P-678 Dry Dock 8 Saltwater System Specs Part 1 Vol1of4 Final Design Submittal 02282022.pdf

PDF 9 MB Posted

Attached to
P-678 Dry Dock 8 Saltwater System for CVN-78, Norfolk Naval Shipyard, Portsmouth, Virginia
Solicitation number
N40085-22-R-2598_Specifications
Issued by

About this file

This document provides specifications for a federal contract solicitation to design and construct a saltwater system for Dry Dock 8 at the Norfolk Naval Shipyard in Portsmouth, Virginia. The project includes upgrading electrical distribution and drainage systems in the pumpwell, replacing main dewatering pump motors, modifying outfalls, and developing an underground saltwater distribution system along with intake structures and returns. Construction will occur in two phases to allow for dry docking of an aircraft carrier between periods. Phase 1 focuses on site electrical work and pumpwell upgrades, while Phase 2 develops saltwater supply and return lines. The specifications reference drawings and appendices providing historical data, permits, instructions, and other supporting documents. The response due date is not included, but the contract award is anticipated in 2022.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Naval Facilities Engineering Systems Command

NAVFAC MID-ATLANTIC

Work Order No. 1364315

Contract No. N40085-22-R-2598

P-678 DRY DOCK 8 SALTWATER SYSTEM

FOR CVN-78

Architectural:

Civil:

Structural:

Geotechnical:

Submitted By:

Approved By:

At the

Norfolk Naval Shipyard, Portsmouth, VA

PREPARED BY:

Moffatt & Nichol/Burns & McDonnell JV 101 W. Main Street

Suite 3000 Norfolk, VA 23511

Bertrand Gonzalez, AIA Cassandra Zwart, PE Adam Morel, PE Roderick Whitsel, PE, SE Maria Murdock, PE

Befu1daedd,PE,PMP AE Project Manager

James Donahue, RA Design Production Director

Mechanical: Tyler Godfrey, PE Electrical: Justin Cashwell, PE

Dmitri Zaichenko, PE Communications: Joseph A. Brittain, PE Fire Protection: Philip Bowman, PE

Date: 28 Feb 2022

Date: 15 Mar 2022

P-678 DRY DOCK 8

SALTWATER SYSTEM

PART 1, VOLUME 1

SPECIFICATIONS

DESIGN SUBMITTAL

Prepared for

NAVFAC MIDLANT

NORFOLK, VA

Contract No. N40085-22-R-2598 eProject #1364315

28 February 2022

Bertrand Gonzalez, AIA Architectural Cassandra Zwart, PE Civil Engineer

Adam Morel, PE Structural Engineer Roderick Whitsel, PE, SE Structural Engineer

Philip Bowman, PE Fire Protection

Engineer Tyler Godfrey, PE Mechanical

Justin Cashwell, PE Electrical

Dmitri Zaichenko, PE Electrical

P678 Dry Dock 8 Saltwater System for CVN-78 Norfolk Naval Shipyard, Portsmouth VA

WO#: 1364315

PROJECT TABLE OF CONTENTS Page 1

PROJECT TABLE OF CONTENTS

PART 1 – COMMON TO PHASE 1 AND PHASE 2

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15 08/14 LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 08/15 SUMMARY OF WORK

01 14 00.00 22 11/20 WORK RESTRICTIONS

01 20 00 02/21 PRICE AND PAYMENT PROCEDURES

01 30 00.00 22 11/20 ADMINISTRATIVE REQUIREMENTS

01 31 23.13 20 02/21 ELECTRONIC CONSTRUCTION AND FACILITY

SUPPORT CONTRACT MANAGEMENT SYSTEM

01 32 17.00 20 08/20 COST-LOADED NETWORK ANALYSIS SCHEDULES

(NAS)

01 33 00.00 22 08/18 SUBMITTAL PROCEDURES

01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND

REPORTING

01 35 13.00 22 11/20 SPECIAL PROJECT PROCEDURES

01 35 26.00 22 08/21 GOVERNMENTAL SAFETY REQUIREMENTS

01 35 40.00 22 04/15 MARINE MAMMAL PROTECTION

01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 22 02/21 QUALITY CONTROL

01 50 00.00 22 11/20 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

01 57 19.00 22 04/21 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 19.01 20 08/20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL

CONTROLS

01 58 00 11/20 PROJECT IDENTIFICATION

01 74 19.00 22 02/19 CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

01 78 00 05/19 CLOSEOUT SUBMITTALS

01 78 23 11/20 OPERATION AND MAINTENANCE DATA

01 78 24.00 20 11/20 FACILITY ELECTRONIC OPERATION AND

MAINTENANCE SUPPORT INFORMATION(eOMSI)

01 91 00.15 20 02/21 TOTAL BUILDING COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00.00 22 02/19 DEMOLITION AND DECONSTRUCTION

02 61 13 02/21 EXCAVATION AND HANDLING OF CONTAMINATED

MATERIAL

02 81 00 02/21 TRANSPORTATION AND DISPOSAL

OF HAZARDOUS MATERIALS

02 82 00.00 22 11/18 LEAD REMEDIATION

02 83 00.00 22 11/18 ASBESTOS REMEDIATION

02 84 16.00 22 05/20 HANDLING OF LIGHTING BALLASTS AND LAMPS

CONTAINING PCBS AND MERCURY

02 84 33.00 22 04/06 REMOVAL AND DISPOSAL OF POLYCHLORINATED

BIPHENYLS (PCBs)

DIVISION 03 - CONCRETE

03 30 00 05/21 CAST-IN-PLACE CONCRETE

03 31 30 02/19 MARINE CONCRETE

PROJECT TABLE OF CONTENTS Page 2

DIVISION 05 – METALS

05 05 20.00 27 02/21 POST-INSTALLED CONCRETE AND MASONRY

ANCHORS

05 12 00 11/18 STRUCTURAL STEEL

05 40 00 08/18 COLD-FORMED METAL FRAMING

05 50 13 08/18 MISCELLANEOUS METAL FABRICATIONS

05 51 33 02/18 METAL LADDERS

05 52 00 02/18 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 11/18 ROUGH CARPENTRY

06 73 01 05/18 FIBERGLASS REINFORCED PLASTIC (FRP)

GRATING

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 92 00 11/18 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 08/20 STEEL DOORS AND FRAMES

08 71 00 08/20 DOOR HARDWARE

08 81 00 05/19 GLAZING

DIVISION 09 - FINISHES

09 22 00 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 02/20 GYPSUM BOARD

09 65 00 08/18 RESILIENT FLOORING

09 90 00.00 22 02/21 PAINTS AND COATINGS

09 90 50.00 22 11/05 PAINT REMOVAL AND CONTROLS

DIVISION 22 – PLUMBING

22 00 00 08/18 PLUMBING, GENERAL PURPOSE

22 14 29.00 40 05/17 SUMP PUMPS

22 15 14.00 40 11/17 GENERAL SERVICE COMPRESSED-AIR

SYSTEMS, LOW PRESSURE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 48.19 08/20 SEISMIC BRACING FOR HVAC

23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR

HVAC

23 81 00 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT

DIVISION 25 – INTEGRATED AUTOMATION

25 05 11.01 05/21 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS

25 05 11.02 05/21 CYBERSECURITY FOR PUMP STATION

MONITORING AND CONTROL SYSTEMS

25 05 11.03 05/21 CYBERSECURITY FOR ELECTRICAL

SUBSTATION CONTROL SYSTEMS

25 05 11.04 05/21 CYBERSECURITY FOR EMERGENCY GENERATOR

CONTROL SYSTEMS

PROJECT TABLE OF CONTENTS Page 3

DIVISION 26 - ELECTRICAL

26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL

EQUIPMENT

26 08 00 02/15 APPARATUS INSPECTION AND TESTING

26 13 26.00 25 11/16 MEDIUM-VOLTAGE SWITCHGEAR

26 20 00 11/19 INTERIOR DISTRIBUTION SYSTEM

26 20 01 11/19 EXTERIOR DISTRIBUTION SYSTEM

26 51 00 05/20 INTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 31 76.00 22 08/14 INTERIOR ADDRESSABLE FIRE ALARM

SYSTEMS

DIVISION 31 – EARTHWORK

31 09 13 01/22 GEOTECHNICAL AND SURVEY MONITORING

31 23 00.00 20 08/15 EXCAVATION AND FILL

31 62 16.13 11/20 STEEL PIPE PILES

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT

32 11 23 08/17 AGGREGATE BASE COURSES

32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING

32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR

ROADS AND SITE FACILITIES

32 17 23 11/18 PAVEMENT MARKINGS

32 31 13 05/17 CHAIN LINK FENCES AND GATES

DIVISION 33 - UTILITIES

33 08 55 08/19 FUEL DISTRIBUTION SYSTEM START-UP

(NON-HYDRANT)

33 11 00.00 22 05/16 POTABLE WATER UTILITY DISTRIBUTION

PIPING

33 11 00.01 22 02/11 SALTWATER UTILITY DISTRIBUTION PIPING

33 30 00 05/18 SANITARY SEWERAGE

33 31 00 10/18 EXTERIOR OILY WASTE, WASTE OIL PIPING

33 40 00 02/19 STORM DRAINAGE UTILITIES

33 52 23.15 11/18 POL SERVICE PIPING WELDING

33 52 40 11/20 FUEL SYSTEMS PIPING (NON-HYDRANT)

33 56 10 11/20 FACTORY-FABRICATED FUEL STORAGE TANKS

33 57 55 11/20 FUEL SYSTEM COMPONENTS (NON-HYDRANT)

33 61 13.19 11/20 VALVES, PIPING, AND EQUIPMENT IN

VALVE MANHOLES

33 63 13 04/06 EXTERIOR UNDERGROUND STEAM

DISTRIBUTION SYSTEM

33 71 02 11/19 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

Kemp, Richard A.

26 20 00 and 26 51 00 have been updated to common specs. Please add them both in this section.

Kemp, Richard A.

26 51 00 has been updated to a common spec. Please remove.

Kemp, Richard A.

26 51 00 has been updated to a common spec. Please remove.

PROJECT TABLE OF CONTENTS Page 4

DIVISION 34 - TRANSPORTATION

34 11 00 04/08 RAILROAD TRACK AND ACCESSORIES

34 11 19.00 20 08/18 WELDING CRANE AND RAILROAD RAIL -

THERMITE METHOD

DIVISION 40 - PROCESS INTERCONNECTIONS

40 05 13 02/20 PIPELINES, LIQUID PROCESS PIPING

40 05 13.96 05/10 WELDING PROCESS PIPING

40 60 00 05/20 PROCESS CONTROL

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 13.33 05/10 PORTAL CRANE TRACK INSTALLATION

41 22 23.19 05/20 MONORAIL HOISTS

PART 2 - COMMON TO PHASE 1

01 45 35 11/20 SPECIAL INSPECTIONS

07 21 16 08/18 MINERAL FIBER BLANKET INSULATION

DIVISION 26 – ELECTRICAL

26 11 13.00 20 11/21 PRIMARY UNIT SUBSTATION

23 13 00 11/14 SF6/HIGH-FIREPOINT FLUIDS INSULATED

PAD-MOUNTED SWITCHGEAR

26 29 01.00 10 11/08 ELECTRIC MOTORS, 3-PHASE VERTICAL

INDUCTION TYPE

26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY, WITH

AUXILIARIES AND LOAD BANK

DIVISION 31 - EARTHWORK

31 63 33 01/19 MICROPILES

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 45 04.00 10 11/20 SUBMERSIBLE PUMP, CENTRIFUGAL TYPE

FOR DRY PIT APPLICATOIN

PROJECT TABLE OF CONTENTS Page 5

PART 3 – COMMON TO PHASE 2

01 45 35 11/20 SPECIAL INSPECTIONS

DIVISION 05 - METALS

05 30 00 05/15 STEEL DECKS

05 51 00 05/17 METAL STAIRS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 13 33 08/17 PIER TIMBERWORK

07 14 00 02/18 FLUID-APPLIED WATERPROOFING

07 21 13 08/20 BOARD AND BLOCK INSULATION

07 22 00 11/18 ROOF AND DECK INSULATION

07 27 10.00 10 02/20 BUILDING AIR BARRIER SYSTEM

07 27 19.01 08/20 SELF-ADHERING AIR BARRIERS

07 52 00 11/19 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 60 00 11/18 FLASHING AND SHEET METAL

DIVISION 08 - OPENINGS

08 51 23 08/20 STEEL WINDOWS

DIVISION 10

- SPECIALTIES

10 14 00.10

11/18

EXTERIOR SIGNAGE

10 44 16 11/19 FIRE EXTINGUISHERS

DIVISION 21 - FIRE SUPPRESSION

21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

DIVISION 26 – ELECTRICAL

26 29 01.00 10 11/08 ELECTRIC MOTORS, 3-PHASE VERTICAL

INDUCTION TYPE

26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY, WITH

AUXILIARIES

26 41 00 11/13 LIGHTNING PROTECTION SYSTEM

DIVISION 31 - EARTHWORK

31 41 16 01/22 STEEL SHEET PILE AND COMBINATION

PILE WALLS

31 52 00 01/22 TEMPORARY COFFERDAMS

31 62 19.13 08/17 TIMBER MARINE PILES

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 20 14 04/08 STOPLOGS

35 45 01 02/21 VERTICAL TURBINE PUMPS

35 59 35 01/22 MOORING FITTINGS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 6

SPECIFICATION APPENDICES

TABLE OF CONTENTS

Appendix A – Reference Drawings A1 – 1941 Dry Dock 8 Discharge Header and Culvert A2 – 1942 Dry Dock 8 Pumpwell A3 - 1941 Quay Wall North of Entrance Pile Plan A4 – 1961 Dry Dock 8 Pump Stations A5 – 1961 Utilities Increment – Dry Dock 8 Sheets A6 – 2009 Dry Dock 8 Repair Walls and Floor – Typical Sections A7 – 2016 Dry Dock 8 Stop Log Seat Repair A8 – 1998 NNSY Drawings – Pumpwell 8 Schematic Flooding & Dewatering Isometric A9 – 2020 Pumpwell 8 – Replace MDP-2 A10- 1941 Berth 39 Appendix B – Historical Geotechnical Data Appendix C – Project Geotechnical Data Appendix D – Soils Chemical and Environmental Analytical Results Appendix E – HAZMAT Inspection Drawing and Laboratory Reports Appendix F – Utility Test Hole Logs Appendix G – Electric Manhole Survey Appendix H - Stormwater Management Plan Appendix I – Permits and Approvals Appendix J – NNSY Instructions P5090 Appendix K – Five-Year Site Management Plan Appendix L – 1941 Berth 39

P678 Dry Dock 8 Saltwater System for CVN-78 Work Order#: 1364315 Norfolk Naval Shipyard, Portsmouth, VA

DOCUMENT 00 01 15

LIST OF DRAWINGS AND REFERENCE DOCUMENTS

02/11

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows:

Sheet Total First

NAVFAC #

Last NAVFAC

NAVFAC #'s Used

Gap Total #'s Used

Package 1 56 12857515 12857758 244 21 265

Package 2 57 12857781 12858077 297 28 325

113 49 590

Overall 12857515 12858104 590

INDEX OF DRAWINGS

SHEET

NO.

NAVFAC NO. SHEET NO. SHEET NAME

GENERAL

1 12857515 1-G-010 COVER SHEET

2 12857516 1-G-011 INDEX OF DRAWINGS - VOLUME 1 OF 4

3 12857517 1-GI001 PUMPWELL - LIFE SAFETY CODE ANALYSIS

4 12857518 1-GI100 PUMPWELL - LIFE SAFETY PLAN

5 12857519 1-GC101 OVERALL DEVELOPMENT PLAN

6 12857520 1-GC102 SITE ACCESS PLAN

7 12857521 1-GC111 PHASE 1 - PROJECT SITE LIMITS

SURVEY

1 12857522 1-VF001 SURVEY NOTES AND LEGEND

2 12857523 1-VF002 EXISTING STRUCTURE TABLES

3 12857524 1-VF100 PHASE 1 - EXISTING CONDITIONS PLAN - OVERALL

DOCUMENT 00 01 15 Page 1

4 12857525 1-VF107 PHASE 1 - EXISTING CONDITIONS PLAN - AREA 7

5 12857526 1-VF108 PHASE 1 - EXISTING CONDITIONS PLAN - AREA 8

6 12857527 1-VF109 PHASE 1 - EXISTING CONDITIONS PLAN - AREA 9

7 12857528 1-VF110 PHASE 1 - EXISTING CONDITIONS PLAN - AREA 10

8 12857529 1-VF112 PHASE 1 - EXISTING CONDITIONS PLAN - AREA 12

9 12857530 1-VF113 PHASE 1 - EXISTING CONDITIONS PLAN - AREA 13

10 12857531 1-VF114 PHASE 1 - EXISTING CONDITIONS PLAN - AREA 14

11 12857532 1-VF115 PHASE 1 - EXISTING CONDITIONS PLAN - AREA 15

GEOTECHNICAL

1 12857533 1-B-001 BORING LOCATION PLAN

2 12857534 1-B-002 BORING LOGS

3 12857535 1-B-003 BORING LOGS

4 12857536 1-B-004 BORING LOGS

5 12857537 1-B-005 BORING LOGS

6 12857538 1-B-006 BORING LOGS

7 12857539 1-B-007 SOUNDING INFORMATION

8 12857540 1-B-008 ENVIRONMENTAL SOIL INFORMATION

9 12857541 1-B-009 ENVIRONMENTAL SOIL INFORMATION

10 12857542 1-B-010 ENVIRONMENTAL SOIL INFORMATION

CIVIL

1 12857543 1-C-001 CIVIL LEGEND AND ABBREVIATIONS

2 12857544 1-C-002 CIVIL NOTES - 1

3 12857545 1-C-003 CIVIL NOTES - 2

4 12857546 1-C-004 CIVIL NOTES - 3

5 12857547 1-C-005 EROSION AND SEDIMENT CONTROL NARRATIVE - 1

6 12857548 1-C-006 EROSION AND SEDIMENT CONTROL NARRATIVE - 2

7 12857549 1-C-007 EROSION AND SEDIMENT CONTROL MINIMUM STANDARDS

8 12857550 1-CD100 PHASE 1 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -

OVERALL

9 12857551 1-CD107 PHASE 1 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -

AREA 7

10 12857552 1-CD108 PHASE 1 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -

AREA 8

11 12857553 1-CD109 PHASE 1 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -

AREA 9

12 12857554 1-CD112 PHASE 1 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -

AREA 12

13 12857555 1-CD113 PHASE 1 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -

AREA 13

14 12857556 1-CD114 PHASE 1 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -

AREA 14

15 12857557 1-CD115 PHASE 1 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -

AREA 15

16 12857558 1-CD501 PHASE 1 - CIVIL DEMOLITION DETAILS

17 12857559 1-CD502 PHASE 1 - CIVIL EROSION CONTROL DETAILS

18 12857560 1-CS100 PHASE 1 - CIVIL SITE PLAN - OVERALL

19 12857561 1-CS107 PHASE 1 - CIVIL SITE PLAN - AREA 7

20 12857562 1-CS108 PHASE 1 - CIVIL SITE PLAN - AREA 8

21 12857563 1-CS109 PHASE 1 - CIVIL SITE PLAN - AREA 9

DOCUMENT 00 01 15 Page 2

22 12857564 1-CS112 PHASE 1 - CIVIL SITE PLAN - AREA 12

23 12857565 1-CS113 PHASE 1 - CIVIL SITE PLAN - AREA 13

24 12857566 1-CS114 PHASE 1 - CIVIL SITE PLAN - AREA 14

25 12857567 1-CS115 PHASE 1 - CIVIL SITE PLAN - AREA 15

26 12857568 1-CS321 PHASE 1 - CIVIL SITE COORDINATES

27 12857569 1-CS501 PHASE 1 - CIVIL SITE PAVING DETAILS

28 12857570 1-CS502 PHASE 1 - CIVIL SITE RAILROAD DETAILS

29 12857571 1-CS503 PHASE 1 - CIVIL TRAFFIC BARRIER DETAILS

30 12857572 1-CU100 PHASE 1 - CIVIL UTILITY PLAN - OVERALL

31 12857573 1-CU107 PHASE 1 - CIVIL UTILITY PLAN - AREA 7

32 12857574 1-CU108 PHASE 1 - CIVIL UTILITY PLAN - AREA 8

33 12857575 1-CU109 PHASE 1 - CIVIL UTILITY PLAN - AREA 9

34 12857576 1-CU112 PHASE 1 - CIVIL UTILITY PLAN - AREA 12

35 12857577 1-CU113 PHASE 1 - CIVIL UTILITY PLAN - AREA 13

36 12857578 1-CU114 PHASE 1 - CIVIL UTILITY PLAN - AREA 14

37 12857579 1-CU115 PHASE 1 - CIVIL UTILITY PLAN - AREA 15

38 12857580 1-CU200 PHASE 1 - CIVIL ALIGNMENT PLAN

39 12857581 1-CU201 PHASE 1 - ELECTRICAL DUCTBANK PROFILES

40 12857582 1-CU202 PHASE 1 - ELECTRICAL DUCTBANK PROFILES

41 12857583 1-CU203 PHASE 1 - ELECTRICAL DUCTBANK PROFILES

42 12857584 1-CU204 PHASE 1 - ELECTRICAL DUCTBANK PROFILES

43 12857585 1-CU206 PHASE 1 - TELECOM DUCTBANK PROFILES

44 12857586 1-CU207 PHASE 1 - TELECOM DUCTBANK PROFILES

45 12857587 1-CU208 PHASE 1 - TELECOM DUCTBANK PROFILES

46 12857588 1-CU209 PHASE 1 - TELECOM DUCTBANK PROFILES

47 12857589 1-CU211 PHASE 1 - PUMPWELL DRAIN PROFILE

48 12857590 1-CU212 PHASE 1 - REDUNDANT DRAINAGE PUMP DISCHARGE

49 12857591 1-CU307 PHASE 1 - CIVIL UTILITY PLAN COORDINATES - AREA 7

50 12857592 1-CU308 PHASE 1 - CIVIL UTILITY PLAN COORDINATES - AREA 8

51 12857593 1-CU309 PHASE 1 - CIVIL UTILITY PLAN COORDINATES - AREA 9

52 12857594 1-CU312 PHASE 1 - CIVIL UTILITY PLAN COORDINATES - AREA 12

53 12857595 1-CU313 PHASE 1 - CIVIL UTILITY PLAN COORDINATES - AREA 13

54 12857596 1-CU314 PHASE 1 - CIVIL UTILITY PLAN COORDINATES - AREA 14

1-CU315 PHASE 1 - CIVIL UTILITY PLAN COORDINATES - AREA 15

55 12857597 1-CU321 PHASE 1 - CIVIL UTILITY COORDINATES

56 12857598 1-CU501 PHASE 1 - CIVIL UTILITY DETAILS

57 12857599 1-CG114 PHASE 1 - CIVIL GRADING AND DRAINAGE PLAN - AREA 14

1-CG115 PHASE 1 - CIVIL GRADING AND DRAINAGE PLAN - AREA 15

58 12857600 1-CG201 PHASE 1 - CIVIL STORM DRAIN PROFILES

59 12857601 1-CG202 PHASE 1 - CIVIL STORM DRAIN PROFILES

60 12857602 1-CG501 PHASE 1 - CIVIL GRADING AND DRAINAGE DETAILS

61 12857603 1-CG502 PHASE 1 - CIVIL GRADING AND DRAINAGE DETAILS

62 12857604 1-CG503 PHASE 1 - CIVIL GRADING AND DRAINAGE DETAILS

DOCUMENT 00 01 15 Page 3

63 12857605 1-CG504 PHASE 1 - CIVIL GRADING AND DRAINAGE DETAILS

STRUCTURAL

1 12857606 1-S-001 GENERAL NOTES

2 12857607 1-S-002 LEGEND AND ABBREVIATIONS

3 12857608 1-SD100 PUMPWELL 8 DEMOLITION KEY PLAN

4 12857609 1-SD102 PUMPWELL 8 DEMOLITION - MOTOR LEVEL PLAN

5 12857610 1-SD103 PUMPWELL 8 DEMOLITION - INTERMEDIATE LEVEL PLAN

6 12857611 1-SD104 PUMPWELL 8 DEMOLITION - MAIN PUMP AND SUCTION CHAMBER

LEVEL PLAN

7 12857612 1-SD115 STRUCTURAL DEMOLITION PLAN - AREA 15

8 12857613 1-SD201 PUMPWELL 8 DEMOLITION - INTERIOR ELEVATION

9 12857614 1-SD202 PUMPWELL 8 DEMOLITION - INTERIOR ELEVATIONS

10 12857615 1-SD401 DEMOLITION DETAILS - SOUTH FLOOD FLUME OUTFALL

11 12857616 1-S-100 PUMPWELL 8 KEYPLAN

12 12857617 1-S-102 PUMPWELL 8 - MOTOR LEVEL PLAN

13 12857618 1-S-103 PUMPWELL 8 - INTERMEDIATE LEVEL PLAN

14 12857619 1-S-104 PUMPWELL 8 - MAIN PUMP AND SUCTION CHAMBER LEVEL PLAN

15 12857620 1-S-201 PUMPWELL 8 - INTERIOR ELEVATIONS

16 12857621 1-S-202 PUMPWELL 8 - INTERIOR ELEVATIONS

17 12857622 1-S-203 PUMPWELL 8 - ELEVATIONS

18 12857623 1-S-301 PUMPWELL 8 - SECTIONS AND DETAILS

19 12857624 1-S-302 PUMPWELL 8 - SECTIONS AND DETAILS

20 12857625 1-S-421 PUMPWELL 8 - ENLARGED PLANS, SECTIONS AND DETAILS

21 12857626 1-S-422 PUMPWELL 8 - MAINTENANCE ACCESS PLATFORM PLANS,

SECTIONS AND DETAILS

22 12857627 1-S-501 TYPICAL FOUNDATION DETAILS

23 12857628 1-S-502 TYPICAL FOUNDATION DETAILS

24 12857629 1-S-503 TYPICAL STEEL FRAMING DETAILS

25 12857630 1-S-504 TYPICAL STEEL EDGE DETAILS

26 12857631 1-S-505 TYPICAL CONCRETE DETAILS

27 12857632 1-S-580 TYPICAL CONCRETE EDGE DETAILS

28 12857633 1-S-581 TYPICAL STAIR DETAILS

29 12857634 1-S-582 TYPICAL STAIR DETAILS

30 12857635 1-S-583 TYPICAL STEEL CONNECTION DETAILS

31 12857636 1-SS501 TYPICAL CRANE RAIL RECONSTRUCTION DETAILS

32 12857637 1-SS502 FUEL TANK FOUNDATION PLANS AND SECTION

33 12857638 1-SS503 GENERATOR FOUNDATION PLAN AND SECTIONS

34 12857639 1-SS504 SUBSTATION AND SWITCHGEAR FOUNDATION PLAN

35 12857640 1-SB001 STRUCTURAL FOUNDATION GENERAL NOTES

36 12857641 1-SB002 ABBREVIATIONS AND LEGEND

37 12857642 1-SB003 DRY DOCK STRUCTURAL TYPICAL DETAILS

38 12857643 1-SB004 DRY DOCK AND SITE STRUCTURAL TYPICAL DETAILS

39 12857644 1-SB115 STRUCTURAL PLAN - SOUTH FLOOD FLUME OUTFALL - AREA 15

40 12857645 1-SB401 SOUTH FLOOD FLUME OUTFALL DETAILS

DOCUMENT 00 01 15 Page 4

41 12857646 1-SB501 STRUCTURAL SLAB DETAILS

GENERAL

1 12857647 1-G-020 COVER SHEET

2 12857648 1-G-021 INDEX OF DRAWINGS - VOLUME 2 OF 4

ARCHITECTURAL

1 12857649 1-A-001 ARCHITECTURAL SYMBOLS, LEGENDS, ABBREVIATIONS AND NOTES

2 12857650 1-AD102 PUMPWELL 8 – DEMOLITION PLAN -MOTOR

3 12857651 1-A-102 PUMPWELL 8 – PLAN, REFLECTED CEIING PLAN & SCHEDULES -

MOTOR

4 12857652 1-A-600 PUMPWELL 8 - DOOR SCHEDULE, PARTITION TYPES & MISC

DETAILS

FIRE PROTECTION

1 12857653 1-FA001 FIRE ALARM GENERAL SHEET

2 12857654 1-FA100 PUMPWELL 8 - FIRE ALARM - KEY PLAN

3 12857655 1-FA102 PUMPWELL - FIRE ALARM PLAN - MOTOR

4 12857656 1-FA103 PUMPWELL - FIRE ALARM PLAN - INTERMEDIATE

5 12857657 1-FA104 PUMPWELL - FIRE ALARM PLAN - MAIN PUMP

6 12857658 1-FA501 FIRE ALARM DETAILS

MECHANICAL

1 12857659 1-M-001 LEGEND, ABBREVIATIONS AND NOTES

2 12857660 1-MD101 PUMPWELL 8 - DEMOLITION PLAN - GRADE LEVEL

3 12857661 1-MD102 PUMPWELL 8 - DEMOLITION PLAN - MOTOR

4 12857662 1-MD103 PUMPWELL 8 - DEMOLITION PLAN - INTERMEDIATE

5 12857663 1-MD104 PUMPWELL 8 - DEMOLITION PLAN - MAIN PUMP

6 12857664 1-MD105 PUMPWELL 8 - DEMOLITION PLAN - DRAINAGE PUMP

7 12857665 1-MD115 SOUTH FLOODING FLUME - DEMOLITION PLAN

8 12857666 1-MD301 PUMPWELL 8 - DEMOLITION SECTION - DRAINAGE PUMP

9 12857667 1-MD302 PUMPWELL 8 - DEMOLITION SECTION - MAIN DEWATERING PUMPS

10 12857668 1-MD401 PUMPWELL 8 - DEMOLITION ENLARGED PLAN - DRAINAGE PUMP

11 12857669 1-MP101 PUMPWELL 8 - MECHANICAL PLAN - GRADE LEVEL

12 12857670 1-MP102 PUMPWELL 8 - MECHANICAL PLAN - MOTOR

13 12857671 1-MP103 PUMPWELL 8 - MECHANICAL PLAN - INTERMEDIATE

14 12857672 1-MP104 PUMPWELL 8 - MECHANICAL PLAN - MAIN PUMP

15 12857673 1-MP105 PUMPWELL 8 - MECHANICAL PLAN - DRAINAGE PUMP

16 12857674 1-MP115 SOUTH FLOODING FLUME - MECHANICAL PLAN

17 12857675 1-MP301 PUMPWELL 8 - MECHANICAL SECTION - DRAINAGE PUMP

PW8-DP-1,2,3

18 12857676 1-MP302 PUMPWELL 8 - MECHANICAL SECTION - DRAINAGE PUMP

PW8-DP-4,5

19 12857677 1-MP303 SOUTH FLOODING FLUME - MECHANICAL SECTION

20 12857678 1-MP304 MAIN DEWATERING PUMP - MECHANICAL SECTION

21 12857679 1-MP401 PUMPWELL 8 - MECHANICAL ENLARGED PLAN - DRAINAGE PUMP

PW8-DP-1,2,3

22 12857680 1-MP402 PUMPWELL 8 - MECHANICAL ENLARGED PLAN - DRAINAGE PUMP

PW8-DP-4,5

23 12857681 1-M-501 MECHANICAL DETAILS

DOCUMENT 00 01 15 Page 5

24 12857682 1-M-502 MECHANICAL DETAILS

25 12857683 1-M-503 MECHANICAL DETAILS

26 12857684 1-M-504 MECHANICAL DETAILS

27 12857685 1-M-505 MECHANICAL DETAILS

28 12857686 1-M-506 MECHANICAL DETAILS

29 12857687 1-M-507 MECHANICAL STEAM DETAILS

30 12857688 1-M-601 MECHANICAL SCHEDULES

31 12857689 1-M-701 PUMPWELL 8 SCHEMATIC

32 12857690 1-M-801 CONTROLS LEGEND AND GENERAL NOTES

33 12857691 1-M-802 PUMP WELL CONTROL CONSOLE AND SCADA DETAILS

34 12857692 1-M-803 PUMPWELL 8 CONTROL CONSOLE LAYOUT

35 12857693 1-M-810 MAIN DEWATERING PUMP P&ID

36 12857694 1-M-811 MAIN DEWATERING PUMP AND MOTOR MONITORING P&ID

37 12857695 1-M-820 DRAINAGE PUMP P&ID

38 12857696 1-M-821 DRAINAGE PUMP MOTOR MONITORING P&ID

39 12857697 1-M-822 DRAINAGE PUMP SEQUENCE OF OPERATION

40 12857698 1-M-830 SUMP PUMP P&ID

41 12857699 1-M-840 FUEL OIL P&ID

42 12857700 1-M-850 HVAC CONTROLS

43 12857701 1-M-901 PUMPWELL 8 MECHANICAL ISOMETRICS

44 12857702 1-M-902 PUMPWELL 8 MECHANICAL ISOMETRICS

ELECTRICAL

1 12857703 1-E-001 LEGEND, ABBREVIATIONS AND GENERAL NOTES

2 12857704 1-E-011 LEGEND, ABBREVIATIONS AND SYMBOLS

3 12857705 1-E-012 GENERAL NOTES

4 12857706 1-ED101 PUMPWELL 8 - ELECTRICAL DEMOLITION PLAN

5 12857707 1-ED102 PUMPWELL 8 - ELECTRICAL DEMOLITION PLAN

6 12857708 1-ED129 ELECTRICAL SITE DEMOLITION PLAN - AREA 9

7 12857709 1-ED132 ELECTRICAL SITE DEMOLITION PLAN - AREA 12

8 12857710 1-ED133 ELECTRICAL SITE DEMOLITION PLAN - AREA 13

9 12857711 1-ED134 ELECTRICAL SITE DEMOLITION PLAN - AREA 14

10 12857712 1-ED135 ELECTRICAL SITE DEMOLITION PLAN - AREA 15

11 12857713 1-ED700 PUMPWELL 8 - DEMOLITION ONE-LINE DIAGRAM

12 12857714 1-EG501 GROUNDING DETAILS

13 12857715 1-EL501 LIGHTING SCHEDULE AND DETAILS

14 12857716 1-EP101 PUMPWELL 8 - ELECTRICAL POWER PLAN

15 12857717 1-EP102 PUMPWELL 8 - ELECTRICAL POWER PLAN

16 12857718 1-EP103 PUMPWELL 8 - ELECTRICAL POWER PLAN

17 12857719 1-EP201 PUMPWELL 8 - EQUIPMENT ELEVATIONS

18 12857720 1-EP501 ELECTRICAL DETAILS

19 12857721 1-EP601 PUMPWELL 8 - SCHEDULES AND ELEVATIONS

20 12857722 1-EP602 PUMPWELL 8 - PANELBOARD SCHEDULES

DOCUMENT 00 01 15 Page 6

21 12857723 1-EP701 PUMPWELL 8 - ONE LINE DIAGRAMS

22 12857724 1-EP702 PUMPWELL 8 - ONE LINE DIAGRAMS

23 12857725 1-ES127 ELECTRICAL SITE PLAN - AREA 7

24 12857726 1-ES128 ELECTRICAL SITE PLAN - AREA 8

25 12857727 1-ES129 ELECTRICAL SITE PLAN - AREA 9

26 12857728 1-ES132 ELECTRICAL SITE PLAN - AREA 12

27 12857729 1-ES133 ELECTRICAL SITE PLAN - AREA 13

28 12857730 1-ES134 ELECTRICAL SITE PLAN - AREA 14

29 12857731 1-ES135 ELECTRICAL SITE PLAN - AREA 15

30 12857732 1-ES201 MV SWITCH PLAN AND ELEVATION

31 12857733 1-ES202 SUBSTATION PLAN AND ELEVATION

32 12857734 1-ES401 ENLARGED PLAN - BUILDING 272

33 12857735 1-ES403 ENLARGED SUBSTATION PLATFORM PLAN - CLEARANCE

34 12857736 1-ES404 ENLARGED SUBSTATION PLATFORM PLAN - GROUNDING

35 12857737 1-ES405 ENLARGED PLAN - SUBSTATION PLATFORM

36 12857738 1-ES406 ENLARGED PLAN - SUBSTATION PLATFORM

37 12857739 1-ES501 DUCTBANK DETAILS

38 12857740 1-ES502 DUCTBANK DETAILS

39 12857741 1-ES503 DUCTBANK DETAILS - MANHOLE 897

40 12857742 1-ES504 DUCTBANK DETAILS

41 12857743 1-ES505 DUCTBANK DETAILS

42 12857744 1-ES506 MANHOLE DETAILS

43 12857745 1-ES507 MANHOLE DETAILS

44 12857746 1-ES508 MANHOLE DETAILS

45 12857747 1-ES509 MANHOLE DETAILS

46 12857748 1-ES510 MANHOLE DETAILS

47 12857749 1-ES516 GROUNDING DETAILS

48 12857750 1-ES520 FIBER RISER

49 12857751 1-ES603 CONDUIT AND CABLING SCHEDULE

50 12857752 1-ES701 MV SYSTEM ONE-LINE DEMOLITION - SHEET A

51 12857753 1-ES702 MV SYSTEM ONE-LINE DEMOLITION - SHEET B

52 12857754 1-ES703 MV SYSTEM ONE-LINE DEMOLITION - SHEET C

53 12857755 1-ES705 MV SYSTEM ONE-LINE NEW WORK - SHEET A

54 12857756 1-ES706 SUBSTATION ONE-LINE DIAGRAM

55 12857757 1-ES707 PRIMARY UNIT SUBSTATION CONTROL POWER CIRCUITS

56 12857758 1-ES710 SCADA FIBER OPTIC CABLING DIAGRAM

INDEX OF DRAWINGS

SHEET

NO.

NAVFAC NO. SHEET NO. SHEET NAME

GENERAL

DOCUMENT 00 01 15 Page 7

1 12857781 2-G-030 COVER SHEET

2 12857782 2-G-031 INDEX OF DRAWINGS - VOLUME 3 OF 4

3 12857783 2-GD150 BUILDING 828 - DEMOLITION PLANS & SECTION

4 12857784 2-GD160 BUILDING 829 - DEMOLITION PLANS & SECTION

5 12857785 2-GI050 PUMP STATION 6 - LIFE SAFETY CODE ANALYSIS

6 12857786 2-GI060 PUMP STATION 8 - LIFE SAFETY CODE ANALYSIS

7 12857787 2-GI150 PUMP STATION 6 - LIFE SAFETY PLAN

8 12857788 2-GI160 PUMP STATION 8 - LIFE SAFETY PLAN

9 12857789 2-GC111 PHASE 2 - PROJECT SITE LIMITS

10 12857790 2-GC121 PHASE 2 - FIRE PROTECTION SITE PLAN

CIVIL

11 12857791 2-CD100 PHASE 2 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -

OVERALL

12 12857792 2-CD107 PHASE 2 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -

AREA 7

13 12857793 2-CD108 PHASE 2 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -

AREA 8

14 12857794 2-CD109 PHASE 2 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -

AREA 9

15 12857795 2-CD110 PHASE 2 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -

AREA 10

16 12857796 2-CD112 PHASE 2 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -

AREA 12

17 12857797 2-CD113 PHASE 2 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -

AREA 13

18 12857798 2-CD114 PHASE 2 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -

AREA 14

19 12857799 2-CD115 PHASE 2 - CIVIL DEMOLITION AND EROSION CONTROL PLAN -

AREA 15

DOCUMENT 00 01 15 Page 8

20 12857800 2-CD221 PHASE 2 - UTILITY CORRIDOR A - DEMOLITION PLAN AND

PROFILE

21 12857801 2-CS100 PHASE 2 - CIVIL SITE PLAN - OVERALL

22 12857802 2-CS107 PHASE 2 - CIVIL SITE PLAN - AREA 7

23 12857803 2-CS108 PHASE 2 - CIVIL SITE PLAN - AREA 8

24 12857804 2-CS109 PHASE 2 - CIVIL SITE PLAN - AREA 9

25 12857805 2-CS110 PHASE 2 - CIVIL SITE PLAN - AREA 10

26 12857806 2-CS112 PHASE 2 - CIVIL SITE PLAN - AREA 12

27 12857807 2-CS113 PHASE 2 - CIVIL SITE PLAN - AREA 13

28 12857808 2-CS114 PHASE 2 - CIVIL SITE PLAN - AREA 14

29 12857809 2-CS115 PHASE 2 - CIVIL SITE PLAN - AREA 15

30 12857810 2-CS321 PHASE 2 - CIVIL SITE COORDINATES

31 12857811 2-CS501 PHASE 2 - CIVIL SITE IMPROVEMENT DETAILS

32 12857812 2-CU100 PHASE 2 - CIVIL UTILITY PLAN - OVERALL

33 12857813 2-CU107 PHASE 2 - CIVIL UTILITY PLAN - AREA 7

34 12857814 2-CU108 PHASE 2 - CIVIL UTILITY PLAN - AREA 8

35 12857815 2-CU109 PHASE 2 - CIVIL UTILITY PLAN - AREA 9

36 12857816 2-CU110 PHASE 2 - CIVIL UTILITY PLAN - AREA 10

37 12857817 2-CU112 PHASE 2 - CIVIL UTILITY PLAN - AREA 12

38 12857818 2-CU113 PHASE 2 - CIVIL UTILITY PLAN - AREA 13

39 12857819 2-CU114 PHASE 2 - CIVIL UTILITY PLAN - AREA 14

DOCUMENT 00 01 15 Page 9

40 12857820 2-CU115 PHASE 2 - CIVIL UTILITY PLAN - AREA 15

41 12857821 2-CU200 PHASE 2 - CIVIL ALIGNMENT PLAN

42 12857822 2-CU201 PHASE 2 - ELECTRICAL DUCTBANK PROFILES

43 12857823 2-CU202 PHASE 2 - TELECOM DUCTBANK PROFILES

44 12857824 2-CU203 PHASE 2 - ELECTRICAL AND TELECOM DUCTBANK PROFILES

45 12857825 2-CU204 PHASE 2 - TELECOM DUCTBANK PROFILES

46 12857826 2-CU211 PHASE 2 - SALTWATER SUPPLY MAIN PROFILE - 1

47 12857827 2-CU212 PHASE 2 - SALTWATER SUPPLY MAIN PROFILE - 2

48 12857828 2-CU213 PHASE 2 - SALTWATER SUPPLY MAIN PROFILE - 3

49 12857829 2-CU214 PHASE 2 - SALTWATER SUPPLY MAIN PROFILE - 4

50 12857830 2-CU215 PHASE 2 - SALTWATER SUPPLY LATERAL PROFILES - 1

51 12857831 2-CU216 PHASE 2 - SALTWATER SUPPLY LATERAL PROFILES - 2

52 12857832 2-CU221 PHASE 2 - UTILITY CORRIDOR A - PLAN AND PROFILE

53 12857833 2-CU222 PHASE 2 - UTILITY CORRIDOR B - PLAN AND PROFILE

54 12857834 2-CU223 PHASE 2 - UTILITY CORRIDOR C - PLAN AND PROFILE

55 12857835 2-CU224 PHASE 2 - UTILITY CORRIDOR D - PLAN AND PROFILE

56 12857836 2-CU225 PHASE 2 - UTILITY CORRIDOR E - PLAN AND PROFILE

57 12857837 2-CU231 PHASE 2 - OW/WO PLAN AND PROFILE

58 12857838 2-CU307 PHASE 2 - CIVIL UTILITY PLAN COORDINATES - AREA 7

59 12857839 2-CU308 PHASE 2 - CIVIL UTILITY PLAN COORDINATES - AREA 8

DOCUMENT 00 01 15 Page 10

60 12857840 2-CU309 PHASE 2 - CIVIL UTILITY PLAN COORDINATES - AREA 9

61 12857841 2-CU310 PHASE 2 - CIVIL UTILITY PLAN COORDINATES - AREA 10

62 12857842 2-CU312 PHASE 2 - CIVIL UTILITY PLAN COORDINATES - AREA 12

63 12857843 2-CU313 PHASE 2 - CIVIL UTILITY PLAN COORDINATES - AREA 13

64 12857844 2-CU314 PHASE 2 - CIVIL UTILITY PLAN COORDINATES - AREA 14

65 12857845 2-CU315 PHASE 2 - CIVIL UTILITY PLAN COORDINATES - AREA 15

66 12857846 2-CU321 PHASE 2 - CIVIL UTILITY COORDINATES

67 12857847 2-CU501 PHASE 2 - CIVIL UTILITY DETAILS

68 12857848 2-CU502 PHASE 2 - CIVIL UTILITY DETAILS

69 12857849 2-CG110 PHASE 2 - CIVIL GRADING AND DRAINAGE PLAN - AREA 10

70 12857850 2-CG115 PHASE 2 - CIVIL GRADING AND DRAINAGE PLAN - AREA 15

71 12857851 2-CG201 PHASE 2 - CIVIL STORM DRAIN PROFILES

72 12857852 2-CG202 PHASE 2 - CIVIL STORM DRAIN PROFILES

73 12857853 2-CG501 PHASE 2 - CIVIL GRADING AND DRAINAGE DETAILS

74 12857854 2-CG502 PHASE 2 - CIVIL GRADING AND DRAINAGE DETAILS

STRUCTURAL

75 12857855 2-S-001 GENERAL NOTES

76 12857856 2-S-002 GENERAL NOTES

77 12857857 2-S-003 LEGEND AND ABBREVIATIONS

78 12857858 2-S-004 PUMP STATION 6 AND 8 WIND ISOMETRIC DIAGRAMS

DOCUMENT 00 01 15 Page 11

79 12857859 2-SD110 STRUCTURAL FOUNDATION DEMO PLAN - PUMP STATION PS-6 -

AREA 10

80 12857860 2-SD115 STRUCTURAL FOUNDATION DEMO PLAN - PUMP STATION PS-8 -

AREA 15

81 12857861 2-SD301 PUMP STATION PS-6 FOUNDATION DEMOLITION SECTIONS -

STAGE 1

82 12857862 2-SD302 PUMP STATION PS-6 FOUNDATION DEMOLITION SECTIONS -

STAGE 2

83 12857863 2-SD303 PUMP STATION PS-8 FOUNDATION DEMOLITION SECTIONS

84 12857864 2-SD401 PUMP STATION PS-6 ENLARGED FOUNDATION DEMOLITION PLAN

- STAGE 1

85 12857865 2-SD402 PUMP STATION PS-6 ENLARGED FOUNDATION DEMOLITION PLAN

- STAGE 2

86 12857866 2-SD403 PUMP STATION PS-8 ENLARGED FOUNDATION DEMOLITION PLAN

87 12857867 2-SD404 DEMOLITION DETAILS - NORTH FLOOD FLUME OUTFALL

88 12857868 2-SD405 TEMPORARY COFFERDAM PLAN AND SECTIONS

89 12857869 2-SD406 INTAKE STRUCTURE DEMOLITION DETAILS - AREA 10

90 12857870 2-SD407 INTAKE STRUCTURE DEMOLITION DETAILS - AREA 15

91 12857871 2-S-150 PUMP STATION 6 - FOUNDATION PLAN

92 12857872 2-S-151 PUMP STATION 6 - FRAMING PLAN - FIRST FLOOR

93 12857873 2-S-152 PUMP STATION 6 - FRAMING PLAN - SECOND FLOOR

94 12857874 2-S-153 PUMP STATION 6 - FRAMING PLAN - ROOF

95 12857875 2-S-160 PUMP STATION 8 - FOUNDATION PLAN

96 12857876 2-S-161 PUMP STATION 8 - FRAMING PLAN - FIRST FLOOR

97 12857877 2-S-162 PUMP STATION 8 - FRAMING PLAN - SECOND FLOOR

98 12857878 2-S-163 PUMP STATION 8 - FRAMING PLAN - ROOF

DOCUMENT 00 01 15 Page 12

99 12857879 2-S-215 EXTERIOR STAIR ELEVATIONS

100 12857880 2-S-216 EXTERIOR STAIR ELEVATIONS

101 12857881 2-S-217 INTERIOR STAIR ELEVATIONS

102 12857882 2-S-220 PUMP STATION 6 AND 8 TYPICAL WALL ELEVATIONS

103 12857883 2-S-301 PUMP STATION 6 AND 8 SECTIONS & DETAILS

104 12857884 2-S-302 PUMP STATION 6 AND 8 SECTIONS & DETAILS

105 12857885 2-S-303 PUMP STATION 6 AND 8 SECTIONS & DETAILS

106 12857886 2-S-415 PUMP STATION 6 AND 8 ROOF ENLARGED PLAN

107 12857887 2-S-416 ROOF HATCH PLAN AND SECTIONS

108 12857888 2-S-430 EXTERIOR STAIR ENLARGED PLAN

109 12857889 2-S-431 EXTERIOR STAIR ENLARGED PLAN

110 12857890 2-S-503 PUMP STATION 6 AND 8 TYPICAL FRAMING DETAILS

111 12857891 2-S-515 PUMP STATION 6 AND 8 STANDARD BASE PLATE AND ANCHOR

BOLT DETAILS

112 12857892 2-SS501 TYPICAL SITE STRUCTURAL PIPE SUPPORT DETAILS

113 12857893 2-SS502 TYPICAL CRANE RAIL RECONSTRUCTION DETAILS

114 12857894 2-SS504 GENERATOR AND FUEL TANK FOUNDATION PLANS

115 12857895 2-SS505 STOP LOG FOUNDATION PLAN, SECTIONS AND DETAILS

116 12857896 2-SB110 STRUCTURAL FOUNDATION PLAN - PUMP STATION PS-6 - AREA

117 12857897 2-SB115 STRUCTURAL FOUNDATION PLAN - PUMP STATION PS-8 - AREA

118 12857898 2-SB301 PUMP STATION PS-6 FOUNDATION SECTIONS

DOCUMENT 00 01 15 Page 13

119 12857899 2-SB302 PUMP STATION PS-6 FOUNDATION SECTIONS

120 12857900 2-SB303 PUMP STATION PS-8 FOUNDATION SECTIONS

121 12857901 2-SB401 PUMP STATION PS-6 ENLARGED FOUNDATION PLAN

122 12857902 2-SB402 PUMP STATION PS-8 ENLARGED FOUNDATION PLAN

123 12857903 2-SB403 NORTH FLOOD FLUME OUTFALL DETAILS

124 12857904 2-SB501 PILE AND PUMP STATION FOUNDATION DETAILS

125 12857905 2-SB502 PUMP STATION PS-6 INTAKE STRUCTURES REINFOCING DETAILS

126 12857906 2-SB503 PUMP STATION PS-8 FOUNDATION SLAB REINORCING DETAILS

127 12857907 2-SB504 PUMP STATION PS-8 INTAKE STRUCTURES REINFOCING DETAILS

128 12857908 2-SB505 MISCELLANEOUS REINFORCING DETAILS

129 12857909 2-SB506 PS-6 FENDER DETAILS

130 12857910 2-SB507 INTAKE GRATING AND STIFFENED PLATE DETAILS - 1 of 2

131 12857911 2-SB508 INTAKE GRATING AND STIFFENED PLATE DETAILS - 2 of 2

132 12857912 2-SB509 INTAKE STRUCTURES SCREEN DETAILS

133 12857913 2-SB510 STRUCTURAL SLAB DETAILS

134 12857914 2-SB601 PILE SCHEDULES - PUMP STATION PS-6

135 12857915 2-SB602 PILE SCHEDULES - PUMP STATION PS-8

ARCHITECTURAL

136 12857916 2-A-151 PUMP STATION 6 - FLOOR PLAN - FIRST LEVEL & SECOND

LEVEL

137 12857917 2-A-153 PUMP STATION 6 - ROOF PLAN & DETAILS

DOCUMENT 00 01 15 Page 14

138 12857918 2-A-161 PUMP STATION 8 - FLOOR PLAN - FIRST LEVEL, SECOND

LEVEL & ROOF

139 12857919 2-A-250 PUMP STATION 6 - BUILDING ELEVATIONS

140 12857920 2-A-260 PUMP STATION 8 - BUILDING ELEVATIONS

141 12857921 2-A-350 PUMP STATION 6 & 8 - TYP. BUILDING & WALL SECTIONS

142 12857922 2-A-601 DOOR & FINISH SCHEDULE

FIRE PROTECTION

143 12857923 2-F-001 FIRE PROTECTION GENERAL SHEET

144 12857924 2-FA150 PUMP STATION 6 - FIRE ALARM PLAN

145 12857925 2-FA160 PUMP STATION 8 - FIRE ALARM PLAN

146 12857926 2-FA501 FIRE ALARM DETAILS

147 12857927 2-FX150 PUMP STATION 6 - FIRE SUPPRESSION PLAN

148 12857928 2-FX160 PUMP STATION 8 - FIRE SUPPRESSION PLAN

149 12857929 2-FX501 FIRE SUPPRESSION DETAILS

GENERAL

150 12857930 2-G-040 COVER SHEET

151 12857931 2-G-041 INDEX OF DRAWINGS - VOLUME 4 OF 4

MECHANICAL

152 12857932 2-M-001 MECHANICAL LEGEND, ABBREVIATIONS AND NOTES

153 12857933 2-M-010 MECHANICAL GENERAL SHEET

154 12857934 2-M-101 MECHANICAL SITE PLAN – PUMP STATION 6

DOCUMENT 00 01 15 Page 15

155 12857935 2-M-102 MECHANICAL LOWER LEVEL PLAN - PUMP STATION 6

156 12857936 2-M-103 MECHANICAL UPPER LEVEL PLAN - PUMP STATION 6

157 12857937 2-M-104 MECHANICAL SITE PLAN – PUMP STATION 8

158 12857938 2-M-105 MECHANICAL LOWER LEVEL PLAN - PUMP STATION 8

159 12857939 2-M-106 MECHANICAL UPPER LEVEL PLAN - PUMP STATION 8

160 12857940 2-M-301 MECHANICAL SECTION - PUMP STATION 6

161 12857941 2-M-302 MECHANICAL SECTION - PUMP STATION 6

162 12857942 2-M-303 MECHANICAL SECTION - PUMP STATION 8

163 12857943 2-M-304 MECHANICAL SECTION - PUMP STATION 8

164 12857944 2-M-501 MECHANICAL DETAILS

165 12857945 2-M-502 MECHANICAL DETAILS

166 12857946 2-M-503 MECHANICAL DETAILS

167 12857947 2-M-504 MECHANICAL DETAILS

168 12857948 2-M-505 MECHANICAL DETAILS

169 12857949 2-M-601 MECHANICAL SCHEDULES - PUMP STATION 6

170 12857950 2-M-602 MECHANICAL SCHEDULES - PUMP STATION 8

171 12857951 2-M-701 SW SCHEMATIC - PUMP STATION 6 & 8

172 12857952 2-M-801 CONTROLS LEGEND AND GENERAL NOTES

173 12857953 2-M-802 CONTROL MISC

174 12857954 2-M-803 SW PUMP P&ID

DOCUMENT 00 01 15 Page 16

175 12857955 2-M-804 SW PUMP SEQUENCE AND POINTS LIST

176 12857956 2-M-805 SW PUMP AND MOTOR MONITORING P&ID - PUMP STATION 6

177 12857957 2-M-806 SW PUMP AND MOTOR MONITORING P&ID - PUMP STATION 8

178 12857958 2-M-807 MISC CONTROL

179 12857959 2-M-808 FUEL OIL P&ID - PUMP STATION 6

180 12857960 2-M-809 FUEL OIL P&ID - PUMP STATION 8

181 12857961 2-M-901 MECHANICAL ISOMETRICS - PUMP STATION 6

182 12857962 2-M-902 MECHANICAL ISOMETRICS - PUMP STATION 6

183 12857963 2-M-903 MECHANICAL ISOMETRICS - PUMP STATION 8

184 12857964 2-M-904 MECHANICAL ISOMETRICS - PUMP STATION 8

185 12857965 2-MD108 MECHANICAL DEMOLITION SITE PLAN - AREA 8 BASIN

186 12857966 2-MD109 MECHANICAL DEMOLITION SITE PLAN - AREA 9 BASIN

187 12857967 2-MD110 MECHANICAL DEMOLITION SITE PLAN - AREA 10 BASIN

188 12857968 2-MD113 MECHANICAL DEMOLITION SITE PLAN - AREA 13 BASIN

189 12857969 2-MD114 MECHANICAL DEMOLITION SITE PLAN - AREA 14 BASIN

190 12857970 2-MD115 MECHANICAL DEMOLITION SITE PLAN - AREA 15 - DISCHARGE

FLUME

191 12857971 2-MD127 MECHANICAL DEMOLITION SITE PLAN - AREA 7

192 12857972 2-MD128 MECHANICAL DEMOLITION SITE PLAN - AREA 8

193 12857973 2-MD129 MECHANICAL DEMOLITION SITE PLAN - AREA 9

194 12857974 2-MD130 MECHANICAL DEMOLITION SITE PLAN - AREA 10

DOCUMENT 00 01 15 Page 17

195 12857975 2-MD132 MECHANICAL DEMOLITION SITE PLAN - AREA 12

196 12857976 2-MD133 MECHANICAL DEMOLITION SITE PLAN - AREA 13

197 12857977 2-MD134 MECHANICAL DEMOLITION SITE PLAN - AREA 14

198 12857978 2-MD135 MECHANICAL DEMOLITION SITE PLAN - AREA 15

199 12857979 2-MD321 MECHANICAL DEMOLITION SECTION

200 12857980 2-MD322 MECHANICAL DEMOLITION SECTION

201 12857981 2-MD401 ENLARGED DEMOLITION PLAN

202 12857982 2-MS108 MECHANICAL SITE PLAN - AREA 8 - BASIN

203 12857983 2-MS109 MECHANICAL SITE PLAN - AREA 9 - BASIN

204 12857984 2-MS110 MECHANICAL SITE PLAN - AREA 10 - BASIN

205 12857985 2-MS113 MECHANICAL SITE PLAN - AREA 13 - BASIN

207 12857987 2-MS115 MECHANICAL SITE PLAN - AREA 15 - DISCHARGE FLUME

208 12857988 2-MS127 MECHANICAL SITE PLAN - AREA 7

209 12857989 2-MS128 MECHANICAL SITE PLAN - AREA 8

210 12857990 2-MS129 MECHANICAL SITE PLAN - AREA 9

211 12857991 2-MS130 MECHANICAL SITE PLAN - AREA 10

212 12857992 2-MS132 MECHANICAL SITE PLAN - AREA 12

213 12857993 2-MS133 MECHANICAL SITE PLAN - AREA 13

214 12857994 2-MS134 MECHANICAL SITE PLAN - AREA 14

215 12857995 2-MS135 MECHANICAL SITE PLAN - AREA 15

DOCUMENT 00 01 15 Page 18

216 12857996 2-MS227 MECHANICAL ELEVATIONS - AREA 7

217 12857997 2-MS228 MECHANICAL ELEVATIONS - AREA 8

218 12857998 2-MS229 MECHANICAL ELEVATIONS - AREA 9

219 12857999 2-MS230 MECHANICAL ELEVATIONS - AREA 10

220 12858000 2-MS232 MECHANICAL ELEVATIONS - AREA 12

221 12858001 2-MS233 MECHANICAL ELEVATIONS - AREA 13

222 12858002 2-MS234 MECHANICAL ELEVATIONS - AREA 14

223 12858003 2-MS235 MECHANICAL ELEVATIONS - AREA 15

224 12858004 2-MS321 MECHANICAL SECTIONS

225 12858005 2-MS322 MECHANICAL SECTIONS

226 12858006 2-MS323 MECHANICAL SECTIONS

227 12858007 2-MS401 ENLARGED PLAN

228 12858008 2-MS402 ENLARGED PLAN

229 12858009 2-MS501 MECHANICAL DETAILS

230 12858010 2-MS502 MECHANICAL DETAILS

231 12858011 2-MS503 MECHANICAL DETAILS

232 12858012 2-MS504 MECHANICAL STEAM DETAILS

233 12858013 2-MS521 MECHANICAL DETAILS

234 12858014 2-MS522 MECHANICAL DETAILS

235 12858015 2-MS523 MECHANICAL DETAILS

DOCUMENT 00 01 15 Page 19

236 12858016 2-MS524 MECHANICAL FLOW DIAGRAM

237 12858017 2-MS525 MECHANICAL FLOW DIAGRAM

238 12858018 2-MS601 MECHANICAL SCHEDULES

239 12858019 2-MS621 MECHANICAL SCHEDULES

240 12858020 2-MS622 MECHANICAL SCHEDULES

ELECTRICAL

1 12858021 2-E-001 LEGEND, ABBREVIATIONS AND GENERAL NOTES

2 12858022 2-E-011 LEGEND, ABBREVIATIONS AND SYMBOLS

3 12858023 2-E-012 GENERAL NOTES

4 12858024 2-ED124 ELECTRICAL SITE DEMOLITION PLAN - AREA 4

5 12858025 2-ED127 ELECTRICAL SITE DEMOLITION PLAN - AREA 7

6 12858026 2-ED128 ELECTRICAL SITE DEMOLITION PLAN - AREA 8

7 12858027 2-ED129 ELECTRICAL SITE DEMOLITION PLAN - AREA 9

8 12858028 2-ED130 ELECTRICAL SITE DEMOLITION PLAN - AREA 10

9 12858029 2-ED132 ELECTRICAL SITE DEMOLITION PLAN - AREA 12

10 12858030 2-ED133 ELECTRICAL SITE DEMOLITION PLAN - AREA 13

11 12858031 2-ED134 ELECTRICAL SITE DEMOLITION PLAN - AREA 14

12 12858032 2-ED135 ELECTRICAL SITE DEMOLITION PLAN - AREA 15

13 12858033 2-EG151 PUMP STATION 6 - LIGHTINING PROTECTION PLAN AND

GROUNDING PLAN

14 12858034 2-EG161 PUMP STATION 8 - LIGHTNING PROTECTION PLAN AND

GROUNDING PLAN

DOCUMENT 00 01 15 Page 20

15 12858035 2-EG501 GROUNDING DETAILS

16 12858036 2-EG502 LIGHTNING PROTECTION DETAILS

17 12858037 2-EL151 PUMP STATION 6 - LIGHTING PLAN - FIRST LEVEL

18 12858038 2-EL152 PUMP STATION 6 - LIGHTING PLAN - SECOND LEVEL

19 12858039 2-EL161 PUMP STATION 8 - LIGHTING PLAN - FIRST LEVEL

20 12858040 2-EL162 PUMP STATION 8 - LIGHTING PLAN - SECOND LEVEL

21 12858041 2-EL501 LIGHTING SCHEDULES AND DETAILS

22 12858042 2-EP151 PUMP STATION 6 - ELECTRICAL POWER PLAN - FIRST LEVEL

23 12858043 2-EP152 PUMP STATION 6 - ELECTRICAL POWER PLAN - SECOND LEVEL

24 12858044 2-EP161 PUMP STATION 8 - ELECTRICAL POWER PLAN - FIRST LEVEL

25 12858045 2-EP162 PUMP STATION 8 - ELECTRICAL POWER PLAN - SECOND LEVEL

26 12858046 2-EP251 PUMP STATION 6 - EQUIPMENT ELEVATIONS

27 12858047 2-EP261 PUMP STATION 8 - EQUIPMENT ELEVATIONS

28 12858048 2-EP651 PUMP STATION 6 - SWITCHBOARD SCHEDULES AND ELEVATIONS

29 12858049 2-EP652 PUMP STATION 6 - PANELBOARD SCHEDULES

30 12858050 2-EP661 PUMP STATION 8 - SWITCHBOARD SCHEDULES AND ELEVATIONS

31 12858051 2-EP662 PUMP STATION 8 - PANELBOARD SCHEDULES

32 12858052 2-EP751 PUMP STATION 6 - ONE LINE DIAGRAMS

33 12858053 2-EP752 PUMP STATION 6 - ONE LINE DIAGRAMS

34 12858054 2-EP761 PUMP STATION 8 - ONE LINE DIAGRAMS

DOCUMENT 00 01 15 Page 21

35 12858055 2-EP762 PUMP STATION 8 - ONE LINE DIAGRAMS

36 12858056 2-ES127 ELECTRICAL SITE PLAN - AREA 7

37 12858057 2-ES128 ELECTRICAL SITE PLAN - AREA 8

38 12858058 2-ES129 ELECTRICAL SITE PLAN - AREA 9

39 12858059 2-ES130 ELECTRICAL SITE PLAN - AREA 10

40 12858060 2-ES132 ELECTRICAL SITE PLAN - AREA 12

41 12858061 2-ES133 ELECTRICAL SITE PLAN - AREA 13

42 12858062 2-ES134 ELECTRICAL SITE PLAN - AREA 14

43 12858063 2-ES135 ELECTRICAL SITE PLAN - AREA 15

44 12858064 2-ES405 ENLARGED PLAN - SUBSTATION PLATFORM

45 12858065 2-ES406 ENLARGED PLAN - SUBSTATION PLATFORM

46 12858066 2-ES503 DUCKBANK DETAILS - MANHOLE 860

47 12858067 2-ES509 MANHOLE DETAILS

48 12858068 2-ES510 MANHOLE DETAILS

49 12858069 2-ES515 MANHOLE DETAILS

50 12858070 2-ES603 CONDUIT AND CABLING SCHEDULE

51 12858071 2-ES604 CONDUIT AND CABLING SCHEDULE

52 12858072 2-ES702 MV SYSTEM ONE-LINE DEMOLITION - SHEET B

53 12858073 2-ES703 MV SYSTEM ONE-LINE DEMOLITION - SHEET C

54 12858074 2-ES704 MV SYSTEM ONE-LINE DEMOLITION - SHEET D

DOCUMENT 00 01 15 Page 22

55 12858075 2-ES705 MV SYSTEM ONE-LINE NEW WORK - SHEET A

56 12858076 2-ES706 PRIMARY UNIT SUBSTATION DD8-SS-1N(1S) ONE-LINE DIAGRAM

57 12858077 2-ES710 SCADA FIBER OPTIC CABLING DIAGRAM

1.3 REFERENCE DOCUMENTS

These reference documents may not be a part of the contract but are included with the drawings for information.

1.3.1 Norfolk Naval Shipyard Instructions

These Norfolk Naval Shipyard Instructions (NNSI) are included in the contract to the extent referenced in the drawings and specifications. The following Instructions are found in Appendix J.

P5090.2 VOL II CH. 15 Personal Protective Equipment P5090.2 VOL II CH. 25 Man-made Vitreous Fibers P5090.2 VOL II CH. 27 Hazardous Material Control and Management P5090.2 VOL II CH. 38 Non-Bulk Recovery Material Control P5090.2 VOL II CH. 40 Emergency and Hazardous Materials Discharge

Contingency Plan P5090.2 VOL II CH. 41 Polychlorinated Biphenyls (PCB) Program P5090.2 VOL II CH. 45 Bulk Recovery Material Program P5090.2 VOL II CH. 52 Solid Waste Management P5090.2 VOL II CH. 58 Water Pollution Control Plan P5090.2 VOL II CH. 63 Clean Air Act (CAA) Compliance

1.3.2 Reference Drawings

Reference drawings located in APPENDIX 'A' - REFERENCE RECORD DRAWINGS are intended only to show the original construction. Drawings are the property of the Government and shall not be used for any purpose other than that intended by the contract.

1.3.3 Boring Logs

Logs of 2006 AND 2009 historical geotechnical borings and test data from report by by Han-Padron Associates for the project area are contained in APPENDIX 'B' - HISTORICAL GEOTECHNICAL DATA. Logs of recent investigations, geotechnical test data, and pavement corings performed by GET Solutions for the project are contained in APPENDIX 'C' - PROJECT GEOTECHNICAL DATA. The Government does not guarantee that borings indicate actual conditions, except for the exact locations and the time that they were made.

DOCUMENT 00 01 15 Page 23

1.3.4 Other Reference Documents

DOCUMENT

LOCATION

DOCUMENT NO.

OR DATE

TI TLE OR DESCRI PTI ON

Appendix 'A' A1 - 1941 Dry Dock 8 Discharge Header and Culvert

A2 - 1942 Dry Dock 8 Pumpwell

A3 - 1941 Quay Wall North of Entrance Pile Plan

A4 - 1961 Dry Dock 8 Pump Stations

A5 - 1961 Utilities Increment - Dry Dock 8 Sheets

A6 - 2009 Dry Dock 8 Repair Walls and Floor - Typical Sections

A7 - 2016 Dry Dock 8 Stop Log Seat Repair

A8 - 1998 NNSY Drawings - Pumpwell 8 Schematic Flooding & Dewatering Isometric

A9 - 2020 Pumpwell 8 - Replace MDP-2

A10- 1941 Berth 39

Appendix 'B' HISTORICAL GEOTECHNICAL DATA

Appendix 'C' PROJECT GEOTECHNICAL DATA

Appendix 'D' PROJECT SOILS CHEMICAL &

ENVIRONMENTAL ANALYTICAL RESULTS

Appendix 'E' May 2020 HAZARDOUS MATERIALS INSPECTION

DRAWINGS AND LABORATORY REPORTS -

Dry Dock 8 prepared by AH Environmental Consultants, Inc.

Appendix 'F' December 2020 - September 2021

UTILITY TEST HOLE REPORT prepared by Inframap Corp.

DOCUMENT 00 01 15 Page 24

DOCUMENT

LOCATION

DOCUMENT NO.

OR DATE

TI TLE OR DESCRI PTI ON

Appendix 'G' November 2020 ELECTRIC MANHOLE SURVEY prepared by W.R. O'Neal Electric, Inc.

Appendix 'H' October 2021 STORMWATER MANAGEMENT PLAN prepared by Burns & McDonnell

Appendix 'I' Ongoing PERMITS AND APPROVALS- Completed Checklist CATX#33 and Permits Record of Decision

Appendix 'J' Various Dates NNSY Instructions NAVSHIPYDNORINST P5090.2

Appendix 'K' September 2021 Five-Year Site Management Plan, FY 2022 - 2026, by CH2M HILL

-- End of Document --

DOCUMENT 00 01 15 Page 25

THIS PAGE INTENTIONALLY LEFT BLANK

DOCUMENT 00 01 15 Page 26

SECTION 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00.00 22 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Utility Outage Requests

Utility Connection Requests

Excavation Permits

Welding Permits

Salvage Plan; G

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The work includes the following and incidental related work.

The project must be constructed in two (2) phases to allow the dry docking of an aircraft carrier between the phases. The project includes:

Phase 1 - Si t e El ect r i cal Di st r i but i on and Wor k i n Pumpwel l

Site electrical distribution, switches and substations SCADA system Pumpwell 8 drainage pumps piping, valves and supporting systems Main Dewatering Pump (MDP) motor replacements Outfalls and sitework Pumpwell electrical upgrades

Phase 2 - Sal t wat er Suppl y and Ret ur n Di st r i but i on

Pump Stations 6 and 8 Underground Saltwater distribution system Gallery and coping level saltwater distribution Saltwater return system Saltwater intakes and outfalls

1.2.2 Location

The work is located at the Norfolk Naval Shipyard in Portsmouth, Virginia, approximately as indicated. The exact location will be shown by the Contracting Officer.

SECTION 01 11 00 Page 1

1.3 OCCUPANCY OF PREMISES

Surrounding Building(s) and site will be occupied during performance of work under this Contract.

Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage and staging of materials and equipment, and use of approaches, drive aisles, and roadways.

1.4 EXISTING WORK

In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

1.5 ON-SITE PERMITS

1.5.1 Utility Outage Requests and Utility Connection Requests

Schedule work to minimize outages. For utility outages and connections required during the execution of work that affect existing systems, schedule outside the regular working hours or on weekends, as approved by the Contracting Officer. Schedule utility outages and connections to minimize disruptions to the Government. No additional payment will be provided for utility outages and connections required to be performed outside the regular work hours.

Submit requests for utility outages and connections in writing to the Contracting Officer for approval at least 15 calendar days in advance of the time required. In each request, state the system involved, area involved, approximate duration of outage, and the nature of work involved.

1.5.2 Excavation, Welding, Permits

ACTIVITY SUBMISSION DATE SUBMISSION FORM

Building Demolition including selective demoliton in the Pumpwell

15 calendar days prior to work

Crane Rail Demolition / Reconstruction 15 calendar days prior to work

Excavation Permits 15 calendar days prior to work

Welding Permits 15 calendar days prior to work

Electrical Demolition 15 calendar days prior to work

SECTION 01 11 00 Page 2

1.6 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.

Contact local utility locating service a minimum of 72 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.

Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground, pier deck or paved surface where existing underground utilities or utilities encased in pier structures are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

1.6.1 Notification Prior to…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .