This document is a Statement of Work (SOW) for a federal contract opportunity to replace roofing systems at several buildings at the VA Puget Sound Healthcare System in Seattle, WA. The key details are:

The Department of Veterans Affairs, VA Puget Sound Healthcare System requires a contractor to provide all necessary services, labor, materials, and equipment to completely prepare project areas, perform selective demolition and removal of existing materials, and replace and/or repair roofing systems for Buildings 100, 1, 33, 20, and 22 at the Seattle campus. The total period of performance is 150 calendar days. The work is to be completed in phased construction, with the contractor required to provide a detailed phasing schedule for review and approval. There are specific requirements regarding work hours, contractor personnel access, and safeguarding of VA information. The solicitation will be issued as an SVOSB set-aside under NAICS code 236220, with an anticipated solicitation date of November 10, 2023.

View the file

Other files

File Type Posted
P01 Wage Determination-WA20240108.pdf PDF
36C26024R0027.docx DOCX document
P01 663-18-102.2 Phase IIa Roofs.pdf PDF
P01 663-18-102.3 Phase IIb Roofs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Project number: 663-18-102 Project Title: Replace Roofs Phase II – Seattle VA Project Location: VA Puget Sound Healthcare System, Seattle Division

1. GENERAL:

The Department of Veterans Affairs, VA Puget Sound Healthcare System (VAPSHCS) requires the services of a contractor to provide all necessary supervision, services, tools, labor, materials and equipment to completely prepare project areas for construction operations, including selective demolition and removal of existing materials, and furnishing all necessary tools, equipment, labor, materials, temporary equipment and items, specialty services, supervision, and performing all work to replace and/or repair select roofing systems of Buildings 100, 1, 33, 20, and 22 at the VAPSHCS Seattle Campus. The contractor shall provide payment and performance bonds within 10 days of award of contract. The Notice to Proceed will not be issued until after receipt of bonds. All work shall be performed per contract drawings and specifications.

2. Statement of bid items:

All work indicated on the drawings and specifications. Note that construction drawings may include buildings that are not a part of the base bid at time of solicitation. All bids will take into consideration the existing site conditions; it is the responsibility of the Contractor to review the entire job area and existing site conditions prior to bid submission to properly be able to price the work. It includes the following:

1. ITEM 1 – Base Bid:

1. Building 1 A, B, C, D, E, F, G, H, and J.

2. Building 100 A, B, C, D, F, H, J

3. Building 33

4. Building 20

5. Building 22

Work includes general construction and all labor, material, equipment and supervision to perform and complete the re-roofing and/or roof repairs as indicated on contract drawings. This work may include necessary removal of existing structures and construction, asbestos abatement and lightning protection work, and certain other items of work required by the drawings and specifications.

3. CONSTRUCTION PHASING:

See Contract Documents, Specification 01 00 00 – General Requirements for details. Arrange phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to the Medical Center Director, Project Engineer, and Contractor.

1. The Medical Center must maintain its operation 24 hours a day, 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the Project Engineer to ensure that no lapses in operation occur. It is the Contractor’s responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.

2. To ensure such executions, Contractor shall furnish the Project Engineer with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof.

3. In addition, Contractor shall notify the Project Engineer 30 days in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to insure accomplishment of this work in successive phases mutually agreeable to the Medical Center Director, Project Engineer, and Contractor. Refer to section 1.38 “RECOMMENDED ROOF PHASING PLAN” of the Specifications for additional information.

4. The Contractor is to submit his phasing schedule in writing to the Contracting Officer for review and approval no later than two weeks after issuance of the Notice to Proceed. This includes utility outages and access closures.

5. All work, such as corridor work, which is outside the main construction area, shall be done on evenings or weekends, so as not to disrupt the normal operations.

6. All renovation activities will take place at a busy Medical Center. The Contractor shall not interfere with existing, on-going functions, or normal activity of the hospital. The Contractor will provide walk off mats for dust control, appropriate construction barriers, and keep noise & vibration to a minimum during normal business hours. Certain portions of the work will be confined to evenings, and/or weekends, as identified on the drawings.

7. No work shall start until the preconstruction survey and inspection is completed.

8. The Contractor shall provide a detailed asbestos abatement schedule, if required by the project scope.

9. Any utility service, parking lot, roadway, loading dock, and/or Grounds interruptions requests shall be submitted in writing 30 days in advance of the planned utility interruption/access closure.

10. Set up phasing by buildings, wings, floors, areas in accordance with information received from the Medical Center through the Project Engineer and the Contracting Officer.

4. Work Hours:

All renovation activities will take place at a busy Medical Center. The Contractor shall not interfere with existing, on-going functions, or normal activity of the hospital.

1. Unless instructed by the COR, drawings, or specifications, construction work may occur during normal functioning business hours, 7:00 AM to 4:30 PM.

2. National Holidays: The ten holidays observed by the Federal Government are: New Year’s Day, Martin Luther King’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day and Christmas Day and any other day specifically declared by the President of the United States to be a national holiday.

5. CONTRACT SPECIFICATIONS AND CONTRACT DRAWINGS:

Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense. Where there are contradictions between either the statement of work, contract specifications and/or contract drawings, the most stringent shall apply.

6. SCHEDULING:

The total period of performance is 150 calendar days. A written work schedule identifying the work schedule shall be submitted to the project COR for review and approval. All work must be scheduled through individuals as identified by the COR.

7. CONTRACTOR PERSONNEL BADGES AND PARKING:

1. The contractor shall provide the COR with a list of contractor employees expected to enter the buildings to pick up confidential documents. While on VA premises, all contractor personnel shall comply with the rules, regulations, and procedures governing the conduct of personnel and the operation of the facility.

2. An access badge will be given to the contractor’s employee upon entrance into VA buildings.

The contractor employee must safeguard the access badge and immediately report any lost, stolen, or destroyed badges to the COR. All contract personnel must properly display their access badges. Access badges must be worn at or above the waist (facing forward.). The contractor’s employees must return the access badge(s) to the COR or designee at the end of each pick-up process.

3. The contractor shall be required to comply with all security policies/requirements of the VA Puget

Sound Healthcare System. All security policies/requirements must be met, and employees cleared prior to the contractor performing work under this contract. Contractors that cannot meet the security and clearance requirements shall not be allowed to perform work under this contract.

4. It is the responsibility of the contractor’s personnel to park in the appropriate designated parking areas. Parking information shall be coordinated with the facility COR.

8. Interference to Normal Function:

Contractor may be required to interrupt their work at any time so as not to interfere with the normal functioning of the facility, including utility services, fire protection systems, and passage of facility patients, personnel, equipment and carts.

1. In the event of an emergency, contractor services may be stopped and rescheduled at no additional cost to the government.

2. Contractor personnel shall inform the COR or the designee of the need to gain access to secured areas. If access is required to secure areas, prearranged scheduling will be made with COR or designee.

9. Privacy Officer Language for Statement of Work (SOW):

1. Information made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA. This clause expressly limits the contractor/subcontractor's rights to use data as described in Rights in Data- General, FAR 52.227-14(d) (1).

2. VA information should not be co-mingled, if possible, with any other data on the contractors/subcontractor’s information systems or media storage systems in order to ensure VA requirements related to data protection and media sanitization can be met. If co-mingling must be allowed to meet the requirements of the business need, the contractor must ensure that VA’s information is returned to the VA or destroyed in accordance with VA’s sanitization requirements. VA reserves the right to conduct on-site inspections of contractor and subcontractor IT resources to ensure data security controls, separation of data and job duties, and destruction/media sanitization procedures are in compliance with VA directive requirements.

3. Prior to termination or completion of this contract, contractor/subcontractor must not destroy information received from VA, or gathered/created by the contractor in the course of performing this contract without prior written approval by the VA. Any data destruction done on behalf of VA by a contractor/subcontractor must be done in accordance with National Archives and Records Administration (NARA) requirements as outlined in VA Directive 6300, Records and Information Management and its Handbook 6300.1 Records Management Procedures, applicable VA Records Control Schedules, and VA Handbook 6500.1, Electronic Media Sanitization. Self-certification by the contractor that the data destruction requirements above have been met must be sent to the VA Contracting Officer within 30 days of termination of the contract.

4. The contractor/subcontractor must receive, gather, store, back up, maintain, use, disclose and dispose of VA information only in compliance with the terms of the contract and applicable Federal and VA information confidentiality and security laws, regulations and policies. If Federal or VA information confidentiality and security laws, regulations and policies become applicable to the VA information or information systems after execution of the contract, or if NIST issues or updates applicable FIPS or Special Publications (SP) after execution of this contract, the parties agree to negotiate in good faith to implement the information confidentiality and security laws, regulations and policies in this contract.

5. The contractor/subcontractor shall not make copies of VA information except as authorized and necessary to perform the terms of the agreement or to preserve electronic information stored on contractor/subcontractor electronic storage media for restoration in case any electronic equipment or data used by the contractor/subcontractor needs to be restored to an operating state. If copies are made for restoration purposes, after the restoration is complete, the copies must be appropriately destroyed.

10. Privacy Officer Language for Statement of Work (SOW):

The following standard items relate to records generated in executing the contract and should be included in a typical Electronic Information Systems (EIS) procurement contract:

1. Citations to pertinent laws, codes and regulations such as 44 U.S.C chapters 21, 29, 31 and 33;

Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C. 552a); 36 CFR Part 1222 and Part 1228.

2. Contractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest.

3. Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records.

4. Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act.

5. Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract.

6. The Government Agency owns the rights to all data/records produced as part of this contract.

7. The Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc.) and all supporting documentation created as part of this contract. Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data.

8. Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974.

These policies include the preservation of all records created or received regardless of format [paper, electronic, etc.] or mode of transmission [e- mail, fax, etc.] or state of completion [draft, final, etc.].

9. No disposition of documents will be allowed without the prior written consent of the Contracting

Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules.

10. Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, this contract.

The Contractor (and any sub-contractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information.