ora-umatill582-1_Pavement Evaluation.pdf
PDF 3 MB Posted
- Attached to
- OR FLAP UMATILL 582(1), Mill Creek Road
- Solicitation number
- 69056724B000019
About this file
This document is a pavement evaluation report for Mill Creek Road in Umatilla County, Oregon, which is part of a Federal Lands Access Program (FLAP) application submitted by Umatilla County in 2016. The report provides an analysis of the existing pavement conditions, including subsurface explorations, falling weight deflectometer (FWD) testing, and pavement design recommendations. The key recommendations include:
- Recondition the existing 12 inches of aggregate base (AB) and add 4 inches of new AB for areas with sufficient existing aggregate. For areas with less than 12 inches of existing aggregate, install 16 inches of new AB over a nonwoven geotextile.
- Apply a double course chip seal surface treatment over the AB.
- Install 12 inches of AB for vehicle pullouts, also over a nonwoven geotextile.
The report estimates a 20-year traffic loading of 28,200 Equivalent Single-Axle Loads (ESALs) for the main roadway and 2,820 ESALs for the pullouts. The recommended pavement design is based on a 20-year design life and 50% reliability level. The report also provides guidance on construction considerations and materials specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Tab_OR FLAP UMATILL 582(1).pdf | ||
| BidSum_OR FLAP UMATILL 582(1).pdf | ||
| QA_11-07-2024.pdf | ||
| QA_11-12-2024.pdf | ||
| Amendment A001.pdf | ||
| ora-umatill582-1_Final_Revised Geotechnical Report.pdf | ||
| ora-umatill582-1_XS.pdf | ||
| Physical Data.zip | ZIP file | |
| ora-umatill582-1_proposed-alignments.pdf | ||
| ora-umatill582-1_Earthwork.pdf | ||
| ora-umatill582-1_plans.pdf | ||
| ora-umatill582-1_control-points.xlsx | XLSX spreadsheet | |
| IFB_69056724B000019_OR FLAP UMATILL 582(1).pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GR1223
Pavement Evaluation
OR UMATIL 582(1),
Mill Creek Road Umatilla County, Oregon
September 30, 2020
Prepared for
Daniel Iliyn, PE David Evans and Associates, Inc.
2100 SW River Parkway Portland, OR 97201
Prepared by
9750 SW Nimbus Avenue Beaverton, OR 97008-7172
(503) 641-3478 | www.gri.com
GRI PN #6307-A – Mill Creek Road Pavement Design September 30, 2020
TABLE OF CONTENTS
1 INTRODUCTION
2 PROJECT DESCRIPTION
3 SITE DESCRIPTION
3.1 Site Conditions
4 SUBSURFACE CONDITIONS
4.1 General
4.2 Subsurface Explorations
4.3 Groundwater
4.4 FWD Testing
5 ANALYSIS AND RECOMMENDATIONS
5.2 Pavement Design Documentation
6 RECOMMENDATIONS FOR MATERIALS AND CONSTRUCTION
6.1 Standard Specifications
6.2 Construction Considerations
7 DESIGN REVIEW AND CONSTRUCTION SERVICES
8 LIMITATIONS
9 REFERENCES
TABLES
Table 5-1: 2016 FLAP Application Traffic Information Table 5-3: AASHTO Design Parameters Table 6-1: Recommended Material Specifications
APPENDICES
Appendix A: Field Explorations and Laboratory Testing Appendix B: Pavement Design Calculations
FIGURES
Figure 1: Vicinity Map Figure 2: Site Plan
GRI PN #6307-A – Mill Creek Road Pavement Design Page 1
1 INTRODUCTION
As subconsultant to David Evans and Associates, Inc. (DEA), GRI completed a pavement evaluation for OR UMATIL 582 (1), Mill Creek Road in Umatilla County, Oregon. A vicinity map of the project area is included as Figure 1. This evaluation project is a part of a 2016 Federal Lands Access Program (FLAP) application submitted by Umatilla County. This work follows-up on to the December 2019 report titled “Mill Creek Road Final Scoping Design Report” and prepared by DEA.
2 PROJECT DESCRIPTION
The Mill Creek Road is located approximately 13 miles southeast of Walla Walla, Washington, in Umatilla County, Oregon, and the project limits are from the Oregon- Washington state line to Tiger Creek Road (Forest Road 65). Mill Creek Road is a 2.82-mile-long, aggregate-surfaced, two-lane, two-way, minor collector. The roadway has variable widths and, in a few locations, only one vehicle can pass at a time. Mill Creek Road serves as the primary access to the Umatilla National Forest, the Wenaha-Tucannon Wilderness Area, Jubilee Lake, and private homes.
We understand Umatilla County (County) would like to upgrade the road to a solid surface in order to reduce the amount of maintenance, including dust abetment, grading, and addition of extra surfacing aggregate. Additionally, the County would like to add vehicle pullouts in narrow areas. During the previous scoping design project referenced above, three potential alternatives were identified, including 1) asphalt concrete (AC) over aggregate base (AB), 2) double course chip seal over AB, and 3) double course chip seal over cement-treated AB.
After discussions with the project team, the preferred design option was identified as a double course chip seal over AB. This report summarizes our findings and pavement-design recommendations.
3 SITE DESCRIPTION
3.1 Site Conditions
The roadway section is located on sloping topography adjacent to Mill Creek, and portions of the road appear to have been constructed with a cut into the uphill side of the alignment. Materials observed in the cut slopes typically consist of soils and colluvial materials derived from basalt from the Gwin-Rock Complex.
To assist us in characterizing the subgrade conditions at the site, we reviewed the U.S.
Department of Agriculture (USDA) Web Soil Survey Map (Version 14, September 17, 2018) to compare the near-surface soils shown on the USDA map with our field reconnaissance observations. Based on the USDA map, the near-surface soils generally consist of the Mugwump-Mellow-Bullroar Complex and Gwin-Rock Complex. In a typical profile, the
GRI PN #6307-A – Mill Creek Road Pavement Design Page 2 upper subgrades of these soil series are very gravelly or cobbly sandy silt or clay. Our site investigation discussed herein generally agrees with the mapped USDA soil units on Mill Creek Road.
Since our initial site visit in 2019, flooding occurred in February 2020 that severely damaged the road. We understand the County repaired the roadway by regrading damaged areas and replacing the gravel base and/or surfacing.
4 SUBSURFACE CONDITIONS
4.1 General
We completed falling weight deflectometer (FWD) deflection testing and subsurface explorations along the existing roadway alignment within the project limits during June 2020. Additional information about the explorations and FWD testing is provided below and in Appendices A and B, respectively.
4.2 Subsurface Explorations
The subsurface materials and conditions at the site were investigated on June 23, 2020, with six borings designated B-1 through B-6. For the purpose of discussion, the materials disclosed by the drilled explorations have been grouped into the following units based on their physical characteristics and engineering properties and listed as they were encountered below the aforementioned pavement section:
a. Silty, Sandy GRAVEL
b. Silty CLAY
The following paragraphs provide a detailed description of the materials encountered and a discussion of the groundwater conditions at the site.
a. Silty, Sandy GRAVEL At all six exploration locations, we encountered silty, sandy gravel that ranges from angular to rounded. The shallow explorations extended to 36 inches below ground surface (BGS), and gravel was observed to this depth except at boring B-4, where the gravel terminates at 13 inches BGS. We also encountered cobbles at all locations except borings B-2 and B- 5.
b. Silty CLAY We observed subgrade material at boring B-4, where the gravel is underlain by clay starting at a depth of 13 inches BGS. The clay is silty, red-brown, and medium stiff.
4.3 Groundwater
Groundwater was not encountered in our subsurface explorations. We anticipate the groundwater levels will fluctuate in response to seasonal variation of the nearby Mill Creek.
