This document is an Addendum issued by the Oregon State Hospital for the Meadow Unit Renovation Project at their Junction City campus. The addendum modifies the original bidding documents issued on 3/24/2023 by providing revisions to the drawings and specifications. The narrative modifications include defining the ligature resistant devices and tamper resistant fasteners required in patient accessible areas. The addendum also includes reissued mechanical schedules and air terminal device specifications. Substitution requests for various lighting products have been accepted, as listed in the document.

The Meadow Unit Renovation Project is a state and local contract opportunity seeking bids from qualified licensed contractors to provide interior demolition and renovation services for the first floor suite of rooms at the Oregon State Hospital's Junction City campus, located in Lane County. The project is funded by the state of Oregon, but the specific funding sources and amounts are not provided in this document.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum No. 1 4/17/2024 Page 1 of 2

ADDENDUM

No. 1 Date: 4/17/2024 Project No. 2022017 Attention: Russell Brammer Project Name: OSH JC Meadow Unit Address: 635 Capitol Street NE

Suite 350 Salem, Oregon 97301

Issued By: Jon Mehlschau Distribution: Plan Holders Bidders List This Addendum forms a part of the Bidding and Contract Documents and modifies the original issued Bidding Documents (dated 3/24/2023), and no previously issued Addendum for the above titled project, as indicated below, and is hereby incorporated into the Contract Documents as part thereof.

Bidders are required to acknowledge receipt of this Addendum in the space provided on the Proposal/Bid Form.

NARRATIVE MODIFICATIONS TO DRAWINGS

For each drawing listed below, provide the modification described herein.

Drawing G002 Code Analysis REVISE the following text to the “Area Access Legend” after “Patient Care” to define the patient accessible areas requiring ligature resistant devices and tamper resistant fasteners:

“All exposed fasteners to be tamper resistant fastener type and devices to be ligature resistant through out the following spaces; Corridor R1101, Admit Interview R1103, Exchange R1104, Sallyport R1106, Tlt & Shower R1108, Corridor W1001, Activity & Dining W1002, Pat Bedroom W1003, Pat Tlt & Shower W1004,Secl Restraint W1007, Secl Tlt W1008, Consult & Quiet Room W1010”

REISSUED DRAWINGS

ATTACHMENTS: The following is a list of the modified documents and a brief description of what has been modified. Incorporate the following revised Drawing(s) reissued as attachment(s) to this Addendum:

Drawing M5.02 Mechanical Schedules Indicated packless sound attenuator required for all new air terminals as was indicated in the issued Specification Section 23 36 00 2.1.G.

REISSUED SPECIFICATIONS

ATTACHMENTS: The following is a list of the modified documents and a brief description of what has been modified. Incorporate the following revised Drawing(s) reissued as attachment(s) to this Addendum:

23 36 00 – Air Terminal Devices In Part 1.J and 1.L the reference to 15860 is replaced with reference to Part 2 of Section 23 36 00.

Addendum No. 1 4/17/2024 Page 2 of 2

APPROVALS – SUBSTITUTION REQUESTS

Substitution Requests for the following products have been accepted in addition to the product specified.

Acceptance of any substitution is based on compliance with the Bid Document requirements, specification Section 01600 requirements and any notations made by the Architect in processing the substitution request form.

DOCUMENT MANUFACTURER PRODUCT

Section 10 18 50, 2.1 A.1 EverFab S6336A0NR Drawing E5.01 Luminaire Schedule Fixture C4D Day-O-Lite Harmony Drawing E5.01 Luminaire Schedule Fixture F2 LC Doane Co. SJ-LED Drawing E5.01 Luminaire Schedule Fixture F4 LC Doane Co. SJ-LED Drawing E5.01 Luminaire Schedule Fixture F6D LC Doane Co. CRC Drawing E5.01 Luminaire Schedule Fixture F6D Kenall RMCA-4 Drawing E5.01 Luminaire Schedule Fixture F8 HE Williams SLF-4 Drawing E5.01 Luminaire Schedule Fixture F22 LA Lighting STW200

This Addendum consists of 177 pages (including ALL attachments).

Addendum #1 – 2 pages

23 36 00 Air Terminal Devices – 5 pages M5.02 Mechanical Schedules – 1 page

Northern Illumination Substitutions - 41 pages Associated Lighting Reps Substitutions – 128 pages