P-678 Dry Dock 8 Saltwater System Spec Appendices Vol1of2 Final Design Submittal 02282022.pdf

PDF 37 MB Posted

Attached to
P-678 Dry Dock 8 Saltwater System for CVN-78, Norfolk Naval Shipyard, Portsmouth, Virginia
Solicitation number
N40085-22-R-2598_Specifications
Issued by

About this file

This document outlines a federal contract opportunity for a saltwater system for Dry Dock 8 at Norfolk Naval Shipyard in Portsmouth, Virginia. The solicitation number is N40085-22-R-2598 and is seeking a contractor to design and install a new saltwater system for Dry Dock 8 to support maintenance on the aircraft carrier CVN-78. Interested parties can access the drawings and specifications for this opportunity under Notice IDs N40085-22-R-2598_Drawings and N40085-22-R-2598_Specifications. The Naval Facilities Engineering Command is the contracting agency. The document provides relevant details on the scope of work and instructions for accessing procurement documents but does not specify pricing terms, response dates or other contractual elements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P-678 DRY DOCK 8 SALTWATER SYSTEM FOR CVN-78

NORFOLK NAVAL SHIPYARD, PORTSMOUTH, VIRGINIA

VOLUME 1

SPECIFICATION APPENDICES

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND MIDLANT

eProject Number: 1364315

28 February 2022

P-678 DRY DOCK 8

SALTWATER SYSTEM

SPECIFICATION APPENDICES

SUBMITTAL

Prepared for

NAVFAC MIDLANT

NORFOLK, VA

Contract No. N40085-22-R-2598 eProject #1364315

February 28 2022

P678 Dry Dock 8 Saltwater System for CVN-78 Norfolk Naval Shipyard, Portsmouth VA

WO#: 1364315

PROJECT TABLE OF CONTENTS Page 6

SPECIFICATION APPENDICES

TABLE OF CONTENTS

Appendix A – Reference Drawings A1 – 1941 Dry Dock 8 Discharge Header and Culvert A2 – 1942 Dry Dock 8 Pumpwell A3 - 1941 Quay Wall North of Entrance Pile Plan A4 – 1961 Dry Dock 8 Pump Stations A5 – 1961 Utilities Increment – Dry Dock 8 Sheets A6 – 2009 Dry Dock 8 Repair Walls and Floor – Typical Sections A7 – 2016 Dry Dock 8 Stop Log Seat Repair A8 – 1998 NNSY Drawings – Pumpwell 8 Schematic Flooding & Dewatering Isometric A9 – 2020 Pumpwell 8 – Replace MDP-2 A10- 1941 Berth 39

Appendix B – Historical Geotechnical Data Appendix C – Project Geotechnical Data Appendix D – Soils Chemical and Environmental Analytical Results Appendix E – HAZMAT Inspection Drawing and Laboratory Reports Appendix F – Utility Test Hole Logs Appendix G – Electric Manhole Survey Appendix H - Stormwater Management Plan Appendix I – Permits and Approvals Appendix J – NNSY Instructions P5090 Appendix K – Five-Year Site Management Plan

APPENDIX ‘A’

Reference Record Drawings

-,- "j ·.,...

I ,., I

I l --- ---- ----

1 l I .

II __ _

t I

II

-I , I ~

I

' I

I I I i I

~ I

I

I I ! I b ___________ ' ------- ..... ·-- .. ''-· ----

R ?. "lS .1:, ... m:...-

1"2: .. ~

SLAB

fl· s· ~"CS~~ - f.,Jkcno.t<... W ;j-j, ~ v

SCHE.DULE.

d.. bo.ro:.. · ~o €!.1~·-.,.e d.

-s f d.:

.J D

I

I u lT 5t:.CTION />...-"'-.__ TYPICAL SLAB

5TRJ.... IG\-\T .BI>-...R

SC:.).(E.DULE.

N D- SIZ.~ LE>-1'=\H

32.' I 0 __ J..f: &"

1 <0 3 '*' 4-' . .;, lc .5 .:>"1·1

'l±t=t--=- ---~';- 1(; s; .P 1 1-c;;

I 1 1,_ d> -J-<§Cc- 2.0> I 6' l cr

X ~~~ll __j .--;--! --..,' '-------

(f · bars

<D V) dl r E

I<.OOF

'"1 E.

PLA.N

I j

~;'1--1 r 4>-5~q, -l'2.z-'

~.;z,~1·~t;:;,:::;:.~c~~a);iiJ=;~~~ll0~:~ ..

" r

A

1!: ~~

C---J I I

"' d)

_J

If)

.SE.CTION D·D

?. RLo'C>

If)

.J

VJ

r-----.----------- ... ····--··-------.--------------·----------------·---------... -------- ·---- ) I

I [D i.

I l rl

I ---- ---- ---- --·- ·------ ------- ----

I i I I ! I j !

I ~~I

-- .. ___ i{·---------~--

SE.CTION B·l'>

SE.CTION E-E..

' I

If) tD J if) l---

SECTION C-C

2 R~Q~D

NOTE.- />..LL RI:.INFci<.CH1EJ·lT IS 'To H.J>.Vt.. ('..

f.:\1>-itMUNI Cot-!Ce.LTL ;o><:.OTt..~T~ol>l e>P 2"

1}-US ewe; \o e.e... USf:..b FeR. Rt.l..j l='"oRCINC.

.}oR.O"f)-{"E:..~ l?'Mf.NSsor--J~. -D~TA-.1'-S,~TC

.:">LL DWG. N-..S!>'2.ll, let .. VA ..::;. N-SD 2>5.

E_2

' L:::.

E.4-c.

J-c - . ---·- .

E>

.... _E.

TYPE

c.

r. i r. i!

l'-=='''=====!.>

TYPE. 8

-r '(i vi -t- r===:==+"_____ ,e, ~!

I I lYP!: .. G.

~v-~.

lf=_=. ===2=,=10==_= __ =_= . ..,-"'f:\'\' .··.

iYK. E_12." I

~-I·O]tr '2·~ I ..... ·- .... --------~

<'·"- I .... ... "

"l.·o

·e;, ',<(c

, I h

··~ •-' ,., 'T'~'"-""~·t--_-;•,.,.._ -<~C"~·'·"'"~'"""· ""'"""""-~'""'""'~=-,·--.-r. '"'"'-«-"t~-=t-'>.""""-,.._-.,,- '-""•>'"-''-~"''"'"'""''""' I .

~ 1()"',-,.._T':..: :.:~ r;_. T ,', ;!'"'I'(" \'.Yr· T1·"1' C1?..,..,T> L c-onu -~ .J ......... 'd ... ~...._, ~:- __,. _ _,r~_,u .._"l!.'t.u ........ .1.."-i ~ Lc '- .i'l.

! ""'l"~~~·-·vv'!" "• ~ f rl.l.>Dl__,h_U~l,l""h, ~- B~'!:9 .. <>~_.?.!.~$. ---·-·---··------- ---l. 'U.!' '-"-. F:?I.Jt:-:12~.~-i,..h __ _I?,9S?.!:

~ :c<G D l>.'f D a c.~<:,-__ NC? :.I? .. : .... YC? .. 12.1:2h!S- ,Y A_, __ __ j;:-c·~-" 'F~>.EI>e:-l..lc.. l. J-h..li-I>..IS. l~<c..... .:

I i.

' 1 i i i l .

' i i I i l I

' . i I ·,_ ·r j

J l < :- : : •;u· ',. :: . 'DR'<' __ ']) a c...-,.:·· .A.s .. -'?..~ ~-'-" r..~'i> ................. , f :.';.!:>, ."TY.t..'<'.-1-~ ... \::l~Li :.:r-:s! i::y E.R.F -~ Swg. No, ·

... .. . .., .. : ....................... ., ... .... . ................... -........ ------------·-·-y---~---t~~~=;~::,::.: .. ?~~~J. l:c~~;,:S""L~;::~. ·:J ~ r i

I ,.

I

• l ' i.

i l' f

•. ' ·,j :.

"j

' 1 .. t·

·i ' . '.

. -. -, l

I

B7

,'J s-

·,, '-, .• ' f' ' .. _. .

-� • -: r .-_

N

I -�--�-----·-·----,----- ·····-------- -··-·-------- ---· --.. ---- -,-_-----·------- ----------,-----,--------,i ' .-,.,--:,,·

· //_F/,z;,-85.00

" . . ·• .. ·. c----' I . . . ,. . .

' i\VIELD-.Coii'i''i'iiiio�s: .. . J,-· 7.'

V'_ o�o ., ? "-o �holc:17 ... .... - 1' ·--··--. .

E SECTION G-G

N·o'T'E !.

·---t--' BEAMS B-S $- B-1 Ar,� DcSffjNEO.

To T"l"IKE: LATE'RAL. PRE'.s-.SVR'f,

1. FRAMES ( ,COVCRS REQP

5::Ai..F: 311 =- i 1-'·0 1.1

PLAN OF PUMP MOTOR fLOOR I-IT- ELEV 83.0

---, SECTION l_f___J

D ""

SECTION II l , . . . .· .. · • . . . . . I

5ee ;,:;,;��-;,;;�;�; superstru�rure M'o��- �-/· 7

;__c_·-_'6-'.J · · · ;;;>� · '\ �,, �S-li{� / /;;�2- .5e.,,,O,-v,J N-.5t7-.?07? /;���:, ,_ _ _________ /".'/2':: . '---� 3�4¢11ool:e'{:fJ,;,,�f;/JL017,/-1c-ck�f , _, ____ �/� ··---- ----·---�-------· '.'.-/✓,f:<f __

-. • 1' • . . '

SECT/QN A-A

s·•. - - :

�-j� ___ I!.f!

_?._@ /�2''. --- --·- ---•s"•'-

PR.O\flDE S1..oTT'E:O TYPE C.a..'ST !Row \w.�n.,-s ON Ut--ti>ERS10� · OF''.FLo�� F'oR Su-sPENDINCi C1.tC.:t&1cA.� Duc..Ts

A1rt DIJ<:.1&, Aw.of'1PES l«TH� DEs1Gf-iA.T'l:'D A1."1c1-.1M1;tn.PLt-.�e-.. · · AYti\TlONI\L fliSER'!S Otl 5'.6± CEirTERS 0'-lei;>.,. Re:1.11\tNill;'R.

o.:·. So;i.l""A.ctf, . G-!�'a (18'0"Ld,) - 7· J/2;-''a J

� -7�,4-·'c 1- • 14 ·'a(! 8 :o•· L9)

····· ---"i

, I l r , ' ' l ' __.,__J_ ...

. •·· \,;J;' I/

'__ , ..../'1,, ··, SECTION 5]

NOTES·

SECTION.· W-W TYPICAL

SCALE· - .;,; 1�0•' . . • 2- ' '.: ..

/. &1i?lorc1117 bors lo. a beol orOt//7d .S/770'1/ Of7<?/7/0q:S C?'/7d.

c vt q / /orye,, opea//79S . ·· . · ·

: _ 2. Leore /-6 0/o. Opea1r17s r'ors117a/l 1770/or.s aod sll.or/-s . �r;/es.s c/,ai?<?e'!' .by rype OT dtv!l?OCJ'E'_ 17u11117 selecl-ed

.;;1_ All re117/orc1/79' sl-ee/.s/70// _ 17ov_e .3 ol"col/e,llaless ..

ol-/7erw/se nor-ed. . . . . .. ·. . . . • : " · . . ·_· · . -.. ·. ·· ...

4. · C/,orr;rer all e!xpot,~ed. car,7ers e?uli/es::; o/172-rr✓l->e /1oted . .

· 5 Lqp er// re1ororc1h7 pars .¢0@0ms:t.//7le,ss or,W,- · ·•·•.· wise oof'ed, . G. Pum;-7 moror- f/oo,-· of Elev. aao rorec;/ve .s reel -/-,-ou/e/ Tt,;1:sh.

· f?EFER'ENCE DRAWINGS /j/-5p ,?03 .· £9u/pr17e/7/ /oyovr ;V-5p 207 /17rer/17ed,•ofe .secrcr · IV-50210 Sqqe.rsl'ru:r</re Wails 1V-5£7 2t:J4 . /rdy_ L7ro,wJh9 .·:··

5fCTION 6- B . _SECT \Of\l · D- D

5[C:Tl01\J C-C

I I '

?·t¾.''a 1N 2Rows�B-5

,.. �&·-/1,C:1N 2 /?OV;'[.,·8·/,:_J

· · .... r··-··----· r:

':>-!CWll\',G RfiNFOKCEMEK1' OF b\ f E5

I

::,i=CTION F-F :,rioi,VING T"\'PICAL REINFORCE M£NT OF 82 ·. ONLY

I I

A 7/12.11 Re:1NF0RCING SrE,( • AOO 13·5 RMS·HNF Revision Date

CHIEF D'PM. E.J. Q.

IN CHARGE oF·c.s:E· DESIGN BY -----lf,);1,_5,.

CHECKED BY.��_,i}H'J£ ..

DRAWN BY . .f?.NL.'.:J,{'_Q.J\J

THIS DRAWING ACCOMPANIE

$ECTION �. OF TH£ .

SPEC/FIC.ATIOli i'CCOMOUN1N

CONTRACT NQ.

No a: �too

. Brief

FREDERIC R. HARRIS, INC.

;CONSULTING ENGINEERS

27 WILLIAM ST., NEW YORK

By

NAVY DEPARTMENT 6URE'AU or YAlliJS $ DOCKS

U. 5. NAVY YARD ··

NORFOLK,VA.

DRY. DOCK NO. 8

.·. ••.··· .. ·._ PU\\llPWELL

MAlN PUMP. MOTOR FLOOR

5CALE: � ",1:/j'1 As Nore:o �... . '

DRfa.'NI NG NO

N�SD209

·1 erik.bonenfant Rectangle

SR-002

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

D R

Y D

O C

K

P U

M P

W E

LL

R

IG

G

IN

G

L O

C A

TI

O

S

SR-003

A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

D R

Y D

O C

K

P U

M P

W E

LL

R

IG

G

IN

G

L O

C A

TI

O

S

G-001

VICINITY MAP SYMBOLS LEGEND GENERAL NOTES

ABBREVIATIONSLOCATION MAP

DETAIL OR SECTION TITLE B2

LIST OF SHEETS

SHEET NO.

NAVFAC

DWG. NO.

SHEET TITLE

NNSY DRY DOCK 8 PUMPWELL

REPLACE MAIN DEWATERING PUMP 2

NORFOLK NAVAL SHIPYARD ° PORTSMOUTH, VIRGINIA

NAVAL FACILITIES ENGINEERING COMMAND ~ MID-ATLANTIC

PUBLIC WORKS DEPARTMENT PORTSMOUTH

FACILITIES ENGINEERING AND ACQUISITION DIVISION

NORFOLK NAVAL SHIPYARDNORFOLK NAVAL SHIPYARD

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

A

TL

A N

TI

C

R E

P

LA

C E

M A

IN

D

E W

A

TE

R

IN

G P

U M

P

AutoCAD SHX Text

COVER SHEET

AutoCAD SHX Text 12832345

AutoCAD SHX Text

AutoCAD SHX Text

EJB

AutoCAD SHX Text

EJB

AutoCAD SHX Text

RPZ

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text

BRANCH

AutoCAD SHX Text

SOUTHERN

AutoCAD SHX Text

SHIPYARD

AutoCAD SHX Text

U.S. NAVAL

AutoCAD SHX Text

PORTSMOUTH

AutoCAD SHX Text

AutoCAD SHX Text

NAVY DEPOT

AutoCAD SHX Text

CRANEY ISLAND

AutoCAD SHX Text

ELIZABETH RIVER

AutoCAD SHX Text

AutoCAD SHX Text

SEWELLS POINT

AutoCAD SHX Text

WESTERN

AutoCAD SHX Text

BRANCH

AutoCAD SHX Text

BRANCH

AutoCAD SHX Text

AutoCAD SHX Text

NORFOLK

AutoCAD SHX Text

AutoCAD SHX Text

EASTERN

AutoCAD SHX Text

CHESAPEAKE BAY

AutoCAD SHX Text

CHESAPEAKE

AutoCAD SHX Text

BAY

AutoCAD SHX Text

WILLOUGHBY

AutoCAD SHX Text

U.S. NAVAL

AutoCAD SHX Text

AIR STATION

AutoCAD SHX Text

ST. JULIEN'S CREEK

AutoCAD SHX Text

U.S. NAVAL ANNEX

AutoCAD SHX Text

NANSEMOND RIVER

AutoCAD SHX Text

DISPOSAL AREA

AutoCAD SHX Text

U.S. ARMY CRANEY ISLAND

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

U.S. NAVAL STATION

AutoCAD SHX Text

VA BEACH

AutoCAD SHX Text

LITTLE CREEK U.S. NAVAL AMPHIBIOUS BASE

AutoCAD SHX Text

PROJECT SITE

AutoCAD SHX Text

WORK SITE

AutoCAD SHX Text DETAIL, SECTION, OR ELEVATION NUMBER. NUMBER REFERENCES GRID PLACEMENT ON SHEET WHICH DETAIL IS DRAWN.

AutoCAD SHX Text

SHEET ON WHICH DETAIL, SECTION, OR ELEVATION IS DRAWN

AutoCAD SHX Text

CARET SYMBOLIZES A PHOTOGRAPH OR INTERIOR ELEVATION.

AutoCAD SHX Text

SHADED ARROW SIGNIFIES A SECTION CUT OR EXTERIOR ELEVATION.

AutoCAD SHX Text

OCEANA NAVAL AIR STATION

AutoCAD SHX Text MFR MANUFACTURER MANUFACTURER MPH MILES PER HOUR MILES PER HOUR OC ON CENTER ON CENTER PSF POUNDS PER SQ FT POUNDS PER SQ FT PSI POUNDS PER SQ IN POUNDS PER SQ IN REINF REINFORCING,-MENT REINFORCING,-MENT REQ'D REQUIRED REQUIRED SCHED SCHEDULE SCHEDULE SHT SHEET SHEET SPEC SPECIFICATION SPECIFICATION SQ SQUARE SQUARE T&B TOP & BOTTOM TOP & BOTTOM TYP TYPICAL TYPICAL VERT VERTICAL VERTICAL UON UNLESS OTHERWISE UNLESS OTHERWISE NOTED VDOT VIRGINIA DEPT OF VIRGINIA DEPT OF TRANSPORTATION W/ WITH WITH W/O WITHOUTWITHOUT

AutoCAD SHX Text ALUM ALUMINUM ALUMINUM B/W BETWEEN BETWEEN CL CENTERLINE CENTERLINE CMU CONC MASONRY UNIT CONC MASONRY UNIT CONC CONCRETE CONCRETE DEPT DEPARTMENT DEPARTMENT or DIA DIAMETER DIM DIMENSION DIMENSION DWGS DRAWINGS DRAWINGS ELEV ELEVATION ELEVATION EXIST EXISTING EXISTING FED FEDERAL FEDERAL GALV GALVANIZED GALVANIZED KIP 1000 POUNDS 1000 POUNDS KSI KIPS PER SQ INCH KIPS PER SQ INCH KTR CONTRACTOR CONTRACTOR LB POUNDS POUNDS LONG LONGITUDINAL LONGITUDINAL MAX MAXIMUM MAXIMUM MIN MINIMUM MINIMUM

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

NAVAL SUPPORT

AutoCAD SHX Text SHEET(S) ON WHICH DETAIL, SECTION, ELEVATION, OR PHOTOGRAPH IS CALLED OUT [INCLUDE ALL RELATED LOCATIONS]

AutoCAD SHX Text B2

AutoCAD SHX Text G-001

AutoCAD SHX Text

SCALE: X/X" = 1'-0"

AutoCAD SHX Text G-001, A-00#

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text G-001

AutoCAD SHX Text 12832345

AutoCAD SHX Text

COVER SHEET

AutoCAD SHX Text

1. COMPLY WITH FEDERAL, STATE, AND BASE REGULATIONS. COMPLY WITH FEDERAL, STATE, AND BASE REGULATIONS. 2. COMPLY WITH BASE SECURITY, ENVIRONMENTAL, AND OSHA COMPLY WITH BASE SECURITY, ENVIRONMENTAL, AND OSHA HEALTH SAFETY REGULATIONS. 3. THE LOCATION OF UTILITIES SHOWN IN THESE DRAWINGS ARE THE LOCATION OF UTILITIES SHOWN IN THESE DRAWINGS ARE APPROXIMATE AND REFERENCED FROM BASE RECORD DRAWINGS. 4. SCAN AND MARK UTILITIES PRIOR TO EXCAVATION. SCANNING SCAN AND MARK UTILITIES PRIOR TO EXCAVATION. SCANNING SHALL BE PERFORMED WITH ELECTROMAGNETIC & ULTRASONIC DETECTION EQUIPMENT. 5. EXERCISE CAUTION DURING EXCAVATION. HAND DIG WHEN EXERCISE CAUTION DURING EXCAVATION. HAND DIG WHEN GETTING CLOSE (WITH IN 2 FEET) OF EXISTING ADJACENT OR TRAVERSING UTILITIES AND STRUCTURES. 6. FIELD VERIFY DIMENSIONS PRIOR TO PURCHASING MATERIALS. FIELD VERIFY DIMENSIONS PRIOR TO PURCHASING MATERIALS. 7. OBTAIN OUTAGE APPROVAL PRIOR TO STARTING WORK THAT MAY OBTAIN OUTAGE APPROVAL PRIOR TO STARTING WORK THAT MAY INTERRUPT TRAFFIC, UTILITIES, OR OPERATIONAL SERVICES. ALLOW UP TO 15 DAYS FOR OUTAGE COORDINATION AND APPROVAL. 8. PROVIDE TECHNICAL SUBMITTALS ON ALL EQUIPMENT, PIPING, PROVIDE TECHNICAL SUBMITTALS ON ALL EQUIPMENT, PIPING, ANCHORS, COATINGS, AND VALVES. PROVIDE TECHNICAL SUBMITTALS IN ELECTRONIC FORMAT. 9. LAY DOWN AREA SHALL BE AS INDICATED BY THE CONTRACTING LAY DOWN AREA SHALL BE AS INDICATED BY THE CONTRACTING OFFICER. 10. SECURE PROJECT AREA'S DURING DEMOLITION AND SECURE PROJECT AREA'S DURING DEMOLITION AND CONSTRUCTION. PROVIDE PEDESTRIAN AND VEHICLE TRAFFIC CONTROL PLANS. 11. PROTECT EXISTING STRUCTURES AND SURROUNDING SURFACES PROTECT EXISTING STRUCTURES AND SURROUNDING SURFACES TO REMAIN DURING DEMOLITION AND REPAIR OPERATIONS. ALL EXIST MATERIALS TO REMAIN THAT ARE DAMAGED OR OTHERWISE DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE REPAIRED OR REPLACED. 12. COMPLY WITH BASE COVID 19 PRACTICES AND POLICIES.COMPLY WITH BASE COVID 19 PRACTICES AND POLICIES.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BERTH 43

AutoCAD SHX Text

BERTH 45

AutoCAD SHX Text

BERTH 44

AutoCAD SHX Text

MCCAULEY ST.

AutoCAD SHX Text

WEAVER ST.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BARKER AV.

AutoCAD SHX Text

BERTH 40

AutoCAD SHX Text

BERTH 35

AutoCAD SHX Text

AutoCAD SHX Text

PIER NO. 5

AutoCAD SHX Text

BERTH 28

AutoCAD SHX Text

BERTH 42

AutoCAD SHX Text

AutoCAD SHX Text

BERTH 41

AutoCAD SHX Text

BERTH 34

AutoCAD SHX Text

BERTH 33

AutoCAD SHX Text

BERTH 29

AutoCAD SHX Text

BERTH 22

AutoCAD SHX Text

BERTH 21

AutoCAD SHX Text

BERTH 17

AutoCAD SHX Text

BERTH 16

AutoCAD SHX Text

BERTH 19

AutoCAD SHX Text

BERTH 20

AutoCAD SHX Text

BERTH 18

AutoCAD SHX Text

BERTH 27

AutoCAD SHX Text

BERTH 23

AutoCAD SHX Text

PIER NO. 4

AutoCAD SHX Text

PIER NO. 3

AutoCAD SHX Text

AutoCAD SHX Text

DRYDOCK 7

AutoCAD SHX Text

DRYDOCK 6

AutoCAD SHX Text

DAVIS AV.

AutoCAD SHX Text

DRYDOCK 4

AutoCAD SHX Text

BERTH 36

AutoCAD SHX Text

DRYDOCK 8

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BERTH 39

AutoCAD SHX Text

PIER NO. 6

AutoCAD SHX Text

BERTH 32

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BERTH 37

AutoCAD SHX Text

BERTH 38

AutoCAD SHX Text

AutoCAD SHX Text

STEVENS ST.

AutoCAD SHX Text

BERTH 26

AutoCAD SHX Text

BERTH 24

AutoCAD SHX Text

AutoCAD SHX Text

BERTH 30

AutoCAD SHX Text

BERTH 25

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

JONES ST.

AutoCAD SHX Text

HITCHCOCK ST.

AutoCAD SHX Text

AutoCAD SHX Text

BERTH 31

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BERTH 1

AutoCAD SHX Text

BERTH 8

AutoCAD SHX Text

DRYDOCK 2

AutoCAD SHX Text

DRYDOCK 1

AutoCAD SHX Text

TRUXTON ST.

AutoCAD SHX Text

BERTH 10

AutoCAD SHX Text

BERTH 9

AutoCAD SHX Text

BERTH 12

AutoCAD SHX Text

BERTH 15

AutoCAD SHX Text

BERTH 14

AutoCAD SHX Text

BERTH 13

AutoCAD SHX Text

BERTH 11

AutoCAD SHX Text

DRYDOCK 3

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BROWN AV.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BREESE ST.

AutoCAD SHX Text

RENSHAW AV.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BERTH 7

AutoCAD SHX Text

AutoCAD SHX Text

BERTH 3

AutoCAD SHX Text

BERTH 6

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BERTH 2

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MCKEEVER AV.

AutoCAD SHX Text

AutoCAD SHX Text

BERRIEN ST.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 174-A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FIRST ST./OLD WARRINGTON AV.

AutoCAD SHX Text

WILKENSON ST.

AutoCAD SHX Text

AutoCAD SHX Text

LIVINGSTON ST.

AutoCAD SHX Text

BERTH 5

AutoCAD SHX Text

BERTH 4

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 15A

AutoCAD SHX Text

SLOAT ST.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

KILTY ST.

AutoCAD SHX Text

AutoCAD SHX Text

QUARTERS A

AutoCAD SHX Text

SKINNER ST.

AutoCAD SHX Text

AutoCAD SHX Text

GREEN ST. / OLD WILLIAMS AV.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text M-22

AutoCAD SHX Text

MAHONEY ST.

AutoCAD SHX Text

AutoCAD SHX Text

WALLIN ST.

AutoCAD SHX Text

HITCHCOCK ST.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BRUMBY AV.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BERRIEN ST.

AutoCAD SHX Text

STEVENS ST.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

HENLEY AV.

AutoCAD SHX Text M-1

AutoCAD SHX Text

BERRIEN ST. EXT.

AutoCAD SHX Text

PENNOCK ST.

AutoCAD SHX Text M-32

AutoCAD SHX Text

MCLEAN ST.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MARSHALL ST.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GREEN ST.

AutoCAD SHX Text

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text M-001

AutoCAD SHX Text

GENERAL MECHANICAL NOTES

AutoCAD SHX Text M-101

AutoCAD SHX Text

PUMP WELL - PUMP FLOOR PLAN

AutoCAD SHX Text G-002

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text M-201

AutoCAD SHX Text

PUMP WELL ELEVATIONS

AutoCAD SHX Text

AutoCAD SHX Text M-202

AutoCAD SHX Text

AutoCAD SHX Text M-501

AutoCAD SHX Text

PWD PORTSMOUTH

AutoCAD SHX Text

NORFOLK NAVAL SHIPYARD - PORTSMOUTH, VIRGINIA

AutoCAD SHX Text William Shirk, PE

AutoCAD SHX Text

DESIGN MANAGER

AutoCAD SHX Text

BRANCH MANAGER

AutoCAD SHX Text

ENGR DIRECTOR

AutoCAD SHX Text

CUSTOMER

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

CONSTR. CONTR. NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING COMMAND

AutoCAD SHX Text

DES

AutoCAD SHX Text

DRW

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

DRAWFORM REVISION: 10 MARCH 2009

AutoCAD SHX Text

CHK

AutoCAD SHX Text

SATISFACTORY TO

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FOR COMMANDER NAVFAC

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

A/E INFO

AutoCAD SHX Text

OF

AutoCAD SHX Text

EPROJECT NO.:

AutoCAD SHX Text

NORFOLK NAVAL SHIPYARD

AutoCAD SHX Text

PORTSMOUTH, VIRGINIA

AutoCAD SHX Text 1632158

AutoCAD SHX Text

AutoCAD SHX Text

ERIK BONENFANT

AutoCAD SHX Text

AutoCAD SHX Text M-502

AutoCAD SHX Text

PUMPS MDP3 & MDP4 PIPING (OPTION REMOVED FROM CONTRACT)

AutoCAD SHX Text

4 SHEETS

AutoCAD SHX Text

REF DWGS_1632158_2009 RIGGING NOTES.PDF

AutoCAD SHX Text

PUMP MDP2 AND PIPING

AutoCAD SHX Text

AutoCAD SHX Text M-503

AutoCAD SHX Text

ALTERNATE PIPING FOR VALVE REPLACEMENTS

AutoCAD SHX Text

AutoCAD SHX Text M-504

AutoCAD SHX Text

ELEVATIONS FOR 54" GATE VALVE

AutoCAD SHX Text

REFERENCE DRAWINGS (PROVIDED IN BID DOCUMENTS IN SEPARATE FILES)

AutoCAD SHX Text

MDP PUMP ELEVATIONS

AutoCAD SHX Text

AutoCAD SHX Text S-001

AutoCAD SHX Text

STRUCTURAL NOTES AND ABBREVIATIONS

AutoCAD SHX Text

AutoCAD SHX Text S-101

AutoCAD SHX Text

MAIN PUMP ROOM PLAN VIEWS

AutoCAD SHX Text

AutoCAD SHX Text S-301

AutoCAD SHX Text

CONCRETE PEDESTAL DETAILS

AutoCAD SHX Text

4 SHEETS

AutoCAD SHX Text

REF DWGS_1632158_2009 DD8MDP2 54IN GATE VALVE REPLEACEMENT.PDF

AutoCAD SHX Text

REF DWGS_1632158_1941 ORIGINAL PUMP WELL CONSTRUCTION.PDF

AutoCAD SHX Text

6 SHEETS

AutoCAD SHX Text

AutoCAD SHX Text S-302

AutoCAD SHX Text

COFFERDAM DETAILS

AutoCAD SHX Text

AutoCAD SHX Text S-102

AutoCAD SHX Text

COFFERDAM PLAN VIEW

AutoCAD SHX Text 12832346

AutoCAD SHX Text 12832347

AutoCAD SHX Text 12832348

AutoCAD SHX Text 12832349

AutoCAD SHX Text 12832350

AutoCAD SHX Text 12832351

AutoCAD SHX Text 12832352

AutoCAD SHX Text 12832353

AutoCAD SHX Text 12832354

AutoCAD SHX Text 12832355

AutoCAD SHX Text 12832356

AutoCAD SHX Text 12832357

AutoCAD SHX Text 12832358

AutoCAD SHX Text 12832359

AutoCAD SHX Text S-303

AutoCAD SHX Text

SUCTION BELL BLANK DETAILS

AutoCAD SHX Text

AutoCAD SHX Text 12832360

G-002

SCHEDULE NOTES RIGGING AND LIFTING NOTESCONFINED SPACE ENTRY NOTESGENERAL PUMPWELL NOTES

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

A

TL

A N

TI

C

R E

P

LA

C E

M A

IN

D

E W

A

TE

R

IN

G P

U M

P

ENVIRONMENTAL NOTES

SUCTION BELL EVALUATION

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text 12832346

AutoCAD SHX Text

AutoCAD SHX Text

EJB

AutoCAD SHX Text

EJB

AutoCAD SHX Text

RPZ

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text THE FOLLOWING BASED ON THE DEC 2020 WATERFRONT SCHEDULE CONTRACT AWARD 4/1/2021 4/1/2021 SUCTION BELL COFFER DAM - MUST BE INSTALL PRIOR TO CAISSON REMOVAL. LONG LEAD EQUIPMENT 07/01/2021 -10/01/2022 GATE VALVE WORK- DISCHARGE FLUME ISOLATION (STOPLOG) MUST BE IN PRIOR TO WORK TO VALVE WORK. THE STOP LOG WILL MAKE AN OUTAGE ON THE DISCHARGE FLUME, BUILDING 828 SALT WATER STATION AND PUMPWELL DRAIN PUMPS. MILCON COORDINATION CAISSON PROJECT DOCK COFFERDAM MUST BE IN PLACE PRIOR TO PUMP WORK. CAISSON OUT - MAY 2022 TO JAN 2024 PUMP REPLACEMENT 10/01/22 - 2/01/23 MILCON P678 PUMP WELL WORK IS ALSO SCHEDULED DURING THIS TIME. THE MDP2 PROJECT WORK MAY BE DELAYED. THE CONTRACTOR SHALL PROVIDE A BID OPTION FOR A DEMOBILIZATION AND REMOBILZATION AND OTHER COST ASSOCIATED WITH A DELAY OF WORK. CONTRACT COMPLETION 5/12/2023 5/12/2023 PUMP OPERATION AND TESTING SHALL BE SCHEDULED WITH 30 AND 14 DAYS NOTICE TO CONSTRUCTION MANAGER & NNSY CODE 980. * THE CONTRACTOR SHALL SEAL THE PUMPWELL WITHIN 48 HOURS OF THE CONTRACTOR SHALL SEAL THE PUMPWELL WITHIN 48 HOURS OF EMERGENCY RESPONSE TO DESTRUCTIVE WEATHER OR OTHER EMERGENCY DOCKING OPERATION.

AutoCAD SHX Text

1. RIGGING SHALL BE IN ACCORDANCE WITH NAVFAC P-307, RIGGING SHALL BE IN ACCORDANCE WITH NAVFAC P-307, "MANAGEMENT OF WEIGHT HANDLING EQUIPMENT", LATEST REVISION. 2. PRIOR TO COMMENCEMENT OF WORK, A RIGGING PLAN SHALL PRIOR TO COMMENCEMENT OF WORK, A RIGGING PLAN SHALL BE SUBMITTED TO THE CONTRACTING OFFICER FOR GOVERNMENT APPROVAL, STAMPED BY A REGISTERED PROFESSIONAL ENGINEER. THE RIGGING PLAN SHALL BE DEVELOPED FOR TRANSPORTING THE EXISTING PUMP PARTS FROM THE EXISTING LOCATIONS TO A VEHICLE OUTSIDE OF THE EXISTING PUMPWELL AND THEN BACK INTO PLACE WITHIN THE PUMPWELL. THE PLAN SHALL INCLUDE RIGGING MEANS AND METHODS, AS WELL AS THE PROPOSED SEQUENCE OF EVENTS. TIE-OFF POINTS TO THE EXISTING STRUCTURE SHALL BE INCLUDED IN THE PLAN. IF TIE-OFF POINTS TO THE EXISTING STRUCTURE ARE PROPOSED, CALCULATIONS INDICATING THAT THE EXISTING STRUCTURE AND THE TIE-OFF POINTS HAVE THE CAPACITY TO SUPPORT THE APPLIED LOADS SHALL BE INCLUDED IN THE PLAN. 3. SEE THE REFERENCE DRAWINGS IN PARTICULAR SHEETS 7-10 SEE THE REFERENCE DRAWINGS IN PARTICULAR SHEETS 7-10 DESCRIBING SOME THE RESOURCES AND CONSTRAINTS WITH RESPECT TO RIGGING IN THE PUMP WELL. 4. THE MAXIMUM UPWARD FORCE APPLIED SHALL NOT EXCEED THE MAXIMUM UPWARD FORCE APPLIED SHALL NOT EXCEED 15,000 LBS. 5. SEE SHEET M201 FOR ESTIMATES ON EQUIPMENT AND PART SEE SHEET M201 FOR ESTIMATES ON EQUIPMENT AND PART WEIGHTS. 6. THIS CONTRACT INCLUDES THE REMOVAL AND REINSTALLATION THIS CONTRACT INCLUDES THE REMOVAL AND REINSTALLATION OF THE EXISTING PUMPWELL ROOF HATCH. THE EXISTING ROOF HATCH WEIGHS APPROXIMATELY 20,350 LBS. CODE 980 POSSESSES (4) EXISTING HOIST RINGS FOR USE IN LIFTING THE EXISTING HATCH. CONTACT THE CONTRACTING OFFICER FOR HOIST RINGS. REMOVE AND SALVAGE (4) EXISTING PLUGS FROM EXISTING TAPPED HOLES AND INSERT EXISTING HOIST RINGS, APPLYING TORQUE AS REQUIRED FOR TIGHT FIT. AFTER PLACING THE EXISTING ROOF HATCH BACK ONTO THE PUMPWELL ROOF, REMOVE HOIST RINGS AND REINSTALL PLUGS. RETURN THE EXISTING HOIST RINGS TO THE CONTRACTING OFFICER. PERFORM THESE STEPS EACH TIME THE EXISTING HATCH IS TO BE LIFTED.

AutoCAD SHX Text

1. CONFINED SPACE ENTRY SHALL BE IN ACCORDANCE WITH ALL CONFINED SPACE ENTRY SHALL BE IN ACCORDANCE WITH ALL APPLICABLE OSHA REQUIREMENTS AND U.S. ARMY CORPS OF ENGINEERS MANUAL EM-385. 2. THE SUCTION CHAMBER (THE CHAMBER BELOW THE PUMP THE SUCTION CHAMBER (THE CHAMBER BELOW THE PUMP FLOOR) CAN BE ACCESSED THROUGH THE DRYDOCK FLOOR TRENCH OR BY PUMP WELL FLOOR HATCH. 3. FOR THE PURPOSES OF THIS CONTRACT, THE DOCK FLOOR FOR THE PURPOSES OF THIS CONTRACT, THE DOCK FLOOR TRENCH AND THE SUCTION CHAMBER ARE CONSIDERED CONFINED SPACES. 4. CONFINED SPACES SHALL BE TESTED FOR ATMOSPHERIC CONFINED SPACES SHALL BE TESTED FOR ATMOSPHERIC HAZARDOUS GASES IN ACCORDANCE WITH OSHA STANDARDS AND CERTIFIED AS SAFE FOR ENTRY PRIOR TO ANY PERSONNEL ACCESS. PERMITS SHALL BE POSTED AT ENTRANCES IN ACCORDANCE WITH OSHA STANDARDS. 5. A SPACE ATTENDANT SHALL BE POSITIONED OUTSIDE OF EACH A SPACE ATTENDANT SHALL BE POSITIONED OUTSIDE OF EACH ENTRANCE INTO THE CONFINED SPACE AT ALL TIMES WHEN PERSONNEL ARE WITHIN THE CONFINED SPACE, AND CONTACT SHALL BE MAINTAINED AT ALL TIMES BETWEEN THE SPACE ATTENDANT AND EACH OF THE ENTRANTS OF THE CONFINED SPACE BY VOICE, RADIO, OR OTHER APPROVED MEANS. 6. PROVIDE OSHA SPECIFIED FALL PROTECECTION AROUND OPEN PROVIDE OSHA SPECIFIED FALL PROTECECTION AROUND OPEN PITS THAT ARE GREATER THAN 5 FEET DEEP.

AutoCAD SHX Text

1. APPROXIMATELY 3 FEET OF WATER WILL BE PRESENT ALONG APPROXIMATELY 3 FEET OF WATER WILL BE PRESENT ALONG THE BASE OF THE SUCTION CHAMBER WITHIN THE VICINITY OF WORK. 2. EXISTING GATES VALVES AND DEWATERING PUMPS WILL BE EXISTING GATES VALVES AND DEWATERING PUMPS WILL BE OPERATED BY SHIPYARD PERSONNEL STATIONED WITHIN THE PUMPWELL. WORK SHALL BE COORDINATED WITH THESE PUMPWELL OPERATORS ON A DAILY BASIS. 3. THE CONTRACTOR SHALL PROTECT SITE EQUIPMENT, ESPECIALLY THE CONTRACTOR SHALL PROTECT SITE EQUIPMENT, ESPECIALLY MOTORS AND ELECTRICAL GEAR FROM CONSTRUCTION DUST AND DEBRIS. 4. CHAMBER CLEANLINESS. ALL TRASH, DEBRIS AND EQUIPMENT CHAMBER CLEANLINESS. ALL TRASH, DEBRIS AND EQUIPMENT SHALL BE REMOVED AT THE END OF THE DAY.

AutoCAD SHX Text

PWD PORTSMOUTH

AutoCAD SHX Text

NORFOLK NAVAL SHIPYARD - PORTSMOUTH, VIRGINIA

AutoCAD SHX Text William Shirk, PE

AutoCAD SHX Text

DESIGN MANAGER

AutoCAD SHX Text

BRANCH MANAGER

AutoCAD SHX Text

ENGR DIRECTOR

AutoCAD SHX Text

CUSTOMER

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

CONSTR. CONTR. NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING COMMAND

AutoCAD SHX Text

DES

AutoCAD SHX Text

DRW

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

DRAWFORM REVISION: 10 MARCH 2009

AutoCAD SHX Text

CHK

AutoCAD SHX Text

SATISFACTORY TO

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FOR COMMANDER NAVFAC

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

A/E INFO

AutoCAD SHX Text

OF

AutoCAD SHX Text

EPROJECT NO.:

AutoCAD SHX Text

NORFOLK NAVAL SHIPYARD

AutoCAD SHX Text

PORTSMOUTH, VIRGINIA

AutoCAD SHX Text 1632158

AutoCAD SHX Text

AutoCAD SHX Text

ERIK BONENFANT

AutoCAD SHX Text

1. SUCTION CHAMBER DEWATERING SUCTION CHAMBER DEWATERING THERE MAY BE UP TO 3 FEET WATER IN THE SUCTION CHAMBER. THE CONTRACTOR SHALL DEWATER AS NECESSARY TO INSTALL THE SUCTION BELL COFFER DAM. IF THE WATER IN THE CHAMBER HAS NOT COMINGLED WITH CONSTRUCTION OR INDUSTRIAL ACTIVITIES, IT CAN BE PUMPED TOPSIDE AND DISCHARGED TO THE RIVER THROUGH OUTFALL 92 WITH APPROVAL FROM C106.31. CONTACT C106.31 AT LEAST 30 DAYS PRIOR TO THE NEEDED DISCHARGE DATE TO ALLOW ENOUGH TIME FOR DISCHARGE COORDINATION AND NOTIFICATION TO REGULATORY AGENCIES. IF THE WATER IN THE CHAMBER HAS COMINGLED WITH CONSTRUCTION OR INDUSTRIAL ACTIVITIES, IT MUST BE COLLECTED AND DISPOSED OF AND IS NOT AUTHORIZED FOR DISCHARGE TO THE STORM DRAIN SYSTEM OR RIVER.

RDRY DOCK 8 MAIN DEWATERING PUMP SUCTION BELL MATERIALS EVALUATION SCOPE OF WORK: THE PURPOSE OF THE EVALUATION WILL BE TO DETERMINE THE REMAINING USEFUL LIFE OF THE EXISTING SUCTION BELL. THE EXISTING SUCTION BELL WAS INSTALL IN THE EARLY 1940'S (1942). THE SUCTION BELL IS PART OF THE DOCK DEWATERING PUMP INTAKE PIPING AND ARE EXPOSED TO PERIODIC SUBMERSION DURING DOCKING EVOLUTIONS. THE SUBMERGENCE IS OF RIVER WATER, WHICH IS CONSIDER TO BE BRACKISH SEA WATER OR SALT WATER. DOCKING EVOLUTION MAY BE UP TO A WEEK AND UP TO SEVERAL TIMES A YEAR. THE SUCTION BELL EVALUATION MUST INCLUDE PROFESSIONAL METALLURGICAL ANALYSIS AND SUBSEQUENT REPORT, TO INCLUDE THE FOLLOWING TESTS: 1. VISUAL INSPECTION VISUAL INSPECTION 2. ULTRASONIC TESTING (UT) ULTRASONIC TESTING (UT) 3. MICROSCOPIC IMAGING (SEM) MICROSCOPIC IMAGING (SEM) 4. MACROSCOPIC IMAGING MACROSCOPIC IMAGING 5. MOLECULAR SPECTROSCOPY TO INCLUDE IDENTIFICATION OF ANY MOLECULAR SPECTROSCOPY TO INCLUDE IDENTIFICATION OF ANY FOREIGN MATTER NOT CONSISTENT WITH CAST IRON 6. REPORT MUST INCLUDE SUMMARY OF TESTING CONDUCTED, REPORT MUST INCLUDE SUMMARY OF TESTING CONDUCTED, TEST RESULTS, MATERIAL CLASSIFICATION INCLUDING STRUCTURAL PROPERTIES SUCH AS YIELD AND IMPACT AND ULTIMATE STRENGTHS, A LIST OF COMPARATIVE PROPERTIES TO VIRGIN CAST IRON, AND LIFE EXPECTANCY PROGNOSIS. THE CONTRACTOR MAY REMOVE A SAMPLE FROM THE MAIN DEWATERING PUMP 1 SUCTION BELL AS REQUIRED TO COMPLETE TESTING. THE SAMPLE MUST BE TAKEN FROM THE BOTTOM OF ONE VANE OF THE SUCTION BELL AS INDICATED ON M-202. THE SAMPLE SIZE MUST BE LIMITED TO 1”X 3”. SIZES BEYOND THIS MUST BE X 3”. SIZES BEYOND THIS MUST BE . SIZES BEYOND THIS MUST BE REVIEWED AND APPROVED BY NAVFAC PRIOR TO CUTTING. THE ORIGINAL THICKNESS OF BELL COMPONENTS IS APPROXIMATELY 1.5”. VERIFY WITH THE LAB THE SUFFICIENT . VERIFY WITH THE LAB THE SUFFICIENT AMOUNT OF MATERIAL REQUIRED FOR TESTING AGAINST THE ABOVE CONSTRAINTS. SAMPLE MUST BE CUT IN A MANNER WHICH LEAVES A SMOOTH CONTOUR. SUBMIT SAMPLE TO NAVFAC FOR EXAMINATION PRIOR TO SENDING TO METALLURGICAL LAB FOR ANALYSIS. FOR ANALYSIS PURPOSES, THE SUCTION BELL SHOULD BE CONSIDERED TO BE IN A 100% RELATIVE HUMIDITY WHEN DOCK IS ON OPERATION AND THE SPACE DEALS WITH DRAIN WATER AT ALL TIMES. STATICALLY, THE BELL IS SUBJECTED TO FLUID PRESSURE WITH A ΔH=63.23FT. AS A MINIMUM, THE SUCTION BELL MUST BE ΔH=63.23FT. AS A MINIMUM, THE SUCTION BELL MUST BE H=63.23FT. AS A MINIMUM, THE SUCTION BELL MUST BE STABLE AND INTACT UNDER THIS PRESSURE. THE REPORT MUST INCLUDE ALL IMAGING AND TEST RESULTS TO BE REVIEWED BY NAVFAC ENGINEERS. ANY CALCULATIONS COMPLETED IN THE COURSE OF ANALYSIS PERTAINING TO STRUCTURAL INTEGRITY MUST BE INCLUDED IN THE REPORT. THE REPORT ANALYSIS MUST PROVIDE A DETAILED DESCRIPTION OF THE CURRENT CONDITION OF THE MATERIAL AND DESCRIBE THE RATE OF DETERIORATION OVER TIME WITH SUPPORTING GRAPHS AND/OR CALCULATIONS THAT SHOW DETERIORATION OF THE MATERIAL WITH A PRECISION OF 1X10^-6 METERS. THE CONCLUSION OF THE REPORT MUST ESTIMATE THE REMAINING USEFUL LIFE.

M-001

PUMP REPLACEMENT NOTESPUMP EQUIPMENT NOTESGENERAL NOTES VALVE NOTES SAFETY NOTES

BID NOTES

A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

A

TL

A N

TI

C

R E

P

LA

C E

M A

IN

D

E W

A

TE

R

IN

G P

U M

P

BID OPTION NOTES

PUMP REPAIR QC NOTES

LEGEND & SYMBOLS

AutoCAD SHX Text

GENERAL MECHANICAL NOTES

AutoCAD SHX Text 12832347

AutoCAD SHX Text

AutoCAD SHX Text

EJB

AutoCAD SHX Text

EJB

AutoCAD SHX Text

RZ

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text PUMP DEMOLITION 1. PROVIDE RIGGING EQUIPMENT TO DISASSEMBLE THE PUMP PROVIDE RIGGING EQUIPMENT TO DISASSEMBLE THE PUMP ON-SITE. PUMP DISASSEMBLY SHALL INCLUDE REMOVING INTERMEDIATE SHAFT, BABBITT BEARING ASSEMBLY, BACK SUPPORT PLATE, AND ROTATING ASSEMBLY. 2. ASBESTOS ABATEMENT WILL BE REQUIRED FOR REMOVAL OF ASBESTOS ABATEMENT WILL BE REQUIRED FOR REMOVAL OF OLD GASKET MATERIAL, AND WILL BE PERFORMED BY THE CONTRACTOR (KTR). 3. REMOVE ALL PUMP PARTS FROM THE JOB SITE, (INCLUDING REMOVE ALL PUMP PARTS FROM THE JOB SITE, (INCLUDING BEARINGS, SHAFT, ROTATING ASSEMBLY COMPONENTS, PUMP VOLUTE, AND BASE. 4. THE MOTOR SHALL REMAIN IN PLACE. THE MOTOR SHALL REMAIN IN PLACE. 5. PROVIDE RIGGING EQUIPMENT TO BRING PUMP COMPONENTS TO PROVIDE RIGGING EQUIPMENT TO BRING PUMP COMPONENTS TO TOP LEVEL OF PUMPWELL. USE A TRUCK CRANE TO REMOVE PARTS FROM THE TOP FLOOR. SALVAGE AND REUSE EXISTING SHAFTS 1. ALL SHAFTS WILL BE INSPECTED FOR RADIAL AND AXIAL RUN ALL SHAFTS WILL BE INSPECTED FOR RADIAL AND AXIAL RUN OUT, NOT TO EXCEED 0.003 IN. NEW PUMP ROTATING ASSEMBLY AND IMPELLER 1. BALANCE ROTATING ASSEMBLY TO MIL-STD-167. BALANCE ROTATING ASSEMBLY TO MIL-STD-167. 2. VIBRATION TEST THE ROTATING ASSEMBLY TO ENSURE A VIBRATION TEST THE ROTATING ASSEMBLY TO ENSURE A VIBRATION OF LESS THAN 2 MILS. IMPELLER BEARING 1. PROVIDE A SPLIT CASE ROLLER BEARING AND BEARING PROVIDE A SPLIT CASE ROLLER BEARING AND BEARING HOUSING TO ALLOW BEARING REPLACEMENT WITHOUT SHAFT REMOVAL. PROVIDE CALCULATIONS AND BEARING RATINGS TO DEMONSTRATE THAT THE BEARINGS ARE DESIGN FOR RADIAL AND AXIAL LOADS. COATINGS 1. PUMP COATING SHALL BE APPLIED AT THE FACTORY. TOUCH UP PUMP COATING SHALL BE APPLIED AT THE FACTORY. TOUCH UP COATINGS SHALL BE BE APPLIED IN THE FIELD. PUMP INSTALLATION 1. TRANSPORT PUMP PARTS TO NNSY/PUMPWELL 8. PROVIDE TRANSPORT PUMP PARTS TO NNSY/PUMPWELL 8. PROVIDE CRANE SERVICE TO LOWER PARTS INTO PUMP WELL UPPER LEVEL. KTR TO PROVIDE RIGGING EQUIPMENT AND SERVICE TO LOWER ALL PARTS FROM UPPER LEVEL TO LOWER LEVELS. 2. ASSEMBLE PUMP. INSTALL ROTATING ASSEMBLY INTO THE ASSEMBLE PUMP. INSTALL ROTATING ASSEMBLY INTO THE VOLUTE, INSTALL INTERMEDIATE SHAFT, INTERMEDIATE BEARING. 3. CHECK ALIGNMENT OF SHAFTS AND CORRECT AS NEEDED. CHECK ALIGNMENT OF SHAFTS AND CORRECT AS NEEDED. 4. PROVIDE NEW LUBRICATION, GASKETS, SEALS, AND FASTENERS. PROVIDE NEW LUBRICATION, GASKETS, SEALS, AND FASTENERS. 5. PROVIDE ALL INSTALLATION PRODUCTS AS RECOMMENDED BY PROVIDE ALL INSTALLATION PRODUCTS AS RECOMMENDED BY THE MANUFACTURER. TEST PUMP 1. TEST PUMP FOR PROPER ROTATION. TEST PUMP FOR PROPER ROTATION. 2. ONCE CORRECT ROTATION IS VERIFIED, THE PUMP IS TO BE ONCE CORRECT ROTATION IS VERIFIED, THE PUMP IS TO BE TEST RUN UNTIL BEARING TEMPERATURES STABILIZE. PUMP OPERATION AND TESTING SHALL BE SCHEDULED WITH 30 AND 14 DAYS NOTICE TO NNSY CODE 980. WET TEST SHALL BE SCHEDULED THE NNSY CODE 980 AND DEPENDANT ON THE DOCK SCHEDULE. FINAL VIBRATION READINGS WILL BE TAKEN AND FURNISHED IN REPORT. CLEAN UP 1. CLEAN UP PUMP AND TOUCH UP EXTERIOR PAINT. PAINT CLEAN UP PUMP AND TOUCH UP EXTERIOR PAINT. PAINT FINISH SHALL BE GLOSSY AND GRAY COLOR SIMILAR TO EXISTING. REPAINT IN ACCORDANCE WITH MPI STANDARDS

AutoCAD SHX Text

1. SEE SPECIFIC SCHEDULING NOTES ON SHEET G-002. 2. THE CONTRACTOR SHALL PROVIDE PRE-WORK BRIEFINGS AND UPDATES TO THE CONSTRUCTION SCHEDULE WEEKLY AND AS REQUIRED BY THE CONSTRUCTION MANAGER. 3. THE CONTRACTOR SHALL PROVIDE 14 DAYS NOTICE OF OUTAGES. AND FOLLOW BASE LOCK OUT TAG OUT PROCEDURES. 4. NNSY WILL PROVIDE LOCKOUT / TAG OUT DEVICES FOR PUMP VALVES, CONTRACTOR SHALL PROVIDE THEIR OWN LOCKS AND TAGS. 5. PROVIDE TEMPORARY SEALS TO PIPING AND FLOOR IN ADVANCE OF DOCK FLOODING EVENTS. PROVIDE SHOP DRAWINGS. 6. PROVIDE DUST CONTROL MEASURES TO PROTECT MOTORS AND ELECTRICAL GEAR. CONTROLS SHALL INCLUDE MEASURES TO PREVENT DUST MIGRATING TO THE MOTOR FLOOR. 7. ON THESE DREAWINGS BOTHE THE TERM "PROVIDE" AND TEH MEANS TO REMOVE EXISTING AND PROVIDE NEW AND ALSO THE TERM "REPLACE" MEANS TO REMOVE EXISTING AND PROVIDE NEW. 8. NOTIFY PUMPWELL OPERATORS PRIOR TO CONNECTING CONSTRUCTION EQUIPMENT OR TOOLS TO EXISTING FACILITY UTILITY SERVICES. VERIFY THAT THE CONSTRUCTION EQUIPMENT BEING CONNECTED TO RECEPTACLES DO NOT HAVE AN AMP LOAD RATING THAT EXCEED THE CIRCUIT BREAKER RATINGS. 9. CHAMBER INSPECTION BY GOVERNMENT AND CONTRACTING OFFICER PRIOR TO TESTING. 10. DUE TO SPACE CONSTRAINTS THE PUMP WILL NEED TO COME IN PARTS AND ASSEMBLED IN PLACE ON THE PUMP FLOOR.

AutoCAD SHX Text PUMP PERFORMANCE NOTES PROVIDE NEW MAIN DEWATERING PUMP. THE PUMP CAPACITY SHALL BE AT LEAST 54,000 GAL/MIN AT 54 FT TOTAL HEAD AND 130,000 GAL/MIN AT 20 TOTAL HEAD, HAVE A DEAD HEAD OF 72 FEET AT 0 GPM. THE PUMP DESIGN AND EFFICIENCY SHALL NOT OVERLOAD THE 1200 HP MOTOR AT ANY POINT ON THE OPERATING PUMP CURVE. THE PUMP NPSHR SHALL NOT EXCEED NPSHA FOR ANY POINT ON THE PUMP CURVE. PUMP MATERIAL NOTES CASING - CAST IRON SHAFTS - STEEL SHAFT SLEEVES - BRONZE IMPELLER - BRONZE WEAR RINGS - BRONZE PROVIDE DIELECTRIC MATERIALS AT MATING SURFACES WITH DISSIMILAR METALS. SEE SPECIFICATIONS FOR ADDITIONAL DETAILS. THE EXISTING PUMP IS A WORTHINGTON MODEL 54 MSC-1 WORTHINGTON PUMP IS NOW PART OF THE FLOWSERVE CORPORATION 1-800-787-7867 LOCAL OFFICE (757) 285-5306

AutoCAD SHX Text

1. MATERIAL HANDLING, RIGGING AND TRANSPORT PLANS SHALL BE MATERIAL HANDLING, RIGGING AND TRANSPORT PLANS SHALL BE REVIEWED AND APPROVED BY A REGISTERED PROFESSIONAL ENGINEER. RIGGING EQUIPMENT AND ANCHORS SHALL BE INSPECTED AND HAVE CURRENT CERTIFICATION PRIOR TO USE. MATERIALS SHALL BE WEIGHT PRIOR TO TRANSPORT TO VERIFY THAT THE MATERIAL WEIGHTS DO NOT EXCEED THE LIMITATIONS OF THE LIFTING PLANS. 2. MANUFACTURER'S DESIGNATED ENGINEERS SHALL PROVIDE MANUFACTURER'S DESIGNATED ENGINEERS SHALL PROVIDE QUALITY CONTROL (QC) FOR THE FABRICATION, INSTALLATION, AND TESTING. 3. PUMP FABRICATIONS AND PART MACHINING SHALL BE PUMP FABRICATIONS AND PART MACHINING SHALL BE PERFORMED BY AN ISO 9001 CERTIFIED MACHINE SHOPS. 4. A 3RD PARTY QUALITY CONTROL PERSON, (NOT BE AN A 3RD PARTY QUALITY CONTROL PERSON, (NOT BE AN EMPLOYEE OF THE SUPPLIER) SHALL WITNESS, RECORD, AND MAKE REPORTS ON THE FABRICATIONS AND INSTALLATION. REPORTS SHALL INCLUDE PHOTOS. REPORTS SHALL INCLUDE THE FOLLOWING ITEMS: - WEIGHT OF THE ROTATING ASSEMBLY AND PARTS - CLEARANCES AND TOLERANCES OF THE ROTATING ASSEMBLY PARTS. - AXIAL AND RADIAL RUN OUT ON THE SHAFT - BALANCING OF THE ROTATING ASSEMBLY - COATING PREPARATION & CONDITIONS, APPLICATION THICKNESS - PERFORMANCE TEST - ALIGNMENTS - VIBRATION MEASUREMENTS - BEARING TEST

AutoCAD SHX Text SAFETY PRECAUTIONS SAFETY PRECAUTIONS 1. THE WORK REQUIRES RIGGING AND HEAVY EQUIPMENT HANDLING THE WORK REQUIRES RIGGING AND HEAVY EQUIPMENT HANDLING OF PUMP PARTS UP AND DOWN THREE FLOORS. 2. THE PUMP WELL IS A 57 FT' DEEP 3 STORY STRUCTURE WITH THE PUMP WELL IS A 57 FT' DEEP 3 STORY STRUCTURE WITH A SURFACE ELEVATION OF 103 FT AND BOTTOM FLOOR ELEVATION OF 46 FT. THE CONTRACTORS SHALL TAKE PRUDENT PRECAUTIONS WHEN AT THE EDGE OF EXISTING FLOOR OPENS. THE EXISTING FLOOR OPENS ARE PROTECTED WITH FLOOR GRATING AND HAND RAILS, WHICH SOME MAY NEED TO BE TEMPORARILY MOVED TO PERFORM WORK. THE CONTRACTORS SHALL PROVIDE FALL PROTECTION BARRIERS OVER PIT OPENINGS THAT OCCUR AS PART OF THE CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE PIT COVERS TO PREVENT TRASH AND DEBRIS FROM ENTERING INTO THE SUCTION CHAMBER. 3. SOLVENTS USED FOR CLEANING OF THE PUMP & EPOXIES SOLVENTS USED FOR CLEANING OF THE PUMP & EPOXIES USED FOR PUMP REPAIRS MAY HAVE SOME GAS FUMES. 4. PROVIDE EXHAUST VENTILATION AND FLEX DUCT TO VENT PROVIDE EXHAUST VENTILATION AND FLEX DUCT TO VENT FUMES. THE CONTRACTOR SHALL HAVE (2) 120 ELECTRICAL OUTLETS AVAILABLE FOR FAN EQUIPMENT AND A DUCT DISCHARGE POINT NEAR THE ENTRANCE OF THE PUMP WELL. 5. WORKERS IN CLOSE PROXIMITY TO SOLVENTS, EPOXIES, AND WORKERS IN CLOSE PROXIMITY TO SOLVENTS, EPOXIES, AND SAND BLAST MEDIA SHALL WEAR THE APPROPRIATE RESPIRATORS FOR THE MATERIALS BEING HANDLED. CONTRACTOR TO NOTIFY PUMPWELL MECHANICS IF SOLVENTS ARE BEING USED THAT REQUIRE ADDITIONAL PPE. 6. THE EXISTING PUMP DISCHARGE FLANGE GASKET, SUCTION BELL THE EXISTING PUMP DISCHARGE FLANGE GASKET, SUCTION BELL GASKET AND PUMP SPLIT CASING GASKET ARE LIKELY TO CONTAIN ASBESTOS MATERIALS. CONCRETE IN PUMPWELL MAY CONTAIN ASBESTOS. IN PUMPWELL MAY CONTAIN ASBESTOS. PUMPWELL MAY CONTAIN ASBESTOS. MAY CONTAIN ASBESTOS. PLAN DEMOLITION ACCORDINGLY. ABATE ASBESTOS IN ACCORDANCE WITH SPECIFICATIONS. THE CONTRACTORS SHALL PLAN ON USING CONTAINMENT ENCLOSURES, GLOVE BAGS, RESPIRATORS, AND TAKING AIR SAMPLES. 7. BOLTS ARE KNOWN TO HAVE ZINC COATINGS AND BOLTS MAY BOLTS ARE KNOWN TO HAVE ZINC COATINGS AND BOLTS MAY HAVE LEAD PAINT COATING. PLAN DEMOLITION ACCORDINGLY. 8. PLACE SAFETY RAILS AROUND UNPROTECTED OPENINGS SUCH AS THE ROOF HATCH OPENING, WHEN THE ROOF HATCH IS TAKEN OFF TO REMOVE EQUIPMENT FROM THE PUMP WELL. OSHA STANDARDS THE CONTRACTOR SHALL FOLLOW OSHA STANDARDS DURING PERFORMANCE OF WORK WITH PARTICULAR ATTENTION TO THE FOLLOWING SECTIONS. 1. RIGGING: OSHA 29 CFR 1926.253 AND 1926.253 2. FALL PROTECTION: OSHA 29 CFR 1926.760 3. GASES AND FUMES: OSHA 29 CFR 1926.55 4. VENTILATION: OSHA 29 CFR 1926.57 5. RESPIRATORS: OSHA 29 CFR 1926.103, 1910.134 6. ASBESTOS: OSHA 29 CFR 1926.1001

AutoCAD SHX Text

1. CONTRACTORS WILL HAVE THE OPPORTUNITY FOR A SITE VISIT PRIOR TO THE BID DUE DATE. THE VISIT SHALL BE SCHEDULED BY THE CONTRACT ADMINISTRATOR. 2. THE EXISTING FACILITY HAS SOME UTILITY SERVICES FOR CONSTRUCTION TOOLS AND EQUIPMENT. (2) WATER HOSE SPIGOTS (1) AIR HOSE CONNECTIONS (5/8" HANSON FITTING), (2) ELECTRICAL CONNECTIONS (120V, 20 AMP). THE CONTRACTOR SHALL PROVIDE HIS OWN UTILITY SERVICES, FOR CONTRACTOR EQUIPMENT REQUIREMENTS BEYOND THESE EXISTING AVAILABLE SERVICES.

AutoCAD SHX Text

PWD PORTSMOUTH

AutoCAD SHX Text

NORFOLK NAVAL SHIPYARD - PORTSMOUTH, VIRGINIA

AutoCAD SHX Text William Shirk, PE

AutoCAD SHX Text

DESIGN MANAGER

AutoCAD SHX Text

BRANCH MANAGER

AutoCAD SHX Text

ENGR DIRECTOR

AutoCAD SHX Text

CUSTOMER

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

CONSTR. CONTR. NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING COMMAND

AutoCAD SHX Text

DES

AutoCAD SHX Text

DRW

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

DRAWFORM REVISION: 10 MARCH 2009

AutoCAD SHX Text

CHK

AutoCAD SHX Text

SATISFACTORY TO

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FOR COMMANDER NAVFAC

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

A/E INFO

AutoCAD SHX Text

OF

AutoCAD SHX Text

EPROJECT NO.:

AutoCAD SHX Text

NORFOLK NAVAL SHIPYARD

AutoCAD SHX Text

PORTSMOUTH, VIRGINIA

AutoCAD SHX Text 1632158

AutoCAD SHX Text

AutoCAD SHX Text

ERIK BONENFANT

AutoCAD SHX Text

1. BID ITEM 0001 - THE BASE BID SHALL BE ALL WORK ASSOCIATED WITH THE REPLACEMENT OF MAIN DEWATERING PUMP MDP2. OPTIONS FOR MAIN DEWATERING PUMP MDP2 002A REPLACE MDP 2 GATE VALVE 002B REPLACE MDP 2 CHECK VALVE 002C REPLACE MDP 2 FLEX JOINT

AutoCAD SHX Text VALVE NOTES 1. VALVES SHALL BE PROVIDED WITH NEW VALVE ACTUATOR VALVES SHALL BE PROVIDED WITH NEW VALVE ACTUATOR 2. VALVES AND VALVE OPERATIONS SHALL BE TESTED FOR VALVES AND VALVE OPERATIONS SHALL BE TESTED FOR CORRECT OPERATIONS. 3. VALVE ACTUATOR POSITION AND TORQUE LIMITS SHALL BE FIELD VALVE ACTUATOR POSITION AND TORQUE LIMITS SHALL BE FIELD TESTED DURING COMMISSIONING.

NEW TO EXISTING CONNECTION

M-101

GENERAL SHEET NOTES

GRAPHIC SCALE

DEMOLITION KEYNOTES

NEW WORK KEYNOTES

PUMP FLOOR PLAN

MDP2 WORK AREA

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

A

TL

A N

TI

C

R E

P

LA

C E

M A

IN

D

E W

A

TE

R

IN

G P

U M

P

MDP2, OPTIONS 2A, 2B, &2C

AutoCAD SHX Text 6"

AutoCAD SHX Text 24"

AutoCAD SHX Text

LOCATION OF INTERMEDIATE FLOOR PLATFORM

AutoCAD SHX Text MOTOR FLOOR OPENING APPROX. 7'x10'

AutoCAD SHX Text

LOCATION OF INTERMEDIATE FLOOR PLATFORM

AutoCAD SHX Text

MDP1

AutoCAD SHX Text

MDP2

AutoCAD SHX Text

MDP3

AutoCAD SHX Text

MDP4

AutoCAD SHX Text

FLEX JOINT

AutoCAD SHX Text

CHK VALVE

AutoCAD SHX Text

GATE VALVE

AutoCAD SHX Text

FLEX JOINT

AutoCAD SHX Text

CHK VALVE

AutoCAD SHX Text

GATE VALVE

AutoCAD SHX Text

FLEX JOINT

AutoCAD SHX Text

CHK VALVE

AutoCAD SHX Text

GATE VALVE

AutoCAD SHX Text MOTOR FLOOR OPENING APPROX. 7'x10'

AutoCAD SHX Text

PUMP WELL - PUMP FLOOR PLAN

AutoCAD SHX Text 12832348

AutoCAD SHX Text

AutoCAD SHX Text

EJB

AutoCAD SHX Text

EJB

AutoCAD SHX Text

RZ

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text

1. THE PUMP MUST BE DISASSEMBLED INTO PARTS AND THE PUMP MUST BE DISASSEMBLED INTO PARTS AND REASSEMBLED ON THE PUMP FLOOR. THE CASING HALVES MUST BE SEPARATED TO FIT THROUGH THE ROOF AND MOTOR FLOOR OPENINGS. THE INTERMEDIATE FLOOR PLATFORM OBSTRUCTS PASSAGE BY APPROXIMATELY 3'. 2. SEE ELEVATIONS AND ESTIMATED PART WEIGHTS LISTED ON SEE ELEVATIONS AND ESTIMATED PART WEIGHTS LISTED ON SHEET M201. 3. THE CONTRACTOR SHALL REMOVE AND REINSTALL PUMP THE CONTRACTOR SHALL REMOVE AND REINSTALL PUMP ACCESSORIES AS REQUIRE TO PERFORM WORK AND RESTORE THE NEW PUMP TO SERVICE CONDITION. THIS WORK INCLUDES; THE PUMP SERVICE PLATFORM ON TOP OF THE PUMP, VENT LINES (ON THE PUMP VORTEX AND CASING), COUPLING GUARDS, AND THE WATER SERVICE LINE TO THE PACKING GLANDS. DISCONNECT AND RECONNECT FLUSH WATER SYSTEM & VORTEX DRAIN.

AutoCAD SHX Text

1. REMOVE BEARINGS REMOVE BEARINGS 2. REMOVE SHAFTS AND ROTATING ASSEMBLY. REMOVE SHAFTS AND ROTATING ASSEMBLY. 3. DISCONNECT SUCTION FLANGE (SEE SHEET M201) DISCONNECT SUCTION FLANGE (SEE SHEET M201) 4. DISCONNECT DISCHARGE FLANGE DISCONNECT DISCHARGE FLANGE 5. DISCONNECT PEDESTAL FLOOR ANCHORS DISCONNECT PEDESTAL FLOOR ANCHORS 6. SEPARATE CASING HALVES SEPARATE CASING HALVES 7. REMOVE PARTS THROUGH THE MOTOR FLOOR OPENING.REMOVE PARTS THROUGH THE MOTOR FLOOR OPENING.

AutoCAD SHX Text

1. PROVIDE MDP2 PUMP. (BASE BID ITEM 0001) PROVIDE MDP2 PUMP. (BASE BID ITEM 0001) 2. PROVIDE GATE VALVE, (SEE BID OPTIONS) PROVIDE GATE VALVE, (SEE BID OPTIONS) 3. PROVIDE CHECK VALVE, (SEE BID OPTIONS) PROVIDE CHECK VALVE, (SEE BID OPTIONS) 4. PROVIDE FLEX JOINT. (SEE BID OPTIONS) PROVIDE FLEX JOINT. (SEE BID OPTIONS)

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text 3/16" = 1'-0"

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

AutoCAD SHX Text 0'

AutoCAD SHX Text 3/16"=1'-0"

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text 12'

AutoCAD SHX Text A4

AutoCAD SHX Text M201

AutoCAD SHX Text

1. REF DWG N-SD200REF DWG N-SD200

AutoCAD SHX Text

PWD PORTSMOUTH

AutoCAD SHX Text

NORFOLK NAVAL SHIPYARD - PORTSMOUTH, VIRGINIA

AutoCAD SHX Text William Shirk, PE

AutoCAD SHX Text

DESIGN MANAGER

AutoCAD SHX Text

BRANCH MANAGER

AutoCAD SHX Text

ENGR DIRECTOR

AutoCAD SHX Text

CUSTOMER

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

CONSTR. CONTR. NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING COMMAND

AutoCAD SHX Text

DES

AutoCAD SHX Text

DRW

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

DRAWFORM REVISION: 10 MARCH 2009

AutoCAD SHX Text

CHK

AutoCAD SHX Text

SATISFACTORY TO

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FOR COMMANDER NAVFAC

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

A/E INFO

AutoCAD SHX Text

OF

AutoCAD SHX Text

EPROJECT NO.:

AutoCAD SHX Text

NORFOLK NAVAL SHIPYARD

AutoCAD SHX Text

PORTSMOUTH, VIRGINIA

AutoCAD SHX Text 1632158

AutoCAD SHX Text

AutoCAD SHX Text

ERIK BONENFANT

AutoCAD SHX Text A4

AutoCAD SHX Text M501

AutoCAD SHX Text A4

AutoCAD SHX Text M502

AutoCAD SHX Text A4

M502

M-201

GRAPHIC SCALEELEVATION

GENERAL SHEET NOTES

DEMOLITION KEYNOTES

NEW WORK KEYNOTES

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

A

TL

A N

TI

C

R E

P

LA

C E

M A

IN

D

E W

A

TE

R

IN

G P

U M

P

MDP2 WORK AREA

MDP2 & OPTIONS 2A, 2B, & 2C

AutoCAD SHX Text

EXIST. W12 COLUMN

AutoCAD SHX Text

EXISTING 54" DISCHARGE

AutoCAD SHX Text

EL. 32.27'

AutoCAD SHX Text 8'-0"

AutoCAD SHX Text 8'-0"

AutoCAD SHX Text

EL. 32.27'

AutoCAD SHX Text

EL. 32.27'

AutoCAD SHX Text 8'-0"

AutoCAD SHX Text 8'-0"

AutoCAD SHX Text

EL. 32.27'

AutoCAD SHX Text 8'-0"

AutoCAD SHX Text 8'-0"

AutoCAD SHX Text

MAIN PUMP MOTOR #4 2300V, 3 PHASE , 60HZ 1200 HP , INDUCTION TYPE 277 R.PM.

AutoCAD SHX Text

MAIN PUMP MOTOR #3 2300V, 3 PHASE , 60HZ 1200 HP , INDUCTION TYPE 277 R.PM.

AutoCAD SHX Text

MAIN PUMP MOTOR #2 2300V, 3 PHASE , 60HZ 1200 HP , INDUCTION TYPE 277 R.PM.

AutoCAD SHX Text

MAIN PUMP MOTOR #1 2300V, 3 PHASE , 60HZ 1200 HP , INDUCTION TYPE 277 R.PM.

AutoCAD SHX Text

PUMP #3

AutoCAD SHX Text

EL. 49.77'

AutoCAD SHX Text

EL. 46.00'

AutoCAD SHX Text

EL. 68.0'

AutoCAD SHX Text

EL. 83.00'

AutoCAD SHX Text

EL. 103.00'

AutoCAD SHX Text

PUMP #4

AutoCAD SHX Text

PUMP #2

AutoCAD SHX Text

PUMP #1

AutoCAD SHX Text

PUMP WELL - ELEVATIONS

AutoCAD SHX Text 12832349

AutoCAD SHX Text

AutoCAD SHX Text

EJB

AutoCAD SHX Text

EJB

AutoCAD SHX Text

RZ

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text 3/16" = 1'-0"

AutoCAD SHX Text 0'

AutoCAD SHX Text 3/16"=1'-0"

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text 12'

AutoCAD SHX Text

1. DISASSEMBLE INTERMEDIATE BEARING AND COUPLING DISASSEMBLE INTERMEDIATE BEARING AND COUPLING 2. REMOVE INTERMEDIATE SHAFT (ESTIMATED AT 3000 LBS) REMOVE INTERMEDIATE SHAFT (ESTIMATED AT 3000 LBS) DISASSEMBLE IMPELLER SLEEVE BEARING 3. DISCONNECT SHAFT COUPLINGS AND REMOVE SHAFT DISCONNECT SHAFT COUPLINGS AND REMOVE SHAFT 4. DISCONNECT ROTATING ASSEMBLY COVER TO REMOVE ROTATING DISCONNECT ROTATING ASSEMBLY COVER TO REMOVE ROTATING ASSEMBLY. 5. REMOVE ROTATING ASSEMBLY (ESTIMATED AT 8000 LBS). REMOVE ROTATING ASSEMBLY (ESTIMATED AT 8000 LBS). 6. DISCONNECT DISCHARGE FLANGE DISCONNECT DISCHARGE FLANGE 7. DISCONNECT SUCTION FLANGE DISCONNECT SUCTION FLANGE 8. DISCONNECT PEDESTAL FLOOR ANCHORS DISCONNECT PEDESTAL FLOOR ANCHORS 9. REMOVE MOTOR FLOOR GRATINGS (~ 500 LBS). REMOVE MOTOR FLOOR GRATINGS (~ 500 LBS). 10.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .