY
PLAN AND COORDINATED WITH COR BEFORE STARTING WORK.
KEY NOTES:
1. CRITICAL AIR INTAKE, AIR HANDLER ON ROOF. PROVIDE MERV-8 RATED CARBON
PRE-FILTER FOR ODOR CONTROL. CARBON PRE-FILTER MUST BE IN-PLACE BEFORE
BEGINNING WORK AND MUST REMAIN IN PLACE FOR 7 DAYS AFTER THE COMPLETION
OF ROOF CONSTRUCTION. COORDINATE INSTALLATION AND REMOVAL OF CARBON
PRE-FILTER WITH COR. SEE SHEET GI004 FOR AIR INTAKE FILTER SCHEDULE AND
INFORMATION.
SCALE:
GC113
B1-A CONSTRUCTION CONTAINMENT OVER FIRST FLOOR
1/8" = 1'-0"
ROOF AREA ≈ 3,964 GSF
DHH BAJ
SCALE: 18" = 1'-0"
0 4' 8' 24'16'
NORTH
SCALE:
GC114
B1-B CONSTRUCTION CONTAINMENT OVER FIRST FLOOR
1/8" = 1'-0"
GC114
B1-B CONSTRUCTION CONTAINMENT
OVER FIRST FLOOR
KEY NOTES:
1. CRITICAL AIR INTAKE, AIR HANDLER ON ROOF. PROVIDE MERV-8 RATED CARBON
PRE-FILTER FOR ODOR CONTROL. CARBON PRE-FILTER MUST BE IN-PLACE BEFORE
BEGINNING WORK AND MUST REMAIN IN PLACE FOR 7 DAYS AFTER THE COMPLETION
OF ROOF CONSTRUCTION. COORDINATE INSTALLATION AND REMOVAL OF CARBON
PRE-FILTER WITH COR. SEE SHEET GI004 FOR AIR INTAKE FILTER SCHEDULE AND
INFORMATION.
2. CRITICAL AIR INTAKE, LOUVER ON EXTERIOR WALL. PROVIDE MERV-8 RATED
CARBON PRE-FILTER FOR ODOR CONTROL. CARBON PRE-FILTER MUST BE IN-PLACE
BEFORE BEGINNING WORK AND MUST REMAIN IN PLACE FOR 7 DAYS AFTER THE
COMPLETION OF ROOF CONSTRUCTION. COORDINATE INSTALLATION AND REMOVAL
OF CARBON PRE-FILTER WITH COR. SEE SHEET GI004 FOR AIR INTAKE FILTER
SCHEDULE AND INFORMATION.
1 2 2
DHH BAJ
SCALE: 18" = 1'-0"
0 4' 8' 24'16'
NORTH
SCALE:
GC115
B1-C CONSTRUCTION CONTAINMENT OVER SECOND FLOOR
1/8" = 1'-0"
GC115
B1-C CONSTRUCTION CONTAINMENT
OVER SECOND FLOOR
KEY NOTES:
1. CRITICAL AIR INTAKE, AIR HANDLER ON ROOF. PROVIDE MERV-8 RATED CARBON
PRE-FILTER FOR ODOR CONTROL. CARBON PRE-FILTER MUST BE IN-PLACE BEFORE
BEGINNING WORK AND MUST REMAIN IN PLACE FOR 7 DAYS AFTER THE COMPLETION
OF ROOF CONSTRUCTION. COORDINATE INSTALLATION AND REMOVAL OF CARBON
PRE-FILTER WITH COR. SEE SHEET GI004 FOR AIR INTAKE FILTER SCHEDULE AND
INFORMATION.
2. CRITICAL AIR INTAKE, LOUVER ON EXTERIOR WALL. PROVIDE MERV-8 RATED
CARBON PRE-FILTER FOR ODOR CONTROL. CARBON PRE-FILTER MUST BE IN-PLACE
BEFORE BEGINNING WORK AND MUST REMAIN IN PLACE FOR 7 DAYS AFTER THE
COMPLETION OF ROOF CONSTRUCTION. COORDINATE INSTALLATION AND REMOVAL
OF CARBON PRE-FILTER WITH COR. SEE SHEET GI004 FOR AIR INTAKE FILTER
SCHEDULE AND INFORMATION.
ROOF AREA ≈ 4,064 GSF
DHH BAJ
SCALE: 18" = 1'-0"
0 4' 8' 24'16'
NORTH
SCALE:
GC116
B1-D CONSTRUCTION CONTAINMENT OVER SECOND FLOOR
1/8" = 1'-0"
ROOF AREA ≈ 3,740 GSF
GC116
B1-D CONSTRUCTION CONTAINMENT
OVER SECOND FLOOR
KEY NOTES:
1. CRITICAL AIR INTAKE, AIR HANDLER ON ROOF. PROVIDE MERV-8 RATED CARBON
PRE-FILTER FOR ODOR CONTROL. CARBON PRE-FILTER MUST BE IN-PLACE BEFORE
BEGINNING WORK AND MUST REMAIN IN PLACE FOR 7 DAYS AFTER THE COMPLETION
OF ROOF CONSTRUCTION. COORDINATE INSTALLATION AND REMOVAL OF CARBON
PRE-FILTER WITH COR. SEE SHEET GI004 FOR AIR INTAKE FILTER SCHEDULE AND
INFORMATION.
2. CRITICAL AIR INTAKE, LOUVER ON EXTERIOR WALL. PROVIDE MERV-8 RATED
CARBON PRE-FILTER FOR ODOR CONTROL. CARBON PRE-FILTER MUST BE IN-PLACE
BEFORE BEGINNING WORK AND MUST REMAIN IN PLACE FOR 7 DAYS AFTER THE
COMPLETION OF ROOF CONSTRUCTION. COORDINATE INSTALLATION AND REMOVAL
OF CARBON PRE-FILTER WITH COR. SEE SHEET GI004 FOR AIR INTAKE FILTER
METAL
ROOF
N.I.C.
EAST ROOF AREASWEST ROOF AREAS
INTERIOR
AREA
INTERIOR
AREA
DHH BAJ
SCALE: 18" = 1'-0"
0 4' 8' 24'16'
NORTH
SCALE:
GC117
B1-E CONSTRUCTION CONTAINMENT OVER SEVENTH FLOOR
1/8" = 1'-0"
GC117
B1-E CONSTRUCTION CONTAINMENT
OVER SEVENTH FLOOR
EAST ROOF AREA ≈ 2,551 GSF
EAST ROOF ALCOVE AREA ≈ 375 GSF
WEST ROOF AREA ≈ 1,661 GSF
WEST ROOF ALCOVE AREA ≈ 543 GSF
KEY NOTES:
1. CRITICAL AIR INTAKE, AIR HANDLER ON ROOF. PROVIDE MERV-8 RATED CARBON
PRE-FILTER FOR ODOR CONTROL. CARBON PRE-FILTER MUST BE IN-PLACE BEFORE
BEGINNING WORK AND MUST REMAIN IN PLACE FOR 7 DAYS AFTER THE COMPLETION
OF ROOF CONSTRUCTION. COORDINATE INSTALLATION AND REMOVAL OF CARBON
PRE-FILTER WITH COR. SEE SHEET GI004 FOR AIR INTAKE FILTER SCHEDULE AND
INFORMATION.
1 1
INTERIOR
AREA
WEST ROOF AREA #1
WEST ROOF AREA #2
WEST ROOF AREA #3
DHH BAJ
SCALE: 18" = 1'-0"
0 4' 8' 24'16'
NORTH
SCALE:
GC118
B1-F (WEST) CONSTRUCTION CONTAINMENT OVER EIGHTH FLOOR
1/8" = 1'-0"
WEST ROOF AREA #1 ≈ 4,763 GSF
WEST ROOF AREA #2 ≈ 110 GSF
WEST ROOF AREA #1 ≈ 394 GSF
TOTAL WEST ROOF AREA ≈ 5,267 GSF
GC118
B1-F (WEST) CONSTRUCTION
CONTAINMENT OVER EIGHTH FLOOR
KEY NOTES:
1. CRITICAL AIR INTAKE, AIR HANDLER ON ROOF. PROVIDE MERV-8 RATED CARBON
PRE-FILTER FOR ODOR CONTROL. CARBON PRE-FILTER MUST BE IN-PLACE BEFORE
BEGINNING WORK AND MUST REMAIN IN PLACE FOR 7 DAYS AFTER THE COMPLETION
OF ROOF CONSTRUCTION. COORDINATE INSTALLATION AND REMOVAL OF CARBON
PRE-FILTER WITH COR. SEE SHEET GI004 FOR AIR INTAKE FILTER SCHEDULE AND
1 1
EAST ROOF AREA #1
EAST ROOF AREA #2
DHH BAJ
SCALE: 18" = 1'-0"
0 4' 8' 24'16'
NORTH
SCALE:
GC119
B1-F (EAST) CONSTRUCTION CONTAINMENT OVER EIGHTH FLOOR
1/8" = 1'-0"
GC119
B1-F (EAST) CONSTRUCTION
CONTAINMENT OVER EIGHTH FLOOR
EAST ROOF AREA #1 ≈ 4,870 GSF
EAST ROOF AREA #2 ≈ 110 GSF
TOTAL EAST ROOF AREA ≈ 4,980 GSF
KEY NOTES:
1. CRITICAL AIR INTAKE, AIR HANDLER ON ROOF. PROVIDE MERV-8 RATED CARBON
PRE-FILTER FOR ODOR CONTROL. CARBON PRE-FILTER MUST BE IN-PLACE BEFORE
BEGINNING WORK AND MUST REMAIN IN PLACE FOR 7 DAYS AFTER THE COMPLETION
OF ROOF CONSTRUCTION. COORDINATE INSTALLATION AND REMOVAL OF CARBON
PRE-FILTER WITH COR. SEE SHEET GI004 FOR AIR INTAKE FILTER SCHEDULE AND
INTERIOR
AREA
DHH BAJ
SCALE: 18" = 1'-0"
0 4' 8' 24'16'
NORTH
SCALE:
GC120
B1-G CONSTRUCTION CONTAINMENT OVER NINTH FLOOR
1/8" = 1'-0"
MAIN ROOF AREA ≈ 1,075 GSF
METAL ROOF AREA ≈ 1,333 GSF
GC120
B1-G CONSTRUCTION CONTAINMENT
OVER NINTH FLOOR
KEY NOTES:
1. CRITICAL AIR INTAKE, VENT HOOD ON ROOF. PROVIDE MERV-8 RATED CARBON
PRE-FILTER FOR ODOR CONTROL. CARBON PRE-FILTER MUST BE IN-PLACE BEFORE
BEGINNING WORK AND MUST REMAIN IN PLACE FOR 7 DAYS AFTER THE COMPLETION
OF ROOF CONSTRUCTION. COORDINATE INSTALLATION AND REMOVAL OF CARBON
PRE-FILTER WITH COR. SEE SHEET GI004 FOR AIR INTAKE FILTER SCHEDULE AND
INFORMATION.
2. CRITICAL AIR INTAKE, LOUVER ON EXTERIOR WALL. PROVIDE MERV-8 RATED
CARBON PRE-FILTER FOR ODOR CONTROL. CARBON PRE-FILTER MUST BE IN-PLACE
BEFORE BEGINNING WORK AND MUST REMAIN IN PLACE FOR 7 DAYS AFTER THE
COMPLETION OF ROOF CONSTRUCTION. COORDINATE INSTALLATION AND REMOVAL
OF CARBON PRE-FILTER WITH COR. SEE SHEET GI004 FOR AIR INTAKE FILTER
INTERIOR
AREA
DHH BAJ
SCALE: 18" = 1'-0"
0 4' 8' 24'16'
NORTH
SCALE:
GC121
B1-H CONSTRUCTION CONTAINMENT OVER TENTH FLOOR
1/8" = 1'-0"
SCALE:
GC121
B1-J CONSTRUCTION CONTAINMENT OVER PENTHOUSE FLOOR
1/8" = 1'-0"
ROOF AREA ≈ 561 GSF
ROOF AREA ≈ 592 GSF
GC121
B1-H+J CONSTRUCTION CONTAINMENT
OVER TENTH+PENTHOUSE FLOORS
KEY NOTES:
1. CRITICAL AIR INTAKE, LOUVER ON EXTERIOR WALL. PROVIDE MERV-8 RATED
CARBON PRE-FILTER FOR ODOR CONTROL. CARBON PRE-FILTER MUST BE IN-PLACE
BEFORE BEGINNING WORK AND MUST REMAIN IN PLACE FOR 7 DAYS AFTER THE
COMPLETION OF ROOF CONSTRUCTION. COORDINATE INSTALLATION AND REMOVAL
OF CARBON PRE-FILTER WITH COR. SEE SHEET GI004 FOR AIR INTAKE FILTER
| 663-18-102.2 002 GI002 |
| Sheets and Views |
| GI002 (2) |
| 663-18-102.2 005 GC113 |
| Sheets and Views |
| GC113 (2) |
| 663-18-102.2 006 GC114 |
| Sheets and Views |
| GC114 (2) |
| 663-18-102.2 007 GC115 |
| Sheets and Views |
| GC115 (2) |
| 663-18-102.2 008 GC116 |
| Sheets and Views |
| GC116 (2) |
| 663-18-102.2 009 GC117 |
| Sheets and Views |
| GC117 (2) |
| 663-18-102.2 010 GC118 |
| Sheets and Views |
| GC118 (2) |
| 663-18-102.2 011 GC119 |
| Sheets and Views |
| GC119 (2) |
| 663-18-102.2 012 GC120 |
| Sheets and Views |
| GC120 (2) |
| 663-18-102.2 013 GC121 |
| Sheets and Views |
| GC121 (2) |
| 663-18-102.2 004 GI004.pdf |
| Sheets and Views |
| GI004 (2) |
| 663-18-102.2 001 GI001.pdf |
| Sheets and Views |
| GI001 (2) |
File details come from the government source that posted it. Updated .