GRI PN #6307-A – Mill Creek Road Pavement Design Page 3
4.4 FWD Testing
GRI conducted nondestructive FWD deflection testing using our KUAB 2m Model 150 FWD, which complies with ASTM International (ASTM) D4694. Testing was completed between the project limits on June 22, 2020, at approximately 200-foot intervals within the outer wheelpath in both directions. The FWD testing was performed to estimate the in-situ modulus of the subgrade from backcalculation analysis. The pavement surface deflections in mil units (1 mil = 0.001 inch) were normalized to a 9,000-pound (9-kip) FWD load. The deflection results are shown in Table 1B and plotted by location on Figure 1B of Appendix B.
5 ANALYSIS AND RECOMMENDATIONS
5.2 Pavement Design Documentation
5.2.1 General
The pavement-design analysis was accomplished in general accordance with the 1993 American Association of State Highway and Transportation Officials (AASHTO) Guide for Design of Pavement Structures (AASHTO Guide).
The analysis was conducted in order to estimate the structural requirements based on the existing gravel road structural capacity, subgrade support conditions, and estimated traffic loading.
5.2.2 Backcalculation Analysis
We analyzed the FWD deflection data to backcalculate the equivalent elastic moduli of the subgrade soils at each FWD test location. Backcalculation analysis was accomplished using the PAVBACK backcalculation analysis program, which is an iterative, elastic layered analysis procedure. Deflections are calculated using the Boussinesq-Odemark equivalent-thickness procedure (Ullidtz, 1998). PAVBACK solutions were validated by comparing calculated and measured values of the subgrade compressive strain/stress using data from tests on instrumented pavement (test data published in Ullidtz, 2000), where the calculated values were based on the moduli backcalculated by PAVBACK from the deflections measured on the instrumented pavement. The backcalculation results are summarized in Table 1B of Appendix B.
5.2.3 Design Subgrade Resilient Modulus
We developed a design modulus from the backcalculated subgrade moduli, which represents the minimum from either the average or the 2.3-percentile value divided by
0.70. This procedure follows the statistical-reliability assumptions in the AASHTO Guide design procedure, which is based on using the average subgrade modulus as the design value provided the coefficient of variation (CoV) does not exceed 15%. Based on these results, we used a design modulus of 5,400 pounds per square inch (psi).
GRI PN #6307-A – Mill Creek Road Pavement Design Page 4
5.2.4 Traffic-Loading Analysis
The traffic-loading estimate for Mill Creek Road is based on the 20-year average daily traffic (ADT) provided by Umatilla County in the 2016 FLAP application. The County provided the ADT data summarized in Table 5-1.
Table 5-1: 2016 FLAP APPLICATION TRAFFIC INFORMATION
Location 20-Year Traffic Projections North End of Project
ADT
Percent Trucks
2% South End of Project
ADT
Percent Trucks
1%
For our analysis, we used the critical traffic loading, which is the data listed for the north end of the project in Table 5-1. Additionally, based on a conversation with the County, we understand the typical truck traffic comprises primarily delivery or garbage trucks, occasional construction trucks, and historically trucks associated with logging operations.
In order to estimate the cumulative 18-kip Equivalent Single-Axle Load (ESAL) repetitions (traffic loading) for a 20-year design period, we used the inputs and assumptions shown in Table 2B of Appendix B. The 20-year traffic-loading estimate for Mill Creek Road is 28,200 ESALs. We also estimated the ESAL loading for the pullouts along Mill Creek Road at not more than 10% of the total traffic, or 2,820 ESALs.
5.2.5 Pavement Design Analysis
For roadways surfaced with chip seals, the chip seal layer provides very little to no structural value; therefore, our analysis was based on the aggregate thickness required to support the traffic loading. We used a maximum rutting threshold in our design evaluation of 2 inches, which we assume is a practical maximum for a low-volume, low-speed, chip seal-surfaced road. The pavement design analysis was accomplished in general accordance with the AASHTO Guide design for low-volume roads using the parameters shown below.
Table 5-3: AASHTO DESIGN PARAMETERS
Parameter Design Value
Design Period 20 years Traffic Loading, ESALs
Mill Creek Road Pullouts
28,200
2,820
Design Reliability Level 50%
Initial Serviceability 4.2
Terminal Serviceability 2.0
GRI PN #6307-A – Mill Creek Road Pavement Design Page 5
Parameter Design Value
Standard Deviation 0.5
Subgrade Modulus 5,400 psi
Aggregate Base Resilient Modulus 20,000 psi
As discussed above, we observed 13 inches to 36 inches of aggregate above the subgrade within the project limits along Mill Creek Road, with five of the six explorations containing at least 36 inches of gravel. Our analysis indicates Mill Creek Road requires 16 inches of AB to support a 20-year traffic loading as shown on Figure 2B. Therefore, we recommend reconditioning the existing aggregate to a depth of 12 inches and add 4 inches of new AB for grading and shaping the roadway. In areas where there is not enough existing aggregate or aggregate reconditioning is not feasible, 16 inches of new AB should be placed over a nonwoven geotextile. We estimate these conditions will cover less than 10% of the alignment along Mill Creek Road. Areas requiring a thicker aggregate section can be identified by performing potholing approximately every 250 feet.
5.3 Pavement Design Recommendations
5.3.1 Pavement-Design Section Recommendations
The pavement-design recommendations for the 20-year design period are given below.
Roadway (existing gravel surfacing greater than 12 inches) Type 2B Double Course Chip Seal Prime Coat 4-inch-thick, ¾-inch, Dense-Graded AB 12-inch Aggregate Reconditioning
Roadway (existing gravel surfacing less than 12 inches)
Type 2B Double Course Chip Seal Prime Coat 16-inch-thick, ¾-inch, Dense-Graded AB Nonwoven Geotextile Fabric
Pullouts
Optional: Type 2B Double Course Chip Seal 12-inch-thick, ¾-inch, Dense-Graded AB Nonwoven Geotextile Fabric
6 RECOMMENDATIONS FOR MATERIALS AND CONSTRUCTION
6.1 Standard Specifications
Construction materials and procedures should comply with the applicable sections of Federal Highway Administration (FHWA) FP-14, Standard Specifications for Construction of
GRI PN #6307-A – Mill Creek Road Pavement Design Page 6
Road and Bridges on Federal Highway Projects, with the modifications or supplements given below.
Table 6-1: RECOMMENDED MATERIAL SPECIFICATIONS
Materials/Activity FHWA FP-14 Specification Comments
Subgrade Geosynthetics Section 207 Provide a Class 1 Type B nonwoven geotextile according to Table 714-1.
Subgrade Stabilization Section 301 Provide subbase aggregate that meets Grading Designation A according to Table 703-2.
Aggregate Base Section 302 Provide surface course aggregate that meets Grading Designation D or E according to Table 703-2 and Section 703.05(c) requirements.
Aggregate Base Reconditioning Section 303
Compaction should follow Method 2 of Section
302.05. See additional recommendations below.
Chip Seal Section 407 Place a Type 2B double course chip seal.
Use a high float emulsion.
Prime Coat Section 411 Method 1.
6.2 Construction Considerations
The pavement sections provided above assume pavement construction will be accomplished during warm, dry conditions and all workmanship and materials will conform to the applicable specifications. During periods of wet weather or when wet-ground conditions exist, it may be necessary to increase the thickness of the AB in order to support construction equipment and protect the potentially moisture-sensitive subgrade soils from disturbance.
6.2.1 Aggregate Reconditioning
The ability to successfully recondition the existing aggregate will depend on moisture conditions of the aggregate and subgrade soil. The contractor will face significant challenges in achieving adequate density of the existing aggregate material if reconditioning is attempted when wet-ground conditions exist. Our recommendations for aggregate reconditioning assume construction operations will be performed following an extended period of dry weather and during warm, dry weather conditions. Bearing this in mind, reconditioning of the existing aggregate material should be conducted in accordance with FHWA FP-14 Section 303, taking into account the following considerations and requirements:
The moisture content of the existing aggregate material at time of compaction should not exceed the optimum moisture content of the material as determined by AASHTO T 99, Standard Method of Test for Moisture-Density Relations of Soils. Accordingly, GRI PN #6307-A – Mill Creek Road Pavement Design Page 7 scarification and aeration may be necessary to reduce the moisture content if the aggregate material is wet of optimum moisture content at the time of construction. If scarification and aeration are necessary, scarification should not exceed a depth of 12 inches.
Compaction of the aggregate material should be accomplished using a smooth-wheeled roller weighing between 10 tons to 15 tons. The AB material should be compacted by a sufficient number of coverages of the roller to achieve the level of compaction identified below. Since fine-grained, moisture-sensitive soils were observed in our field explorations, vibratory compaction should not be permitted.
Areas that exhibit deflections or pumping during compaction should be overexcavated to competent soil and backfilled with compacted aggregate as described in FHWA FP- 14 Section 303.
Compact the aggregate material in accordance with FHWA FP-14 Section 303 to 95% of maximum dry density as determined by AASHTO T 180 Method D.
Proof roll the compacted aggregate material with a loaded dump truck prior to placing the prime coat. The proof roll should be observed by an experienced geotechnical engineer. Areas exhibiting deflections or pumping during the proof roll should be overexcavated to competent soil and backfilled with compacted aggregate as described in FHWA FP-14 Section 303.
Do not allow traffic on the compacted aggregate material except as necessary for placing the new AB, prime coat, and chip seal.
6.2.2 Aggregate Base
After placing the final 4-inch lift of new AB, traffic should not be permitted before the chip seal construction is complete.
6.2.3 Maintenance Considerations
We designed the pavement structure with a 20-year traffic loading, but routine maintenance will be necessary to correct potential areas of localized distress or to repair surface defects. Typically, a new chip-seal application will be necessary every five years to seven years. We also recommend the County apply a second double course chip seal within the first three years following construction.
7 DESIGN REVIEW AND CONSTRUCTION SERVICES
We welcome the opportunity to review and discuss construction plans and specifications for this project as they are being developed. In addition, GRI should be retained to review all geotechnical-related portions of the plans and specifications to evaluate whether they
GRI PN #6307-A – Mill Creek Road Pavement Design Page 8 are in conformance with the recommendations provided in our report and to observe compliance with the intent of our recommendations, the design concepts, and the plans and specifications. Our construction-phase services will allow for timely design changes if site conditions are encountered that are different from those described in our report. If we do not have the opportunity to confirm our interpretations, assumptions, and analyses during construction, we cannot be responsible for the application of our recommendations to subsurface conditions different from those described in this report.
8 LIMITATIONS
This report has been prepared to aid the project team in the design of this project. The scope is limited to the specific project and location described herein, and our description of the project represents our understanding of the significant aspects of the project relevant to design and construction on Mill Creek Road. In the event that any changes in the design and location of the project elements as outlined in this report are planned, we should be given the opportunity to review the changes and modify or reaffirm the conclusions and recommendations of this report in writing.
The conclusions and recommendations in this report are based on the data obtained from the subsurface explorations at the locations shown on Figure 2 and other sources of information discussed in this report. In the performance of subsurface investigations, specific information is obtained at specific locations at specific times. However, it is acknowledged that variations in subsurface conditions may exist between exploration locations. This report does not reflect variations that may occur between these explorations. The nature and extent of variation may not become evident until construction. If, during construction, subsurface conditions differ from those encountered in the explorations, we should be advised at once so we can observe and review these conditions and reconsider our recommendations where necessary.
Submitted for GRI, Lindsi Hammond, PE
Principal This document has been submitted electronically.
GRI PN #6307-A – Mill Creek Road Pavement Design Page 9
9 REFERENCES
ASTM International, ASTM STP 1375, Third Volume, Tayabji, D., and Lukanen, E.O., Eds., pp.
14-22.
Soil Survey Staff, 2020, Natural Resources Conservation Service, United States Department of Agriculture, Web soil survey, available online at http://websoilsurvey.nrcs.usda.gov/, accessed 07/10/20.
Ullidtz, P., 1998, Modeling flexible pavement response and performance, Polyteknisk Forlag.
Ullidtz, P., 2000, Will nonlinear backcalculation help? Nondestructive testing of pavements and backcalculation of moduli: American
--- E Highwa� f �
Tou Cher Valley L-----------------------7
ITm
ITm
Whitman
College Place
C ,-.._ '-I'<> \ \ d
Coppei 1603 ft
� Harbert Kibler ti "'''"' ----------lfJa\\'3 -------------------------- -
I/ Cobb\ PROJECT LOCATION --
MILL CREEK ROAD ine Ridge
Milton-Freewater
Downing
Weston
Lincton Mountain
Couse creek
Basket Mountain
West0n Mountain
Reed and Hawley Mountain
Wildhorse
Reservation Mountain
Gibbon
Mountain er, C
0-
AERIAL TOPOGRAPHY OBTAINED FROM ESRI - ACCESSED JULY 21, 2020
LEGEND
- PROJECT LOCATION
\ e, '<;;is
Q., q:
Varna
__,t:1/
Five Points
Tollgate r- - - -
I I I
I I I
North Fork Urn,atilla R,·
7Ver
I
I
Long
�orseshoe -1,,-. 1 Prairie
,,-� I ,:o I r - - - - - -�- - J I ro
Dusty Ridge
.. 5308 ft
Ro M
0 5 10 MILES
G R I
DAVID EVANS AND ASSOCIATES, INC.
OR UMATIL 582(1), MILL CREEK ROAD
PAVEMENT EVALUATION
VICINITY MAP
SEP. 2020 JOB NO. 6307-A FIG. 1
BEGINNING OF PROJEC
PAVEMf Nr €: HAN GE
- 80RDER
AERIAL IMAGERY OBTAINED FROM OREGON STATEWIDE IMAGERY PROGRAM (OSIP) - ACCESSED JULY 20, 2020
LEGEND
- Northbound FWD Test Line
- Southbound FWD Test Line
Northbound Boring Locations
Southbound Boring Locations
0 2,000 4,000 F T
[11110
DAVID EVANS AND ASSOCIATES, INC.
OR UMATIL 582(1), MILL CREEK ROAD
PAVEMENT EVALUATION
SITE PLAN
SEP. 2020 JOB NO. 6307-A
FIG. 1
APPENDIX A
Field Explorations and Laboratory Testing
GRI PN #6307-A – Mill Creek Road Pavement Design Page A-1
APPENDIX A
FIELD EXPLORATIONS AND LABORATORY TESTING
A.1 FIELD EXPLORATIONS
A.1.1 General
Subsurface conditions and materials for the roadway improvements on Mill Creek Road were investigated by GRI on June 23, 2020, with six shallow borings designated B-1 through B-6. The locations of the explorations are shown on Figure 2. The field exploration and laboratory programs completed for this project are described below.
A.1.2 Machine-Drilled Borings The borings were advanced to a depth of about 3 feet at the locations shown on Figure 2.
The borings were drilled using solid-stem auger drilling techniques with a Dandy Digger 25-30T rig provided and operated by Custom Hole Drilling, Inc., of Molalla, Oregon. The field-exploration work was coordinated and documented by a member of GRI’s engineering staff, who maintained a detailed log of the materials and conditions disclosed during the course of the work.
Disturbed samples were obtained, the soil samples were carefully examined in the field, and representative portions were saved in sample bags for further examination and physical testing in our laboratory.
Logs of the borings are provided on Figures 1A through 3A. Each log presents a descriptive summary of the various types of materials encountered and notes the depths where the materials and/or characteristics of the materials change. To the right of the descriptive summary, the numbers and types of samples taken during the drilling operation are indicated. Farther to the right are the natural moisture contents (as measured in our laboratory). The terms and symbols used to describe the materials encountered are defined in Table 1A and the attached legend.
A.2 LABORATORY TESTING
A.2.1 General
All samples obtained from the field exploration program were brought to our laboratory for examination and testing, where the physical characteristics were noted and the field classifications modified where necessary. The laboratory-testing program included determinations of natural moisture contents and performing Atterberg limits on subgrade soil samples.
GRI PN #6307-A – Mill Creek Road Pavement Design Page A-2
A.2.2 Natural Moisture Content Natural moisture content determinations were made in conformance with ASTM International D2216. The results are summarized in Table 2A and shown on Figures 1A through 3A.
A.2.2 Atterberg Limits Atterberg-limits testing was performed on one subgrade soil sample in conformance with ASTM International D4318. The test result is summarized on the Plasticity Chart, Figure 4A, Figure 2A, and in Table 2A.
Table 1A
GUIDELINES FOR CLASSIFICATION OF SOIL
Description of Relative Density for Granular Soil
Relative Density Standard Penetration Resistance (N-values) blows/foot
Very Loose 0 - 4
Loose 4 - 10
Medium Dense 10 - 30
Dense 30 - 50
Very Dense over 50
Description of Consistency for Fine-Grained (Cohesive) Soils
Consistency
Standard Penetration Resistance (N-values) blows/foot
Torvane or Undrained Shear
Strength, tsf
Very Soft 0 - 2 less than 0.125
Soft 2 - 4 0.125 - 0.25
Medium Stiff 4 - 8 0.25 - 0.50
Stiff 8 - 15 0.50 - 1.0
Very Stiff 15 - 30 1.0 - 2.0
Hard over 30 over 2.0
Grain-Size Classification Modifier for Subclassification
Boulders:
>12 in.
Cobbles:
3-12 in.
Gravel:
¼ - ¾ in. (fine) ¾ - 3 in. (coarse) Sand:
No. 200 - No. 40 sieve (fine) No. 40 - No. 10 sieve (medium) No. 10 - No. 4 sieve (coarse) Silt/Clay:
Pass No. 200 sieve
Adjective
Primary Constituent SAND or GRAVEL
Primary Constituent SILT or CLAY
Percentage of Other Material (By Weight) trace: 5 - 15 (sand, gravel) 5 - 15 (sand, gravel) some: 15 - 30 (sand, gravel) 15 - 30 (sand, gravel) sandy, gravelly: 30 - 50 (sand, gravel) 30 - 50 (sand, gravel) trace: <5 (silt, clay) Relationship of clay and silt determined by plasticity index test some: 5 - 12 (silt, clay) silty, clayey: 12 - 50 (silt, clay)
B-1 S-1 2.7 -- 5 -- -- -- -- Silty GRAVEL B-2 S-1 2.7 -- 12 -- -- -- -- Silty GRAVEL B-3 S-1 2.7 -- 17 -- -- -- -- Silty GRAVEL B-4 S-1 2.0 -- 29 -- 59 29 -- Silty CLAY
S-2 2.7 -- 25 -- -- -- -- Silty CLAY B-5 S-1 2.0 -- 12 -- -- -- -- Silty GRAVEL
S-2 2.7 -- 11 -- -- -- -- Silty GRAVEL B-6 S-1 2.7 -- 6 -- -- -- -- Silty GRAVEL
Table 2A
SUMMARY OF LABORATORY RESULTS
Sample Information Atterberg Limits
Soil Type Fines
Content, % Plasticity Index, %
Liquid Limit, %
Dry Unit Weight, pcf
Moisture Content, %Elevation, ftSampleLocation Depth, ft
GRAVEL; clean to some silt, clay, and sand
Sandy GRAVEL; clean to some silt and clay
Silty GRAVEL; up to some clay and sand
Clayey SAND; up to some silt and gravel
Gravelly CLAY; up to some silt and sand
Sandy CLAY; up to some silt and gravel
Silty CLAY; up to some sand and gravel
Symbol Description
Flush-mount monument set in concrete
Concrete, well casing shown where applicable
Filter pack, machine-slotted well casing shown where applicable
1-in.-diameter solid PVC
FIELD MEASUREMENTS
Typical Description
Groundwater level after drilling and date measured
Symbol Typical Description
BASALT
MUDSTONE
SILTSTONE
PEAT
Symbol
FILL
Clayey GRAVEL; up to some silt and sand
SAND; clean to some silt, clay, and gravel
SILT; up to some clay, sand, and gravel
Gravelly SILT; up to some clay and sand
Sandy SILT; up to some clay and gravel
Clayey SILT; up to some sand and gravel
CLAY; up to some silt, sand, and gravel
Grab Sample
Rock core sample interval
Sonic core sample interval
INSTALLATION SYMBOLS
Symbol
Bentonite seal, well casing shown if applicable
Vibrating-wire pressure transducer
SymbolBEDROCK SYMBOLS
SOIL SYMBOLS
Typical Description
SAMPLER SYMBOLS
Sampler DescriptionSymbol
LANDSCAPE MATERIALS
Gravelly SAND; clean to some silt and clay
Silty SAND; up to some clay and gravel
Shelby tube sampler with recovery
(ASTM D1587)
Grout, vibrating-wire transducer cable shown where applicable
1-in.-diameter hand-slotted PVC
Grout, inclinometer casing shown where applicable
Groundwater level during drilling and date measured
SANDSTONE
SURFACE MATERIAL SYMBOLS
Symbol Typical Description
BORING AND TEST PIT LOG LEGEND
Rock quality designation (RQD, %)
Asphalt concrete PAVEMENT
Portland cement concrete PAVEMENT
Crushed rock BASE COURSE
2.0 in. O.D. split-spoon sampler and Standard Penetration Test with recovery (ASTM D1586)
3.0 in. O.D. split-spoon sampler with recovery
(ASTM D3550)
Push probe sample interval
Rock/sonic core or push probe recovery (%)
B O
R
IN
G A
N D
T E
S T
P
IT
L O
G L
E G
E N
D G
R I D
A T
A T
E M
P
LA
T E
.G D
T
/1
/2
Silty sandy GRAVEL, brown, very dense, subrounded, contains cobbles
(6/23/2020)
Date Started:
Excavated by: Equipment:
Note:
TORVANE SHEAR STRENGTH, TSF
0.50
J. UdingLogged By:
1.0
6/23/20 Custom Hole Drilling, Inc. Dandy Digger 25-30T
See Legend for Explanation of Symbols
B-1 Surface Elevation: Not Available
GPS Coordinates: Not Available
PLASTIC LIMIT, %
LIQUID LIMIT, %
SA
M
PL
E
N O
G R
AP
H
IC
L
O G
D
EP
TH
, F
T
COMMENTS AND
ADDITIONAL TESTS
SA
M
PL
E
TY
PECLASSIFICATION OF MATERIAL
D
EP
TH
, F
T FINES CONTENT, %
MOISTURE CONTENT, %
BORINGS
FIG. 1A
G R
I H A
L O
G
G P
S
P P
N
O E
LE
V
G R
I D A
T A
T E
M P
LA
T
E .G
D T
/1
7/
Silty sandy GRAVEL, brown, very dense, angular
(6/23/2020)
Date Started:
Excavated by: Equipment:
Note:
TORVANE SHEAR STRENGTH, TSF
0.50
J. UdingLogged By:
1.0
6/23/20 Custom Hole Drilling, Inc. Dandy Digger 25-30T
See Legend for Explanation of Symbols
B-2 Surface Elevation: Not Available
GPS Coordinates: Not Available
3.0 S-1
JOB NO. 6307-ASEP. 2020
3.0 S-1
0 100
0 100
Silty sandy GRAVEL, brown, very dense, subangular to subrounded, contains cobbles gray, subangular below 2 ft
(6/23/2020)
Date Started:
Excavated by: Equipment:
Note:
TORVANE SHEAR STRENGTH, TSF
0.50
J. UdingLogged By:
1.0
6/23/20 Custom Hole Drilling, Inc. Dandy Digger 25-30T
See Legend for Explanation of Symbols
B-3 Surface Elevation: Not Available
GPS Coordinates: Not Available
PLASTIC LIMIT, %
LIQUID LIMIT, %
SA
M
PL
E
N O
G R
AP
H
IC
L
O G
D
EP
TH
, F
T
COMMENTS AND
ADDITIONAL TESTS
SA
M
PL
E
TY
PECLASSIFICATION OF MATERIAL
D
EP
TH
, F
T FINES CONTENT, %
MOISTURE CONTENT, %
BORINGS
FIG. 2A
G R
I H A
L O
G
G P
S
P P
N
O E
LE
V
G R
I D A
T A
T E
M P
LA
T
E .G
D T
/1
7/
Silty sandy GRAVEL, dense, rounded, contains cobbles
Silty CLAY, red-brown, medium stiff
(6/23/2020)
Date Started:
Excavated by: Equipment:
Note:
TORVANE SHEAR STRENGTH, TSF
0.50
J. UdingLogged By:
1.0
6/23/20 Custom Hole Drilling, Inc. Dandy Digger 25-30T
See Legend for Explanation of Symbols
B-4 Surface Elevation: Not Available
GPS Coordinates: Not Available
3.0 S-1
JOB NO. 6307-ASEP. 2020
1.1
3.0
S-1
S-2
0 100
0 100
Silty sandy GRAVEL, brown, dense, angular
(6/23/2020)
Date Started:
Excavated by: Equipment:
Note:
TORVANE SHEAR STRENGTH, TSF
0.50
J. UdingLogged By:
1.0
6/23/20 Custom Hole Drilling, Inc. Dandy Digger 25-30T
See Legend for Explanation of Symbols
B-5 Surface Elevation: Not Available
GPS Coordinates: Not Available
PLASTIC LIMIT, %
LIQUID LIMIT, %
SA
M
PL
E
N O
G R
AP
H
IC
L
O G
D
EP
TH
, F
T
COMMENTS AND
ADDITIONAL TESTS
SA
M
PL
E
TY
PECLASSIFICATION OF MATERIAL
D
EP
TH
, F
T FINES CONTENT, %
MOISTURE CONTENT, %
BORINGS
FIG. 3A
G R
I H A
L O
G
G P
S
P P
N
O E
LE
V
G R
I D A
T A
T E
M P
LA
T
E .G
D T
/1
7/
Silty sandy GRAVEL, brown, very dense, angular, contains cobbles
(6/23/2020)
Date Started:
Excavated by: Equipment:
Note:
TORVANE SHEAR STRENGTH, TSF
0.50
J. UdingLogged By:
1.0
6/23/20 Custom Hole Drilling, Inc. Dandy Digger 25-30T
See Legend for Explanation of Symbols
B-6 Surface Elevation: Not Available
GPS Coordinates: Not Available
3.0
S-1
S-2
JOB NO. 6307-ASEP. 2020
3.0 S-1
0 100
0 100
0 10 20 30 40 50 60 70 80 90 100
Sample Classification LL PL PI MC, %
B-4 S-1 Silty CLAY, red-brown 59 30 29
OL
ML
CL
PL
A
ST
IC
IT
Y
IN
D
EX
LIQUID LIMIT, %
Location Depth, ft
2.0
INORGANIC CLAYEY SILTS TO VERY FINE
SANDS OF SLIGHT PLASTICITY
INORGANIC CLAYS OF HIGH PLASTICITY
UNIFIED SOIL CLASSIFICATION
FINE-GRAINED SOIL GROUPS
GROUP
SYMBOL
GROUP
SYMBOL
OH
MH
CH
PLASTICITY CHART
ORGANIC SILTS AND ORGANIC SILTY
CLAYS OF LOW PLASTICITY
A T
T E
R B
E R
G -P
LA
S
T
IC
IT
Y
P
E R
P A
G E
G R
I D A
T A
T E
M P
LA
T
E .G
D T
/1
/2
CH
CL
MH or OH
CL-ML
ML or OL
INORGANIC CLAYS OF LOW TO MEDIUM
PLASTICITY
ORGANIC CLAYS OF MEDIUM TO HIGH
PLASTICITY, ORGANIC SILTS
INORGANIC SILTS AND CLAYEY SILT
UNIFIED SOIL CLASSIFICATION
FINE-GRAINED SOIL GROUPS
SEP. 2020 FIG. 4AJOB NO. 6307-A
APPENDIX B
Pavement Design Calculations
Table 1B - NORMALIZED DEFLECTIONS AND BACKCALCULATION SUMMARY
MILL CREEK ROAD
Road Name: Mill Creek Road (from WA-OR border to Tiger Creek Road) Distance Reference: Pavement Change at WA-OR border=10+00 Based on FWD Testing Conducted: 6/22/2020 Load Plate Radius, in: 5.91 Sensor Distance, in: 0 8 12 18 24 48 72
Test No. Test Station Test Line Boring D 0, mils D 1, mils D 2, mils D 3, mils D 5, mils D 6, mils D 8, mils
Surface Temp., °F Time
Surface Modulus, Ksi Analysis Unit
Subgrade MR at 6 psi Deviator Stress, psi
1 11+00 SB 11.42 7.63 5.39 3.91 3.07 1.47 0.79 97 11:16:08 64 1 13,030
2 13+01 SB 19.79 14.71 10.97 7.91 6.02 2.09 0.89 88 11:17:30 37 1 12,409
3 14+99 SB 22.09 16.35 12.08 8.75 6.54 2.17 0.89 65 11:19:12 33 1 9,608
4 17+00 SB 24.71 16.13 11.17 7.16 4.70 1.20 0.47 102 11:20:44 29 1 11,684
5 19+01 SB 16.14 11.41 8.42 5.91 4.45 1.74 0.88 81 11:22:33 45 1 8,516
6 21+08 SB 13.11 9.80 7.67 5.93 4.83 2.08 1.06 93 11:24:19 55 1 7,020
7 23+00 SB 8.26 5.13 3.67 2.94 2.52 1.51 0.90 93 11:25:57 88 1 19,237
8 25+00 SB 13.01 7.91 5.55 4.17 3.36 1.78 1.14 68 11:27:15 56 1 23,092
9 27+05 SB 10.00 6.70 5.09 4.14 3.58 2.10 1.34 96 11:28:26 73 1 19,014
10 29+00 SB 18.80 13.02 9.42 6.93 5.36 2.39 1.42 87 11:30:08 39 1 11,799
11 31+01 SB 30.58 20.52 14.57 9.44 6.65 2.17 1.16 80 11:31:21 24 1 7,237
12 32+99 SB 17.93 12.13 9.08 6.42 4.99 2.10 1.17 95 11:32:47 41 1 10,101
13 35+07 SB 16.03 9.19 6.28 4.31 3.27 1.46 0.83 102 11:34:05 45 1 15,867
14 37+03 SB 16.38 10.76 7.57 5.34 3.95 1.48 0.84 97 11:35:28 44 1 15,116
15 39+00 SB 16.68 8.64 5.63 3.91 2.68 0.87 0.51 102 11:37:48 44 1 17,804
16 41+00 SB 31.39 17.31 9.98 6.06 4.26 1.18 0.63 98 11:38:59 23 1 17,451
17 43+01 SB 21.68 14.58 10.57 7.64 5.59 1.96 0.91 101 11:40:11 34 1 12,553
18 45+00 SB 17.51 11.74 8.37 6.40 5.12 2.36 1.26 92 11:41:26 42 1 7,475
19 46+98 SB 18.41 13.10 9.88 7.16 5.59 2.21 1.24 98 11:42:38 39 1 11,607
20 48+99 SB 14.18 9.20 6.07 4.22 3.17 1.24 0.62 97 11:44:03 51 1 20,227
21 51+01 SB 11.89 8.37 6.26 4.85 3.99 1.81 0.92 105 11:45:12 61 1 8,008
22 53+04 SB 16.94 11.37 8.26 6.16 4.83 2.01 1.16 100 11:46:27 43 1 14,672
23 54+96 SB 18.64 13.79 9.53 6.51 4.47 1.33 0.53 96 11:47:45 39 1 9,478
24 57+14 SB 17.19 11.73 8.89 6.69 5.46 2.22 1.09 73 11:49:43 42 1 5,590
25 59+00 SB 16.92 11.45 8.59 6.35 4.95 2.17 1.16 103 11:51:10 43 1 8,351
26 61+02 SB 12.77 11.51 8.44 6.26 4.97 2.28 1.31 102 11:53:27 57 1 10,826
27 63+01 SB 19.84 13.65 9.98 6.97 5.14 2.13 1.15 76 11:55:18 37 1 14,972
28 65+00 SB 14.45 10.33 7.71 5.75 4.49 1.81 0.91 102 11:56:31 50 1 7,644
29 65+51 SB B-3 14.71 10.62 8.17 6.21 4.95 1.84 0.78 99 11:57:41 49 1 11,957
30 67+01 SB 15.74 10.78 8.26 6.46 5.18 2.34 1.16 89 11:59:14 46 1 5,665
31 69+05 SB 14.16 10.02 7.44 5.68 4.50 2.06 1.15 102 12:00:31 51 1 10,386
32 71+06 SB 9.61 6.63 4.84 3.81 3.20 1.74 0.97 82 12:01:53 76 1 12,169
33 73+02 SB 16.00 11.40 8.26 5.91 4.45 1.58 0.77 105 12:03:08 45 1 12,392
Deflections Normalized to 9000 lbf Basis
Test No. Test Station Test Line Boring D 0, mils D 1, mils D 2, mils D 3, mils D 5, mils D 6, mils D 8, mils
Surface Temp., °F Time
Surface Modulus, Ksi Analysis Unit
Subgrade MR at 6 psi Deviator Stress, psi
34 74+99 SB 18.47 11.96 8.81 6.38 4.94 2.17 1.17 94 12:04:32 39 1 8,670
35 77+02 SB 14.98 10.24 7.45 5.46 4.14 1.39 0.63 73 12:05:50 49 1 12,198
36 79+09 SB 11.88 7.82 5.65 4.36 3.58 1.93 1.17 89 12:07:15 61 1 16,497
37 81+02 SB 16.85 11.25 8.47 6.26 4.76 1.87 1.13 101 12:09:12 43 1 13,547
38 83+01 SB 25.59 17.24 11.40 7.46 5.51 1.98 0.84 110 12:10:35 28 1 17,033
39 84+86 SB 26.60 17.33 11.62 7.22 4.89 1.63 0.81 107 12:11:47 27 1 17,034
40 87+03 SB 6.27 3.82 2.65 2.37 2.22 1.61 1.07 74 12:13:01 116 1 30,156
41 89+02 SB 15.15 9.16 6.63 4.92 3.64 1.29 0.60 71 12:14:25 48 1 15,031
42 91+02 SB 25.37 15.00 9.88 6.23 4.34 1.27 0.58 78 12:15:53 29 1 13,878
43 93+04 SB 18.25 9.89 5.95 3.56 2.43 0.69 0.29 105 12:17:12 40 1 28,629
44 95+09 SB 37.86 23.68 14.87 9.16 5.53 1.01 0.40 94 12:18:37 19 1 8,153
45 97+12 SB 48.98 37.48 25.65 14.16 8.66 2.49 1.05 99 12:20:47 15 1 8,720
46 99+27 SB B-4 20.52 13.97 10.04 7.01 5.14 1.69 0.64 102 12:22:57 35 1 9,495
47 101+02 SB 17.12 12.33 9.68 7.78 6.42 3.39 1.91 97 12:24:29 42 1 6,634
48 102+99 SB 23.16 15.97 10.18 6.86 5.15 1.74 0.67 109 12:25:47 31 1 9,845
49 105+01 SB 37.23 26.24 18.47 12.05 8.10 1.72 0.63 87 12:27:00 20 1 6,046
50 107+03 SB 24.78 18.02 13.03 9.07 6.57 1.85 0.69 78 12:28:15 29 1 5,912
51 109+06 SB 12.87 7.26 4.61 3.28 2.71 1.68 1.20 108 12:29:27 56 1 27,686
52 111+02 SB 18.49 9.74 6.19 3.62 2.47 1.08 0.81 103 12:31:15 39 1 26,897
53 113+00 SB 9.77 5.48 3.49 2.28 1.71 0.89 0.62 71 12:32:32 74 1 55,472
54 115+06 SB 12.04 5.31 3.32 2.42 1.90 1.05 0.64 101 12:33:54 60 1 47,911
55 117+01 SB 26.68 15.03 9.81 5.91 3.63 1.08 0.75 107 12:35:10 27 1 12,237
56 119+00 SB 10.71 7.00 4.73 3.68 2.04 0.60 0.33 101 12:37:44 68 1 17,766
57 119+00 SB 10.14 6.67 4.52 2.93 1.99 0.56 0.29 98 12:38:30 72 1 32,590
58 121+01 SB 15.09 10.38 6.94 3.70 2.21 0.44 0.27 109 12:40:50 48 1 18,433
59 122+99 SB 32.08 21.45 13.16 6.71 3.73 0.61 0.32 78 12:42:29 23 1 10,090
60 124+98 SB 20.94 13.44 9.04 5.39 3.47 0.89 0.39 95 12:43:42 35 1 13,594
61 124+98 SB 23.90 15.90 10.25 5.98 3.85 0.89 0.38 94 12:44:29 30 1 13,356
62 127+04 SB 34.02 23.10 15.83 9.21 5.79 1.52 0.80 110 12:45:47 21 1 9,706
63 128+96 SB 11.22 6.45 4.47 3.45 2.97 1.95 1.40 100 12:47:09 65 1 23,864
64 130+97 SB 22.55 16.21 11.39 7.88 5.60 1.83 0.97 87 12:48:55 32 1 8,604
65 131+48 SB B-5 13.72 8.61 5.84 4.44 3.62 1.69 0.81 83 12:50:25 53 1 6,605
66 133+00 SB 22.83 13.28 8.70 5.71 4.16 1.57 0.84 108 12:51:48 32 1 14,435
67 135+01 SB 97.01 47.07 21.13 8.76 6.41 2.74 1.37 108 12:53:23 7 1 4,412
68 135+26 SB 48.53 40.47 22.51 9.36 4.63 1.93 0.97 91 12:55:14 15 1 4,564
69 135+26 SB 56.54 39.23 22.24 9.60 5.08 2.00 1.01 88 12:56:08 13 1 5,085
70 137+01 SB 31.58 23.89 13.98 7.09 4.77 2.28 1.28 112 12:57:33 23 1 10,109
71 139+12 SB 27.81 13.91 8.80 6.32 4.83 2.09 1.20 101 12:59:08 26 1 11,648
72 141+01 SB 19.20 12.54 8.79 6.12 4.72 1.96 1.14 107 13:00:18 38 1 14,987
Test No. Test Station Test Line Boring D 0, mils D 1, mils D 2, mils D 3, mils D 5, mils D 6, mils D 8, mils
Surface Temp., °F Time
Surface Modulus, Ksi Analysis Unit
Subgrade MR at 6 psi Deviator Stress, psi
73 142+99 SB 16.80 10.79 7.25 5.28 4.22 1.97 1.01 106 13:01:29 43 1 7,752
74 145+00 SB 15.23 8.82 5.72 3.82 2.91 1.40 0.84 111 13:02:49 48 1 22,443
75 146+98 SB 30.49 21.30 15.53 10.51 7.44 1.94 1.10 110 13:04:05 24 1 4,701
76 149+05 SB 26.95 17.90 12.30 8.50 6.41 2.76 1.78 109 13:05:38 27 1 11,788
77 151+00 SB 34.63 8.38 5.12 3.75 2.95 1.17 0.76 108 13:06:59 21 1 22,398
78 153+01 SB 19.72 12.17 8.39 5.32 3.93 1.62 0.91 98 13:08:39 37 1 22,009
79 155+01 SB 21.42 12.45 7.55 3.82 2.08 0.65 0.50 89 13:10:20 34 1 16,849
80 157+00 SB 12.87 8.18 5.70 3.96 2.91 1.24 0.71 112 13:11:41 56 1 25,745
81 158+99 SB 7.70 4.22 2.68 1.76 1.32 0.58 0.40 75 13:13:33 94 1 72,380
82 161+06 SB 19.67 12.99 9.25 6.36 4.77 1.75 0.84 113 13:15:43 37 1 6,630
83 163+00 SB 7.46 3.93 2.40 1.67 1.33 0.75 0.52 97 13:17:37 97 1 75,176
84 162+01 NB 17.12 10.74 7.78 5.49 3.99 1.11 0.43 114 13:25:50 42 1 9,564
85 160+01 NB 16.16 10.22 6.76 4.61 3.50 1.44 0.80 114 13:27:04 45 1 14,148
86 157+98 NB 11.92 7.02 4.33 2.90 2.29 1.06 0.60 93 13:28:33 61 1 37,535
87 156+11 NB 16.61 9.84 6.26 4.03 2.94 0.91 0.45 113 13:29:43 44 1 30,123
88 154+00 NB 17.82 10.60 6.91 4.80 3.53 1.36 0.65 103 13:33:06 41 1 17,667
89 152+68 NB B-6 15.51 9.69 6.09 4.29 3.09 1.12 0.62 109 13:40:54 47 1 18,425
90 150+00 NB 30.57 17.63 11.45 6.71 4.53 1.75 0.98 114 13:42:20 24 1 14,525
91 148+03 NB 46.65 34.71 26.80 19.37 14.28 3.83 1.35 112 13:43:34 16 1 4,558
92 145+94 NB 18.18 9.47 6.10 4.20 3.04 0.98 0.41 110 13:44:49 40 1 15,544
93 143+99 NB 18.59 14.47 11.81 8.91 7.37 2.99 1.29 113 13:45:57 39 1 8,758
94 142+01 NB 10.03 6.24 4.41 3.24 2.53 0.93 0.37 116 13:47:09 72 1 22,841
95 139+99 NB 22.04 13.92 9.34 6.70 5.12 1.92 0.93 103 13:48:19 33 1 6,285
96 138+00 NB 21.62 14.07 10.12 6.73 4.87 1.79 1.01 111 13:49:28 34 1 11,878
97 135+97 NB 13.22 8.99 7.04 5.62 4.85 2.58 1.52 112 13:50:34 55 1 10,663
98 133+98 NB 10.68 6.15 3.82 3.01 2.58 1.37 0.78 100 13:51:39 68 1 16,993
99 132+04 NB 14.80 9.54 6.75 4.96 3.88 1.65 0.96 77 13:52:45 49 1 15,476
100 130+00 NB 15.36 10.55 7.54 5.31 4.17 1.81 0.93 113 13:53:53 47 1 8,305
101 128+00 NB 13.62 8.30 5.86 4.19 3.38 1.22 0.57 98 13:55:48 53 1 16,710
102 125+90 NB 27.95 17.91 12.92 8.72 6.18 1.62 0.61 110 13:57:11 26 1 5,716
103 124+00 NB 18.91 13.49 9.73 7.13 5.45 2.01 0.91 110 13:58:17 38 1 4,462
104 121+99 NB 9.35 6.08 4.60 3.57 2.88 1.50 1.03 110 13:59:21 78 1 32,503
105 119+99 NB 10.50 6.28 4.61 2.98 2.05 0.65 0.35 112 14:00:30 69 1 33,233
106 117+88 NB 29.56 17.84 11.38 7.36 5.28 1.63 0.69 115 14:01:40 25 1 11,900
107 116+03 NB 111.44 59.07 30.32 7.67 2.58 1.03 0.56 115 14:03:21 7 1 2,607
108 113+99 NB 8.02 5.25 3.57 2.30 1.65 0.67 0.45 88 14:04:42 91 1 49,773
109 111+97 NB 15.91 12.63 6.63 3.15 1.94 1.24 0.81 93 14:05:55 46 1 21,025
110 110+00 NB 20.39 10.91 6.26 3.87 2.87 1.36 0.87 112 14:08:26 36 1 28,434
111 107+92 NB 20.38 12.40 7.29 4.37 2.98 1.03 0.67 102 14:09:31 36 1 23,506
Test No. Test Station Test Line Boring D 0, mils D 1, mils D 2, mils D 3, mils D 5, mils D 6, mils D 8, mils
Surface Temp., °F Time
Surface Modulus, Ksi Analysis Unit
Subgrade MR at 6 psi Deviator Stress, psi
112 106+02 NB 8.71 5.62 4.12 3.23 2.64 1.14 0.53 105 14:10:36 83 1 28,391
113 104+00 NB 17.11 11.18 7.58 5.21 4.04 1.76 0.91 106 14:11:32 42 1 18,372
114 102+00 NB 17.27 11.49 7.98 5.46 3.99 1.32 0.62 114 14:12:35 42 1 12,346
115 103+72 NB 17.55 10.68 7.08 4.77 3.62 1.20 0.50 110 14:14:08 41 1 13,659
116 99+98 NB 15.14 9.34 5.97 3.78 2.61 0.53 0.18 114 14:15:46 48 1 26,495
117 98+00 NB 18.36 12.43 8.83 6.34 4.90 2.10 1.13 80 14:16:48 40 1 8,719
118 96+00 NB 12.93 7.92 5.54 4.10 3.35 1.49 0.77 114 14:17:58 56 1 23,653
119 94+01 NB 11.25 7.01 5.16 3.73 2.85 0.99 0.44 110 14:19:21 65 1 18,620
120 92+02 NB 12.53 7.57 4.76 3.29 2.41 0.90 0.44 117 14:20:48 58 1 24,651
121 89+99 NB 6.87 3.69 2.11 1.46 1.13 0.40 0.16 114 14:22:00 106 1 88,296
122 87+85 NB 16.96 11.09 7.63 5.12 3.81 1.51 0.73 107 14:23:04 43 1 17,059
123 86+13 NB 27.03 20.75 14.69 9.87 7.00 2.26 1.30 107 14:24:38 27 1 6,759
124 84+03 NB 15.16 9.97 6.95 4.69 3.30 0.96 0.42 109 14:25:58 48 1 12,362
125 81+96 NB 52.11 36.50 26.85 18.01 13.69 5.14 2.85 113 14:27:08 14 1 4,375
126 79+89 NB 8.97 5.79 4.18 3.17 2.64 1.50 0.99 116 14:28:14 81 1 31,116
127 77+97 NB 10.37 7.15 5.48 4.24 3.50 1.47 0.57 114 14:29:16 70 1 20,788
128 76+00 NB 11.85 7.19 4.59 2.82 1.85 0.37 0.14 88 14:30:38 61 1 30,703
129 73+99 NB 13.86 9.04 6.71 5.10 4.20 1.83 0.81 105 14:31:46 52 1 4,617
130 72+03 NB 12.36 8.66 6.62 5.20 4.26 1.98 1.01 113 14:32:52 59 1 7,539
131 70+00 NB 9.86 6.29 4.41 3.11 2.39 0.77 0.29 116 14:34:00 74 1 41,917
132 68+00 NB 9.30 6.05 4.29 3.13 2.45 0.84 0.30 113 14:35:13 78 1 21,146
133 65+99 NB 16.56 10.55 7.57 5.32 3.95 1.32 0.52 114 14:36:40 44 1 12,627
134 64+00 NB 17.67 11.81 8.91 6.89 5.51 2.09 0.84 112 14:37:59 41 1 11,423
135 62+00 NB 19.08 13.90 10.56 7.97 6.24 2.28 1.06 114 14:39:10 38 1 4,285
136 59+89 NB 10.62 7.25 5.40 4.08 3.20 1.36 0.67 115 14:40:20 68 1 22,966
137 58+00 NB 14.64 9.81 7.15 5.41 4.30 1.69 0.85 104 14:41:31 50 1 8,370
138 56+00 NB 9.75 5.66 3.92 2.57 1.76 0.38 0.16 112 14:42:57 75 1 38,426
139 54+00 NB 13.19 8.57 6.32 4.85 3.84 1.48 0.50 108 14:44:08 55 1 16,277
140 52+00 NB 11.76 8.00 6.02 4.66 3.76 1.69 0.71 115 14:45:41 62 1 21,692
141 50+00 NB 19.66 14.04 10.44 7.84 5.25 1.47 0.20 113 14:46:53 37 1 7,343
142 47+98 NB 18.29 11.25 7.72 5.32 4.15 1.62 0.61 109 14:48:08 40 1 15,401
143 45+97 NB 13.38 7.91 5.43 3.74 2.90 1.25 0.68 102 14:49:15 54 1 26,201
144 43+81 NB 20.40 12.82 9.01 6.63 5.17 1.94 1.10 111 14:50:24 36 1 11,609
145 41+94 NB -181.65 -78.35 -17.28 6.24 6.87 1.99 0.54 103 14:52:17 -4 Road Washed Out 246
146 41+54 NB 81.60 49.88 23.44 10.84 4.31 1.20 0.68 108 14:53:52 9 1 2,743
147 39+99 NB 28.47 17.53 11.69 7.17 5.13 1.25 0.49 105 14:55:20 26 1 15,087
148 37+94 NB 21.20 11.16 6.55 3.48 2.06 0.34 0.12 113 14:57:07 34 1 18,961
149 36+00 NB 22.33 11.99 7.15 4.21 2.60 0.56 0.32 95 14:58:32 33 1 17,605
150 34+00 NB 22.22 13.59 9.70 6.92 5.26 2.04 1.15 108 14:59:43 33 1 11,977
Test No. Test Station Test Line Boring D 0, mils D 1, mils D 2, mils D 3, mils D 5, mils D 6, mils D 8, mils
Surface Temp., °F Time
Surface Modulus, Ksi Analysis Unit
Subgrade MR at 6 psi Deviator Stress, psi
151 31+99 NB 29.79 21.74 16.23 11.73 8.85 2.31 0.87 108 15:00:53 24 1 9,622
152 29+98 NB 25.15 18.70 14.24 10.72 8.19 2.87 1.34 112 15:02:03 29 1 3,522
153 28+00 NB 12.90 8.61 6.61 5.39 4.71 2.65 1.53 112 15:03:14 56 1 9,483
154 25+92 NB 9.87 6.37 4.75 3.70 3.16 1.65 1.01 91 15:04:29 74 1 20,115
155 24+00 NB 14.45 10.73 8.55 6.95 5.84 2.71 1.28 106 15:05:43 50 1 3,866
156 38+82 NB B-2 20.13 12.76 8.19 5.06 3.44 0.74 0.29 89 15:14:07 36 1 18,964
157 21+99 NB 33.91 24.41 18.56 13.48 10.15 2.73 1.29 113 15:16:21 21 1 3,589
158 20+01 NB 19.04 12.52 8.96 6.29 4.71 1.22 0.44 110 15:17:40 38 1 7,416
159 18+00 NB 18.77 13.07 9.44 6.49 4.82 1.35 0.54 97 15:18:50 39 1 8,089
160 16+00 NB 24.63 16.20 10.78 7.06 5.40 2.42 1.32 85 15:20:46 30 1 18,056
161 13+98 NB 18.55 13.09 9.55 6.95 5.43 1.97 0.91 97 15:22:01 39 1 5,028
162 12+00 NB 16.74 10.67 7.08 4.77 3.67 1.46 0.69 108 15:23:11 43 1 17,973
163 18+35 NB B-1 17.75 11.67 7.93 5.36 3.94 1.43 0.64 101 15:29:39 41 1 14,467
Statistical Summary
Analysis Unit From To Direction
Average D0, mils
Average Subgrade MR at 6 psi Deviator Stress, psi
1 11+00 163+00 NB/SB 20.29 16,459
Design Subgrade Resilient Modulus for AASHTO Reconstruction Analysis
Analysis Unit From To Direction
2.3 Percentile/
0.70 Subgrade
Modulus, psi
Design Subgrade Modulus, psi
1 11+00 163+00 NB/SB 5,405 5,400
Table 2B - 20-YEAR TRAFFIC LOADING ANALYSIS
Information from 2016 Oregon FLAP Application
ADT 2016
20-Year
Projections North End of Project 272 400 South End of Project 70 150 Percent Trucks 1 - 2% 1 - 2% Total Number of Trucks 5.44 8 Critical traffic loading case
Traffic Loading Analysis Design Period, yrs: 20
(1) (2) (3) (4) (5) (6) FHWA % No. of Total Truck Number of
Truck Class Trucks Trucks/day LEF 20-Yr Design Period Axle Passes Class 5 70% 6 104 11,648 81,760 Class 6 20% 2 284 9,088 35,040 Class 9 10% 1 466 7,456 29,200
Totals 28,192 146,000
20 Year Design Traffic Loading, ESALs: 28,200
(1) Information regarding the FHWA truck classification distribution was not provided. Based on conversation with Umatilla County and observations during a site visit, we selected the distribution of trucks shown above using the critical case.
(2) No. of trucks/day = % trucks (from column (2))* estimated ADT for the critical case using 20-year traffic projections
(4) LEF = load equivalency factor (i.e. number of equivalent 18-kip single axle loads, ESALs, per truck), based on ODOT.
(5) 20-Yr Traffic = No. of trucks/day * LEF * 20-years
(6) Number of axles passes used in the Giroud & Han aggregate thickness design analysis.
B-1 B-2
B-3
B-4 B-5 B-6
0.00
20.00
40.00
60.00
80.00
100.00
120.00
10+00 20+00 30+00 40+00 50+00 60+00 70+00 80+00 90+00 100+00 110+00 120+00 130+00 140+00 150+00 160+00
N or m al ize d
9, 0-lb
D ef le ct io n, m ils
FWD Test Station (10+00 = Pavement Change at OR-WA Border)
Figure 1B - 9-KIP NORMALIZED DEFLECTIONS FOR TRAVEL LANES
MILL CREEK ROAD
Northbound Lane
Southbound Lane
Cores
+0
PC
O R-
W A
Bo rd er
3+
C L
Ti ge r C re ek R d
R IG
SEP. 2020 JOB NO. 6307-A FIG. 2B
AB THICKNESS DESIGN
R IG
SEP. 2020 JOB NO. 6307-A FIG. 3B
PULLOUT AB
THICKNESS DESIGN ANALYSIS
| 1 Introduction |
| 2 Project Description |
| 3 Site Description |
| 3.1 Site Conditions |
| 4 Subsurface Conditions |
| 4.1 General |
| 4.2 Subsurface Explorations |
| 4.3 Groundwater |
| 4.4 FWD Testing |
| 5 Analysis and Recommendations |
| 5.2 Pavement Design Documentation |
| 5.2.1 General |
| 5.2.2 Backcalculation Analysis |
| 5.2.3 Design Subgrade Resilient Modulus |
| 5.2.4 Traffic-Loading Analysis |
| 5.2.5 Pavement Design Analysis |
| 5.3 Pavement Design Recommendations |
| 5.3.1 Pavement-Design Section Recommendations |
| Roadway (existing gravel surfacing greater than 12 inches) |
| Roadway (existing gravel surfacing less than 12 inches) |
| Pullouts |
| 6 Recommendations for Materials and Construction |
| 6.1 Standard Specifications |
| 6.2 Construction Considerations |
| 6.2.1 Aggregate Reconditioning |
| 6.2.2 Aggregate Base |
| 6.2.3 Maintenance Considerations |
| 7 Design Review and Construction Services |
| 8 Limitations |
| 9 References |
| A.1 Field Explorations |
| A.1.1 General |
| A.1.2 Machine-Drilled Borings |