ora-waa-crgnsa-mult2_plans_IFB.pdf
PDF 34 MB Posted
- Solicitation number
- 69056725B000008
About this file
This document is a set of construction plans and bid schedule for the OR FLAP CRGNSA MULT(2) & WA FLAP CRGNSA MULT(2) project, a Columbia River Gorge National Scenic Area (CRGNSA) sign inventory, maintenance, and replacement initiative. The project involves work across multiple locations in Oregon and Washington along I-84, US Route 197, Oregon Route 35, and the Historic Columbia River Highway.
The bid schedule identifies 50 line items with estimated quantities across Oregon and Washington work areas, totaling deliverables including mobilization, construction survey and staking, contractor quality control and testing, construction scheduling, and soil erosion control. Major work items include guardrail system installation (375 linear feet MGS Type 2 Class B wood posts), terminal sections, sign removal and installation (163 signs to remove, 3,680 square feet of new sign panels and 203 square feet of shield signs), turf establishment (1,000 square yards), and extensive temporary traffic control measures including drums, tubular markers, barricades, arrow boards, warning lights, shadow vehicles, flagger services, and traffic control supervision. Permanent traffic control fixtures include multiple bracket types (I-VI and VIA), concrete and wood pentagon posts, and masonry bases. The plans contain detailed tabulations of permanent traffic control quantities across 15 area maps in Oregon, site plans for individual signs (OR-1A through OR-65), sign panel layouts with specific dimensions, guardrail system assembly details, and temporary traffic control layouts for I-84 eastbound and westbound with lane closures up to 1,685 feet and taper distances ranging from 400 to 1,000 feet. Wind speed requirements for the project range from 85 mph in western Oregon to 110 mph in Columbia River Gorge areas with full exposure.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12/31/2026
Digitally signed by Luke Rowley Date: 2025.09.09 11:57:11-06'00'
Digitally signed by Luke Rowley Date: 2025.09.09 11:57:31-06'00'
BRENT L COE Digitally signed by BRENT L COE Date: 2025.09.10 07:17:01 -07'00'
WA DOT 14(2)
:1
P M
S e p te m b e r
S h e e t
A .2 c p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln g e n a a
.d g n
SHEET INDEX
PROJECT
NUMBER
SHEET
WA FLAP CRGNSA MULT(2)
OR FLAP CRGNSA MULT(2)
A.2
BH TP
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
M.P.
M.L.
monument minimum thousand gallon maximum material mile post main line
W
RIP
G W G WV
CP GPS
36 31
36 31
E
N 1000EL. 1234.56
SEC.
SEC.
DI
N
TP
TP
θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
between bearing bridge balance point bench mark back face back btwn brg.
br.
BP
BM
b.f.
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center
NO SCALE
NOTE:
1.
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend
W west drwg(s).
dist.
diaph.
dia.
DHV
D exp. jt.
exc.
EW
EQ or eq.
EOP
emb.
elev.
El. 94.16 e.f.
e E expansion joint excavation edge of water equation edge of pavement embankment elevation elevation in feet each face superelevation rate east drawing(s) distance diaphragm diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge) jt.
IE
ID
joint invert elevation inside diameter ftg.
flg.
fin.
f.f.
footing flange finish front face
LW
lt. or LT Ls
LPSM
long.
LNFT
lat.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude length of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph V vertical point of intersection vehicles per hour design speed (velocity)
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sect.
SC
SADT
S point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
KSI
square inch thousand pounds per pvmt.
PT
PST
PSC
PSI
PSF
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve pounds per square inch pounds per square foot point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve
OHWM
OG
OD
o. to o.
o.c.
ordinary high water mark original ground outside diameter out to out on center
NC
N normal crown north
A A
DI
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Control Point (Terrestrial and GPS)
Gas & Water Meter; Gas & Water Valve
Flagpole; Fire Hydrant
Cooking Grate; Garbage Can; Picnic Table
Boulder; Well; Antenna; Grave
Above Ground Tank; Underground Tank
Spot Elevation; Coordinate Grid Tick
Material Source; Bore Hole; Test Pit
Treeline; Individual Trees
Spring or Seep
Section Line 4
Section Corner (Found, Projected) 4
Section Line 16
Section Corner (Found, Projected)16
Property Line
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Paved, Gravel)
Railroad
Trail
Fiber Roll
Silt Fence
Sandbag
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservoir; Marshland
North Arrow
Slope Stake Limits Top of Cut
Toe of Fill
Construction Limits
Bottom of Ditch
Fence
Gate with Fence
Cattleguard
Guardrail
Concrete Barrier and Guard Wall
Retaining Wall wall face
Signs (single, double post; portable)
Delineators
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Pipe Culvert with Drop Inlet
Box Culvert
Underdrain
Overhead/Above Ground Utilities
Underground Utilities
Light, Support w/Anchor) Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
Building
Right-of-Way Line
Permanent Easement
Construction Easement
Riprap
- no symbol -
Section A-A
EXISTING PROPOSED
STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, TP = telephone pedestal, TV = CATV pedestal,
- no symbol -
ABBREVIATIONS
PLAN SYMBOLS AND
101-1W
FP-14
6/2022
WFLHD DETAIL
:2
S e p te m b e r
D e t W
-1 p w w o rk d ir \j a c o b s -u s -v a -p w -0
\d
\O
R
(2 p ln g e n a
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
NUMBER
SHEET
A.3
WA FLAP CRGNSA MULT(2)
right
Sheet and Description
Section C Section D Section E Section F Section G Section I
Oregon
Permanent
Traffic
Control
Oregon
Safety
Features
Oregon
Temporary
Traffic
Control
Washington
Permanent
Traffic
Control
Washington
Temporary
Traffic
Control
Soil Erosion and
Sediment
Control
BID
SCHEDULE
A0010 15101-0000 MOBILIZATION LPSM ALL
A0020 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0030 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0040 15401-0000 CONTRACTOR TESTING LPSM ALL
A0050 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0060 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 1500 100 1600
A0070 20301-2400 REMOVAL OF SIGN,(PANEL) EACH 78 85 163
A0080 20301-2700 REMOVAL OF STRUCTURE,(SIGN SUPPORT) EACH 6 5 11
A0090 61701-4700 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS B WOOD POSTS,(ODOT Type 2A) LNFT 375 375
A0100 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT,(ODOT non-flared energy absorbing terminal) EACH 2 2
A0110 61703-0000 TERMINAL END,(ODOT type 1 anchor & type C end piece) EACH 2 2
A0120 62302-0000 SPECIAL LABOR,(STONE MASON) HOUR 80
A0130 62502-0000 TURF ESTABLISHMENT SQYD 900 100 1000
A0140 63302-0000 SIGN SYSTEM,(PANEL) SQFT 2088.3 1577.9 13.8 3680
A0150 63302-0000 SIGN SYSTEM,(SHIELD) SQFT 56 147 203
A0160 63502-0300 TEMPORARY TRAFFIC CONTROL, ARROW BOARD, TYPE C EACH 1 1
A0170 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 2 2 4
A0180 63502-1250 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 42-INCH EACH 600 50 50 700
A0190 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 315 20 25 360
A0200 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A EACH 2 2 4
A0210 63502-1900 TEMPORARY TRAFFIC CONTROL, SHADOW VEHICLE EACH 1 1 2
A0220 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 353 280 17 650
A0230 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 200 300 500
A0240 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR DAY 45 50 95
A0250 64603-0000 FIXTURE,(BRACKET, TYPE I) EACH 19 43 62
A0260 64603-0000 FIXTURE,(BRACKET, TYPE II) EACH 4 16 20
A0270 64603-0000 FIXTURE,(BRACKET, TYPE III) EACH 8 4 12
A0280 64603-0000 FIXTURE,(BRACKET, TYPE IV) EACH 14 11 25
A0290 64603-0000 FIXTURE,(BRACKET, TYPE VI) EACH 6 3 9
A0300 64603-0000 FIXTURE,(BRACKET, TYPE VIA) EACH 12 2 14
A0310 64603-0000 FIXTURE,(CONCRETE PENTAGON POST, 14") EACH 4 6 10
A0320 64603-0000 FIXTURE,(CONCRETE PENTAGON POST, 24") EACH 4 4
A0330 64603-0000 FIXTURE,(CONCRETE PENTAGON POST, 8.4") EACH 10 2 12
A0340 64603-0000 FIXTURE,(MASONRY BASE, TYPE VI) EACH 1 3 4
A0350 64603-0000 FIXTURE,(WOOD PENTAGON POST) EACH 4 24 28
PAY ITEM
NUMBER
LINE
ITEM
NO.
h tt p s
/j a c o b s e n g in e e ri n g .s h a re p o in t.
c o m
/s it e s /C
P C o lu m b ia
R iv e rG o rg e S ig n s /S h a re d D o c u m e n ts
/G e n e ra l/ In te rn a l/
E E
C R G
N S A m w -s u m m a ry
-q u a n ti ti e s .x ls m
]S h e e t
-S e p -2
:4 A
M
A
M
E
N
D
SUMMARY OF QUANTITIES
100% Milestone
Completed 9/19/2025
Remarks and/or
Determination of Estimated
Quantity
Estimated
Quantities
ALLOWANCEUNITPAY ITEM DESCRIPTION
PROJECT
B.1
OR FLAP CRGNSA MULT(2)
WA FLAP CRGNSA MULT(2)
US197 = United States Route 197
HCRH = Historic Columbia River Highway
I-84 = Interstate 84
LEGEND:9
:2
S e p te m b e r
C
.1 p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln q ta b c c
.d g n
(Sheet 1 of 6)
QUANTITIES
PERMANENT TRAFFIC CONTROL
TABULATION OF OREGON
PROJECT
C.1
I-84 = Interstate 84
LEGEND:8
:3
S e p te m b e r p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln q ta b c c
.d g n
(Sheet 2 of 6)
QUANTITIES
PERMANENT TRAFFIC CONTROL
TABULATION OF OREGON
PROJECT
NUMBER
SHEET
WA FLAP CRGNSA MULT(2)
C.2
OR35 = Oregon Route 35
I-84 = Interstate 84
LEGEND:8
:2
S e p te m b e r
.3 p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln q ta b c c
.d g n
(Sheet 3 of 6)
QUANTITIES
PERMANENT TRAFFIC CONTROL
TABULATION OF OREGON
PROJECT
NUMBER
SHEET
WA FLAP CRGNSA MULT(2)
C.3
US197 = United States Route 197
I-84 = Interstate 84
LEGEND:9
:2
S e p te m b e r
.4 p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln q ta b c c
.d g n
(Sheet 4 of 6)
QUANTITIES
PERMANENT TRAFFIC CONTROL
TABULATION OF OREGON
PROJECT
NUMBER
SHEET
WA FLAP CRGNSA MULT(2)
C.4
:2
S e p te m b e r
.5 p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln q ta b c c
.d g n
(Sheet 5 of 6)
QUANTITIES
PERMANENT TRAFFIC CONTROL
TABULATION OF OREGON
PROJECT
NUMBER
SHEET
WA FLAP CRGNSA MULT(2)
C.5
OR35 = Oregon Route 35
I-84 = Interstate 84
LEGEND:9
:2
S e p te m b e r
.6 p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln q ta b c c
.d g n
(Sheet 6 of 6)
QUANTITIES
PERMANENT TRAFFIC CONTROL
TABULATION OF OREGON
PROJECT
C.6
N
Legend
Sign
FIXTURE (BRACKET, TYPE III)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-12, TYPE III
SIGNS: OR-1A, OR-1B, OR-2, OR-3, OR-4
AREA MAP 1
SIGNS: OR-5, OR-6
AREA MAP 2 SIGNS: OR-7, OR-8, OR-9, OR-10, OR-11
AREA MAP 3
SIGNS: OR-13, OR-14, OR-15, OR-16
AREA MAP 4 SIGNS: OR-17, OR-18, OR-19, OR-20
AREA MAP 5
FIXTURE (BRACKET, TYPE VI)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-19A, TYPE VI
SCALE IN MILES
1 0 1 2
:0
S e p te m b e r
S ig n L o c a ti o n s
S h e e t] p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln p tc s it e c X c X
.d g n
(Sheet 1 of 5)
OREGON KEY MAP
PROJECT
NUMBER
SHEET
WA FLAP CRGNSA MULT(2)
C.7
Salvaged Material Storage
Eagle Creek Trailhead
Legend
Sign
SIGNS: OR-25, OR-26
AREA MAP 7
SIGNS: OR-27, OR-28
AREA MAP 8
OR-37, OR-38, OR-39, OR-40
SIGNS: OR-33, OR-34, OR-35, OR-36,
AREA MAP 10
SIGNS: OR-29, OR-30, OR-31, OR-32
AREA MAP 9
OR-44, OR-45, OR-46
SIGNS: OR-41, OR-42, OR-43,
AREA MAP 11
FIXTURE (BRACKET, TYPE III)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-47, TYPE III
FIXTURE (BRACKET, TYPE VIA)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-48, TYPE VI
OR-23, OR-24
SIGNS: OR-21, OR-22
AREA MAP 6
SCALE IN MILES
1 0 1 2
:1
S e p te m b e r
S ig n L o c a ti o n s
S h e p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln p tc s it e c X c X
.d g n
(Sheet 2 of 5)
OREGON KEY MAP
PROJECT
NUMBER
SHEET
WA FLAP CRGNSA MULT(2)
C.8
Sign
FIXTURE (BRACKET, TYPE IV)
FIXTURE (CONCRETE PENTAGON POST)
SIGN SYSTEM (PANEL)
REMOVAL OF STRUCTURE (SIGN SUPPORT)
OR-57, TYPE IV
SIGNS: OR-49, OR-50
AREA MAP 12
SIGNS: OR-51, OR-52, OR-53
AREA MAP 13
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-56, TYPE VI
SCALE IN MILES
1 0 1 2
:5
S e p te m b e r
S ig n L o c a ti o n s
S h e p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln p tc s it e c X c X
.d g n
(Sheet 3 of 5)
OREGON KEY MAP
PROJECT
NUMBER
SHEET
WA FLAP CRGNSA MULT(2)
C.9
Sign
FIXTURE (BRACKET, TYPE VIA)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-58, TYPE VI
FIXTURE (BRACKET, TYPE IV)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-60, TYPE IV
SIGNS: OR-61, OR-62
AREA MAP 14
SIGNS: OR-63, OR-64
AREA MAP 15
FIXTURE (BRACKET, TYPE IV)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-59, TYPE IV
SCALE IN MILES
1 0 1 2
:5
S e p te m b e r
S ig n
L o c a ti o n s
S h e p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln p tc s it e c X c X
.d g n
(Sheet 4 of 5)
OREGON KEY MAP
PROJECT
NUMBER
SHEET
WA FLAP CRGNSA MULT(2)
C.10
Sign
FIXTURE (BRACKET, TYPE IV)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-65, TYPE IV
SCALE IN MILES
1 0 1 2
:5
S e p te m b e r
S ig n L o c a ti o n s
S h e p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln p tc s it e c X c X
.d g n
(Sheet 5 of 5)
OREGON KEY MAP
PROJECT
NUMBER
SHEET
WA FLAP CRGNSA MULT(2)
C.11
Sign
FIXTURE (BRACKET, TYPE VI)
FIXTURE (MASONRY BASE, TYPE VI)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF STRUCTURE (SIGN SUPPORT)
REMOVAL OF SIGN (PANEL)
OR-2, TYPE VI
See Sheet C.16
OR-1A
See Sheet C.17
OR-1B
FIXTURE (BRACKET, TYPE IV)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-4, TYPE IV
FIXTURE (BRACKET, TYPE IV)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-3, TYPE IV
FIXTURE (BRACKET, TYPE II)
FIXTURE (WOOD PENTAGON POST)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-5, TYPE V
FIXTURE (BRACKET, TYPE IV)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-6, TYPE IV
FIXTURE (BRACKET, TYPE IV)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-7, TYPE IV
FIXTURE (BRACKET, TYPE VI)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-8, TYPE VI
FIXTURE (BRACKET, TYPE III)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-9, TYPE III
FIXTURE (BRACKET, TYPE VIA)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-10, TYPE VI
FIXTURE (BRACKET, TYPE III)
FIXTURE (CONCRETE PENTAGON POST)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF STRUCTURE (SIGN SUPPORT)
REMOVAL OF SIGN (PANEL)
OR-11, TYPE III
AREA MAP 1 AREA MAP 2
AREA MAP 3
SCALE IN FEET
1000 0 1000 2000
:5
S e p te m b e r
S ig n L o c a ti o n s
S h e p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln p tc s it e c X c X
.d g n
(Sheet 1 of 4)
OREGON AREA MAP
PROJECT
NUMBER
SHEET
WA FLAP CRGNSA MULT(2)
C.12
FIXTURE (BRACKET, TYPE I)
FIXTURE (CONCRETE PENTAGON POST)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-15, TYPE I
FIXTURE (BRACKET, TYPE I)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-24, TYPE I
Legend
Sign
FIXTURE (BRACKET, TYPE VIA)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-13, TYPE VI
FIXTURE (BRACKET, TYPE III)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-14, TYPE III
FIXTURE (BRACKET, TYPE I)
FIXTURE (CONCRETE PENTAGON POST)
SIGN SYSTEM (PANEL)
OR-16, TYPE I
FIXTURE (BRACKET, TYPE VIA)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-17, TYPE VI
FIXTURE (BRACKET, TYPE I)
FIXTURE (CONCRETE PENTAGON POST)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-18, TYPE I
FIXTURE (BRACKET, TYPE I)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-19, TYPE I
FIXTURE (BRACKET, TYPE VIA)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-20, TYPE VI
FIXTURE (BRACKET, TYPE II)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-21, TYPE II
FIXTURE (BRACKET, TYPE I)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-22, TYPE I
FIXTURE (BRACKET, TYPE VIA)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-23, TYPE VI
FIXTURE (BRACKET, TYPE III)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-25, TYPE III
FIXTURE (BRACKET, TYPE II)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-26, TYPE II
AREA MAP 4 AREA MAP 5
AREA MAP 7AREA MAP 6
SCALE IN FEET
1000 0 1000 2000
:5
S e p te m b e r
S ig n L o c a ti o n s
S h e p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln p tc s it e c X c X
.d g n
(Sheet 2 of 4)
OREGON AREA MAP
PROJECT
NUMBER
SHEET
WA FLAP CRGNSA MULT(2)
C.13
FIXTURE (BRACKET, TYPE I)
FIXTURE (CONCRETE PENTAGON POST)
SIGN SYSTEM (PANEL)
OR-39, TYPE I
FIXTURE (BRACKET, TYPE I)
FIXTURE (CONCRETE PENTAGON POST)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-38, TYPE I
FIXTURE (BRACKET, TYPE VI)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-35, TYPE VI
FIXTURE (BRACKET, TYPE VI)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-34, TYPE VI
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-36, TYPE VI
FIXTURE (BRACKET, TYPE VI)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-37, TYPE VI
FIXTURE (BRACKET, TYPE I)
FIXTURE (CONCRETE PENTAGON POST)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-40, TYPE I
FIXTURE (BRACKET, TYPE III)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-33, TYPE III
FIXTURE (BRACKET, TYPE I)
FIXTURE (WOOD PENTAGON POST)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-46, TYPE I
FIXTURE (BRACKET, TYPE I)
FIXTURE (WOOD PENTAGON POST)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-45, TYPE I
FIXTURE (BRACKET, TYPE VIA)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-44, TYPE VI
FIXTURE (BRACKET, TYPE I)
FIXTURE (CONCRETE PENTAGON POST)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-43, TYPE I
FIXTURE (BRACKET, TYPE I)
FIXTURE (WOOD PENTAGON POST)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-42, TYPE I
FIXTURE (BRACKET, TYPE VIA)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-41, TYPE VISalvaged Material Storage
Eagle Creek Trailhead
Legend
Sign
FIXTURE (BRACKET, TYPE III)
FIXTURE (CONCRETE PENTAGON POST)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF STRUCTURE (SIGN SUPPORT)
OR-27, TYPE III
FIXTURE (BRACKET, TYPE I)
FIXTURE (CONCRETE PENTAGON POST)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-28, TYPE I
FIXTURE (BRACKET, TYPE I)
FIXTURE (CONCRETE PENTAGON POST)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-29, TYPE I
FIXTURE (BRACKET, TYPE VIA)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-30, TYPE VI
FIXTURE (BRACKET, TYPE I)
FIXTURE (CONCRETE PENTAGON POST)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-31, TYPE I
FIXTURE (BRACKET, TYPE IV)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-32, TYPE IV
AREA MAP 8 AREA MAP 9
AREA MAP 11AREA MAP 10
SCALE IN FEET
1000 0 1000 2000
:3
S e p te m b e r
S ig n L o c a ti o n s
S h e p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln p tc s it e c X c X
.d g n
(Sheet 3 of 4)
OREGON AREA MAP
PROJECT
NUMBER
SHEET
WA FLAP CRGNSA MULT(2)
C.14
Sign
FIXTURE (BRACKET, TYPE IV)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-63, TYPE IV
FIXTURE (BRACKET, TYPE IV)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-64, TYPE IV
FIXTURE (BRACKET, TYPE VIA)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-49, TYPE VI
FIXTURE (BRACKET, TYPE I)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-50, TYPE I
FIXTURE (BRACKET, TYPE IV)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-51, TYPE IV
FIXTURE (BRACKET, TYPE I)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-52, TYPE I
FIXTURE (BRACKET, TYPE I)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-53, TYPE I
FIXTURE (BRACKET, TYPE VIA)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-62, TYPE VI
FIXTURE (BRACKET, TYPE II)
SIGN SYSTEM (SHIELD)
SIGN SYSTEM (PANEL)
REMOVAL OF SIGN (PANEL)
OR-61, TYPE II
AREA MAP 12 AREA MAP 13
AREA MAP 15AREA MAP 14
SCALE IN FEET
1000 0 1000 2000
:0
S e p te m b e r
S ig n L o c a ti o n s
S h e p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln p tc s it e c X c X
.d g n
(Sheet 4 of 4)
OREGON AREA MAP
PROJECT
NUMBER
SHEET
WA FLAP CRGNSA MULT(2)
C.15
SS
Soil erosion control, fiber roll
Direction of drainage
6B-15-13 for permanent boundary location.
Refer to Physical Data for ODOT right-of-way plan1.
N
25 50012.525
Scale in feet
Fixture (Bracket, Type IV)
Fixture (Concrete Pentagon Post)
Sign System (Panel)
Removal of Sign (Panel)
OR-1A, Type IV
M.P. 18.10, Rt.
(Sign Support)
Removal of Structure
M.P. 18.2
See Section I
Install soil erosion control, fiber roll
I-84 WESTBOUND
I-84 EASTBOUND
311' construction activities areas disturbed by
Apply turf establishment to (See Section D) absorbing terminal) tangent (ODOT non-flared energy Guardrail terminal section type MGS M.P. 18.10, Rt.
(L=187.5 LNFT)
(See Section D) Class B wood posts (ODOT Type 2A) Guardrail system MGS, Type 2 M.P. 18.04 to M.P. 18.10, Rt.
(See Section D) absorbing terminal) (ODOT non-flared energy Terminal section, type MGS tangent M.P. 18.04, Rt.
LEGEND:
NOTE:
11'
:5
A u g u s t
D
.9 p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln p p c c
.d g n
SIGN OR-1A SITE PLAN
OREGON I-84 EASTBOUND
PROJECT
OR FLAP CRGNSA MULT(2) C.16
I-84 WESTBOUND
I-84 EASTBOUND
Soil erosion control, fiber rol
Direction of drainage
See Section I
Install soil erosion control, fiber roll
6B-15-13 for permanent boundary location.
Refer to Physical Data for ODOT right-of-way plan1.
Fixture (Bracket, Type IV)
Fixture (Concrete Pentagon Post)
Sign System (Panel)
Removal of Structure (Sign Support)
Removal of Sign (Panel)
Sign OR-1B, Type IV
M.P. 18.68, Lt.
11' disturbed by construction activities
Apply turf establishment to areas
See Section D absorbing terminal) tangent (ODOT non-flared energy Guardrail terminal section type MGS
M.P. 18.72, Lt.
(L=187.5 LNFT)
(See Section D)
Class B wood posts (ODOT Type 2A) Guardrail system MGS, Type 2
M.P. 18.68 to M.P. 18.72, Lt.
(See Section D) 1 anchor and Type C end piece)
Terminal end (ODOT Type M.P. 18.68, Lt.
N
25 50012.525
Scale in feet
LEGEND:
NOTE:
:2
S e p te m b e r
D p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln p p c c
.d g n
SIGN OR-1B SITE PLAN
OREGON I-84 WESTBOUND
PROJECT
C.18
OR FLAP CRGNSA MULT(2) C.17
National
Scenic
Area
Leaving Columbia
River
Gorge national scenic area
116" 116"
12"
12"
12"
12"
12"
12"
12"
12"
10"
6"
6"
6"
18"
6"
6"
6"
12"
10"
15½"
15⅝"
15⅝"
15⅝"
15⅝"
12"
12"
12"
12"
12"
12"
12"
172"
3½" 3½"
FRONT BACK
(See Note 2)
OR-1B
OR-1A
2. New sign layouts, fabricate as detailed.
1. Sign layouts for information only, verify existing sign layout and dimensions before fabrication.
Note:
NO SCALE
:3
S e p te m b e r
O
R P ro p o s e d S ig n s p w w o rk d ir \j a c o b s -u s -v a -p w -0
\d
\O
R (2 p ln p tc c X
-c X
.d g n
SIGN PANEL LAYOUTS
OREGON
PROJECT
NUMBER
SHEET
C.18 sandy river delta
68"
12½"
5"
49"
6"
2½"
1⅝"
2½"
5"
Columbia River Gorge National Scenic Area
1½"
5⅞"
3" 3"
3"
Lewis and Clark State Recreation Site
108"
20"
8"
4"
58"
8⅜"
4"
5⅜"
8¼"
3½"
National
Scenic
Area
Leaving Columbia
River Gorge national scenic area
74" 74"
8"
8"
8"
8"
8"
8"
116"
8"
10⅜"
10⅜"
10⅜"
10⅜"
10½"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
4"
4"
4"
12"
4"
4"
4"
8"
3½" 3½"
FRONT BACK
116"
OR-3
OR-4
OR-2
1. Sign layouts for information only, verify existing sign layout and dimensions before fabrication.
Note:
NO SCALE
:4
S e p te m b e r
O
R
E x is ti n g p w w o rk d ir \j a c o b s -u s -v a -p w -0
\d
\O
R (2 p ln p tc c X
-c X
.d g n
SIGN PANEL LAYOUTS
OREGON
PROJECT
NUMBER
SHEET
C.19
Dabney
36"
2"
5"
12½"
32"
6"
5"
3½"
State Recreation Site
Dabney
88"
20"
8"
4"
58"
8⅝"
4"
5⅜"
8"
3½"
Portland Women's Forum State Scenic Viewpoint
108"
20"
8"
8"
4"
70"
8¾"
4"
3"
5⅜"
8⅞"
3½"
Vista House Crown point
State Scenic Corridor
92"
20"
8"
4"
4"
64"
8½"
4"
5½"
2"
8"
3½"
OR-5
OR-6
OR-7 OR-8
1. Sign layouts for information only, verify existing sign layout and dimensions before fabrication.
Note:
NO SCALE
:4
S e p te m b e r
O
R
E x is ti n p w w o rk d ir \j a c o b s -u s -v a -p w -0
\d
\O
R (2 p ln p tc c X
-c X
.d g n
SIGN PANEL LAYOUTS
OREGON
PROJECT
OR FLAP CRGNSA MULT(2) C.20
Falls Latourell
48"
2"
5"
5"
12½"
40"
5¼"
1⅝"
5"
5⅝"
Shepperd's Dell
52"
2"
5"
5"
12½"
40"
5¼"
1⅝"
5"
5⅝"
State Park
Guy W. talbot
64"
15"
6"
3"
6¼"
3"
4½"
6¼"
44"
2½"
Guy W.
Talbot
36"
2"
5"
5"
12½"
40"
5¼"
1⅝"
5"
5⅝"
OR-9 OR-11
OR-10
OR-12
1. Sign layouts for information only, verify existing sign layout and dimensions before fabrication.
Note:
NO SCALE
:4
S e p te m b e r
O
R
E x is ti n p w w o rk d ir \j a c o b s -u s -v a -p w -0
\d
\O
R (2 p ln p tc c X
-c X
.d g n
SIGN PANEL LAYOUTS
OREGON
PROJECT
NUMBER
SHEET
C.21
Bridal Veil
Viewpoint
State Scenic
84"
20"
8"
4"
4"
64"
8⅝"
4"
5⅜"
2"
8"
3½"
56"
1½"
3"
2" 2"
2"
2"
8"
2¼"
⅞"
⅞"
4⅛"
2.3 mi
4.8 mi
6.4 mi
Angel's Rest Trail angel's rest wahkeena trail #420 wahkeena falls
26"
Angel's Rest Trailhead
52"
2"
5"
5"
12½"
40"
5¼"
1⅝"
5"
5⅝"
OR-13
OR-15
OR-14
1. Sign layouts for information only, verify existing sign layout and dimensions before fabrication.
Note:
NO SCALE
:4
S e p te m b e r
O
R
E x is ti n p w w o rk d ir \j a c o b s -u s -v a -p w -0
\d
\O
R (2 p ln p tc c X
-c X
.d g n
SIGN PANEL LAYOUTS
OREGON
PROJECT
NUMBER
SHEET
C.22
56"
1½"
3"
2"
2"
2"
2"
8"
2¼"
⅞"
⅞"
4⅛"
2.3 mi
4.8 mi
6.4 mi
Angel's Rest Trail angel's rest wahkeena trail #420 wahkeena falls
26"
Wahkeena Falls Trail Wahkeena Falls Larch Mt. Trail
Multnomah falls
0.2 mi
3.0 mi
52"
1½"
3"
2"
2"
2"
8"
2¼"
⅞"
⅞"
5"
26"
Wahkeena Falls
68"
12½"
5"
49"
6"
2½"
1⅝"
2½"
5"
Columbia River Gorge National Scenic Area
1½"
5⅞"
3" 3" 3"
0.5 mi
(See Note 2)
OR-16
OR-17
OR-18
2. New sign layout, fabricate as detailed.
1. Sign layouts for information only, verify existing sign layout and dimensions before fabrication.
Note:
NO SCALE
:4
S e p te m b e r
O
R
E x is ti n p w w o rk d ir \j a c o b s -u s -v a -p w -0
\d
\O
R (2 p ln p tc c X
-c X
.d g n
SIGN PANEL LAYOUTS
OREGON
PROJECT
OR FLAP CRGNSA MULT(2) C.23
Larch Mountain Trail
6.8 mi
Multnomah Falls Bridge
Top of Falls
Wahkeena Trail
Larch Mountain
1.8 mi
0.2 mi
1.0 mi
56"
1½"
3"
2"
2"
2"
2"
8"
2¼"
⅞"
⅞"
⅞"
4⅛"
28"
Gorge
Oneonta
52"
15"
6"
6"
48"
7½"
3"
2"
8½"
2½"
Larch Mountain
68"
12½"
5"
49"
6"
2½"
1⅝"
2½"
5"
Columbia River Gorge National Scenic Area
1½"
5⅞"
3" 3" 3"
Multnomah Falls
68"
12½"
5"
49"
6"
2½"
1⅝"
2½"
5"
Columbia River Gorge National Scenic Area
1½"
5⅞"
3" 3" 3"
OR-19
OR-20 OR-21
OR-19A
1. Sign layouts for information only, verify existing sign layout and dimensions before fabrication.
Note:
NO SCALE
:4
S e p te m b e r
O
R
E x is ti n p w w o rk d ir \j a c o b s -u s -v a -p w -0
\d
\O
R (2 p ln p tc c X
-c X
.d g n
SIGN PANEL LAYOUTS
OREGON
PROJECT
NUMBER
SHEET
C.24
56"
3"
2"
2"
2"
2"
8"
2¼"
⅞"
⅞"
⅞"
4⅛"
28"
Oneonta Trail Horsetail Falls Trail Triple Falls Horsetail Creek Trail Larch Mountain
0.8 mi
1.8 mi
2.9 mi
7.7 mi
52"
1½"
3"
2"
2"
2"
2"
8"
2¼"
⅞"
⅞"
⅞"
4⅛"
28" Upper Horsetail Falls View Point Oneonta Creek Oneonta Trail
0.4 mi
0.8 mi
1.2 mi
1.3 mi
Horsetail Falls Trail
Horsetail Falls
68"
12½"
5"
49"
6"
2½"
1⅝"
2½"
5"
Columbia River Gorge National Scenic Area
1½"
5⅞"
3" 3" 3"
(See Note 2)
OR-22
OR-23
OR-24
2. New sign layout, fabricate as detailed.
1. Sign layouts for information only, verify existing sign layout and dimensions before fabrication.
Note:
NO SCALE
:4
S e p te m b e r
O
R
E x is ti n p w w o rk d ir \j a c o b s -u s -v a -p w -0
\d
\O
R (2 p ln p tc c X
-c X
.d g n
SIGN PANEL LAYOUTS
OREGON
PROJECT
NUMBER
SHEET
C.25
State Park
Ainsworth
48"
2"
5"
3"
12½"
37"
5⅜"
3⅜"
2½"
5¼"
Ainsworth State Park
Campground
60"
15"
6"
3"
3"
50"
6½"
3"
4½"
2½"
6½"
2½"
State Park
John B. Yeon
2"
5"
3"
12½"
37"
5⅜"
3⅜"
2½"
5¼"
48"
OR-25 OR-26
(See Note 2)
OR-27
2. New sign layout, fabricate as detailed.
1. Sign layouts for information only, verify existing sign layout and dimensions before fabrication.
Note:
NO SCALE
:4
S e p te m b e r
O
R
E x is ti n p w w o rk d ir \j a c o b s -u s -v a -p w -0
\d
\O
R (2 p ln p tc c X
-c X
.d g n
SIGN PANEL LAYOUTS
OREGON
PROJECT
NUMBER
SHEET
C.26
3"
2"
2"
2"
2"
2¼"
⅞"
⅞"
4⅛"
26"
Trailheads wahclella falls highway state trail historic columbia river
1½"
40"
6⅜"
1.0 mi
Wahclella Falls Trail Wahclella Falls
52"
1½"
3"
2"
19"
7¾"
2¼"
4"
Trailhead Columbia River Gorge National Scenic Area
80"
12½"
6"
3" 3"
52"2"
4"
5"
3½"
Wahclella Falls
1½"
6"
4¼"
4¾"
0.1 mi
Upper McCord Creek Falls
Columbia Gorge Trail #400
4.9 mi
Elowah Falls Trail
Nesmith Point Via Trail 428
0.8 mi
1.1 mi
56"
1½"
3"
2" 2"
2"
2"
5⅛"
2¼"
⅞"
⅞"
⅞"
4⅛"
28"
Elowah Falls
Ainsworth St. Pk. Campground 4.5 mi
⅞" 2"
OR-28
OR-29 OR-31
1. Sign layouts for information only, verify existing sign layout and dimensions before fabrication.
Note:
NO SCALE
OR-30
:4
S e p te m b e r
O
R
E x is ti n p w w o rk d ir \j a c o b s -u s -v a -p w -0
\d
\O
R (2 p ln p tc c X
-c X
.d g n
SIGN PANEL LAYOUTS
OREGON
PROJECT
OR FLAP CRGNSA MULT(2) C.27
64"
15"
6"
6"
3"
3"
2"
4½"
56"
2½"
Toothrock Trailhead
Highway State Trail
Historic Columbia River1½" 3"
6"
6"
Cascade Fish Hatchery
44"
2"
5"
3"
12½"
37"
5⅜"
3⅜"
2½"
5¼"
Eagle Creek Overlook
68"
15"
6"
6" 57"
7"
3"
2"
4"
2½"
Columbia River Gorge National Scenic Area
3" 3"
1½"
6½"
Eagle Creek Campground
68"
12½"
5"
49"
6"
2½"
1⅝"
2½"
5"
Columbia River Gorge National Scenic Area
1½"
5⅞"
3" 3" 3"
OR-32
OR-33
OR-34 OR-35
1. Sign layouts for information only, verify existing sign layout and dimensions before fabrication.
Note:
NO SCALE
:4
S e p te m b e r
O
R
E x is ti n g p w w o rk d ir \j a c o b s -u s -v a -p w -0
\d
\O
R (2 p ln p tc c X
-c X
.d g n
SIGN PANEL LAYOUTS
OREGON
PROJECT
OR FLAP CRGNSA MULT(2) C.28
0.9 mi
1.3 mi
Gorge Trail
Tanner Creek Road
Wauna Viewpoint Trail
Tanner Creek 3.0 mi
52"
1½"
3"
2"
2"
2"
25"
4¼"
⅞"
⅞"
2¼"
7¾"
0.2 mi
0.5 mi
2.5 mi
Buck Point Trail Ruckle Creek Trail Pacific Crest Trail
Gorge Trail
52"
1½"
3"
2"
2"
2"
4¼"
⅞"
⅞"
2¼"
7¾"
25"
Historic Columbia River Highway
68"
5"
78"
2½"
3"
State Trail Cascade Locks
Eagle Creek Recreation Area
Trailhead Picnic Area Campground
Overlook
5"
5"
5"
5"
3"
3"
3"
3"
3"
3"
3"
8"
4"
2½"
2½"
2"
2"
13"
OR-37
(See Note 2)
OR-39
OR-38
OR-36
2. New sign layout, fabricate as detailed.
1. Sign layouts for information only, verify existing sign layout and dimensions before fabrication.
Note:
NO SCALE
:1
S e p te m b e r
O
R
E x is ti n g p w w o rk d ir \j a c o b s -u s -v a -p w -0
\d
\O
R (2 p ln p tc c X
-c X
.d g n
SIGN PANEL LAYOUTS
OREGON
PROJECT
OR FLAP CRGNSA MULT(2) C.29
Cascade Locks
2"
9½"
7½"
48"
19"2.4 Mi
Cascade Locks Trail Head
67"
15"
6"
6"
57"
7"
3"
2"
4"
2½"
Historic Columbia River
Highway State Trail
3" 3"
1½"
6½"
Pacific Crest National
1½"
2"
6"
1½"
48"
18" Scenic Trail North
City of Cascade Locks 1½"
2"
2" 3"
Pacific Crest Trail
1½"
2"
8"
1½"
48"
18"
Gorge Trail 400 2"
4½"
OR-40
OR-41
OR-42 OR-43
1. Sign layouts for information only, verify existing sign layout and dimensions before fabrication.
Note:
NO SCALE
:5
S e p te m b e r
O
R
E x is ti n g p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln p tc c X c X
.d g n
SIGN PANEL LAYOUTS
OREGON
PROJECT
OR FLAP CRGNSA MULT(2) C.30
Trailhead
Columbia River Gorge
National Scenic Area
95"
12½"
6"
3"
3"
52"2"
6¼"
5"
3½"
Bridge of the Gods
1¼"
6"
4"
5"
Pacific Crest Trail North
1½"
2"
7½"
1½"
48"
24"City of Cascade Locks 2"
4"
Pacific Crest Trail South
Gorge Trail 400
1½"
1½"
2"
2"
Pacific Crest Trail South
1½"
2"
7½"
1½"
48"
24"Gorge Trail 400 2"
4"
Pacific Crest Trail North
City of Cascade Locks
1½"
1½"
2"
2"
OR-45
OR-46
OR-44
1. Sign layouts for information only, verify existing sign layout and dimensions before fabrication.
Note:
NO SCALE
:5
S e p te m b e r
O
R
E x is ti n g p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln p tc c X c X
.d g n
SIGN PANEL LAYOUTS
OREGON
PROJECT
OR FLAP CRGNSA MULT(2) C.31
Fish Hatchery
Oxbow
44"
2"
5"
3"
12½"
37"
5⅜"
3⅜"
2½"
5¼"
Herman Creek Campground
78"
12½"
6"
6" 55"
5"
4"
2"
4"
2½"
Columbia River Gorge National Scenic Area
3" 3"
1½"
8"
Trailhead Historic Columbia River
Highway State Trail
72"
15"
6"
3"
3"
56" 2"
4"
5"
3½"
Wyeth
1"
6"
6"
5"
Wyeth
Columbia River Gorge
National Scenic Area
12½"
6"
3"
3"
55"
4¼"
3"
4½"
2½"
6"
2½"
68"
Campground 6"
4¼"
State Park
Creek Starvation
64"
15"
6"
6"
3"
6¼"
3"
2"
4½"
6¼"
52"
2½"
OR-49OR-48
OR-47
OR-50
OR-51
1. Sign layouts for information only, verify existing sign layout and dimensions before fabrication.
Note:
NO SCALE
:5
S e p te m b e r
O
R
E x is ti n g p w w o rk d ir \j a c o b s -u s -v a -p w -0
\d
\O
R (2 p ln p tc c X
-c X
.d g n
SIGN PANEL LAYOUTS
OREGON
PROJECT
OR FLAP CRGNSA MULT(2) C.32
42"
2½"
55"
Historic Columbia
State Trail
River Highway hole in the wall falls .5 miles wyeth trailhead 4.6 miles viento state park 1 mile starvation creek falls .1 miles
3"
3"
3"
1"
1"
1"
1"
8"
2"
2"
6"
1½"
1½"
1½"
1½" 2½"
2½"
42"
2½"
Historic Columbia
State Trail
River Highway
Waterfall
Picnic Area
3"
3"
3"
8"
2"
2"
5"
1½"
2¼"
2¼"
55"
VIENTO1.0 MILE 2"
3"
1" 2"
2"
OR-52 OR-53
1. Sign layouts for information only, verify existing sign layout and dimensions before fabrication.
Note:
NO SCALE
:5
S e p te m b e r
O
R
E x is ti n g p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln p tc c X c X
.d g n
SIGN PANEL LAYOUTS
OREGON
PROJECT
OR FLAP CRGNSA MULT(2) C.33
Columbia
River
Gorge
National
Scenic
Area
Leaving
National
Scenic
Area
56"56"
6"
6"
6"
6"
6"
6"
6"
6"
88"
7"
3"
3"
3"
9"
3"
3"
3"
6"
6"
6"
6"
6"
6"
6"
7"
7⅝"
7⅞"
7⅞"
7⅞"
7¾"
6"
2½" 2½"
54"
6"
48"
2½"
USDA
Forest Service
Columbia River Gorge
National Scenic Area
15"
5"
2" 2"
2"
2"
3"
4"
3" 4"
Mark O. Hatfield
Historic Columbia River Highway State Trail
74"
54"
5½"
3½"
Senator
West Trailhead
5½"
1½"
2"
2"
2"
2"
5"
5"
5"
12½"
3"
3"
Highway State Park
Mark O. Hatfield Senator
64"
74"
2½"
6¼"
3"
Trailhead
Historic Columbia River 6½"
6½"
3"
3"
2½"
5"
5"
5"
12½"
3"
3"
(See Note 2)
OR-57OR-56
OR-58
OR-59
2. New sign layout, fabricate as detailed.
1. Sign layouts for information only, verify existing sign layout and dimensions before fabrication.
Note:
NO SCALE
Back Front
:5
S e p te m b e r
O
R
E x is ti n g p w w o rk d ir \j a c o b s -u s -v a -p w -0
\d
\O
R (2 p ln p tc c X
-c X
.d g n
SIGN PANEL LAYOUTS
OREGON
PROJECT
OR FLAP CRGNSA MULT(2) C.34
Memaloose Overlook
64"
6"
6"
35"
11½"
2"
9½"
2½"
Rowena Crest
68"
20"
8"
8"
64"
9"
4"
3"
12"
3½"
42"
2½"
60"
TOM McCALL
PRESERVE
5"
5"
12½"
6"
6"
4½"
3"
Discovery Center
112"
3½"
54"
Columbia Gorge
Wasco County
Historical Museum
6"
6"
6"
6"
12"
3"
3"
3"
3"
6"
OR-62
OR-60
OR-61
OR-63
1. Sign layouts for information only, verify existing sign layout and dimensions before fabrication.
Note:
NO SCALE
:5
S e p te m b e r
O
R
E x is ti n g p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln p tc c X c X
.d g n
SIGN PANEL LAYOUTS
OREGON
PROJECT
OR FLAP CRGNSA MULT(2) C.35
Discovery Columbia Gorge
Center And
Museum
12"
12"
12"
12"
12"
3"
3"
3"
3"
8"
6"
142"
3½"
90"
National
Scenic
Area
Leaving Columbia
River
Gorge national scenic area
55½"
3½"
FRONT BACK
3"
3"
3"
3"
3"
3"
6"
6"
6"
10"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
8"
8"
8"
8"
8"
88"
55½"
3½"
OR-64
OR-65
1. Sign layouts for information only, verify existing sign layout and dimensions before fabrication.
Note:
NO SCALE
:5
S e p te m b e r
O
R
E x is ti n g p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln p tc c X c X
.d g n
SIGN PANEL LAYOUTS
OREGON
PROJECT
OR FLAP CRGNSA MULT(2) C.36
:0
A u g u s t p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln
D
.d g n
SAFETY FEATURES
TABULATION OF OREGON
PROJECT
NUMBER
SHEET
WA FLAP CRGNSA MULT(2)
D.1
DETAIL CONVERTED FROM ODOT STD. DRG. RD-402
TYPES
MIDWEST GUARDRAIL SYSTEM
THRIE BEAM GUARDRAIL
necessary to achieve required guardrail height.
Existing posts shall not be raised. Replace posts as material may be used. See ODOT's QPL.
Wood blocks shown. Blocks of an approved alternate galvanized nails in top of block to prevent block rotation.
Wood block shall be toe-nailed to the post with 2-16d all types). 1-inch ± tolerance.
measured from final paved surface at face of rail (Typical
Final paved surfacing to extend to face of post. Rail height
Lap guardrail in direction of adjacent traffic.
as needed.
from the face of the tightened nut; trim the treated portion
-inch2
-inch to 4 permitted to extend beyond limits of nearest the traffic lane. The bolt's threaded portion is not
Orient post bolts with the button head located on the side as face of guardrail.
When required by the plans, drainage curb alignment same details not shown.
See appropriate ODOT guardrail standard drawings(s) for
3.
2.
1.
8.
7.
6.
5.
4.
NORMAL RAIL ELEMENT DATA
TYPE RAIL EFFECTIVE LENGTHS GAUGE
4 TRANSITION
2A
Thrie beam
Thrie beam
W-beam
W-beam
6.25'
6.25', 12.5', 25'
6.25', 12.5', 25'
6.25', 12.5', 25'
10 & 12
10 & 12
10 & 12
10 & 12
GENERAL NOTES:
W-BEAM GUARDRAIL W-BEAM GUARDRAIL ASSEMBLY
TYPICAL INSTALLATIONALTERNATE INSTALLATION
(DOUBLE SIDED W/CHANNEL RAIL)
METAL MEDIAN BARRIERTYPES 2A & 3
(For Type 3 use double thickness (2) rail elements)
(See General Note 3)
TYPE 4 & 4 TRANSITION INITIAL INSTALLATION
(nom.)
8"
(nom.)
8"
"8
7"
" Button head bolt8
5LC
with hex nut & washer (typ.)
" Button head bolt8 on each side of block (typ.)
16d Galv. anti-rotation nail
Thrie beam block
F a c e o f g u a r d r a il rail (typ.)
Thrie beam
(See General Note 2)
(where required)
Drainage curb, Post (wood or steel) hole (typ.)
" dia. thru4
(nom.)
8"
(nom.)
8"
(nom.)
8"
(nom.)
8" to top of post
2" Top of block
"F a c e o f g u a r d r a il
F a c e o f g u a r d r a il
W-beam block
" Button head bolt8
5LC
Channel rail
Post (wood or steel)
F a c e o f g u a r d r a il
Post (wood or steel) with hex nut & washer
" Button head bolt8 on each side of block (typ.)
16d Galv. anti-rotation nail
W-beam block rail (typ.)
W-beam
(See General Note 2)
(where required)
Drainage curb, hole (typ.)
" dia. thru4
:1
S e p te m b e r p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln
D
P
.d g n
PROJECT
NUMBER
D.2
WOOD POST AND BLOCK
MIDWEST GUARDRAIL SYSTEM
DETAIL CONVERTED FROM ODOT STD. DRG. RD-403
2.
1.
GENERAL NOTES:
W-BEAM GUARDRAIL
GUARDRAIL WOOD POST TABLE
W-BEAM
THRIE BEAM
GUARDRAIL TYPE POST SIZE
4 (Transition)
Metal median barrier
2A
8"x8"
6"x8" or 8"x8"
8"x8"
8"x8"
6"x8" or 8"x8"
LENGTH
POST
SPACING
POST
6'-0"
7'-0"
6'-6"
6'-0"
6'-0"
6'-3"
6'-3"
6'-3"
"2 13'-1
"2 13'-1
FRONT SIDE
TOP
TOP
FRONT
SIDE
W-BEAM WOOD BLOCK FOR WOOD POST
6"
3"
S e e p o s t le n g th t a b le
8"
(See General Note 3) hole for guardraill bolt
" dia.16 13" or 4
6"
8"
3"
6"
" 7
8" 6"
6" b lo c k for post attachment through block
" dia. hole4 anti-rotation nail
16d Galv.
hex nut with washer &
" Guardrail bolt8
Post for post attachment through block
" dia. hole4
THRIE BEAM WOOD BLOCK FOR WOOD POSTTHRIE BEAM WOOD POST
TOP
6"
3"
S e e p o s t le n g th t a b le
FRONT SIDE
8" hole for guardraill bolt
" dia.16
" or 4
(See General Note 5)
Block to match post
6"
TOP
FRONT
3"
6" post attachment for through block
" dia. hole4
SIDE
6" 8"
6" for post attachment through block
" dia. hole4 anti-rotation nail
16d Galv.
hex nut with washer &
" Guardrail bolt8
Post b lo c k
W-BEAM ASSEMBLY DETAIL
(6x8 wood post and 6x8 wood block shown)
THRIE BEAM ASSEMBLY DETAIL
NO SCALE
" Guardrail bolt 8 rail element
W-beam anti-rotation nails
16d Galv.
6" 8"
8"
6"
" Recessed nut8 those on terminal sections all posts except
Plain washer, " dia. thru hole4
" Guardrail bolt 8
(See General Note 6)
Thrie beam rail element anti-rotation nails
16d Galv.
8"
8" 6"
6" those on termianl sections all posts except
Plain washer, " Recessed nut8
Post
" dia. thru hole (typ.)4 block rotation.
2-16d galvanized nails in top of block to prevent
Wood block shall be toe-nailed to the post with wood post shall be 8-inch x 8-inch.
When required by the plans, nested thrie beam alternate material may be used. See ODOT's QPL.
Wood blocks shown. Blocks of an approved blocks.
Dimensions shown are for nominal posts and
-inch hole(s) used.16
-inch or 4 is to be installed. Drill 12-inches below top
Lowest hole(s) required only when channel rail drawings(s) for details not shown.
See appropriate ODOT guardrail standard
6.
5.
4.
3.
(See General Note 5)
Block to match post
(6 x 8 wood post and 6 x 8 wood block shown)
(6" x 8" post shown) (6" x 8" wood block shown)
(6" x 8" post shown) (6" x 8" wood block shown)
:3
S e p te m b e r p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln
D
P
.d g n
PROJECT
NUMBER
D.3
(W-BEAM)
DETAIL CONVERTED FROM ODOT STD. DRG. RD-407
3.
2.
1.
GENERAL NOTES:
TYPICAL SECTION
NO SCALE
8.
7.
6.
5.
4.
8"
"4
Paved shldr.
6x8 block (typ.) nail (typ.)
16d galv. anti-rotation
F a c e o f g u a r d r a il rail element
W-beam
(See General Note 2)
(where reqd.)
Drainage curb , (Steel post shown)
Slope break point
Post
NORMAL RAIL ELEMENT DATA
TYPE
LENGTHS
EFFECTIVE
(GALV.)
THICKNESS
2A, 3 6.25' 12.5', 25'10 ga. & 12 ga.
"16
(t y p
(typ.)
" R8
")16
Tol. (-0, +
"16
(t y p ty p
0.105" nom. (Before galv.)
Base metal thkn.
" splice slots (typ.)8 1" x 132 post bolt slots
"2 1" x 24
10°±1°
" rad. (typ.)16
"32
"4
"16
"4
FITTING
Block Post required per splice nut (typ.), eight (8) with recessed hex
" Splice bolt8 rail element
W-beam hex nut (typ.)
washer & recessed
" Post bolt with8
"2
"8
"R64
"R8
SLOT
POST BOLT
SLOT
SPLICE BOLT
removal only.
b. All post bolt threads to be set after assembly for wrench
".2 1" to 4
1 the tightened nuts within limits of
a. When required by the plans, post bolts to extend beyond
NOTE:
SECTION THRU RAIL ELEMENT
"2
3'-16'-3""2
3'-1
12'-6" between splices 12'-6" between splices
12'-6" between splices
6'-3""2
3'-1"2
3'-16'-3"
31" W-beam guardrail splice
Mid span splice
Mid span
TYPICAL ELEVATION
STEEL POST WOOD POST
(W6X8.5 or W6x9) (6x8 or 8x8)
Ground line
"2
13'-6
"4
"4
4 "2
3'-16'-3""2
3'-1
2" (typ.)
about Symmetrical
LC
eight (8) required bolt slot each end
" slice8 1" x 132
TYPICAL W-BEAM RAIL ELEMENT
W-BEAM ASSEMBLY DETAILS
lap at mid-span
Rail splice eight (8) reqd. per splice with recessed hex nut, " Splice bolt8
M id-span
(See Gen. Note 7) wood post
6x8 or 8x8 nex nut & washer
" Recessed8 5 anti-rotation nail
16d Galv.
(See Gen. Note 7) steel post
W6x8.5 or W6x9 anti-rotation nail
16d Galv.
nex nut & washer
" Recessed8
(See Gen. Note 6)
6'x8" block
W-beam rail element recessed hex nut with washer &
" Guardrail bolt8 of tr av el
Di re ct io n post bolt slot (typ.)
"2 1" X 24 pre-curved to Industry standard. Install "Radius Identification Plate".
For guardrail installed on radii of 150' or less (5' min. radius) use rail elements
All posts for guardrail run shall be of the same type: wood or steel.
See ODOT's QPL.
Wood blocks shown. Blocks of an approved alternate material may be used.
Standard Dwg. RD403).
Blocks shall be toe-nailed to prevent rotation when wood posts are used (see paved surface at face of rail to top of rail (typ. all types). 1-inch ± tolerance.
Final paved surfacing to extend to face of post. Rail height measured from final
Lap guardrail in direction of adjacent traffic.
When required by the plans, drainage curb alignment same as face of guardrail.
See appropriate ODOT guardrail standard drawings(s) for details not shown.
:2
S e p te m b e r p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln
D
P
.d g n
PROJECT
NUMBER
D.4
(NUTS, BOLTS, WASHERS AND MISC.)
STANDARD HARDWARE
MIDWEST GUARDRAIL SYSTEM
DETAIL CONVERTED FROM ODOT STD. DRG. RD-416
NO SCALE
3.
2.
1.
GENERAL NOTES:
4.
SUPPLEMENTARY NOTES:
bonding system.
decks. Cast in place or core and install using approved resin
6-inch (min.) penetration into concrete slabs other than bridge structure plans.
Furnished & installed by structure contractor when shown on on Type C End Piece as shown.
Use rectangular Snow Load Tail washer under bolt head nut
Not required if Snow Load Post washer option is used.
d c b a
HHfH
HHfH f
"4
"16 hex nut mod. heavy
" - 118 recess one or both sides
" deep16 11" x
" DIA. RECESSED HEX NUT8
2"
4"
" dia. hole16 11 " Steel plate4
POST WASHER
SNOW LOAD
RAIL WASHER
SNOW LOAD
1"
3"
" Steel plate16 3 Slotted hole
(min.)
"2
"16
"8
Steel plate
PLAIN WASHER
(Use on back of post)
(See General Note 5) as directed by the CO
Use in area of heavy snow,
(L) (IN.)
LENGTH
(T) (IN.)
THREAD LENGTH
(min.)8
(min.)4
4 (min.)
4 (min.)
4 (min.)
BOLT DIMENSION TABLE
(t yp
"16
"32
T
L
"16
ALTERNATIVE NO.1
ALTERNATIVE NO.2
(BUTTON HEADED)
" GUARDRAIL POST/SPLICE BOLT 8
L
T
"16
"8
1"
"4
15""4
10" base plate
"8 510"x6"x place as shown slotted holes, "2 14-1"x1
W6x9 steel post
"8
PLAN
ELEVATION
BASE PLATE DETAILS
than normal for post installation)
(Use when depth of cover is less
(For additional details, see Std. Dwg. BR266) ab c d
Height as required to be vertical.
W6x9 steel post base plate
"8 510"x6"x resin bonded anchor
" bolt, or4 box culvert, etc.
Concrete top of washer (4 reqd.)
Leveling nut & grouted pad
" (min.)2 plate (See detail)
Radius identification rail element
W-beam
Splice bolt slot rail element
W-beam Splice bolt slot
RADIUS IDENTIFICATION PLATE MOUNTING DETAIL
plate (See detail)
Radius identification
RADIUS IDENTIFICATION PLATE
(See General Note 3)
7"
"4
"8
1"8
12.5"
" Steel plate4
" dia. hole4
" DIA. CARRIAGE BOLT8
"16
"32
"8
"16
T
L
(See General Note 4) install Snow Load Rail Washers on terminals.
and a Slow Load Rail Washer on rail element face. Do not
Use a Snow Load Post Wasther on backside of the post nearest the P.C. of the guardrail radius.
the back side of the rail element with the lowest splice bolt
The guardrail radius identification plate is to be mounted on width. Plate shall be galvanized after placement of digits.
-inch (max.)4
-inch (min.) height and 2
Digits shall be 1 letters "HHH", shown on the Radius Identification Plate detail.
placed on the plate with a raised weld bead replacing the
Radius dimensions, in feet to the nearest 0.5-foot, shall be welded.
All indicated welds shall attain the full strength of the section details not shown.
See appropriate ODOT guardrail standard drawings(s) for
(Traffic side)
5.
:2
S e p te m b e r p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln
D
P
.d g n
PROJECT
NUMBER
D.5
END SECTIONS
DETAIL CONVERTED FROM ODOT STD. DRG. RD-417
NO SCALE
GENERAL NOTES:
details not shown.
See appropriate ODOT guardrail standard drawings(s) for 1.
25.5° b b
10 ga. galv.
PLAN
3" "2
3"
Neutral axis a Use rectangular washer under bolt head and nut on Type C End Piece as shown.
3"
"4
4 "4
2"
4" 4"
2'-6"
3 "
LC Beam element slot (optional) post bolt
"2 1"x24
1" dia. holes (typ.)
" dia. holes4
ELEVATION
W-BEAM TERMINAL CONNECTOR
25.5° b
3 3"
PLAN
3" "2
2'-6"
"4
7 4"4" 2"
" Holes4
ELEVATION
THRIE BEAM TERMINAL CONNECTOR
ELEVATION
THRIE BEAM TYPE C END PIECE
"4
2" "2
" slots (typ.)8 1"x132
29 12 ga. galv. plate
ALTERNATE 1 ALTERNATE 2
2" "2
" slot (typ.)8 1"x132
2" "2
"R a a a a
R
R
R
Rail element "4
1218" in rail member
Splice bolt slot
PLAN
ALTERNATE 1 ALTERNATE 2
ELEVATION
W-BEAM TYPE C END PIECE
(For details not shown, see Type B End Piece)
PLAN
SECTION B-B
PLAN
ELEVATION
THRIE BEAM TYPE B END PIECE
"2
82"
25" (min.)
slot (typ.)
"8 1"x132
29slot (typ.)
"8 1"x132
B
B
A
A
LC
S y m m e tr ic a l a b o u t
S y m m e tr ic a l a b o u t
LC
Metal thkn.
12 ga. galv.
6" R slot (typ.)
"8 1"x132
"2
82"
30° "2
SECTION A-A ELEVATION
W-BEAM TYPE B END PIECE
PLAN
"2
Metal thkn.
12 ga. galv.
2" "2 a p p r o x
30°
"2
82" splice bolt slot (typ.)
"8 1"x132
3" (min.)
24"± 1"
" R4 as required Trim post connector (see detail) Terminal
(see detail) connector terminal
Thrie beam end piece.
for use with alternate Type "C"
25.5" bend and hole reqd. only splice bolt slots (typ.)
"8 1" x 132
:3
S e p te m b e r p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln
D
P
.d g n
PROJECT
NUMBER
D.6
GRADING FOR TERMINALS
DETAIL CONVERTED FROM ODOT STD. DRG. RD-419
GENERAL NOTES:
maximum grade break at normal edge of shoulder 8%.
maximum shoulder slope 10% for guardrail widening. If required, Cross slope to match adjacent roadway cross slope (preferred). If required, ensuring that the end piece is entirely off normal shoulder.
Guardrail Non-flared terminal shall be installed with a (min.) 1-foot offset
See project plans for details not shown. E=2' or as shown on project plans.
See appropriate ODOT guardrail standard drawing(s) for details not shown.
appropriate test level for the project.
manufacturer's recommendations. Ensure that guardrail terminal meets
Install a guardrail terminal system that meets MASH reauirements per
Use details shown as a general guide since manufacturer's details may vary.
1:4 slope or flatter preferable, 1:3 (max.).
Length of need post location varies by manufacturer.
"W" distance is measured to face of guardrail at end post, exclusive of end piece.
according to manufacturer's recommendations.
Install a reflectorized object marker on head of every guardrail terminal with "W" 4-feet or less
(post count varies).Provide shop drawings to the CO.
Provide guardrail terminal from ODOT's QPL. Install according to manufacturer's recommendations runs is required.
flared or non-flared. Paving of widened shoulder to the face of posts on both ends of guardrail
On two way two lane highways, both ends of guardrail runs shall be provided with a terminal
4.
3.
2.
1.
10.
9.
8.
7.
6.
5.
ALTERNATIVE GRADING
PREFERRED GRADING
SECTION A-A
SECTION B-B
E w id e n in g
B e g in g r a d e
A
A
B
B to match face of post
Edge of pavement
Top of shoulder rock
Top o f shou lder ro ck
Top of shoulder rock
10:1 taper
Edge of pavement
10:1 taper
Normal edge of paved shoulder
Adjacent traffic flow
'3'
W
E
Cross slope
10' m in m in
Guardrail length of need n e e d p o in t
L e n g th o f
Guardrail terminal length - Varies
A
A w id e n in g
B e g in g r a d e
B
Cross slope
B
3'
W
E
Top o f sho ulder rock
Top of shoulder rock
10:1 taper
Top of shoulder rock
Edge of pavement10:1 taper Normal edge of paved shoulder
Guardrail length of need
Guardrail terminal length - Varies to match face of post
Edge of pavement
10'7' m in
E
Adjacent traffic flow
PLAN
* See Note 6 and 9 ELEVATION
12'-6""2
3'-1 n e e d p o in t
L e n g th o f
Guardrail length of need
Pay limit on finish grade
Ground strut
4" (max.)
See Note 7
Finish Grade
Finish grade
(where required)
Drainage curb to match face of post
Edge of pavement
(See Note 10)
1:3 (max.)
Variable Slope
(2% norm.)
Sl. var.
o f p a v e d s h ld r
N o r m a l e d g e
F a c e o f r a il s h ld r r o c k
T o p o f s h ld r r o c k
T o e o f varies
Shoulder width E 2' Varies
(min.)
Depth varies
(where required)
Drainage curb to match face of post
Edge of pavement
(See Note 10)
1:3 (max.)
Slope varies s h ld r r o c k
T o p o f s h ld r r o c k
T o e o f
Finish grade
(2% norm.)
Sl. var.
o f p a v e d s h ld r
N o r m a l e d g e
Depth varies
Shoulder width E W Widened grading Varies varies (see Note 8) guardrail terminal
B
B
Guardrail terminal - Pay limitGuardrail
A
A to F in is h e d
G r a d e
"Guardrail terminal length - Varies
:3
S e p te m b e r
.7 p w w o r k d ir
\j a c o b s u s v a p w
\d
\O
R p ln
D
P
.d g n
PROJECT
NUMBER
D.7
TERMINAL
NON-FLARED ENERGY-ABSORBING
MIDWEST GUARDRAIL SYSTEM
DETAIL CONVERTED FROM ODOT STD. DRG. RD-420
NO SCALE
NOTE:
(see project plans)
Depth varies
(Slope varies, 2% normal)
Finish grade
E d g e o f s u b g r a d e
(see project plans)
Shoulder width varies o f s h ld r
N o r m a l e d g e
F a c e o f r a il
(Slope varies, 2% normal)
Finish grade
(see project plans)
Shoulder width varies Face of rail
E d g e o f s u b g r a d e
1:3 max. (See Note 4)
SECTION A-A
SECTION B-B
plans)
(see project face of posts shldr. to match
Edge of paved
(where reqd.)
Drainage curb
VariesE
1:3 max. (See Note 4)
(see project plans)
Depth varies
(where reqd.)
Drainage curb face of posts shldr. to match
Edge of paved
Cross slope
(See Note 9)
W
(see tables)
E
*** See Note 3
TEST LEVEL L (ft) W (ft) posts at terminal ends only, as shown.
guardrail. Modify alignment to match face of
2. Drainage curb alignment same as face of
1. E=2', where shown on plans.
NOTE:
(min.)
2'
9.
8.
7.
6.
5.
4.
3.
2.
1.
Variesguardrail teminals
See grading for grading
Edge of widened
1 to 23 (> 45 mph)
1 (≤ 30 mph)
2 (≤ 45 mph)
"2 125'-9 1 ***
"2 138'-3
"2 150'-9
1 ***
Cross slope paved shldr.
Edge of
A to match face of posts Edge of paved shldr.
W
E
B
B
Normal edge of paved shldr.MSKT End Terminal (Shown)
PLAN
ELEVATION
MSKT END TERMINAL
Terminal pay limit n e e d p o in t L e n g th o f
50'
(See project plans) Guardrail type & length
Guardrail pay limit
Ground strut on finish grade
ELEVATION
SOFTSTOP END TERMINAL
Finish grade
Ground strut on finish grade n e e d p o in t L e n g th o f
(See project plans) Guardrail type & length
Guardrail pay limit Terminal pay limit
X (TL-3)
X (TL-2)
X (TL-1)
to normal edge of paved shldr.
Extend 10:1 taper
Finish grade
A
See Note 3
See Note 9
4" (max.)
4" (max.)
See project plans for details not shown.
If required, maximum grade break at normal edge of shoulder 8%.
If required, maximum shoulder slope 10% for guardrail widening.
Cross slope to match adjacent roadway cross slope (preferred).
exclusive of end piece.
"W" distance is measured to face of guardrail at end post, 4-feet or less.
Install fixed object marker on head of every terminal with "W" shop drawings for CO review and approval.
manufacturer's recommendations (post count varies). Provide Provide terminal from ODOT's QPL. Install according to
1:4 slope or flatter preferable, 1:3 (max.)
ensuring that the end piece is entirely off normal shldr.
Non-flared terminal shall be installed with a (min.) 1-foot offset is required.
widened shldr. to the face of posts on both ends of guardrail runs shall be provided with a terminal flared or non-flared.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .