This Invitation for Quote/Bid (IFQ/B) is issued by Palm Beach County's Facilities Development & Operations Department, Capital Improvements Division, for painting and weatherproofing services on the PBSO West Boynton Substation Fuel Island Canopy Refresh project (P-2026-000077). The scope of work involves furnishing all labor, materials, equipment, permits, and supervision necessary to repair, restore, and repaint the existing fuel island canopy located at 7894 S Jog Road, Lake Worth, Florida. Work includes pressure washing all canopy surfaces, identifying and repairing roof leaks and failed seams, mechanically cleaning and treating corrosion on structural steel components, and applying a complete coating system using specified Sherwin-Williams products (Macropoxy 920 Pre-Primer, Macropoxy 646 Fast Cure Epoxy, and Acrolon 218 HS Acrylic Polyurethane) with final color matching the existing green. A mandatory pre-bid meeting is scheduled for August 18, 2026, at 10:00 a.m. at the project site. Bids are due September 10, 2026, by 2:00 p.m. and will be opened publicly at that time. Contractors must be qualified under Palm Beach County's Annual Contract for Painting & Weatherproofing, with qualification applications due at least 10 days before the bid deadline. The contractor must substantially complete all work within 120 calendar days from the Notice to Proceed, with liquidated damages accruing at $120 per day for failure to meet this deadline.
Bid security and a public construction bond equal to 100% of the contract amount are required if the bid exceeds $200,000. All bidders must submit completed Small Business Development (SBD) Program schedules identifying subcontractors and Small Business Enterprise (SBE) participation percentages. Palm Beach County offers an SBE price preference for single-trade construction contracts, awarding to a certified SBE bidder if their bid is within 10% of the lowest non-SBE bid. Bidders must comply with the County's Commercial Non-Discrimination Policy and submit affidavits certifying no use of labor coercion. The Living Wage Ordinance does not apply to this project. All questions must be submitted in writing to FDO-CID-Bids@pbc.gov at least seven calendar days prior to the bid due date. Upon award notification, the successful bidder must provide the signed Work Order, Public Construction Bond, and certificates of insurance within 14 days or face potential bid security forfeiture, contract termination, and suspension or debarment from future projects. The contractor provides a 12-month warranty on all equipment, materials, and labor from the date of substantial completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P-2026-000077 Addendum ONE.pdf | ||
| P-2026-000077 EXHIBIT 5.pdf | ||
| P-2026-000077 VSS Ad-no post.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IFQ/B Page 1 Form Rev. 04/02/26 Invitation for Quote/Bid - NonFederal
INVITATION FOR QUOTE/BID
ANNUAL CONTRACT
DATE:
SENT TO:
SENT FROM:
SENDER:
PHONE:
PROJECT NAME:
PROJECT NUMBER:
Mandatory Pre-Bid Conference. There will be a Mandatory Pre-Bid Meeting at PBSO
#6 West Boynton Substation (meet at main entrance), located at 7894 S Jog Road, Lake
Worth, FL at 10:00 a.m. on August 18, 2026. The purpose of this pre-bid meeting will be to review the requirements for the project described in this Invitation for Quote/Bid. You must attend this meeting if you intend to bid for this work.
The work is to be done under the terms and conditions of Palm Beach County’s
Annual Contract - Painting & Weatherproofing as supplemented by this Invitation for Quote/Bid.
Questions must be e-mailed to FDO-CID-Bids@pbc.gov at least seven (7) calendar days prior to the bid due date. Only questions received in writing will be responded to regarding this Invitation for Quote/Bid.
Facilities Development &
Operations Department
2633 Vista Parkway
West Palm Beach, FL 33411
Telephone - (561) 233-0200
Palm Beach County
Board of County
Commissioners
Sara Baxter, Mayor
Marci Woodward, Vice Mayor
Maria G. Marino
Gregg K. Weiss
Joel G. Flores
Maria Sachs
Bobby Powell Jr.
County Administrator
Joseph Abruzzo
“An Equal Opportunity
Employer”
July 29, 2026
Qualified Contractors
On the Annual Contract - Painting & Weatherproofing
Capital Improvements Division
Patrick McAllen, Facilities Systems Project Manager
(561)233-2051
PBSO West Boynton Substation-Fuel Island Canopy Refresh
P-2026-000077 file://///pbcgov.org/FDO/common/Business/Znachko%20Working%20File/CID%20Forms/Contracts/Construction%20-%20Annual%20(Pre-Qual)/NonFederal/Invitation%20for%20Quote/FDO-CID-Bids@pbc.gov
IFQ/B Page 2
Submitting the Quote/Bid Package
The Quote/Bid Package must be enclosed in a sealed opaque envelope. The envelope must be addressed as follows:
Project Name: PBSO West Boynton Substation-Fuel Island Canopy Refresh
Project Number: P-2026-000077
Capital Improvements Division
2633 Vista Parkway
West Palm Beach, Florida 33411
Attention:
No responsibility will be attached to the Owner for premature opening of or failure to open a quote/bid not properly identified. If the quote/bid is sent by mail, the sealed envelope must be enclosed in a separate mailing with the notation "SEALED QUOTE/BID ENCLOSED" on the face thereof.
PROJECT NAME: PBSO West Boynton Substation-Fuel Island Canopy Refresh
PROJECT NO.: P-2026-000077
*DUE: September 10, 2026 by 2:00 p.m.
* The Quotes/Bids received by this time will be opened at this time at a public meeting at the below address.
RETURN TO: Capital Improvements Division 2633 Vista Parkway
West Palm Beach, FL 33411
Qualification of Contractors. In order to submit a quote/bid in response to this IFQ/B, a contractor must be qualified under the Annual Contract - Painting & Weatherproofing. A contractor may obtain a Qualification Application for this Annual Contract by sending an email with the Project # in the subject line to: FDO-CID-Bids@pbc.gov or call (561) 233-0261. Qualification applications may also be downloaded from the County’s on-line Vendor Self-Service (VSS) system at https://pbcvssp.pbc.gov/vssprd/Advantage4. The contractor must submit the Qualification
Application at least 10 days before the Quote/Bid Due Date in order for its quote/bid to be considered.
file://///pbcgov.org/FDO/common/Business/Znachko%20Working%20File/CID%20Forms/Contracts/Construction%20-%20Annual%20(Pre-Qual)/NonFederal/Invitation%20for%20Quote/FDO-CID-Bids@pbc.gov https://pbcvssp.pbc.gov/vssprd/Advantage4 https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService
IFQ/B Page 3
1. SCOPE OF WORK: This Quote/Bid is to furnish all material, labor, supervision, permits and supplies necessary and reasonably incidental to repair, restore, and repaint the existing fuel island canopy. per the project requirements provided by Capital Improvements Division in this Invitation for Quote/Bid at
Attachment “C” and all exhibits and addenda thereto. Work is to be done under the terms and conditions of Palm Beach County’s Annual Contract - Painting & Weatherproofing, and pursuant to the conditions of the Work Order, both of which are incorporated into the Contract Documents by reference.
2. SCHEDULE OF TIME FOR COMPLETION. The time of completion for this Project will be as follows: The Contractor must substantially complete the work within one hundred twenty (120) calendar days from the Notice to Proceed from Owner.
3. LIQUIDATED DAMAGES. Liquidated Damages are $120/day for failure to achieve certification of
Substantial Completion within the Work Order time or approved extension thereof.
4. BID SECURITY AND PUBLIC CONSTRUCTION BOND. Bid Security and Public Construction
Bond are required for this Project in accordance with Section 5.2 of the Instructions to Bidders of the Annual
Contract as follows:
Bid Security. If Bid is $200,000 or over, this Bid must be accompanied by a Bid Security (in the form of, at Bidder's option, cashier's check, certified check, money order or Bid Bond in favor of the County) in the amount of at least five percent (5%) of the bid price, see Section 5.2.2 of the
Instructions to Bidders of the Annual Contract for detailed requirements regarding Bid Security and Attachment “B”.
Public Construction Bond. If Bid is $200,000 or over (or if cumulative open work orders are
$200,000 or over), then prior to execution of a Work Order, and not later than fourteen (14) calendar days after notification from Owner, the successful Bidder must furnish a Public Construction Bond in the amount of 100% of the Work Order and Guarantee, see Section 5.2.3 of the Instructions to Bidders of the Annual Contract for detailed requirements regarding the Public
Construction Bond and Guarantee.
5. Small Business Development (SBD) Program. Section 5.3 of the Instruction to Bidders of the Annual
Contract sets out the requirements of the County’s Small Business Development Program. All Bidders are required to submit with their bid the appropriate SBD Program schedules. SBD Schedules to be submitted with the quote/bid are as follows:
a) Schedule 1 - List of All Proposed Subcontractors, including SBE Participation. A completed Schedule 1 submitted by the prime shall list the names of all subcontractors, intended to be used in performance of the contract, if awarded. The total proposed percentage of SBE participation shall also be included on this form. This schedule must also be used if an SBE prime bidder is performing any portion of this contract with their work force.
b) Schedule(s) 2 - Letter(s) of Intent to Perform as a Subcontractor, including SBE
Subcontractors. A completed Schedule 2 is a binding agreement between the prime contractor and the subcontractor (of any tier) and should be treated as such. Each
Schedule 2 shall be properly executed by the Prime Contractor and proposed subcontractor. If the Contractor is an SBE, a Schedule 2 shall be submitted to document work to be performed by its workforce.
IFQ/B Page 4
Completed and submitted SBD forms are incorporated into and made a part of the
Contract Documents.
Attachment “A” identifies the affirmative procurement initiatives (APIs) applicable to this Invitation for Quote/Bid.
If Bidder is unable to comply with the API requirements as set forth in Attachment “A”, Bidder shall submit a request for a waiver or partial waiver with its bid by the quote/bid due date. Each waiver request shall include documentation demonstrating the Bidder undertook satisfactory Good Faith
Efforts, as defined in the SBD Ordinance, and set forth in Section 5.3 of the Annual Contract’s Instruction to Bidders. Waiver requests not submitted at the time of bid submission shall not be considered. If the Office of SBD determines that adequate Good Faith Efforts have been demonstrated to warrant a partial or total waiver, the waiver shall be granted accordingly. If the Office of SBD determines that the Bidder failed to submit documentation sufficient to demonstrate
Good Faith Efforts, the request for waiver or partial waiver shall be denied and the Bidder shall be deemed non-responsive. The granting of a waiver shall apply solely to the Bidders to whom it is issued and shall not, by itself, amend, reduce, or otherwise alter the API requirements applicable to other
Bidders under the solicitation. A Bidder may seek reconsideration of an adverse waiver determination as set forth in Section 5.3 of the Annual Contract’s Instruction to Bidders and the SBD
Ordinance.
6. Addendum. Any interpretation, clarification, correction, or change of the Bidding Documents will be made only by Addendum. The Department will send written instructions regarding discrepancies, omissions or unclear intents to all Bidders who are Qualified Contractors with an Annual Contract. For projects $150,000 and over all Addendum to a solicitation will also be posted under the applicable solicitation on the County’s on-line Vendor Self-Service (VSS) system at https://pbcvssp.pbc.gov/vssprd/Advantage4.
Interpretations, corrections or changes to the Bidding Documents made in any other manner will not be binding, and Bidders shall not rely upon such interpretations, corrections and changes. Prior to submission of its Bid/Quote, each Bidder must ascertain that it has received all Addenda issued. The Bidder must acknowledge receipt of each individual Addendum at the time of issuance and final receipt of all Addenda by completing the acknowledgment space provided on the Addendum Form. Failure to acknowledge receipt may result in rejection of a bid/quote.
7. Failure to Provide the Required Documents after Notification of Award. If after Notification of award from the County, the successful Bidder does not provide within 14 Days of Notification the signed
Work Order, the Public Construction Bond and Guarantee (when required), and the required certificates of insurance, the County may: 1. Call in the bid security when provided; 2. Cancel the notification of recommended award and award the project to the next responsive, responsible low bidder; 3. Terminate this Annual Contract for cause; 4. Suspend or debar the Bidder from bidding on future projects for a period of two (2) years, in accordance with the Palm Beach County Purchasing Ordinance; and/or 5. Pursue any and all remedies available against the Bidder for damages resulting from its failure to enter into a Work
Order and provide all required documents within 14 Days after notification.
8. Prohibition against Considering Social, Political or Ideological Interests in Government
Contracting - F.S. 287.05701. Bidders are hereby notified of the provisions of section 287.05701, Florida
Statutes, as amended, that the County will not request documentation of or consider a Bidder's social, political, or ideological interests when determining if the Bidder is a responsible Bidder. Bidders are further notified that the County's governing body may not give preference to a Bidder based on the Bidder's social, political, or ideological interests.
https://pbcvssp.pbc.gov/vssprd/Advantage4 https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService
IFQ/B Page 5
9. Human Trafficking Affidavit. Contractor warrants and represents that it does not use coercion for labor or services as defined in section 787.06, Florida Statutes. Contractor shall execute
Attachment “D”, Nongovernmental Entity Human Trafficking Affidavit, which is attached hereto and incorporated herein by reference.
10. Living Wage Ordinance. Pursuant to section 255.0992, Florida Statutes, the County’s Living Wage
Ordinance shall not apply to this Invitation for Quote/Bid and any resulting Work Order(s), notwithstanding any provision of an existing Annual Contract to the contrary, including, but not limited to, the Instructions to Bidders, the General Conditions to the Annual Contract and the Certification of Compliance with the
Living Wage Ordinance.
11. CONTRACT AMENDMENTS. The Annual Contract is amended as follows: NONE
Quote/Bid Form Page 1 Form Rev. 02/04/26 Quote/Bid Form - NonFederal
QUOTE/BID FORM
PROJECT NUMBER: P-2026-000077
PROJECT NAME: PBSO West Boynton Substation-Fuel Island Canopy Refresh
IN ORDER TO BE DEEMED RESPONSIVE TO THIS INVITATION FOR QUOTE/BID,
THE QUOTE/BID PACKAGE MUST CONTAIN:
a) This Quote/Bid Form completed and executed.
b) OSBD Schedules 1 and 2 completed and executed.
c) Bid Security. (If the bid is $200,000 or more).
d) Signed Addenda, if any issued
THE FOLLOWING MUST BE COMPLETED AND SIGNED BY CONTRACTOR
1. TOTAL QUOTE/BID AMOUNT $ ____________
Written amount ____________
2. Bidder commits to achieving the APIs applicable to this solicitation as designated on Attachment
A and as submitted on its OSBD Schedules 1 and 2.
3. Is the Bidder a Palm Beach County certified SBE? Yes_____ No_____
4. Commercial Non-Discrimination Certification. The undersigned Bidder hereby certifies and agrees that the following information is correct: In preparing its response to this Solicitation, the
Bidder has considered all proposals submitted from qualified, potential Subcontractors and suppliers, and has not engaged in "discrimination" as defined in the County’s Commercial
Nondiscrimination Policy as set forth in Resolution 2025-0748, as may be amended, to wit:
discrimination in the solicitation, selection or commercial treatment of any Subcontractor, vendor, supplier or commercial customer on the basis of race, color, national origin, religion, ancestry, sex, age, marital status, familial status, sexual orientation, disability, or genetic information, or on the basis of any otherwise unlawful use of characteristics regarding the vendor's, supplier's or commercial customer's employees or owners; provided that nothing in this policy shall be construed to prohibit or limit otherwise lawful efforts to remedy the effects of discrimination.
Without limiting the foregoing, "discrimination" also includes retaliating against any person or other entity for reporting any incident of "discrimination." Without limiting any other provision of the solicitation, it is understood and agreed that, if this certification is false, such false certification will constitute grounds for the County to reject the bid submitted by the Bidder for this Solicitation, and to terminate any contract awarded based on the response. As part of its bid, the Bidder shall provide to the County a list of all instances within the immediate past four (4) years where there has been a final adjudicated determination in a legal or administrative proceeding in the State of Florida that the Bidder discriminated against its Subcontractors, vendors, suppliers or commercial customers, and a description of the status or resolution of that complaint, including any remedial action taken. As a condition of submitting a bid to the County, the Bidder agrees to comply with the County’s Commercial Nondiscrimination Policy as described in Resolution 2025-
0748, as may be amended.
Quote/Bid Form Page 2 Form Rev. 02/04/26 Quote/Bid Form - NonFederal
5. The Bidder shall be bound by the terms of its Bid for a period of one hundred twenty (120) calendar Days from the date of the bid opening and may not withdraw its Bid within that time period. If the County issues a Notification from Owner within the above 120-Day period, then the
Bidder will be bound by the Bid as submitted. If the County fails to issue a Notification from
Owner to the successful Bidder within the above identified 120-Day period, the successful bidder will not be required to honor its bid unless otherwise agreed to by both parties. County anticipates, but does not guarantee, the award of a Work Order and written notice to proceed within ninety (90) calendar Days of Notification from Owner, absent the filing of a timely bid protest.
6. It is agreed that the undersigned has received all addenda complete as issued by the County and that related costs are included in the bid submitted. The undersigned acknowledges receipt of said addenda as follows:
Addendum # dated Addendum# dated________
Addendum # dated Addendum# dated
The undersigned has included the signed addenda, if issued, in its bid package.
7. The undersigned does hereby declare that the Bid covers all expenses of every kind incidental to the completion of said Work in accordance with the Contract Documents, including all claims that may arise through damages or other causes whatsoever. The undersigned does hereby declare that it shall make no claim on account of any variation from any estimate in the quantities of Work to be done, nor on account of any misunderstanding or misconception of the nature of the Work to be done or the grounds, subsurface conditions, or place where the Work is to be done.
QUOTE/BID PROVIDED BY:
Contractor Name
Date Signature
Print Name and Title
Quote/Bid Must Contain Original Signatures. No Copies or Emailed/Faxed Quotes/Bids Will
Be Accepted
OSBD SCHEDULE 1
SOLICITATION/PROJECT/BID NAME: ______________ _ SOLICITATION/PROJECT/BID NO.: _____________ _
SOLICITATION OPENING/SUBMITTAL DATE: ______________ COUNTY DEPARTMENT: __________________
Section A PLEASE LIST THE DOLLAR AMOUNT OR PERCENTAGE OF WORK TO BE COMPLETED BY THE PRIME CONTRACTOR/CONSULTANT* ON THE PROJECT:
NAME OF PRIME RESPONDENT/BIDDER: __________________ ADDRESS: ___________________ _
CONTACT PERSON: _____________________ PHONE NO.: __________ E-MAIL:._____________ _
PRIME'S DOLLAR AMOUNT OR PERCENTAGE OF WORK: _____________ _ Non-SBE SBE
SBE Prime's must include their percentage or dollar amount in the Total Participation line under section B.
Section B PLEASE LIST THE DOLLAR AMOUNT OR PERCENTAGE OF WORK TO BE COMPLETED BY ALL SUBCONTRACTORS/SUBCONSULTANTS ON THE PROJECT BELOW:
(Check all Applicable Categories) DOLLAR AMOUNT OR Subcontractor/Sub consultant Name
PERCENTAGE OF WORK
Non-SBE SBE
1. □ DI
2. □ □
3. □ □
4. □ □
5. □ □ (Please use additional sheets if necessary)
Total
Total Bid/Offer Price$. ______________ Total Certified SBE Participation $
I hereby certify that the above information is accurate to the best of my knowledge:
Name & Authorized Signature Title
Note: 1. The amount listed on this form for a Subcontractor/sub consultant must be supported by price or percentage listed on the properly executed Schedule 2 or attached signed proposal.
2. Only those firms certified by Palm Beach County at the time of solicitation due date are eligible to meet the established OSBD Affirmative Procurement Initiative (API). Please
3. Modification of this form is not permitted and will be rejected upon submittal.
4. If a Mandatory API goal applies, failure to submit a properly executed Schedule 2 will result in a determination of non-responsiveness to the solicitation.
OSBD LETTER OF INTENT- SCHEDULE 2
A completed Schedule 2 is a binding document between the Prime Contractor/consultant and a Subcontractor/subconsultant � any tier) and should be treated as such. All Subcontractors/subconsultants, including any tiered Subcontractors/ subconsultants, must properly execute this document. If a Mandatory API goal applies, failure to submit a properly executed Schedule 2 will result in a determination of non-responsiveness to the solicitation. Each properly executed Schedule 2 must be submitted with the bid/proposal.
SOLICITATION/PROJECT NUMBER:------------------------------
SOLICITATION/PROJECT NAME:--------------------------------
Prime Contractor:___________________.Subcontractor:_________________ (Check box(s) that apply)
□ SBE □ Non-SBE □ Supplier Date of Palm Beach County Certification (if applicable): _______
SBE PARTICIPATION - SBE Primes must document all work to be performed by their own work force on this form. Specify in detail, the scope of work to be performed or items supplied with the dollar amount and/or percentage for each work item. When applicable, identify the line item(s) associated with the service/product being supplied. SBE credit will only be given for the areas in which the SBE is certified. A detailed quote/ proposal may be attached to a properly executed Schedule 2 for additional information.
Line
Item
Item Description Unit Price Quantity/
Units
Contingencies/
Allowances
Total Price/Percentage
The undersigned Subcontractor/subconsultant is prepared to self-perform the above-described work in conjunction with the aforementioned project at the following total price or percentage: ________________
If the undersigned intends to subcontract any portion of this work to another Subcontractor/subconsultant, please list the business name and the amount below accompanied by a separate properly executed Schedule 2.
Name of 2nd/3rd tier Subcontractor/subconsultant
Print Name of Prime
By:_________________ Authorized Signature
Print Name
Title
Date: __________________
Price or Percentage: ______________ _
Print Name of Subcontractor/subconsultant
By:------------------ Authorized Signature
Print Name
Title
Date: ___________________
Angela Smith Cross-Out
SOLICITATION/PROJECT/BID NAME: SOLICITATION/PROJECT/BID NO.:
SOLICITATION OPENING/SUBMITTAL DATE: COUNTY DEPARTMENT:
Section A PLEASE LIST THE DOLLAR AMOUNT OR PERCENTAGE OF WORK TO BE COMPLETED BY THE PRIME CONTRACTOR/CONSULTANT* ON THE PROJECT:
NAME OF PRIME RESPONDENT/BIDDER: ADDRESS:
CONTACT PERSON: PHONE NO.: E-MAIL:
Non-SBE SBE
Section B PLEASE LIST THE DOLLAR AMOUNT OR PERCENTAGE OF WORK TO BE COMPLETED BY ALL SUBCONTRACTORS/SUBCONSULTANTS ON THE PROJECT BELOW:
Subcontractor/Sub consultant Name (Check all Applicable Categories)
Non-SBE SBE
DOLLAR AMOUNT OR
PERCENTAGE OF WORK
1.
2.
3.
4.
5.
(Please use additional sheets if necessary) Total _________________________
Total Bid/Offer Price $ Total Certified SBE Participation $
I hereby certify that the above information is accurate to the best of my knowledge:
Title
DIRECTION: List Firm Name, Address & Provide PBC Vendor ID#. (https://www.pbcgov.org/pbcvendors)
Subcontractor 1 1222 Easy St., WPB, FL 33401
561-123-4567 VC178229
Subcontractor 2 5600 Carefree Lane, WPB, FL 33411
954-345-6789 VC123459
SAM
PLE
John Doe
PRIME’S DOLLAR AMOUNT OR PERCENTAGE OF WORK:
SBE Prime’s must include their percentage or dollar amount in the Total Certified SBE Participation line under section B.
Name & Authorized Signature Note: 1. The amount listed on this form for a Subcontractor/sub consultant must be supported by price or percentage listed on the properly executed Schedule 2 or attached signed proposal.
2. Only those firms certified by Palm Beach County at the time of solicitation due date are eligible to meet the established OSBD Affirmative Procurement Initiative (API). Please check the applicable box and list the dollar amount or percentage under the appropriate demographic category.
3. Modification of this form is not permitted and will be rejected upon submittal.
4. If a mandatory API goal applies, failure to submit a properly executed Schedule 2 will result in a determination of non-responsiveness to the solicitation.
OSBD SCHEDULE 1
ddelriocabrera Textbox MUST List ALL Subcontractors/Subconsultants ddelriocabrera Textbox Add All Certified SBE Amounts, Including Prime SBE ddelriocabrera Typewriter $145,385.80 ddelriocabrera Typewriter 181,380.85 ddelriocabrera Textbox
SAMPLE
ddelriocabrera Textbox $86,380.85
Subcontractor:
SBE PARTICIPATION – SBE Primes must document all work to be performed by their own work force on this form. Specify in detail, the scope of work to be performed or items supplied with the dollar amount and/or percentage for each work item. When applicable, identify the line item(s) associated with the service/product being supplied. SBE credit will only be given for the areas in which the SBE is certified. A detailed quote/proposal may be attached to a properly executed Schedule 2 for additional information.
The undersigned Subcontractor/subconsultant is prepared to self-perform the above-described work in conjunction with the aforementioned project at the following total price or percentage:
Print Name of Prime
By:
Authorized Signature
Print Name of Subcontractor/subconsultant
By:
Authorized Signature
Print Name Print Name
Line Item
Item Description Unit Price Quantity/ Units
Contingencies/ Allowances
Total Price/Percentage
If the undersigned intends to subcontract any portion of this work to another Subcontractor/subconsultant, please list the business name and the amount below accompanied by a separate properly executed Schedule 2.
Price or Percentage:
Name of 2nd/3rd tier Subcontractor/subconsultant
SOLICITATION/PROJECT NUMBER:
SOLICITATION/PROJECT NAME:
19600
Carlin Park, Maintenance Bldg, Roofing Replacement
$95,000Remove and replace existing roof
President
John Doe
Roofers Are Us, Inc.
Prime Contractor: Roofers Are Us, Inc.
(Check box(s) that apply)
☒ SBE □ Non-SBE □ Supplier
Title
Date: 6/4/2025
A completed Schedule 2 is a binding document between the Prime Contractor/consultant and a Subcontractor/subconsultant (for any tier) and should be treated as such. All Subcontractors/subconsultants, including any tiered Subcontractors/ subconsultants, must properly execute this document. If a mandatory API goal applies, failure to submit a properly executed Schedule 2 will result in a determination of non-responsiveness to the solicitation. Each properly executed Schedule 2 must be submitted with the bid/proposal.
Date of Palm Beach County Certification (if applicable):3/30/2024 .
Title
Date: 6/4/2025
S D dlynch Highlight dlynch Highlight
Subcontractor:
SBE PARTICIPATION – SBE Primes must document all work to be performed by their own work force on this form. Specify in detail, the scope of work to be performed or items supplied with the dollar amount and/or percentage for each work item. When applicable, identify the line item(s) associated with the service/product being supplied. SBE credit will only be given for the areas in which the SBE is certified. A detailed quote/proposal may be attached to a properly executed Schedule 2 for additional information.
The undersigned Subcontractor/subconsultant is prepared to self-perform the above-described work in conjunction with the aforementioned project at the following total price or percentage:
Print Name of Prime
By:
Authorized Signature
Print Name of Subcontractor/subconsultant
By:
Authorized Signature
Print Name Print Name
Title
Date:
Line Item
Item Description Unit Price Quantity/ Units
Contingencies/ Allowances
Total Price/Percentage
If the undersigned intends to subcontract any portion of this work to another Subcontractor/subconsultant, please list the business name and the amount below accompanied by a separate properly executed Schedule 2.
Price or Percentage:
Name of 2nd/3rd tier Subcontractor/subconsultant
Remove and replace existing roof
Subcontractor 1
President Assistant Vice President
John Doe James Doe
Roofers Are Us, Inc.
SAM
PLE
Subcontractor 1
$50,385.80
Date: 6/4/2025 6/4/2025
Date of Palm Beach County Certification (if applicable):1/1/2024
Prime Contractor: Roofers Are Us, Inc.
(Check box(s) that apply)
☒ SBE ☐ Non-SBE □ Supplier
SAMPLE OSBD LETTER OF INTENT – SCHEDULE 2
A completed Schedule 2 is a binding document between the Prime Contractor/consultant and a Subcontractor/subconsultant (for any tier) and should be treated as such. All Subcontractors/subconsultants, including any tiered Subcontractors/ subconsultants, must properly execute this document. If a mandatory API goal applies, failure to submit a properly executed Schedule 2 will result in a determination of non-responsiveness to the solicitation. Each properly executed Schedule 2 must be submitted with the bid/proposal.
SOLICITATION/PROJECT NUMBER: 19600
SOLICITATION/PROJECT NAME: Carlin Park, Maintenance Bldg, Roofing Replacement dlynch Highlight dlynch Highlight dlynch Highlight dlynch Highlight dlynch Highlight dlynch Placed Image
Placed Image
SBE PARTICIPATION – SBE Primes must document all work to be performed by their own work force on this form. Specify in detail, the scope of work to be performed or items supplied with the dollar amount and/or percentage for each work item. When applicable, identify the line item(s) associated with the service/product being supplied. SBE credit will only be given for the areas in which the SBE is certified. A detailed quote/proposal may be attached to a properly executed Schedule 2 for additional information.
The undersigned Subcontractor/subconsultant is prepared to self-perform the above-described work in conjunction with the aforementioned project at the following total price or percentage:
Print Name of Prime
By:
Authorized Signature
Print Name
Date:
Line Item
Item Description Unit Price Quantity/ Units
Contingencies/ Allowances
Total Price/Percentage
If the undersigned intends to subcontract any portion of this work to another Subcontractor/subconsultant, please list the business name and the amount below accompanied by a separate properly executed Schedule 2.
President
John Doe
Roofers Are Us, Inc.
SAM
Prime Contractor: Roofers Are Us, Inc.
Subcontractor 2 Print Name of Subcontractor/subconsultant
By:
Authorized Signature
Jane Doe Print Name
Vice President
Subcontractor: Subcontractor 2
Date of Palm Beach County Certification (if applicable):
$35,995.05
$25,995.05
$10,0002nd Tier Subcontractor
Date: 6/4/2025 6/4/2025
□ SBE ☒ Non-SBE □ Supplier
SAMPLE OSBD LETTER OF INTENT – SCHEDULE 2*
A completed Schedule 2 is a binding document between the Prime Contractor/consultant and a Subcontractor/subconsultant (for any tier) and should be treated as such. All Subcontractors/subconsultants, including any tiered Subcontractors/ subconsultants, must properly execute this document. If a mandatory API goal applies, failure to submit a properly executed Schedule 2 will result in a determination of non-responsiveness to the solicitation. Each properly executed Schedule 2 must be submitted with the bid/proposal.
SOLICITATION/PROJECT NUMBER: 19600
SOLICITATION/PROJECT NAME: Carlin Park, Maintenance Bldg, Roofing Replacement dlynch Highlight dlynch Highlight dlynch Highlight dlynch Highlight dlynch Highlight
Placed Image
SBE PARTICIPATION – SBE Primes must document all work to be performed by their own work force on this form. Specify in detail, the scope of work to be performed or items supplied with the dollar amount and/or percentage for each work item. When applicable, identify the line item(s) associated with the service/product being supplied. SBE credit will only be given for the areas in which the SBE is certified. A detailed quote/proposal may be attached to a properly executed Schedule 2 for additional information.
The undersigned Subcontractor/subconsultant is prepared to self-perform the above-described work in conjunction with the aforementioned project at the following total price or percentage:
Print Name of Prime
Line Item
Item Description Unit Price Quantity/ Units
Contingencies/ Allowances
Total Price/Percentage
If the undersigned intends to subcontract any portion of this work to another Subcontractor/subconsultant, please list the business name and the amount below accompanied by a separate properly executed Schedule 2.
SOLICITATION/PROJECT NAME: Carlin Park, Maintenance Bldg, Roofing Replacement
SAM
Date of Palm Beach County Certification (if applicable):
Prime Contractor: Subcontractor 2 Subcontractor: 2nd Tier Subcontractor
$10,000.00
Jude Doe
Manager
Jane Doe Print Name
Vice President
Subcontractor 2 2nd Tier Subcontractor Print Name of Subcontractor/subconsultant
□ SBE ☒ Non-SBE □ Supplier
Date: 6/4/2025
Date: 6/4/2025
SAMPLE OSBD LETTER OF INTENT – SCHEDULE 2*
A completed Schedule 2 is a binding document between the Prime Contractor/consultant and a Subcontractor/subconsultant (for any tier) and should be treated as such. All Subcontractors/subconsultants, including any tiered Subcontractors/ subconsultants, must properly execute this document. If a mandatory API goal applies, failure to submit a properly executed Schedule 2 will result in a determination of non-responsiveness to the solicitation. Each properly executed Schedule 2 must be submitted with the bid/proposal.
SOLICITATION/PROJECT NUMBER: 19600
dlynch Highlight dlynch Highlight dlynch Highlight dlynch Highlight
Highlight
INSTRUCTIONS ON COMPLETING SUBCONTRACTOR/SUBCONSULTANT SCHEDULES 1 – 2
Respondents must complete and correctly execute the required OSBD Schedules when responding to a solicitation and submitting payment requests after contract award. As long as there is a required API goal, Schedules 1, 2 and 2(a) must be submitted with all bids or proposals from subc ontract ors and subcons ultants in o rd er to b e considere d respo nsive t o the solicitati on.
Important Points to Remember
A. Schedule 1 must be completed by the Prime Contractor and submitted with their bid or proposal.
1. Section “A” of this form must be properly completed by all Prime Contractor/Consultants. Regardless of whether the Prime is a certified or non-certified company. Include the company name, address, contact person, and information, as well as the dollar amount or percentage of work that the prime is responsible for completing.
2. Section “B” of this form must list all Subcontractor(s)/Subconsultant(s) to be utilized on this project.
Please check the appropriate box if the Subcontractor(s)/subconsultant(s) is certified as a PBC-OSBD SBE or Non-SBE.
3. The Prime is to indicate the dollar amount or percentage of work for all subcontractors/subconsultants. All subcontractors/subconsultants must be identified as either SBE or Non-SBE and include the dollar amount or percentage of work under the applicable designation.
4. At the very bottom of the Schedule, write down the total bid amount or percentage of work that will be completed by SBEs.
5. The Prime or authorized individual must print, sign and date the form.
B. Schedule 2 or 2(a) must be properly executed and submitted with the bid/proposal for all subcontractors/subconsultants listed on Schedule 1.
1. Specify in detail the work to be performed or material supplied, along with the dollar amount or percentage of work for each item and corresponding line item number(s), when available.
2. If there is a portion of the work that will not be performed by the subcontractor/subconsultant, a separate, properly executed Schedule 2 must be submitted for all 2nd and 3rd tier Subcontractors/subconsultants. The original subcontractor/subconsultant must indicate that information in the “red box” located in the middle of the form.
3. All subcontractors/subconsultants must print, sign and date the form.
Form Rev. 6/04/2026 Attachment A for Annual Construction–Single Trade
X SBE Price Preference For Single Trade Construction
The work orders under this contract for single trade construction shall be awarded to the lowest, responsive, responsible bidder unless a certified SBE’s bid is within ten percent (10%) of the lowest non-SBE bid, in which case the award shall be made to the certified SBE bidder. Construction contracts where there are no opportunities for subcontracting (i.e. single trade), may include a provision requiring awards of the contract to be made to the lowest responsive, responsible respondent or bidder unless a certified
SBE’s bid is within ten (10) percent of the lowest non-small business bid, in which case the award shall be made to the certified small business bidder submitting the lowest responsive, responsible bid at the price that it bid.
ATTACHMENT “A”
(Annual Construction - Single Trade)
AFFIRMATIVE PROCUREMENT INITIATIVES (APIs) FOR CONSTRUCTION
PROCUREMENT
The API(s) approved for this project are selected below by ☒. Fillable pdfs of all OSB forms can be found on the OSBD website at https://discover.pbc.gov/hed/osbd/
Pages/Documents.aspx . Also, see the SBD Ordinance and Countywide PPM CW-O-043 for further information on APIs.
https://discover.pbc.gov/hed/osbd/Pages/Documents.aspx https://discover.pbc.gov/hed/osbd/Pages/Documents.aspx
Bid Bond / Page 1 Form Rev. 02/04/26 Bid Bond - NonFederal
IFQ/B ATTACHMENT B
Return Attachment B if bid is $200,000 or more
PROJECT NUMBER: P-2026-000077
BID BOND
STATE OF FLORIDA
COUNTY OF PALM BEACH
KNOW ALL MEN BY THESE PRESENTS: That we, (hereinafter called "Principal"), and
(hereinafter called "Surety") are held and firmly bound unto Palm Beach County, a Political Subdivision in the State of Florida, by and through its Board of
County Commissioners, (hereinafter called "County") in the sum of
Dollars,($ ), (which sum is at least 5% of the bid price), lawful money of the United States of America, for the payment of which sum will and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly be these presents;
WHEREAS, the "Principal" contemplates submitting or has submitted a bid to the Board of County
Commissioners, Palm Beach County, Florida, for furnishing and paying for all necessary labor materials, equipment, machinery, tools, apparatus, services, all state workmen's compensation and unemployment compensation taxes incurred in the performance of the Contract, means of transportation for and complete Construction of: (Project Name PBSO West Boynton Substation-Fuel Island Canopy Refresh and
Number P-2026-000077), in the County of Palm Beach, State of Florida; and
WHEREAS, it was a condition precedent to the submission of said bid that a certified check cashier's check, money order or bid bond in the amount of five percent (5%) of the base bid be submitted with said bid as a guarantee that the bidder would, if given a Notification from Owner, enter into a written contract with the County, and furnish a public construction bond in an amount equal to one hundred (100%) of the total
Contract, within fourteen (14) consecutive calendar days after the County issues the Notification from
Owner.
NOW THEREFORE, THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, if the bid of the "Principal" herein is accepted and said "Principal", within fourteen (14) consecutive calendar days after written notice being given of such acceptance, (i) enter into a written contract with the County and (ii) furnishes a public construction contract bond in the amount equal to one hundred percent (100%) of the total contract amount and in a form satisfactory to the County, then this obligation shall be void. If the
Principal fails to complete (i) and (ii) above, the sum herein stated shall be due and payable to the "County", and the "Surety" herein agrees to pay said sum immediately upon demand of the "County", in good and lawful money of the United States of America, as liquidated damages for failure of said "Principal".
Bid Bond Must Contain Original Signatures. No Copies Will Be Accepted.
Bid Bond / Page 2 Form Rev. 02/04/26 Bid Bond - NonFederal
PROJECT NUMBER: P-2026-000077
IN WITNESS WHEREOF, the said as "Principal" herein, has caused these presents to be signed in its name, by its
, and attested by its under the corporate seal, and the said as "Surety" herein, has caused these presents to be signed in its name, by its
, and attested by its corporate Seal, this day of , A.D., 20 .
ATTEST:
TITLE:
(SEAL)
(Contractor Name)
(Signature)
Print Name and Title:
ATTEST:
TITLE:
(SEAL)
(Surety Name)
(Signature)
Print Name and Title:
Bid Bond Must Contain Original Signatures. No Copies Will Be Accepted.
CAPITAL IMPROVEMENTS DIVISION
IFQ/B ATTACHMENT C
PROJECT REQUIREMENTS
ANNUAL CONTRACT - PAINTING & WEATHERPROOFING
Contact: Patrick McAllen, Facilities Systems Project Manager Phone: (561)233-2051 Project Title: PBSO West Boynton Substation-Fuel Island Canopy Refresh Project #: P-2026-000077 Project Location: 7894 S Jog Road, Lake Worth, FL
1. GENERAL
a. The work covered by this Request for Quote consists of the furnishing of all labor, equipment, devices, tools, materials, transportation, professional services, supervision, drawings, permitting, and all miscellaneous requirements to perform all operations necessary to accomplish the work set forth below and shall be considered part of the Scope of Work.
b. Please reference the Annual Contract – Painting & Weatherproofing for additional requirements.
c. Work to be completed during the hours of 7:00 a.m. to 5:00 p.m., Monday through Friday.
d. Contractor shall contact the Project Manager within seventy-two (72) hours of notice to proceed to establish scheduling, etc. required for project implementation.
e. Work to be completed within one hundred twenty (120) calendar days from Notice to
Proceed. Permit application, if required, is to be submitted by Contractor within five (5) days of “Notice to Proceed” and due diligence exercised to address all Building Department comments.
f. Liquidated damages will accrue in the amount of $120 per day.
g. The Contractor will provide a Certificate of Occupancy or Certificate of Completion, as appropriate, obtained from the proper Building official, prior to processing of final payment.
h. Contractor is responsible for obtaining all measurements during the site inspection
2. SCOPE OF WORK
To repair, restore, and repaint the existing fuel island canopy. per the project requirements provided below and specifications included as Exhibits “1” – “4”:
a. Work includes cleaning, leak repairs, corrosion treatment, surface preparation, sealing, and painting to extend the canopy’s life and return it to a safe, functional condition.
b. The Contractor shall protect all fuel equipment, electrical fixtures, and adjacent surfaces during all cleaning, construction, and repair activities.
c. The Contractor shall pressure wash all canopy surfaces including the underside roof panels, structural framing members, beams, columns, downspouts, and any adjacent concrete surfaces impacted by rust staining or runoff. All dirt, mildew, oil residue, loose paint, and contaminants shall be removed to ensure proper adhesion of coatings.
d. The Contractor shall perform a full inspection of the canopy roof system and identify all leak locations, including but not limited to failed seams, open joints, fasteners, penetrations, and areas showing deterioration or rust-through.
e. The Contractor shall repair all identified canopy roof deficiencies by sealing trouble spots, replacing fasteners where required, repairing damaged roof panels, and installing a compatible waterproofing system using the products listed in the Product Information section below, or a PBC approved equal. All work shall result in a watertight canopy system free of active leaks.
f. The Contractor shall identify all areas of corrosion on structural steel, including columns, base plates, beam connections, and canopy framing. Rusted metal surfaces shall be mechanically cleaned, sandblasted, or otherwise prepared as required to remove corrosion and achieve proper surface conditions for the coating system.
g. The Contractor shall apply a complete coating system to all exposed canopy support structure components, including columns, support arms, base plates, beam connections, framing, and related structural steel. The coating system shall use the products listed in the Product Information section below, or a PBC approved equal, and shall include a rust-inhibitive primer and appropriate finish coatings. The final coating color shall match the existing green color of the canopy support structures.
h. All coatings shall be applied in strict accordance with manufacturer’s recommendations and under appropriate environmental conditions. The finished product shall be uniform in appearance and free of runs, drips, and defects.
i. The Contractor shall remove all waste materials, tools, and equipment from the job site daily and shall thoroughly clean the work area prior to final inspection. All personnel shall comply with facility security requirements prior to commencing work. The Contractor shall implement and maintain appropriate protective measures for the duration of the Work and shall promptly repair or replace, at no additional cost to the Owner, any damage resulting from its operations.
3. SUBMITTALS
All submittals shall be sent to the Project Manager for approval. This includes, but is not limited to, products to be used, methods of installation and requests for information and/or clarification. All submittals must be made by the Contractor and must include all details necessary for the Project Manager and Palm Beach County to make any necessary determinations. A transmittal form must be included which clearly requests data or information and deviations from the contract requirements for which approval is being requested. Failure to provide sufficient information will result in the rejection of the submittal. Where the specifications do not specify a brand name product or where a substitution of a product is not specifically prohibited, the Contractor shall submit their selected products for approval by the Project Manager. Such submittals shall include as much detail, and in a format, as required by the Project Manager, so as to allow the Project Manager to evaluate the proposed substitution.
4. PRODUCT INFORMATION
a. MACROPOXY 920 PRE-PRIMER
1. Sherwin-Williams, or PBC approved equal.
2. Two-component, 100% solids penetrating epoxy primer/sealer.
3. Used to seal properly prepared steel, tight rusted steel, concrete, masonry, or approved surfaces.
4. Apply in accordance with manufacturer’s written recommendations listed in Exhibit
“1.”
b. MACROPOXY 646 FAST CURE EPOXY
2. Two-component, high-solids, fast-drying epoxy mastic.
3. Used as the intermediate corrosion-protection coating over properly prepared and primed steel.
4. Apply in accordance with manufacturer’s written recommendations listed in Exhibit
“2.”
5. Final color shall match the existing green color of the canopy structures.
6. Contractor shall provide a color match sample for approval before application.
c. ACROLON 218 HS ACRYLIC POLYURETHANE
2. Two-component acrylic polyurethane finish coating.
3. Used as the final exterior finish coat over the epoxy coating system.
4. Final color shall match the existing green color of the canopy structures.
5. Apply in accordance with manufacturer’s written recommendations listed in Exhibit
“3.”
6. Contractor shall provide a color match sample for approval before application.
d. SILICONE22™ LOW SOLID RUBBERIZED SILICONE ROOF COATING WHITE
1. Rubberized silicone roof coating for low-slope roof waterproofing.
2. Suitable for approved roof substrates, including metal and existing roof coatings.
3. Intended for UV exposure and ponding water conditions.
4. Surface shall be clean, dry, sound, and properly prepared before application.
5. Seams, fasteners, penetrations, and edges shall be detailed per manufacturer’s recommendations.
6. Apply in accordance with manufacturer’s written recommendations listed in Exhibit
“4.”
7. Final color shall be white, unless otherwise approved by Owner.
5. MATERIALS
a. All material shall meet or exceed Florida Building Code and product submittals shall be reviewed and approved by the Owner’s Representative prior to ordering.
b. Materials shall be delivered in their original, unopened packages, and protected from exposure to the elements. Damaged or deteriorated materials shall not be used.
6. TEMPORARY PROTECTION
The Contractor shall protect all workers, staff and the general public from injury. The Contractor shall coordinate and schedule all work with the Project Manager.
7. PROJECT CONDITIONS
Contractor is to coordinate all space and security requirements with the Project Manager.
A construction schedule shall be submitted for review and approval prior to pre-construction meeting, including a start date, substantial completion date, and work plan defining which openings will be scheduled on what day. The Contractor shall conduct all work so as to cause the least interference possible with the normal activities of the operations of the facility and surrounding areas. Any damage caused by Contractor (including landscaping and irrigation) shall be the responsibility of the Contractor to repair and return to its original state.
8. PREPARATION
It shall be the responsibility of the Contractor to prep the site at the construction locations.
9. EXAMINATION
Report to the Project Manager, in writing, any imperfections, unacceptable conditions and/or corrections required to be made before commencing work. Any items not identified, documented and reported to PBC in writing, will become part of the Contractor’s scope.
All other items identified in writing, if approved, shall result in a change order.
10. INSTALLATION
All materials shall be installed in strict accordance with Manufacturer’s written instructions and recommendations. All work shall be done in conformance with applicable Federal, State and Local codes, and established standards.
11. WARRANTY
Contractor warrants all equipment, materials and labor furnished or performed against defects in design, materials and workmanship for a period of twelve (12) months from substantial completion.
12. CLEAN UP
Remove all waste materials, tools and equipment from job site daily. Thoroughly clean the entire job area prior to requesting final inspection.
13. SECURITY
All bidders must have badged employees as identified below prior to commencement of work.
This project is subject to: ☐ Critical Facilities Background Check
☒ CJI Facilities Background Check
☐ No Background Check
DLynch Typewriter
EXHIBIT "1"
DLynch
EXHIBIT "2"
White 100% Silicone
10.27 +/- .5 lbs
80% 68%
5,000-12,000 cps22 mils DFT
Color
Vehicle Base Weight per Gallon Solid by Weight Solid by Volume Viscosity (ASTM D 562) Dry Film Thickness (@ 5 Gallons 250 sq./ft.)
Based on smooth even surface Dry Time
3 to 4 hoursRain Safe
Full cure @ 70°F, 50% relative humidity
24 to 48 hours
Drying Time is temperature, humidity and film thickness dependent
VOC 246 g/L Flash Point >142°F
100% Virgin Mineral Spirits or Naptha
SIZE SKU
KST044500-20
Elongation Tensile Strength Tear Resistance (ASTM D 624)
Permeance (ASTM E 96 Procedure BW)
Solar Reflectance Index
Reflectivity
Thermal Emissivity
370% 261 psi
23.7 lbs/linear feet
13.7 US perms
0.87 0.86
Uniflex® Silicone 22™ Rubberized Silicone White Roof Coating is a low-solids silicone rubber roof ideal for ponding water.
For use on Metal, EPDM, TPO, PVC, smooth BUR, APP, SBS, modified bitumen, polyurethane foam, cured concrete, existing asphaltic and elastomeric roof coatings and other approved surfaces.
NOT for use on roof shingles.
Substrates…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .