This document appears to be a Mechanical Schedules file related to the Meadow Unit Renovation Project at the Oregon State Hospital's Junction City campus. The project is seeking bids from qualified licensed contractors to provide interior demolition and renovation to the first floor suite of rooms in the Meadow Unit. The Mechanical Schedules file includes details on the active chilled beams, air terminal devices, and reheat coils to be used in the project. Key details include the room designations, airflow and water data, sound data, and related equipment specifications. The overall state and local contract opportunity has a contract ID of 660d4445090018083d04a6f4 and involves the state of Oregon, Lane County, and the Juntura CDP jurisdiction.

The pricing terms, funding requirements, and other salient commercial details are not included in this Mechanical Schedules document. However, the overall state and local contract opportunity indicates it is for the renovation of the Meadow Unit at the Oregon State Hospital's Junction City campus, with the state of Oregon, Lane County, and the Juntura CDP as the involved jurisdictions.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACB W1003 PAT BEDROOM 1 IQHC - 2 pipe 6 12 1 150 1 65 50 3229 1.0 4.3 60.0 65.1 28 SECURITY

ACB W1005 NURSE STATION 2 IQHC - 2 pipe 6 4 1 55 1 65 50 3229 1.0 4.3 60.0 65.1 28 STANDARD

ACB W1007 SECL RESTRAINT 1 IQHC - 2 pipe 6 12 1 150 1 65 50 3229 1.0 4.3 60.0 65.1 28 SECURITY

ACB W1010 QUIET ROOM 1 IQHC - 2 pipe 4 6 1 55 1 65 50 1380 0.5 2.0 60.0 62.8 28 SECURITY

ACTIVE CHILLED BEAM SCHEDULE - AHU-RT2

MARK ZONE DESIGNATION CHILLED BEAM DEFINITION PRIMARY AIR DATA (PER CHILLED BEAM) WATER DATA (COOLING MODE) TYPE

NUMBER OF BEAM BEAM SLOT NUMBER AIRWFLOW PER BEAM PRIMARY AIR HUMIDITY SENSIBLE COOLING PRESSURE ENTERING LEAVING SOUND DATA

BEAMS IN MODEL LENGTH SETTING OF SLOT BEAM (CFM) PRESSURE TEMPERATURE CONTENT CAPACITY PER FLOW LOSS TEMP TEMP (NC)

A ZONE TYPE (FEET) ROWS (IN. WG) (°F) - COOL (GRAINS) BEAM (BTU/HR) (GPM) (FEET) (°F) (°F)

SEMCO

ACB (REMOVE) R1102 ANTE 1 IQHC - 2 pipe 6 4 1 55 1 65 50 2228 0.5 2.9 60.0 66.2 28 STANDARD

ACB (REMOVE) R1105 ADMIN SECURITY 2 IQHC - 2 pipe 6 4 1 57 1 65 50 2164 0.5 2.9 60.0 65.8 29 STANDARD

ACB (ETR) R1107 SECURITY 1 IQHC - 2 pipe 6 4 1 55 1 65 50 3229 1.0 4.3 60.0 65.1 28 STANDARD

ACB (REMOVE) R1109 INTER ADMIT 1 IQHC - 2 pipe 4 6 1 55 1 65 50 1380 0.5 2.2 60.0 62.8 28 SECURITY

ACB (REMOVE) R1110 INTER ADMIT 1 IQHC - 2 pipe 6 4 1 55 1 65 50 2093 0.5 2.9 60.0 65.6 28 SECURITY

ACB (REMOVE) R1111 WAITING 1 IQHC - 2 pipe 4 6 1 55 1 65 50 464 0.5 2.2 60.0 59.1 28 SECURITY

ACB (REMOVE) R1117 SECL 1 IQHC - 2 pipe 6 12 1 158 1 65 50 1977 0.5 2.9 60.0 59.9 28 SECURITY

ACB R1103 ADMIT INTERVIEW 1 IQHC - 2 pipe 6 4 1 55 1 65 50 3229 1.0 4.3 60.0 65.1 28 SECURITY

ACB R1104 EXCHANGE 1 IQHC - 2 pipe 4 6 1 55 1 65 50 1380 0.5 2.2 60.0 62.8 28 SECURITY

ACB R1105 ADMIT WORK 1 IQHC - 2 pipe 6 4 1 55 1 65 50 3229 1.0 4.3 60.0 65.1 28 STANDARD

ACB W1002 ACTIVITY & DINING 2 IQHC - 2 pipe 6 4 1 55 1 65 50 3229 1.0 4.3 60.0 65.1 28 SECURITY

W1003, W1004 PAT BEDROOM, PAT TLT & SHOWER S-1 AT- W1003 150 150 5 0.20 PRICE GALV. NONE 4.9 150 0.30 55 85 0.50 140 5 1 8 12 3/4

EV- W1003 150 150 5 0.20 PRICE GALV. NONE

W1005 NURSE STATION S-1 AT- W1005 110 110 4 0.20 PRICE GALV. NONE 3.6 110 0.30 55 85 0.40 140 5 1 8 12 3/4

EV- W1005 110 110 4 0.20 PRICE GALV. NONE

W1006, W1007, W1008 ANTE, SECL RESTRAINT, SECL TLT S-1 AT- W1007 200 200 6 0.20 PRICE GALV. NONE 6.6 200 0.30 55 85 0.70 140 5 1 8 12 3/4

EV- W1007 200 200 6 0.20 PRICE GALV. NONE

AIR TERMINAL SCHEDULE - AHU-RT2 NOTES:

GENERAL AIR TERMINAL DEVICES REHEAT COILS REMARKS (1) PRICE TYPE AIR TERMINALS BASED

ROOM ROOM ROOM CONTROL MARK MAX MIN INLET MAX P.D. TYPE MATRL SOUND CAPACITY AIRSIDE WATER SIDE COILS (6) ON PRICE MODEL SDV FOR SUPPLY

NUMBER NAME OFFSET SEQUENCE CFM CFM SIZE (IN) (IN W.G.) (SEE SPEC) ATTEN. (MBH) REHEAT COILS MAX P.D. INLET OUTLET GPM INLET MAX P.D. NUMBER HT WTH PIPE AND PRICE MODEL RDV FOR EXHAUST

(CFM) (SEE SPECS) TYPE CFM (IN W.G.) TEMP. TEMP. TEMP. (FT H2O) OF ROWS (IN) (IN) SIZE AND RETURN.

(1) (2) (3) (4) (5) (IN) (2) CAPACITY BASED ON REHEAT CFM.

W1010 QUIET ROOM S-1, E-1 AT- W1010 55 55 4 0.19 PRICE GALV. NONE 1.4 55 0.20 55 79.2 0.10 140 5 1 8 12 3/4 EXISTING TO REMAIN. RELABLE & REPROGRAM AS SCHEDULED. (3) REHEAT CFM EQUALS MINIMUM

EV- W1010 55 55 4 0.20 PRICE GALV. NONE EXISTING TO REMAIN. RELABLE & REPROGRAM AS SCHEDULED. CFM UNLESS OTHERWISE NOTED.

R1103, R1104, R1105 ADMIT INTERVIEW, EXCHANGE, ADMIT WORK S-1 AT- R1105 165 165 5 0.20 PRICE GALV. NONE 5.4 165 0.30 55 85 0.60 140 5 1 8 12 3/4

EV- R1105 165 165 5 0.20 PRICE GALV. NONE

R1108 TLT & SHOWER E-1

EV- R1108 120 120 4 0.20 PRICE GALV. NONE

R1117, R1118, R1119 STAFF FITNESS, STAFF TLT & SHOWNER, STORAGE S-1 AT- R1117 700 280 10 0.20 PRICE GALV. NONE 9.2 280 0.30 55 85 1.00 140 5 1 10 12 3/4

EV- R1117 700 280 10 0.20 PRICE GALV. NONE

W1001, W1002 INTERNAL COORIDOR, ACTIVITY & DINING S-1 AT- W1002 110 110 4 0.20 PRICE GALV. NONE 3.6 110 0.30 55 85 0.40 140 5 1 8 12 3/4

EV- W1002 110 110 4 0.20 PRICE GALV. NONE

EV- R11100 55 30 4 0.20 PRICE GALV. NONE REMOVE TERMINAL. UNLESS OTHERWISE NOTED.

R1109, R1110 INTER ADMIT, VITALS S-1 AT- R11100 110 110 4 0.24 PRICE GALV. NONE 2.7 110 0.26 55 77.8 0.18 140 5 1 8 12 3/4 REMOVE TERMINAL.

EV- R11100 110 110 4 0.20 PRICE GALV. NONE REMOVE TERMINAL.

R1111 WAITING S-1, E-1 AT- R1111 55 55 4 0.19 PRICE GALV. NONE 1.3 55 0.20 55 77.0 0.09 140 5 1 8 12 3/4 REMOVE TERMINAL.

EV- R1111 55 55 4 0.20 PRICE GALV. NONE REMOVE TERMINAL.

R1113, R1114, R1115 FITNESS STF, STOR EQUIP, TLT STF S-1 AT- R1113 605 250 9 0.24 PRICE GALV. NONE 8.6 250 0.32 55 86.8 0.57 140 5 1 12-1/2 14 3/4 REMOVE TERMINAL.

EV- R1113 605 250 8 0.20 PRICE GALV. NONE REMOVE TERMINAL.

R1117, R1118, R1119 SECL, ANTE, TLT SECL S-1, E-1 AT- R1117 205 205 5 0.22 PRICE GALV. NONE 5.2 205 0.26 55 78.3 0.35 140 5 1 8 12 3/4 REMOVE TERMINAL.

EV- R1117 205 205 6 0.20 PRICE GALV. NONE REMOVE TERMINAL.

R1101, R1100, R1106, W1009 CORR ADMIT S-1 AT- R1101 325 215 7 0.24 PRICE GALV. NONE 6.7 215 0.31 55 83.6 0.44 140 5 1 10 12 3/4 EXISTING TO REMAIN. RELABLE & REPROGRAM AS SCHEDULED. (4) MAXIMUM COIL AIR PRESSURE DROP

EV- R1101 205 95 7 0.20 PRICE GALV. NONE EXISTING TO REMAIN. RELABLE & REPROGRAM AS SCHEDULED. IS BASED ON MAXIMUM CFM.

R1102, R1103 ANTE, SHWR TLT S-1 AT- R1102 110 75 4 0.24 PRICE GALV. NONE 3.3 75 0.26 55 95.1 0.22 140 5 1 8 12 3/4 REMOVE TERMINAL. (5) GPM BASED ON AN AVERAGE 30

EV- R1103 235 210 5 0.20 PRICE GALV. NONE REMOVE TERMINAL. DEGREES FARENHEIT WATER

R1105 ADMIN SECURITY S-1, E-1 AT- R1105 115 115 4 0.19 PRICE GALV. NONE 5.3 115 0.20 55 97.3 0.35 140 5 1 8 12 3/4 REMOVE TERMINAL. TEMPERATURE RISE THROUGH COIL.

EV- R1105 115 115 4 0.20 PRICE GALV. NONE REMOVE TERMINAL. ACTUAL GPM TO BE SUBMITTED WITH

R1107 SECURITY S-1 AT- R1107 55 40 4 0.24 PRICE GALV. NONE 2.3 40 0.26 55 107.3 0.15 140 5 1 8 12 3/4 EXISTING TO REMAIN. SHOP DRAWINGS AND BE USED FOR

EV- R1107 55 40 4 0.20 PRICE GALV. NONE EXISTING TO REMAIN. WATER BALANCING.

R1108 PAT BLNG S-1 AT- R1100 55 30 4 0.24 PRICE GALV. NONE 0.7 30 0.26 55 76.1 0.05 140 5 1 8 12 3/4 REMOVE TERMINAL. (6) COIL SIZE TO EQUAL BOX OUTLET SIZE

Affiliated

Affiliated Engineers, Inc.

Westlake Center Office Tower

1601 Fifth Avenue, Suite 1400

Engineers

Seattle, WA 98101

Tel 206.256.0800 Fax 206.256.0423

1 2 3 4 5

A

B

C

D

E

Drawing Title

Revisions

Drawn by

Checked by

Drawing No

Consultant Project No

Owner Project No

Project No

Date

Drawing scales indicated apply to 30" x 42" drawing sheets. Scale may not be accurate if drawing plots are less than this size.

/1

/2

:4 :4

P

M

100% CONSTRUCTION

DOCUMENTS

O S

H

J C

M e a d o w

U n it O re g o n

S ta te H o s p it a l J u n c ti o n

C it y

R

E C

O V

E R

Y W

A Y

J U

N C

T

IO

N C

IT

Y

O

R

07.04026.00

03/24/2023

AEI

AEI

M5.02

MECHANICAL

EQUIPMENT SCHEDULE

Number Description Date

1 Addendum #01 04/17/2024

PACKLESS

PACKLESS

PACKLESS

PACKLESS

PACKLESS

PACKLESS

PACKLESS

PACKLESS

PACKLESS

PACKLESS

PACKLESS

PACKLESS

PACKLESS