P-678 Dry Dock 8 Saltwater System Specs Part 1 Vol1of4 Final Design Submittal 02282022.pdf
PDF 9 MB Posted
- Attached to
- P-678 Dry Dock 8 Saltwater System for CVN-78, Norfolk Naval Shipyard, Portsmouth, Virginia
- Solicitation number
- N40085-22-R-2598_Specifications
About this file
This document provides specifications for a federal contract solicitation to design and construct a saltwater system for Dry Dock 8 at the Norfolk Naval Shipyard in Portsmouth, Virginia. The project includes upgrading electrical distribution and drainage systems in the pumpwell, replacing main dewatering pump motors, modifying outfalls, and developing an underground saltwater distribution system along with intake structures and returns. Construction will occur in two phases to allow for dry docking of an aircraft carrier between periods. Phase 1 focuses on site electrical work and pumpwell upgrades, while Phase 2 develops saltwater supply and return lines. The specifications reference drawings and appendices providing historical data, permits, instructions, and other supporting documents. The response due date is not included, but the contract award is anticipated in 2022.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Naval Facilities Engineering Systems Command
NAVFAC MID-ATLANTIC
Work Order No. 1364315
Contract No. N40085-22-R-2598
P-678 DRY DOCK 8 SALTWATER SYSTEM
FOR CVN-78
Architectural:
Civil:
Structural:
Geotechnical:
Submitted By:
Approved By:
At the
Norfolk Naval Shipyard, Portsmouth, VA
PREPARED BY:
Moffatt & Nichol/Burns & McDonnell JV 101 W. Main Street
Suite 3000 Norfolk, VA 23511
Bertrand Gonzalez, AIA Cassandra Zwart, PE Adam Morel, PE Roderick Whitsel, PE, SE Maria Murdock, PE
Befu1daedd,PE,PMP AE Project Manager
James Donahue, RA Design Production Director
Mechanical: Tyler Godfrey, PE Electrical: Justin Cashwell, PE
Dmitri Zaichenko, PE Communications: Joseph A. Brittain, PE Fire Protection: Philip Bowman, PE
Date: 28 Feb 2022
Date: 15 Mar 2022
P-678 DRY DOCK 8
SALTWATER SYSTEM
PART 1, VOLUME 1
SPECIFICATIONS
DESIGN SUBMITTAL
Prepared for
NAVFAC MIDLANT
NORFOLK, VA
Contract No. N40085-22-R-2598 eProject #1364315
28 February 2022
Bertrand Gonzalez, AIA Architectural Cassandra Zwart, PE Civil Engineer
Adam Morel, PE Structural Engineer Roderick Whitsel, PE, SE Structural Engineer
Philip Bowman, PE Fire Protection
Engineer Tyler Godfrey, PE Mechanical
Justin Cashwell, PE Electrical
Dmitri Zaichenko, PE Electrical
P678 Dry Dock 8 Saltwater System for CVN-78 Norfolk Naval Shipyard, Portsmouth VA
WO#: 1364315
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
PART 1 – COMMON TO PHASE 1 AND PHASE 2
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 08/14 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 08/15 SUMMARY OF WORK
01 14 00.00 22 11/20 WORK RESTRICTIONS
01 20 00 02/21 PRICE AND PAYMENT PROCEDURES
01 30 00.00 22 11/20 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 20 02/21 ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
01 32 17.00 20 08/20 COST-LOADED NETWORK ANALYSIS SCHEDULES
(NAS)
01 33 00.00 22 08/18 SUBMITTAL PROCEDURES
01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND
REPORTING
01 35 13.00 22 11/20 SPECIAL PROJECT PROCEDURES
01 35 26.00 22 08/21 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 40.00 22 04/15 MARINE MAMMAL PROTECTION
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 22 02/21 QUALITY CONTROL
01 50 00.00 22 11/20 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19.00 22 04/21 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.01 20 08/20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL
CONTROLS
01 58 00 11/20 PROJECT IDENTIFICATION
01 74 19.00 22 02/19 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19 CLOSEOUT SUBMITTALS
01 78 23 11/20 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 11/20 FACILITY ELECTRONIC OPERATION AND
MAINTENANCE SUPPORT INFORMATION(eOMSI)
01 91 00.15 20 02/21 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00.00 22 02/19 DEMOLITION AND DECONSTRUCTION
02 61 13 02/21 EXCAVATION AND HANDLING OF CONTAMINATED
MATERIAL
02 81 00 02/21 TRANSPORTATION AND DISPOSAL
OF HAZARDOUS MATERIALS
02 82 00.00 22 11/18 LEAD REMEDIATION
02 83 00.00 22 11/18 ASBESTOS REMEDIATION
02 84 16.00 22 05/20 HANDLING OF LIGHTING BALLASTS AND LAMPS
CONTAINING PCBS AND MERCURY
02 84 33.00 22 04/06 REMOVAL AND DISPOSAL OF POLYCHLORINATED
BIPHENYLS (PCBs)
DIVISION 03 - CONCRETE
03 30 00 05/21 CAST-IN-PLACE CONCRETE
03 31 30 02/19 MARINE CONCRETE
PROJECT TABLE OF CONTENTS Page 2
DIVISION 05 – METALS
05 05 20.00 27 02/21 POST-INSTALLED CONCRETE AND MASONRY
ANCHORS
05 12 00 11/18 STRUCTURAL STEEL
05 40 00 08/18 COLD-FORMED METAL FRAMING
05 50 13 08/18 MISCELLANEOUS METAL FABRICATIONS
05 51 33 02/18 METAL LADDERS
05 52 00 02/18 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 11/18 ROUGH CARPENTRY
06 73 01 05/18 FIBERGLASS REINFORCED PLASTIC (FRP)
GRATING
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 92 00 11/18 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 71 00 08/20 DOOR HARDWARE
08 81 00 05/19 GLAZING
DIVISION 09 - FINISHES
09 22 00 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 02/20 GYPSUM BOARD
09 65 00 08/18 RESILIENT FLOORING
09 90 00.00 22 02/21 PAINTS AND COATINGS
09 90 50.00 22 11/05 PAINT REMOVAL AND CONTROLS
DIVISION 22 – PLUMBING
22 00 00 08/18 PLUMBING, GENERAL PURPOSE
22 14 29.00 40 05/17 SUMP PUMPS
22 15 14.00 40 11/17 GENERAL SERVICE COMPRESSED-AIR
SYSTEMS, LOW PRESSURE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 48.19 08/20 SEISMIC BRACING FOR HVAC
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 81 00 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT
DIVISION 25 – INTEGRATED AUTOMATION
25 05 11.01 05/21 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS
25 05 11.02 05/21 CYBERSECURITY FOR PUMP STATION
MONITORING AND CONTROL SYSTEMS
25 05 11.03 05/21 CYBERSECURITY FOR ELECTRICAL
SUBSTATION CONTROL SYSTEMS
25 05 11.04 05/21 CYBERSECURITY FOR EMERGENCY GENERATOR
CONTROL SYSTEMS
PROJECT TABLE OF CONTENTS Page 3
DIVISION 26 - ELECTRICAL
26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL
EQUIPMENT
26 08 00 02/15 APPARATUS INSPECTION AND TESTING
26 13 26.00 25 11/16 MEDIUM-VOLTAGE SWITCHGEAR
26 20 00 11/19 INTERIOR DISTRIBUTION SYSTEM
26 20 01 11/19 EXTERIOR DISTRIBUTION SYSTEM
26 51 00 05/20 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 31 76.00 22 08/14 INTERIOR ADDRESSABLE FIRE ALARM
SYSTEMS
DIVISION 31 – EARTHWORK
31 09 13 01/22 GEOTECHNICAL AND SURVEY MONITORING
31 23 00.00 20 08/15 EXCAVATION AND FILL
31 62 16.13 11/20 STEEL PIPE PILES
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT
32 11 23 08/17 AGGREGATE BASE COURSES
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SITE FACILITIES
32 17 23 11/18 PAVEMENT MARKINGS
32 31 13 05/17 CHAIN LINK FENCES AND GATES
DIVISION 33 - UTILITIES
33 08 55 08/19 FUEL DISTRIBUTION SYSTEM START-UP
(NON-HYDRANT)
33 11 00.00 22 05/16 POTABLE WATER UTILITY DISTRIBUTION
PIPING
33 11 00.01 22 02/11 SALTWATER UTILITY DISTRIBUTION PIPING
33 30 00 05/18 SANITARY SEWERAGE
33 31 00 10/18 EXTERIOR OILY WASTE, WASTE OIL PIPING
33 40 00 02/19 STORM DRAINAGE UTILITIES
33 52 23.15 11/18 POL SERVICE PIPING WELDING
33 52 40 11/20 FUEL SYSTEMS PIPING (NON-HYDRANT)
33 56 10 11/20 FACTORY-FABRICATED FUEL STORAGE TANKS
33 57 55 11/20 FUEL SYSTEM COMPONENTS (NON-HYDRANT)
33 61 13.19 11/20 VALVES, PIPING, AND EQUIPMENT IN
VALVE MANHOLES
33 63 13 04/06 EXTERIOR UNDERGROUND STEAM
DISTRIBUTION SYSTEM
33 71 02 11/19 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
Kemp, Richard A.
26 20 00 and 26 51 00 have been updated to common specs. Please add them both in this section.
Kemp, Richard A.
26 51 00 has been updated to a common spec. Please remove.
Kemp, Richard A.
26 51 00 has been updated to a common spec. Please remove.
PROJECT TABLE OF CONTENTS Page 4
DIVISION 34 - TRANSPORTATION
34 11 00 04/08 RAILROAD TRACK AND ACCESSORIES
34 11 19.00 20 08/18 WELDING CRANE AND RAILROAD RAIL -
THERMITE METHOD
DIVISION 40 - PROCESS INTERCONNECTIONS
40 05 13 02/20 PIPELINES, LIQUID PROCESS PIPING
40 05 13.96 05/10 WELDING PROCESS PIPING
40 60 00 05/20 PROCESS CONTROL
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.33 05/10 PORTAL CRANE TRACK INSTALLATION
41 22 23.19 05/20 MONORAIL HOISTS
PART 2 - COMMON TO PHASE 1
01 45 35 11/20 SPECIAL INSPECTIONS
07 21 16 08/18 MINERAL FIBER BLANKET INSULATION
DIVISION 26 – ELECTRICAL
26 11 13.00 20 11/21 PRIMARY UNIT SUBSTATION
23 13 00 11/14 SF6/HIGH-FIREPOINT FLUIDS INSULATED
PAD-MOUNTED SWITCHGEAR
26 29 01.00 10 11/08 ELECTRIC MOTORS, 3-PHASE VERTICAL
INDUCTION TYPE
26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY, WITH
AUXILIARIES AND LOAD BANK
DIVISION 31 - EARTHWORK
31 63 33 01/19 MICROPILES
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 45 04.00 10 11/20 SUBMERSIBLE PUMP, CENTRIFUGAL TYPE
FOR DRY PIT APPLICATOIN
PROJECT TABLE OF CONTENTS Page 5
PART 3 – COMMON TO PHASE 2
01 45 35 11/20 SPECIAL INSPECTIONS
DIVISION 05 - METALS
05 30 00 05/15 STEEL DECKS
05 51 00 05/17 METAL STAIRS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 13 33 08/17 PIER TIMBERWORK
07 14 00 02/18 FLUID-APPLIED WATERPROOFING
07 21 13 08/20 BOARD AND BLOCK INSULATION
07 22 00 11/18 ROOF AND DECK INSULATION
07 27 10.00 10 02/20 BUILDING AIR BARRIER SYSTEM
07 27 19.01 08/20 SELF-ADHERING AIR BARRIERS
07 52 00 11/19 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 11/18 FLASHING AND SHEET METAL
DIVISION 08 - OPENINGS
08 51 23 08/20 STEEL WINDOWS
DIVISION 10
- SPECIALTIES
10 14 00.10
11/18
EXTERIOR SIGNAGE
10 44 16 11/19 FIRE EXTINGUISHERS
DIVISION 21 - FIRE SUPPRESSION
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
DIVISION 26 – ELECTRICAL
26 29 01.00 10 11/08 ELECTRIC MOTORS, 3-PHASE VERTICAL
INDUCTION TYPE
26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY, WITH
AUXILIARIES
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
DIVISION 31 - EARTHWORK
31 41 16 01/22 STEEL SHEET PILE AND COMBINATION
PILE WALLS
31 52 00 01/22 TEMPORARY COFFERDAMS
31 62 19.13 08/17 TIMBER MARINE PILES
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 20 14 04/08 STOPLOGS
35 45 01 02/21 VERTICAL TURBINE PUMPS
35 59 35 01/22 MOORING FITTINGS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 6
SPECIFICATION APPENDICES
TABLE OF CONTENTS
Appendix A – Reference Drawings A1 – 1941 Dry Dock 8 Discharge Header and Culvert A2 – 1942 Dry Dock 8 Pumpwell A3 - 1941 Quay Wall North of Entrance Pile Plan A4 – 1961 Dry Dock 8 Pump Stations A5 – 1961 Utilities Increment – Dry Dock 8 Sheets A6 – 2009 Dry Dock 8 Repair Walls and Floor – Typical Sections A7 – 2016 Dry Dock 8 Stop Log Seat Repair A8 – 1998 NNSY Drawings – Pumpwell 8 Schematic Flooding & Dewatering Isometric A9 – 2020 Pumpwell 8 – Replace MDP-2 A10- 1941 Berth 39 Appendix B – Historical Geotechnical Data Appendix C – Project Geotechnical Data Appendix D – Soils Chemical and Environmental Analytical Results Appendix E – HAZMAT Inspection Drawing and Laboratory Reports Appendix F – Utility Test Hole Logs Appendix G – Electric Manhole Survey Appendix H - Stormwater Management Plan Appendix I – Permits and Approvals Appendix J – NNSY Instructions P5090 Appendix K – Five-Year Site Management Plan Appendix L – 1941 Berth 39
P678 Dry Dock 8 Saltwater System for CVN-78 Work Order#: 1364315 Norfolk Naval Shipyard, Portsmouth, VA
DOCUMENT 00 01 15
LIST OF DRAWINGS AND REFERENCE DOCUMENTS
02/11
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
Sheet Total First
NAVFAC #
Last NAVFAC
NAVFAC #'s Used
Gap Total #'s Used
Package 1 56 12857515 12857758 244 21 265
Package 2 57 12857781 12858077 297 28 325
113 49 590
Overall 12857515 12858104 590
INDEX OF DRAWINGS
SHEET
NO.
NAVFAC NO. SHEET NO. SHEET NAME
GENERAL
1 12857515 1-G-010 COVER SHEET
2 12857516 1-G-011 INDEX OF DRAWINGS - VOLUME 1 OF 4
3 12857517 1-GI001 PUMPWELL - LIFE SAFETY CODE ANALYSIS
4 12857518 1-GI100 PUMPWELL - LIFE SAFETY PLAN
5 12857519 1-GC101 OVERALL DEVELOPMENT PLAN
6 12857520 1-GC102 SITE ACCESS PLAN
7 12857521 1-GC111 PHASE 1 - PROJECT SITE LIMITS
SURVEY
1 12857522 1-VF001 SURVEY NOTES AND LEGEND
2 12857523 1-VF002 EXISTING STRUCTURE TABLES
3 12857524 1-VF100 PHASE 1 - EXISTING CONDITIONS PLAN - OVERALL
DOCUMENT 00 01 15 Page 1
4 12857525 1-VF107 PHASE 1 - EXISTING CONDITIONS PLAN - AREA 7
5 12857526 1-VF108 PHASE 1 - EXISTING CONDITIONS PLAN - AREA 8
6 12857527 1-VF109 PHASE 1 - EXISTING CONDITIONS PLAN - AREA 9
7 12857528 1-VF110 PHASE 1 - EXISTING CONDITIONS PLAN - AREA 10
8 12857529 1-VF112 PHASE 1 - EXISTING CONDITIONS PLAN - AREA 12
9 12857530 1-VF113 PHASE 1 - EXISTING CONDITIONS PLAN - AREA 13
10 12857531 1-VF114 PHASE 1 - EXISTING CONDITIONS PLAN - AREA 14
11 12857532 1-VF115 PHASE 1 - EXISTING CONDITIONS PLAN - AREA 15
GEOTECHNICAL
1 12857533 1-B-001 BORING LOCATION PLAN
2 12857534 1-B-002 BORING LOGS
3 12857535 1-B-003 BORING LOGS
4 12857536 1-B-004 BORING LOGS
5 12857537 1-B-005 BORING LOGS
6 12857538 1-B-006 BORING LOGS
7 12857539 1-B-007 SOUNDING INFORMATION
8 12857540 1-B-008 ENVIRONMENTAL SOIL INFORMATION
9 12857541 1-B-009 ENVIRONMENTAL SOIL INFORMATION
10 12857542 1-B-010 ENVIRONMENTAL SOIL INFORMATION
CIVIL
1 12857543 1-C-001 CIVIL LEGEND AND ABBREVIATIONS
2 12857544 1-C-002 CIVIL NOTES - 1
3 12857545 1-C-003 CIVIL NOTES - 2
4 12857546 1-C-004 CIVIL NOTES - 3
5 12857547 1-C-005 EROSION AND SEDIMENT CONTROL NARRATIVE - 1
6 12857548 1-C-006 EROSION AND SEDIMENT CONTROL NARRATIVE - 2
7 12857549 1-C-007 EROSION AND SEDIMENT CONTROL MINIMUM STANDARDS
8 12857550 1-CD100 PHASE 1 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -
OVERALL
9 12857551 1-CD107 PHASE 1 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -
AREA 7
10 12857552 1-CD108 PHASE 1 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -
AREA 8
11 12857553 1-CD109 PHASE 1 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -
AREA 9
12 12857554 1-CD112 PHASE 1 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -
AREA 12
13 12857555 1-CD113 PHASE 1 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -
AREA 13
14 12857556 1-CD114 PHASE 1 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -
AREA 14
15 12857557 1-CD115 PHASE 1 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -
AREA 15
16 12857558 1-CD501 PHASE 1 - CIVIL DEMOLITION DETAILS
17 12857559 1-CD502 PHASE 1 - CIVIL EROSION CONTROL DETAILS
18 12857560 1-CS100 PHASE 1 - CIVIL SITE PLAN - OVERALL
19 12857561 1-CS107 PHASE 1 - CIVIL SITE PLAN - AREA 7
20 12857562 1-CS108 PHASE 1 - CIVIL SITE PLAN - AREA 8
21 12857563 1-CS109 PHASE 1 - CIVIL SITE PLAN - AREA 9
DOCUMENT 00 01 15 Page 2
22 12857564 1-CS112 PHASE 1 - CIVIL SITE PLAN - AREA 12
23 12857565 1-CS113 PHASE 1 - CIVIL SITE PLAN - AREA 13
24 12857566 1-CS114 PHASE 1 - CIVIL SITE PLAN - AREA 14
25 12857567 1-CS115 PHASE 1 - CIVIL SITE PLAN - AREA 15
26 12857568 1-CS321 PHASE 1 - CIVIL SITE COORDINATES
27 12857569 1-CS501 PHASE 1 - CIVIL SITE PAVING DETAILS
28 12857570 1-CS502 PHASE 1 - CIVIL SITE RAILROAD DETAILS
29 12857571 1-CS503 PHASE 1 - CIVIL TRAFFIC BARRIER DETAILS
30 12857572 1-CU100 PHASE 1 - CIVIL UTILITY PLAN - OVERALL
31 12857573 1-CU107 PHASE 1 - CIVIL UTILITY PLAN - AREA 7
32 12857574 1-CU108 PHASE 1 - CIVIL UTILITY PLAN - AREA 8
33 12857575 1-CU109 PHASE 1 - CIVIL UTILITY PLAN - AREA 9
34 12857576 1-CU112 PHASE 1 - CIVIL UTILITY PLAN - AREA 12
35 12857577 1-CU113 PHASE 1 - CIVIL UTILITY PLAN - AREA 13
36 12857578 1-CU114 PHASE 1 - CIVIL UTILITY PLAN - AREA 14
37 12857579 1-CU115 PHASE 1 - CIVIL UTILITY PLAN - AREA 15
38 12857580 1-CU200 PHASE 1 - CIVIL ALIGNMENT PLAN
39 12857581 1-CU201 PHASE 1 - ELECTRICAL DUCTBANK PROFILES
40 12857582 1-CU202 PHASE 1 - ELECTRICAL DUCTBANK PROFILES
41 12857583 1-CU203 PHASE 1 - ELECTRICAL DUCTBANK PROFILES
42 12857584 1-CU204 PHASE 1 - ELECTRICAL DUCTBANK PROFILES
43 12857585 1-CU206 PHASE 1 - TELECOM DUCTBANK PROFILES
44 12857586 1-CU207 PHASE 1 - TELECOM DUCTBANK PROFILES
45 12857587 1-CU208 PHASE 1 - TELECOM DUCTBANK PROFILES
46 12857588 1-CU209 PHASE 1 - TELECOM DUCTBANK PROFILES
47 12857589 1-CU211 PHASE 1 - PUMPWELL DRAIN PROFILE
48 12857590 1-CU212 PHASE 1 - REDUNDANT DRAINAGE PUMP DISCHARGE
49 12857591 1-CU307 PHASE 1 - CIVIL UTILITY PLAN COORDINATES - AREA 7
50 12857592 1-CU308 PHASE 1 - CIVIL UTILITY PLAN COORDINATES - AREA 8
51 12857593 1-CU309 PHASE 1 - CIVIL UTILITY PLAN COORDINATES - AREA 9
52 12857594 1-CU312 PHASE 1 - CIVIL UTILITY PLAN COORDINATES - AREA 12
53 12857595 1-CU313 PHASE 1 - CIVIL UTILITY PLAN COORDINATES - AREA 13
54 12857596 1-CU314 PHASE 1 - CIVIL UTILITY PLAN COORDINATES - AREA 14
1-CU315 PHASE 1 - CIVIL UTILITY PLAN COORDINATES - AREA 15
55 12857597 1-CU321 PHASE 1 - CIVIL UTILITY COORDINATES
56 12857598 1-CU501 PHASE 1 - CIVIL UTILITY DETAILS
57 12857599 1-CG114 PHASE 1 - CIVIL GRADING AND DRAINAGE PLAN - AREA 14
1-CG115 PHASE 1 - CIVIL GRADING AND DRAINAGE PLAN - AREA 15
58 12857600 1-CG201 PHASE 1 - CIVIL STORM DRAIN PROFILES
59 12857601 1-CG202 PHASE 1 - CIVIL STORM DRAIN PROFILES
60 12857602 1-CG501 PHASE 1 - CIVIL GRADING AND DRAINAGE DETAILS
61 12857603 1-CG502 PHASE 1 - CIVIL GRADING AND DRAINAGE DETAILS
62 12857604 1-CG503 PHASE 1 - CIVIL GRADING AND DRAINAGE DETAILS
DOCUMENT 00 01 15 Page 3
63 12857605 1-CG504 PHASE 1 - CIVIL GRADING AND DRAINAGE DETAILS
STRUCTURAL
1 12857606 1-S-001 GENERAL NOTES
2 12857607 1-S-002 LEGEND AND ABBREVIATIONS
3 12857608 1-SD100 PUMPWELL 8 DEMOLITION KEY PLAN
4 12857609 1-SD102 PUMPWELL 8 DEMOLITION - MOTOR LEVEL PLAN
5 12857610 1-SD103 PUMPWELL 8 DEMOLITION - INTERMEDIATE LEVEL PLAN
6 12857611 1-SD104 PUMPWELL 8 DEMOLITION - MAIN PUMP AND SUCTION CHAMBER
LEVEL PLAN
7 12857612 1-SD115 STRUCTURAL DEMOLITION PLAN - AREA 15
8 12857613 1-SD201 PUMPWELL 8 DEMOLITION - INTERIOR ELEVATION
9 12857614 1-SD202 PUMPWELL 8 DEMOLITION - INTERIOR ELEVATIONS
10 12857615 1-SD401 DEMOLITION DETAILS - SOUTH FLOOD FLUME OUTFALL
11 12857616 1-S-100 PUMPWELL 8 KEYPLAN
12 12857617 1-S-102 PUMPWELL 8 - MOTOR LEVEL PLAN
13 12857618 1-S-103 PUMPWELL 8 - INTERMEDIATE LEVEL PLAN
14 12857619 1-S-104 PUMPWELL 8 - MAIN PUMP AND SUCTION CHAMBER LEVEL PLAN
15 12857620 1-S-201 PUMPWELL 8 - INTERIOR ELEVATIONS
16 12857621 1-S-202 PUMPWELL 8 - INTERIOR ELEVATIONS
17 12857622 1-S-203 PUMPWELL 8 - ELEVATIONS
18 12857623 1-S-301 PUMPWELL 8 - SECTIONS AND DETAILS
19 12857624 1-S-302 PUMPWELL 8 - SECTIONS AND DETAILS
20 12857625 1-S-421 PUMPWELL 8 - ENLARGED PLANS, SECTIONS AND DETAILS
21 12857626 1-S-422 PUMPWELL 8 - MAINTENANCE ACCESS PLATFORM PLANS,
SECTIONS AND DETAILS
22 12857627 1-S-501 TYPICAL FOUNDATION DETAILS
23 12857628 1-S-502 TYPICAL FOUNDATION DETAILS
24 12857629 1-S-503 TYPICAL STEEL FRAMING DETAILS
25 12857630 1-S-504 TYPICAL STEEL EDGE DETAILS
26 12857631 1-S-505 TYPICAL CONCRETE DETAILS
27 12857632 1-S-580 TYPICAL CONCRETE EDGE DETAILS
28 12857633 1-S-581 TYPICAL STAIR DETAILS
29 12857634 1-S-582 TYPICAL STAIR DETAILS
30 12857635 1-S-583 TYPICAL STEEL CONNECTION DETAILS
31 12857636 1-SS501 TYPICAL CRANE RAIL RECONSTRUCTION DETAILS
32 12857637 1-SS502 FUEL TANK FOUNDATION PLANS AND SECTION
33 12857638 1-SS503 GENERATOR FOUNDATION PLAN AND SECTIONS
34 12857639 1-SS504 SUBSTATION AND SWITCHGEAR FOUNDATION PLAN
35 12857640 1-SB001 STRUCTURAL FOUNDATION GENERAL NOTES
36 12857641 1-SB002 ABBREVIATIONS AND LEGEND
37 12857642 1-SB003 DRY DOCK STRUCTURAL TYPICAL DETAILS
38 12857643 1-SB004 DRY DOCK AND SITE STRUCTURAL TYPICAL DETAILS
39 12857644 1-SB115 STRUCTURAL PLAN - SOUTH FLOOD FLUME OUTFALL - AREA 15
40 12857645 1-SB401 SOUTH FLOOD FLUME OUTFALL DETAILS
DOCUMENT 00 01 15 Page 4
41 12857646 1-SB501 STRUCTURAL SLAB DETAILS
GENERAL
1 12857647 1-G-020 COVER SHEET
2 12857648 1-G-021 INDEX OF DRAWINGS - VOLUME 2 OF 4
ARCHITECTURAL
1 12857649 1-A-001 ARCHITECTURAL SYMBOLS, LEGENDS, ABBREVIATIONS AND NOTES
2 12857650 1-AD102 PUMPWELL 8 – DEMOLITION PLAN -MOTOR
3 12857651 1-A-102 PUMPWELL 8 – PLAN, REFLECTED CEIING PLAN & SCHEDULES -
MOTOR
4 12857652 1-A-600 PUMPWELL 8 - DOOR SCHEDULE, PARTITION TYPES & MISC
DETAILS
FIRE PROTECTION
1 12857653 1-FA001 FIRE ALARM GENERAL SHEET
2 12857654 1-FA100 PUMPWELL 8 - FIRE ALARM - KEY PLAN
3 12857655 1-FA102 PUMPWELL - FIRE ALARM PLAN - MOTOR
4 12857656 1-FA103 PUMPWELL - FIRE ALARM PLAN - INTERMEDIATE
5 12857657 1-FA104 PUMPWELL - FIRE ALARM PLAN - MAIN PUMP
6 12857658 1-FA501 FIRE ALARM DETAILS
MECHANICAL
1 12857659 1-M-001 LEGEND, ABBREVIATIONS AND NOTES
2 12857660 1-MD101 PUMPWELL 8 - DEMOLITION PLAN - GRADE LEVEL
3 12857661 1-MD102 PUMPWELL 8 - DEMOLITION PLAN - MOTOR
4 12857662 1-MD103 PUMPWELL 8 - DEMOLITION PLAN - INTERMEDIATE
5 12857663 1-MD104 PUMPWELL 8 - DEMOLITION PLAN - MAIN PUMP
6 12857664 1-MD105 PUMPWELL 8 - DEMOLITION PLAN - DRAINAGE PUMP
7 12857665 1-MD115 SOUTH FLOODING FLUME - DEMOLITION PLAN
8 12857666 1-MD301 PUMPWELL 8 - DEMOLITION SECTION - DRAINAGE PUMP
9 12857667 1-MD302 PUMPWELL 8 - DEMOLITION SECTION - MAIN DEWATERING PUMPS
10 12857668 1-MD401 PUMPWELL 8 - DEMOLITION ENLARGED PLAN - DRAINAGE PUMP
11 12857669 1-MP101 PUMPWELL 8 - MECHANICAL PLAN - GRADE LEVEL
12 12857670 1-MP102 PUMPWELL 8 - MECHANICAL PLAN - MOTOR
13 12857671 1-MP103 PUMPWELL 8 - MECHANICAL PLAN - INTERMEDIATE
14 12857672 1-MP104 PUMPWELL 8 - MECHANICAL PLAN - MAIN PUMP
15 12857673 1-MP105 PUMPWELL 8 - MECHANICAL PLAN - DRAINAGE PUMP
16 12857674 1-MP115 SOUTH FLOODING FLUME - MECHANICAL PLAN
17 12857675 1-MP301 PUMPWELL 8 - MECHANICAL SECTION - DRAINAGE PUMP
PW8-DP-1,2,3
18 12857676 1-MP302 PUMPWELL 8 - MECHANICAL SECTION - DRAINAGE PUMP
PW8-DP-4,5
19 12857677 1-MP303 SOUTH FLOODING FLUME - MECHANICAL SECTION
20 12857678 1-MP304 MAIN DEWATERING PUMP - MECHANICAL SECTION
21 12857679 1-MP401 PUMPWELL 8 - MECHANICAL ENLARGED PLAN - DRAINAGE PUMP
PW8-DP-1,2,3
22 12857680 1-MP402 PUMPWELL 8 - MECHANICAL ENLARGED PLAN - DRAINAGE PUMP
PW8-DP-4,5
23 12857681 1-M-501 MECHANICAL DETAILS
DOCUMENT 00 01 15 Page 5
24 12857682 1-M-502 MECHANICAL DETAILS
25 12857683 1-M-503 MECHANICAL DETAILS
26 12857684 1-M-504 MECHANICAL DETAILS
27 12857685 1-M-505 MECHANICAL DETAILS
28 12857686 1-M-506 MECHANICAL DETAILS
29 12857687 1-M-507 MECHANICAL STEAM DETAILS
30 12857688 1-M-601 MECHANICAL SCHEDULES
31 12857689 1-M-701 PUMPWELL 8 SCHEMATIC
32 12857690 1-M-801 CONTROLS LEGEND AND GENERAL NOTES
33 12857691 1-M-802 PUMP WELL CONTROL CONSOLE AND SCADA DETAILS
34 12857692 1-M-803 PUMPWELL 8 CONTROL CONSOLE LAYOUT
35 12857693 1-M-810 MAIN DEWATERING PUMP P&ID
36 12857694 1-M-811 MAIN DEWATERING PUMP AND MOTOR MONITORING P&ID
37 12857695 1-M-820 DRAINAGE PUMP P&ID
38 12857696 1-M-821 DRAINAGE PUMP MOTOR MONITORING P&ID
39 12857697 1-M-822 DRAINAGE PUMP SEQUENCE OF OPERATION
40 12857698 1-M-830 SUMP PUMP P&ID
41 12857699 1-M-840 FUEL OIL P&ID
42 12857700 1-M-850 HVAC CONTROLS
43 12857701 1-M-901 PUMPWELL 8 MECHANICAL ISOMETRICS
44 12857702 1-M-902 PUMPWELL 8 MECHANICAL ISOMETRICS
ELECTRICAL
1 12857703 1-E-001 LEGEND, ABBREVIATIONS AND GENERAL NOTES
2 12857704 1-E-011 LEGEND, ABBREVIATIONS AND SYMBOLS
3 12857705 1-E-012 GENERAL NOTES
4 12857706 1-ED101 PUMPWELL 8 - ELECTRICAL DEMOLITION PLAN
5 12857707 1-ED102 PUMPWELL 8 - ELECTRICAL DEMOLITION PLAN
6 12857708 1-ED129 ELECTRICAL SITE DEMOLITION PLAN - AREA 9
7 12857709 1-ED132 ELECTRICAL SITE DEMOLITION PLAN - AREA 12
8 12857710 1-ED133 ELECTRICAL SITE DEMOLITION PLAN - AREA 13
9 12857711 1-ED134 ELECTRICAL SITE DEMOLITION PLAN - AREA 14
10 12857712 1-ED135 ELECTRICAL SITE DEMOLITION PLAN - AREA 15
11 12857713 1-ED700 PUMPWELL 8 - DEMOLITION ONE-LINE DIAGRAM
12 12857714 1-EG501 GROUNDING DETAILS
13 12857715 1-EL501 LIGHTING SCHEDULE AND DETAILS
14 12857716 1-EP101 PUMPWELL 8 - ELECTRICAL POWER PLAN
15 12857717 1-EP102 PUMPWELL 8 - ELECTRICAL POWER PLAN
16 12857718 1-EP103 PUMPWELL 8 - ELECTRICAL POWER PLAN
17 12857719 1-EP201 PUMPWELL 8 - EQUIPMENT ELEVATIONS
18 12857720 1-EP501 ELECTRICAL DETAILS
19 12857721 1-EP601 PUMPWELL 8 - SCHEDULES AND ELEVATIONS
20 12857722 1-EP602 PUMPWELL 8 - PANELBOARD SCHEDULES
DOCUMENT 00 01 15 Page 6
21 12857723 1-EP701 PUMPWELL 8 - ONE LINE DIAGRAMS
22 12857724 1-EP702 PUMPWELL 8 - ONE LINE DIAGRAMS
23 12857725 1-ES127 ELECTRICAL SITE PLAN - AREA 7
24 12857726 1-ES128 ELECTRICAL SITE PLAN - AREA 8
25 12857727 1-ES129 ELECTRICAL SITE PLAN - AREA 9
26 12857728 1-ES132 ELECTRICAL SITE PLAN - AREA 12
27 12857729 1-ES133 ELECTRICAL SITE PLAN - AREA 13
28 12857730 1-ES134 ELECTRICAL SITE PLAN - AREA 14
29 12857731 1-ES135 ELECTRICAL SITE PLAN - AREA 15
30 12857732 1-ES201 MV SWITCH PLAN AND ELEVATION
31 12857733 1-ES202 SUBSTATION PLAN AND ELEVATION
32 12857734 1-ES401 ENLARGED PLAN - BUILDING 272
33 12857735 1-ES403 ENLARGED SUBSTATION PLATFORM PLAN - CLEARANCE
34 12857736 1-ES404 ENLARGED SUBSTATION PLATFORM PLAN - GROUNDING
35 12857737 1-ES405 ENLARGED PLAN - SUBSTATION PLATFORM
36 12857738 1-ES406 ENLARGED PLAN - SUBSTATION PLATFORM
37 12857739 1-ES501 DUCTBANK DETAILS
38 12857740 1-ES502 DUCTBANK DETAILS
39 12857741 1-ES503 DUCTBANK DETAILS - MANHOLE 897
40 12857742 1-ES504 DUCTBANK DETAILS
41 12857743 1-ES505 DUCTBANK DETAILS
42 12857744 1-ES506 MANHOLE DETAILS
43 12857745 1-ES507 MANHOLE DETAILS
44 12857746 1-ES508 MANHOLE DETAILS
45 12857747 1-ES509 MANHOLE DETAILS
46 12857748 1-ES510 MANHOLE DETAILS
47 12857749 1-ES516 GROUNDING DETAILS
48 12857750 1-ES520 FIBER RISER
49 12857751 1-ES603 CONDUIT AND CABLING SCHEDULE
50 12857752 1-ES701 MV SYSTEM ONE-LINE DEMOLITION - SHEET A
51 12857753 1-ES702 MV SYSTEM ONE-LINE DEMOLITION - SHEET B
52 12857754 1-ES703 MV SYSTEM ONE-LINE DEMOLITION - SHEET C
53 12857755 1-ES705 MV SYSTEM ONE-LINE NEW WORK - SHEET A
54 12857756 1-ES706 SUBSTATION ONE-LINE DIAGRAM
55 12857757 1-ES707 PRIMARY UNIT SUBSTATION CONTROL POWER CIRCUITS
56 12857758 1-ES710 SCADA FIBER OPTIC CABLING DIAGRAM
INDEX OF DRAWINGS
SHEET
NO.
NAVFAC NO. SHEET NO. SHEET NAME
GENERAL
DOCUMENT 00 01 15 Page 7
1 12857781 2-G-030 COVER SHEET
2 12857782 2-G-031 INDEX OF DRAWINGS - VOLUME 3 OF 4
3 12857783 2-GD150 BUILDING 828 - DEMOLITION PLANS & SECTION
4 12857784 2-GD160 BUILDING 829 - DEMOLITION PLANS & SECTION
5 12857785 2-GI050 PUMP STATION 6 - LIFE SAFETY CODE ANALYSIS
6 12857786 2-GI060 PUMP STATION 8 - LIFE SAFETY CODE ANALYSIS
7 12857787 2-GI150 PUMP STATION 6 - LIFE SAFETY PLAN
8 12857788 2-GI160 PUMP STATION 8 - LIFE SAFETY PLAN
9 12857789 2-GC111 PHASE 2 - PROJECT SITE LIMITS
10 12857790 2-GC121 PHASE 2 - FIRE PROTECTION SITE PLAN
CIVIL
11 12857791 2-CD100 PHASE 2 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -
OVERALL
12 12857792 2-CD107 PHASE 2 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -
AREA 7
13 12857793 2-CD108 PHASE 2 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -
AREA 8
14 12857794 2-CD109 PHASE 2 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -
AREA 9
15 12857795 2-CD110 PHASE 2 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -
AREA 10
16 12857796 2-CD112 PHASE 2 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -
AREA 12
17 12857797 2-CD113 PHASE 2 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -
AREA 13
18 12857798 2-CD114 PHASE 2 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -
AREA 14
19 12857799 2-CD115 PHASE 2 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -
AREA 15
DOCUMENT 00 01 15 Page 8
20 12857800 2-CD221 PHASE 2 - UTILITY CORRIDOR A - DEMOLITION PLAN AND
PROFILE
21 12857801 2-CS100 PHASE 2 - CIVIL SITE PLAN - OVERALL
22 12857802 2-CS107 PHASE 2 - CIVIL SITE PLAN - AREA 7
23 12857803 2-CS108 PHASE 2 - CIVIL SITE PLAN - AREA 8
24 12857804 2-CS109 PHASE 2 - CIVIL SITE PLAN - AREA 9
25 12857805 2-CS110 PHASE 2 - CIVIL SITE PLAN - AREA 10
26 12857806 2-CS112 PHASE 2 - CIVIL SITE PLAN - AREA 12
27 12857807 2-CS113 PHASE 2 - CIVIL SITE PLAN - AREA 13
28 12857808 2-CS114 PHASE 2 - CIVIL SITE PLAN - AREA 14
29 12857809 2-CS115 PHASE 2 - CIVIL SITE PLAN - AREA 15
30 12857810 2-CS321 PHASE 2 - CIVIL SITE COORDINATES
31 12857811 2-CS501 PHASE 2 - CIVIL SITE IMPROVEMENT DETAILS
32 12857812 2-CU100 PHASE 2 - CIVIL UTILITY PLAN - OVERALL
33 12857813 2-CU107 PHASE 2 - CIVIL UTILITY PLAN - AREA 7
34 12857814 2-CU108 PHASE 2 - CIVIL UTILITY PLAN - AREA 8
35 12857815 2-CU109 PHASE 2 - CIVIL UTILITY PLAN - AREA 9
36 12857816 2-CU110 PHASE 2 - CIVIL UTILITY PLAN - AREA 10
37 12857817 2-CU112 PHASE 2 - CIVIL UTILITY PLAN - AREA 12
38 12857818 2-CU113 PHASE 2 - CIVIL UTILITY PLAN - AREA 13
39 12857819 2-CU114 PHASE 2 - CIVIL UTILITY PLAN - AREA 14
DOCUMENT 00 01 15 Page 9
40 12857820 2-CU115 PHASE 2 - CIVIL UTILITY PLAN - AREA 15
41 12857821 2-CU200 PHASE 2 - CIVIL ALIGNMENT PLAN
42 12857822 2-CU201 PHASE 2 - ELECTRICAL DUCTBANK PROFILES
43 12857823 2-CU202 PHASE 2 - TELECOM DUCTBANK PROFILES
44 12857824 2-CU203 PHASE 2 - ELECTRICAL AND TELECOM DUCTBANK PROFILES
45 12857825 2-CU204 PHASE 2 - TELECOM DUCTBANK PROFILES
46 12857826 2-CU211 PHASE 2 - SALTWATER SUPPLY MAIN PROFILE - 1
47 12857827 2-CU212 PHASE 2 - SALTWATER SUPPLY MAIN PROFILE - 2
48 12857828 2-CU213 PHASE 2 - SALTWATER SUPPLY MAIN PROFILE - 3
49 12857829 2-CU214 PHASE 2 - SALTWATER SUPPLY MAIN PROFILE - 4
50 12857830 2-CU215 PHASE 2 - SALTWATER SUPPLY LATERAL PROFILES - 1
51 12857831 2-CU216 PHASE 2 - SALTWATER SUPPLY LATERAL PROFILES - 2
52 12857832 2-CU221 PHASE 2 - UTILITY CORRIDOR A - PLAN AND PROFILE
53 12857833 2-CU222 PHASE 2 - UTILITY CORRIDOR B - PLAN AND PROFILE
54 12857834 2-CU223 PHASE 2 - UTILITY CORRIDOR C - PLAN AND PROFILE
55 12857835 2-CU224 PHASE 2 - UTILITY CORRIDOR D - PLAN AND PROFILE
56 12857836 2-CU225 PHASE 2 - UTILITY CORRIDOR E - PLAN AND PROFILE
57 12857837 2-CU231 PHASE 2 - OW/WO PLAN AND PROFILE
58 12857838 2-CU307 PHASE 2 - CIVIL UTILITY PLAN COORDINATES - AREA 7
59 12857839 2-CU308 PHASE 2 - CIVIL UTILITY PLAN COORDINATES - AREA 8
DOCUMENT 00 01 15 Page 10
60 12857840 2-CU309 PHASE 2 - CIVIL UTILITY PLAN COORDINATES - AREA 9
61 12857841 2-CU310 PHASE 2 - CIVIL UTILITY PLAN COORDINATES - AREA 10
62 12857842 2-CU312 PHASE 2 - CIVIL UTILITY PLAN COORDINATES - AREA 12
63 12857843 2-CU313 PHASE 2 - CIVIL UTILITY PLAN COORDINATES - AREA 13
64 12857844 2-CU314 PHASE 2 - CIVIL UTILITY PLAN COORDINATES - AREA 14
65 12857845 2-CU315 PHASE 2 - CIVIL UTILITY PLAN COORDINATES - AREA 15
66 12857846 2-CU321 PHASE 2 - CIVIL UTILITY COORDINATES
67 12857847 2-CU501 PHASE 2 - CIVIL UTILITY DETAILS
68 12857848 2-CU502 PHASE 2 - CIVIL UTILITY DETAILS
69 12857849 2-CG110 PHASE 2 - CIVIL GRADING AND DRAINAGE PLAN - AREA 10
70 12857850 2-CG115 PHASE 2 - CIVIL GRADING AND DRAINAGE PLAN - AREA 15
71 12857851 2-CG201 PHASE 2 - CIVIL STORM DRAIN PROFILES
72 12857852 2-CG202 PHASE 2 - CIVIL STORM DRAIN PROFILES
73 12857853 2-CG501 PHASE 2 - CIVIL GRADING AND DRAINAGE DETAILS
74 12857854 2-CG502 PHASE 2 - CIVIL GRADING AND DRAINAGE DETAILS
STRUCTURAL
75 12857855 2-S-001 GENERAL NOTES
76 12857856 2-S-002 GENERAL NOTES
77 12857857 2-S-003 LEGEND AND ABBREVIATIONS
78 12857858 2-S-004 PUMP STATION 6 AND 8 WIND ISOMETRIC DIAGRAMS
DOCUMENT 00 01 15 Page 11
79 12857859 2-SD110 STRUCTURAL FOUNDATION DEMO PLAN - PUMP STATION PS-6 -
AREA 10
80 12857860 2-SD115 STRUCTURAL FOUNDATION DEMO PLAN - PUMP STATION PS-8 -
AREA 15
81 12857861 2-SD301 PUMP STATION PS-6 FOUNDATION DEMOLITION SECTIONS -
STAGE 1
82 12857862 2-SD302 PUMP STATION PS-6 FOUNDATION DEMOLITION SECTIONS -
STAGE 2
83 12857863 2-SD303 PUMP STATION PS-8 FOUNDATION DEMOLITION SECTIONS
84 12857864 2-SD401 PUMP STATION PS-6 ENLARGED FOUNDATION DEMOLITION PLAN
- STAGE 1
85 12857865 2-SD402 PUMP STATION PS-6 ENLARGED FOUNDATION DEMOLITION PLAN
- STAGE 2
86 12857866 2-SD403 PUMP STATION PS-8 ENLARGED FOUNDATION DEMOLITION PLAN
87 12857867 2-SD404 DEMOLITION DETAILS - NORTH FLOOD FLUME OUTFALL
88 12857868 2-SD405 TEMPORARY COFFERDAM PLAN AND SECTIONS
89 12857869 2-SD406 INTAKE STRUCTURE DEMOLITION DETAILS - AREA 10
90 12857870 2-SD407 INTAKE STRUCTURE DEMOLITION DETAILS - AREA 15
91 12857871 2-S-150 PUMP STATION 6 - FOUNDATION PLAN
92 12857872 2-S-151 PUMP STATION 6 - FRAMING PLAN - FIRST FLOOR
93 12857873 2-S-152 PUMP STATION 6 - FRAMING PLAN - SECOND FLOOR
94 12857874 2-S-153 PUMP STATION 6 - FRAMING PLAN - ROOF
95 12857875 2-S-160 PUMP STATION 8 - FOUNDATION PLAN
96 12857876 2-S-161 PUMP STATION 8 - FRAMING PLAN - FIRST FLOOR
97 12857877 2-S-162 PUMP STATION 8 - FRAMING PLAN - SECOND FLOOR
98 12857878 2-S-163 PUMP STATION 8 - FRAMING PLAN - ROOF
DOCUMENT 00 01 15 Page 12
99 12857879 2-S-215 EXTERIOR STAIR ELEVATIONS
100 12857880 2-S-216 EXTERIOR STAIR ELEVATIONS
101 12857881 2-S-217 INTERIOR STAIR ELEVATIONS
102 12857882 2-S-220 PUMP STATION 6 AND 8 TYPICAL WALL ELEVATIONS
103 12857883 2-S-301 PUMP STATION 6 AND 8 SECTIONS & DETAILS
104 12857884 2-S-302 PUMP STATION 6 AND 8 SECTIONS & DETAILS
105 12857885 2-S-303 PUMP STATION 6 AND 8 SECTIONS & DETAILS
106 12857886 2-S-415 PUMP STATION 6 AND 8 ROOF ENLARGED PLAN
107 12857887 2-S-416 ROOF HATCH PLAN AND SECTIONS
108 12857888 2-S-430 EXTERIOR STAIR ENLARGED PLAN
109 12857889 2-S-431 EXTERIOR STAIR ENLARGED PLAN
110 12857890 2-S-503 PUMP STATION 6 AND 8 TYPICAL FRAMING DETAILS
111 12857891 2-S-515 PUMP STATION 6 AND 8 STANDARD BASE PLATE AND ANCHOR
BOLT DETAILS
112 12857892 2-SS501 TYPICAL SITE STRUCTURAL PIPE SUPPORT DETAILS
113 12857893 2-SS502 TYPICAL CRANE RAIL RECONSTRUCTION DETAILS
114 12857894 2-SS504 GENERATOR AND FUEL TANK FOUNDATION PLANS
115 12857895 2-SS505 STOP LOG FOUNDATION PLAN, SECTIONS AND DETAILS
116 12857896 2-SB110 STRUCTURAL FOUNDATION PLAN - PUMP STATION PS-6 - AREA
117 12857897 2-SB115 STRUCTURAL FOUNDATION PLAN - PUMP STATION PS-8 - AREA
118 12857898 2-SB301 PUMP STATION PS-6 FOUNDATION SECTIONS
DOCUMENT 00 01 15 Page 13
119 12857899 2-SB302 PUMP STATION PS-6 FOUNDATION SECTIONS
120 12857900 2-SB303 PUMP STATION PS-8 FOUNDATION SECTIONS
121 12857901 2-SB401 PUMP STATION PS-6 ENLARGED FOUNDATION PLAN
122 12857902 2-SB402 PUMP STATION PS-8 ENLARGED FOUNDATION PLAN
123 12857903 2-SB403 NORTH FLOOD FLUME OUTFALL DETAILS
124 12857904 2-SB501 PILE AND PUMP STATION FOUNDATION DETAILS
125 12857905 2-SB502 PUMP STATION PS-6 INTAKE STRUCTURES REINFOCING DETAILS
126 12857906 2-SB503 PUMP STATION PS-8 FOUNDATION SLAB REINORCING DETAILS
127 12857907 2-SB504 PUMP STATION PS-8 INTAKE STRUCTURES REINFOCING DETAILS
128 12857908 2-SB505 MISCELLANEOUS REINFORCING DETAILS
129 12857909 2-SB506 PS-6 FENDER DETAILS
130 12857910 2-SB507 INTAKE GRATING AND STIFFENED PLATE DETAILS - 1 of 2
131 12857911 2-SB508 INTAKE GRATING AND STIFFENED PLATE DETAILS - 2 of 2
132 12857912 2-SB509 INTAKE STRUCTURES SCREEN DETAILS
133 12857913 2-SB510 STRUCTURAL SLAB DETAILS
134 12857914 2-SB601 PILE SCHEDULES - PUMP STATION PS-6
135 12857915 2-SB602 PILE SCHEDULES - PUMP STATION PS-8
ARCHITECTURAL
136 12857916 2-A-151 PUMP STATION 6 - FLOOR PLAN - FIRST LEVEL & SECOND
LEVEL
137 12857917 2-A-153 PUMP STATION 6 - ROOF PLAN & DETAILS
DOCUMENT 00 01 15 Page 14
138 12857918 2-A-161 PUMP STATION 8 - FLOOR PLAN - FIRST LEVEL, SECOND
LEVEL & ROOF
139 12857919 2-A-250 PUMP STATION 6 - BUILDING ELEVATIONS
140 12857920 2-A-260 PUMP STATION 8 - BUILDING ELEVATIONS
141 12857921 2-A-350 PUMP STATION 6 & 8 - TYP. BUILDING & WALL SECTIONS
142 12857922 2-A-601 DOOR & FINISH SCHEDULE
FIRE PROTECTION
143 12857923 2-F-001 FIRE PROTECTION GENERAL SHEET
144 12857924 2-FA150 PUMP STATION 6 - FIRE ALARM PLAN
145 12857925 2-FA160 PUMP STATION 8 - FIRE ALARM PLAN
146 12857926 2-FA501 FIRE ALARM DETAILS
147 12857927 2-FX150 PUMP STATION 6 - FIRE SUPPRESSION PLAN
148 12857928 2-FX160 PUMP STATION 8 - FIRE SUPPRESSION PLAN
149 12857929 2-FX501 FIRE SUPPRESSION DETAILS
GENERAL
150 12857930 2-G-040 COVER SHEET
151 12857931 2-G-041 INDEX OF DRAWINGS - VOLUME 4 OF 4
MECHANICAL
152 12857932 2-M-001 MECHANICAL LEGEND, ABBREVIATIONS AND NOTES
153 12857933 2-M-010 MECHANICAL GENERAL SHEET
154 12857934 2-M-101 MECHANICAL SITE PLAN – PUMP STATION 6
DOCUMENT 00 01 15 Page 15
155 12857935 2-M-102 MECHANICAL LOWER LEVEL PLAN - PUMP STATION 6
156 12857936 2-M-103 MECHANICAL UPPER LEVEL PLAN - PUMP STATION 6
157 12857937 2-M-104 MECHANICAL SITE PLAN – PUMP STATION 8
158 12857938 2-M-105 MECHANICAL LOWER LEVEL PLAN - PUMP STATION 8
159 12857939 2-M-106 MECHANICAL UPPER LEVEL PLAN - PUMP STATION 8
160 12857940 2-M-301 MECHANICAL SECTION - PUMP STATION 6
161 12857941 2-M-302 MECHANICAL SECTION - PUMP STATION 6
162 12857942 2-M-303 MECHANICAL SECTION - PUMP STATION 8
163 12857943 2-M-304 MECHANICAL SECTION - PUMP STATION 8
164 12857944 2-M-501 MECHANICAL DETAILS
165 12857945 2-M-502 MECHANICAL DETAILS
166 12857946 2-M-503 MECHANICAL DETAILS
167 12857947 2-M-504 MECHANICAL DETAILS
168 12857948 2-M-505 MECHANICAL DETAILS
169 12857949 2-M-601 MECHANICAL SCHEDULES - PUMP STATION 6
170 12857950 2-M-602 MECHANICAL SCHEDULES - PUMP STATION 8
171 12857951 2-M-701 SW SCHEMATIC - PUMP STATION 6 & 8
172 12857952 2-M-801 CONTROLS LEGEND AND GENERAL NOTES
173 12857953 2-M-802 CONTROL MISC
174 12857954 2-M-803 SW PUMP P&ID
DOCUMENT 00 01 15 Page 16
175 12857955 2-M-804 SW PUMP SEQUENCE AND POINTS LIST
176 12857956 2-M-805 SW PUMP AND MOTOR MONITORING P&ID - PUMP STATION 6
177 12857957 2-M-806 SW PUMP AND MOTOR MONITORING P&ID - PUMP STATION 8
178 12857958 2-M-807 MISC CONTROL
179 12857959 2-M-808 FUEL OIL P&ID - PUMP STATION 6
180 12857960 2-M-809 FUEL OIL P&ID - PUMP STATION 8
181 12857961 2-M-901 MECHANICAL ISOMETRICS - PUMP STATION 6
182 12857962 2-M-902 MECHANICAL ISOMETRICS - PUMP STATION 6
183 12857963 2-M-903 MECHANICAL ISOMETRICS - PUMP STATION 8
184 12857964 2-M-904 MECHANICAL ISOMETRICS - PUMP STATION 8
185 12857965 2-MD108 MECHANICAL DEMOLITION SITE PLAN - AREA 8 BASIN
186 12857966 2-MD109 MECHANICAL DEMOLITION SITE PLAN - AREA 9 BASIN
187 12857967 2-MD110 MECHANICAL DEMOLITION SITE PLAN - AREA 10 BASIN
188 12857968 2-MD113 MECHANICAL DEMOLITION SITE PLAN - AREA 13 BASIN
189 12857969 2-MD114 MECHANICAL DEMOLITION SITE PLAN - AREA 14 BASIN
190 12857970 2-MD115 MECHANICAL DEMOLITION SITE PLAN - AREA 15 - DISCHARGE
FLUME
191 12857971 2-MD127 MECHANICAL DEMOLITION SITE PLAN - AREA 7
192 12857972 2-MD128 MECHANICAL DEMOLITION SITE PLAN - AREA 8
193 12857973 2-MD129 MECHANICAL DEMOLITION SITE PLAN - AREA 9
194 12857974 2-MD130 MECHANICAL DEMOLITION SITE PLAN - AREA 10
DOCUMENT 00 01 15 Page 17
195 12857975 2-MD132 MECHANICAL DEMOLITION SITE PLAN - AREA 12
196 12857976 2-MD133 MECHANICAL DEMOLITION SITE PLAN - AREA 13
197 12857977 2-MD134 MECHANICAL DEMOLITION SITE PLAN - AREA 14
198 12857978 2-MD135 MECHANICAL DEMOLITION SITE PLAN - AREA 15
199 12857979 2-MD321 MECHANICAL DEMOLITION SECTION
200 12857980 2-MD322 MECHANICAL DEMOLITION SECTION
201 12857981 2-MD401 ENLARGED DEMOLITION PLAN
202 12857982 2-MS108 MECHANICAL SITE PLAN - AREA 8 - BASIN
203 12857983 2-MS109 MECHANICAL SITE PLAN - AREA 9 - BASIN
204 12857984 2-MS110 MECHANICAL SITE PLAN - AREA 10 - BASIN
205 12857985 2-MS113 MECHANICAL SITE PLAN - AREA 13 - BASIN
207 12857987 2-MS115 MECHANICAL SITE PLAN - AREA 15 - DISCHARGE FLUME
208 12857988 2-MS127 MECHANICAL SITE PLAN - AREA 7
209 12857989 2-MS128 MECHANICAL SITE PLAN - AREA 8
210 12857990 2-MS129 MECHANICAL SITE PLAN - AREA 9
211 12857991 2-MS130 MECHANICAL SITE PLAN - AREA 10
212 12857992 2-MS132 MECHANICAL SITE PLAN - AREA 12
213 12857993 2-MS133 MECHANICAL SITE PLAN - AREA 13
214 12857994 2-MS134 MECHANICAL SITE PLAN - AREA 14
215 12857995 2-MS135 MECHANICAL SITE PLAN - AREA 15
DOCUMENT 00 01 15 Page 18
216 12857996 2-MS227 MECHANICAL ELEVATIONS - AREA 7
217 12857997 2-MS228 MECHANICAL ELEVATIONS - AREA 8
218 12857998 2-MS229 MECHANICAL ELEVATIONS - AREA 9
219 12857999 2-MS230 MECHANICAL ELEVATIONS - AREA 10
220 12858000 2-MS232 MECHANICAL ELEVATIONS - AREA 12
221 12858001 2-MS233 MECHANICAL ELEVATIONS - AREA 13
222 12858002 2-MS234 MECHANICAL ELEVATIONS - AREA 14
223 12858003 2-MS235 MECHANICAL ELEVATIONS - AREA 15
224 12858004 2-MS321 MECHANICAL SECTIONS
225 12858005 2-MS322 MECHANICAL SECTIONS
226 12858006 2-MS323 MECHANICAL SECTIONS
227 12858007 2-MS401 ENLARGED PLAN
228 12858008 2-MS402 ENLARGED PLAN
229 12858009 2-MS501 MECHANICAL DETAILS
230 12858010 2-MS502 MECHANICAL DETAILS
231 12858011 2-MS503 MECHANICAL DETAILS
232 12858012 2-MS504 MECHANICAL STEAM DETAILS
233 12858013 2-MS521 MECHANICAL DETAILS
234 12858014 2-MS522 MECHANICAL DETAILS
235 12858015 2-MS523 MECHANICAL DETAILS
DOCUMENT 00 01 15 Page 19
236 12858016 2-MS524 MECHANICAL FLOW DIAGRAM
237 12858017 2-MS525 MECHANICAL FLOW DIAGRAM
238 12858018 2-MS601 MECHANICAL SCHEDULES
239 12858019 2-MS621 MECHANICAL SCHEDULES
240 12858020 2-MS622 MECHANICAL SCHEDULES
ELECTRICAL
1 12858021 2-E-001 LEGEND, ABBREVIATIONS AND GENERAL NOTES
2 12858022 2-E-011 LEGEND, ABBREVIATIONS AND SYMBOLS
3 12858023 2-E-012 GENERAL NOTES
4 12858024 2-ED124 ELECTRICAL SITE DEMOLITION PLAN - AREA 4
5 12858025 2-ED127 ELECTRICAL SITE DEMOLITION PLAN - AREA 7
6 12858026 2-ED128 ELECTRICAL SITE DEMOLITION PLAN - AREA 8
7 12858027 2-ED129 ELECTRICAL SITE DEMOLITION PLAN - AREA 9
8 12858028 2-ED130 ELECTRICAL SITE DEMOLITION PLAN - AREA 10
9 12858029 2-ED132 ELECTRICAL SITE DEMOLITION PLAN - AREA 12
10 12858030 2-ED133 ELECTRICAL SITE DEMOLITION PLAN - AREA 13
11 12858031 2-ED134 ELECTRICAL SITE DEMOLITION PLAN - AREA 14
12 12858032 2-ED135 ELECTRICAL SITE DEMOLITION PLAN - AREA 15
13 12858033 2-EG151 PUMP STATION 6 - LIGHTINING PROTECTION PLAN AND
GROUNDING PLAN
14 12858034 2-EG161 PUMP STATION 8 - LIGHTNING PROTECTION PLAN AND
GROUNDING PLAN
DOCUMENT 00 01 15 Page 20
15 12858035 2-EG501 GROUNDING DETAILS
16 12858036 2-EG502 LIGHTNING PROTECTION DETAILS
17 12858037 2-EL151 PUMP STATION 6 - LIGHTING PLAN - FIRST LEVEL
18 12858038 2-EL152 PUMP STATION 6 - LIGHTING PLAN - SECOND LEVEL
19 12858039 2-EL161 PUMP STATION 8 - LIGHTING PLAN - FIRST LEVEL
20 12858040 2-EL162 PUMP STATION 8 - LIGHTING PLAN - SECOND LEVEL
21 12858041 2-EL501 LIGHTING SCHEDULES AND DETAILS
22 12858042 2-EP151 PUMP STATION 6 - ELECTRICAL POWER PLAN - FIRST LEVEL
23 12858043 2-EP152 PUMP STATION 6 - ELECTRICAL POWER PLAN - SECOND LEVEL
24 12858044 2-EP161 PUMP STATION 8 - ELECTRICAL POWER PLAN - FIRST LEVEL
25 12858045 2-EP162 PUMP STATION 8 - ELECTRICAL POWER PLAN - SECOND LEVEL
26 12858046 2-EP251 PUMP STATION 6 - EQUIPMENT ELEVATIONS
27 12858047 2-EP261 PUMP STATION 8 - EQUIPMENT ELEVATIONS
28 12858048 2-EP651 PUMP STATION 6 - SWITCHBOARD SCHEDULES AND ELEVATIONS
29 12858049 2-EP652 PUMP STATION 6 - PANELBOARD SCHEDULES
30 12858050 2-EP661 PUMP STATION 8 - SWITCHBOARD SCHEDULES AND ELEVATIONS
31 12858051 2-EP662 PUMP STATION 8 - PANELBOARD SCHEDULES
32 12858052 2-EP751 PUMP STATION 6 - ONE LINE DIAGRAMS
33 12858053 2-EP752 PUMP STATION 6 - ONE LINE DIAGRAMS
34 12858054 2-EP761 PUMP STATION 8 - ONE LINE DIAGRAMS
DOCUMENT 00 01 15 Page 21
35 12858055 2-EP762 PUMP STATION 8 - ONE LINE DIAGRAMS
36 12858056 2-ES127 ELECTRICAL SITE PLAN - AREA 7
37 12858057 2-ES128 ELECTRICAL SITE PLAN - AREA 8
38 12858058 2-ES129 ELECTRICAL SITE PLAN - AREA 9
39 12858059 2-ES130 ELECTRICAL SITE PLAN - AREA 10
40 12858060 2-ES132 ELECTRICAL SITE PLAN - AREA 12
41 12858061 2-ES133 ELECTRICAL SITE PLAN - AREA 13
42 12858062 2-ES134 ELECTRICAL SITE PLAN - AREA 14
43 12858063 2-ES135 ELECTRICAL SITE PLAN - AREA 15
44 12858064 2-ES405 ENLARGED PLAN - SUBSTATION PLATFORM
45 12858065 2-ES406 ENLARGED PLAN - SUBSTATION PLATFORM
46 12858066 2-ES503 DUCKBANK DETAILS - MANHOLE 860
47 12858067 2-ES509 MANHOLE DETAILS
48 12858068 2-ES510 MANHOLE DETAILS
49 12858069 2-ES515 MANHOLE DETAILS
50 12858070 2-ES603 CONDUIT AND CABLING SCHEDULE
51 12858071 2-ES604 CONDUIT AND CABLING SCHEDULE
52 12858072 2-ES702 MV SYSTEM ONE-LINE DEMOLITION - SHEET B
53 12858073 2-ES703 MV SYSTEM ONE-LINE DEMOLITION - SHEET C
54 12858074 2-ES704 MV SYSTEM ONE-LINE DEMOLITION - SHEET D
DOCUMENT 00 01 15 Page 22
55 12858075 2-ES705 MV SYSTEM ONE-LINE NEW WORK - SHEET A
56 12858076 2-ES706 PRIMARY UNIT SUBSTATION DD8-SS-1N(1S) ONE-LINE DIAGRAM
57 12858077 2-ES710 SCADA FIBER OPTIC CABLING DIAGRAM
1.3 REFERENCE DOCUMENTS
These reference documents may not be a part of the contract but are included with the drawings for information.
1.3.1 Norfolk Naval Shipyard Instructions
These Norfolk Naval Shipyard Instructions (NNSI) are included in the contract to the extent referenced in the drawings and specifications. The following Instructions are found in Appendix J.
P5090.2 VOL II CH. 15 Personal Protective Equipment P5090.2 VOL II CH. 25 Man-made Vitreous Fibers P5090.2 VOL II CH. 27 Hazardous Material Control and Management P5090.2 VOL II CH. 38 Non-Bulk Recovery Material Control P5090.2 VOL II CH. 40 Emergency and Hazardous Materials Discharge
Contingency Plan P5090.2 VOL II CH. 41 Polychlorinated Biphenyls (PCB) Program P5090.2 VOL II CH. 45 Bulk Recovery Material Program P5090.2 VOL II CH. 52 Solid Waste Management P5090.2 VOL II CH. 58 Water Pollution Control Plan P5090.2 VOL II CH. 63 Clean Air Act (CAA) Compliance
1.3.2 Reference Drawings
Reference drawings located in APPENDIX 'A' - REFERENCE RECORD DRAWINGS are intended only to show the original construction. Drawings are the property of the Government and shall not be used for any purpose other than that intended by the contract.
1.3.3 Boring Logs
Logs of 2006 AND 2009 historical geotechnical borings and test data from report by by Han-Padron Associates for the project area are contained in APPENDIX 'B' - HISTORICAL GEOTECHNICAL DATA. Logs of recent investigations, geotechnical test data, and pavement corings performed by GET Solutions for the project are contained in APPENDIX 'C' - PROJECT GEOTECHNICAL DATA. The Government does not guarantee that borings indicate actual conditions, except for the exact locations and the time that they were made.
DOCUMENT 00 01 15 Page 23
1.3.4 Other Reference Documents
DOCUMENT
LOCATION
DOCUMENT NO.
OR DATE
TI TLE OR DESCRI PTI ON
Appendix 'A' A1 - 1941 Dry Dock 8 Discharge Header and Culvert
A2 - 1942 Dry Dock 8 Pumpwell
A3 - 1941 Quay Wall North of Entrance Pile Plan
A4 - 1961 Dry Dock 8 Pump Stations
A5 - 1961 Utilities Increment - Dry Dock 8 Sheets
A6 - 2009 Dry Dock 8 Repair Walls and Floor - Typical Sections
A7 - 2016 Dry Dock 8 Stop Log Seat Repair
A8 - 1998 NNSY Drawings - Pumpwell 8 Schematic Flooding & Dewatering Isometric
A9 - 2020 Pumpwell 8 - Replace MDP-2
A10- 1941 Berth 39
Appendix 'B' HISTORICAL GEOTECHNICAL DATA
Appendix 'C' PROJECT GEOTECHNICAL DATA
Appendix 'D' PROJECT SOILS CHEMICAL &
ENVIRONMENTAL ANALYTICAL RESULTS
Appendix 'E' May 2020 HAZARDOUS MATERIALS INSPECTION
DRAWINGS AND LABORATORY REPORTS -
Dry Dock 8 prepared by AH Environmental Consultants, Inc.
Appendix 'F' December 2020 - September 2021
UTILITY TEST HOLE REPORT prepared by Inframap Corp.
DOCUMENT 00 01 15 Page 24
DOCUMENT
LOCATION
DOCUMENT NO.
OR DATE
TI TLE OR DESCRI PTI ON
Appendix 'G' November 2020 ELECTRIC MANHOLE SURVEY prepared by W.R. O'Neal Electric, Inc.
Appendix 'H' October 2021 STORMWATER MANAGEMENT PLAN prepared by Burns & McDonnell
Appendix 'I' Ongoing PERMITS AND APPROVALS- Completed Checklist CATX#33 and Permits Record of Decision
Appendix 'J' Various Dates NNSY Instructions NAVSHIPYDNORINST P5090.2
Appendix 'K' September 2021 Five-Year Site Management Plan, FY 2022 - 2026, by CH2M HILL
-- End of Document --
DOCUMENT 00 01 15 Page 25
THIS PAGE INTENTIONALLY LEFT BLANK
DOCUMENT 00 01 15 Page 26
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00.00 22 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Utility Outage Requests
Utility Connection Requests
Excavation Permits
Welding Permits
Salvage Plan; G
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The work includes the following and incidental related work.
The project must be constructed in two (2) phases to allow the dry docking of an aircraft carrier between the phases. The project includes:
Phase 1 - Si t e El ect r i cal Di st r i but i on and Wor k i n Pumpwel l
Site electrical distribution, switches and substations SCADA system Pumpwell 8 drainage pumps piping, valves and supporting systems Main Dewatering Pump (MDP) motor replacements Outfalls and sitework Pumpwell electrical upgrades
Phase 2 - Sal t wat er Suppl y and Ret ur n Di st r i but i on
Pump Stations 6 and 8 Underground Saltwater distribution system Gallery and coping level saltwater distribution Saltwater return system Saltwater intakes and outfalls
1.2.2 Location
The work is located at the Norfolk Naval Shipyard in Portsmouth, Virginia, approximately as indicated. The exact location will be shown by the Contracting Officer.
SECTION 01 11 00 Page 1
1.3 OCCUPANCY OF PREMISES
Surrounding Building(s) and site will be occupied during performance of work under this Contract.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage and staging of materials and equipment, and use of approaches, drive aisles, and roadways.
1.4 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.5 ON-SITE PERMITS
1.5.1 Utility Outage Requests and Utility Connection Requests
Schedule work to minimize outages. For utility outages and connections required during the execution of work that affect existing systems, schedule outside the regular working hours or on weekends, as approved by the Contracting Officer. Schedule utility outages and connections to minimize disruptions to the Government. No additional payment will be provided for utility outages and connections required to be performed outside the regular work hours.
Submit requests for utility outages and connections in writing to the Contracting Officer for approval at least 15 calendar days in advance of the time required. In each request, state the system involved, area involved, approximate duration of outage, and the nature of work involved.
1.5.2 Excavation, Welding, Permits
ACTIVITY SUBMISSION DATE SUBMISSION FORM
Building Demolition including selective demoliton in the Pumpwell
15 calendar days prior to work
Crane Rail Demolition / Reconstruction 15 calendar days prior to work
Excavation Permits 15 calendar days prior to work
Welding Permits 15 calendar days prior to work
Electrical Demolition 15 calendar days prior to work
SECTION 01 11 00 Page 2
1.6 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.
Contact local utility locating service a minimum of 72 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.
Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground, pier deck or paved surface where existing underground utilities or utilities encased in pier structures are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.6.1 Notification Prior to…