or-ef-umpqu615-2022-2-1_plan.pdf

PDF 30 MB Posted

Attached to
OR ERFO FS UMPQU 615-2022-2(1), Umpqua ERFO Repairs 2022
Solicitation number
69056724B000023
Issued by

About this file

I apologize, but I cannot summarize the file as requested because the actual file content was not provided in the message. While the government-file and federal-contract-opportunity metadata were included, the actual PDF file contents (or-ef-umpqu615-2022-2-1_plan.pdf) are missing. To provide an accurate summary, I would need to see the specific contents of the plan document. The available metadata indicates this is related to a Department of Transportation Federal Highway Administration construction project for Umpqua ERFO Repairs in 2022, with solicitation number 69056724B000023, but without the file contents, I cannot provide a detailed summary of the specific plan.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE PLANE COORDINATES GEO COORDINATES

POINT

NUMBER NORTH EAST ORTHOMETRIC

ELEVATION LATITUDE LONGITUDE ELLIPSOID

HEIGHT

COMBINED

FACTOR DESCRIPTION NOTE:

SITE 3210-1.42 1.

23101 436990.814 4238338.578 2392.139 42°50'14.048514"N 123°02'48.000960"W 2315.2196 0.999800592 5/8" IR W/ FHWA ALUM CAP

23102 437228.307 4238450.302 2400.574 42°50'16.427015"N 123°02'46.598930"W 2323.6545 0.999800122 5/8" IR W/ FHWA ALUM CAP

SITE 4710-2.7

23111 610411.456 4298637.117 1429.007 43°19'03.748214"N 122°50'23.983583"W 1352.5448 0.999833347 5/8" IR W/ FHWA ALUM CAP

23112 610573.694 4298613.852 1422.343 43°19'05.343692"N 122°50'24.359515"W 1345.8821 0.999833685 5/8" IR W/ FHWA ALUM CAP

23113 610796.161 4298623.052 1414.193 43°19'07.542815"N 122°50'24.319190"W 1337.7358 0.999834102 5/8" IR W/ FHWA ALUM CAP

23114 610945.476 4298587.718 1409.413 43°19'09.007362"N 122°50'24.853450"W 1332.958 0.999834349 5/8" IR W/ FHWA ALUM CAP

SITE 4711-1.7

23121 607361.755 4307131.640 1557.752 43°18'35.963992"N 122°48'27.975918"W 1481.4446 0.999826846 5/8" IR W/ FHWA ALUM CAP

23122 607056.717 4307192.778 1592.366 43°18'32.968723"N 122°48'27.035593"W 1516.0641 0.999825156 5/8" IR W/ FHWA ALUM CAP

COORDINATE SYSTEM : Oregon South SPCS NAD83 2011 VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID18

EPOCH DATE : 2010.000

CADD SYSTEM COORDINATE SYSTEM : OR83/2011-SIF NSRS11(NAD83/2011) Oregon, Southern Zone, Intn'l Foot

PROJECT : Umpqua ERFO repairs 2022 DATE OF FIELD WORK :September, 2023 DATE OF FINAL ADJUSTMENT : November, 2023

PROJECT UNITS : International Foot

-M ar -2

2:

P M

C

M yF ile s\

D ow nl oa ds

O R E

R

FO

F S U

M

PQ

U

5-

-2

(1 co nt ro ls he et

.x ls x] S he et

To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.

PROJECT

A.6OR ERFO FS UMPQU 615-2022-2(1)

SHEET

NUMBER

SURVEY CONTROL

Sheet and Description

SECTION C SECTION D SECTION E SECTION F SECTION G

SITE 4710-2.7 SITE 4711-1.7 SITE 3220-1.42 DRAINAGE

EROSION AND

SEDIMENT

CONTROL

Allowance Bid Schedule

A0020 15101-0000 MOBILIZATION LPSM ALL

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL

A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

A0080 15401-0000 CONTRACTOR TESTING LPSM ALL

A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

A0120 15702-6000 SOIL EROSION CONTROL, TEMPORARY STREAM DIVERSION LPSM All ALL

A0140 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 410 90 500

A0160 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 815 185 1,000

A0180 15706-0200 SOIL EROSION CONTROL, CHECK DAM (FILTER ROCK) EACH 23 7 30

A0200 15706-0200 SOIL EROSION CONTROL, CHECK DAM (FIBER ROLL) EACH 18 7 25

A0220 20101-0000 CLEARING AND GRUBBING ACRE 0.3 0.3 0.2 0.1 0.9

A0240 20301-0700 REMOVAL OF DELINEATOR EACH 9 9

A0260 20301-1900 REMOVAL OF PIPE CULVERT EACH 1 1

A0280 20401-0000 ROADWAY EXCAVATION CUYD 127 148 53 34 362

A0300 20402-0000 SUBEXCAVATION CUYD 575 25 600

A0320 20435-1000 BACKFILL, SELECT GRANULAR CUYD 551 49 600

A0340 20701-0400 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE

D (WOVEN) SQYD 778 82 860

A0360 20703-2000 GEOGRID, STABILIZATION SQYD 2,117 83 2,200

A0380 25101-2200 PLACED RIPRAP, METHOD B, CLASS 2 CUYD 8 2 10

A0400 25101-2300 PLACED RIPRAP, METHOD B, CLASS 3 CUYD 26 4 30

A0420 25501-0000 MECHANICALLY STABILIZED EARTH WALL SQFT 1,827 73 1,900

A0440 25501-0000 MECHANICALLY STABILIZED EARTH WALL (WITH STAINING

AGENT) SQFT 558 42 600

A0460 26101-1000 REINFORCED SOIL SLOPE, WELDED WIRE FACE SQFT 704 46 750

A0480 30202-2100 ROADWAY AGGREGATE, METHOD 2, SURFACE COURSE TON 97 277 82 44 500

A0500 60201-0600 18-INCH PIPE CULVERT LNFT 75 5 80

A0520 60201-1000 36-INCH PIPE CULVERT LNFT 37 3 40

A0540 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 40

A0560 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY HOUR 40

A0580 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY

WITH THUMB ATTACHMENT HOUR 40

A0600 62301-0000 GENERAL LABOR HOUR 40

A0620 62401-0400 FURNISHING AND PLACING TOPSOIL, 6-INCH DEPTH SQYD 209 11 220

A0640 62501-0000 TURF ESTABLISHMENT (GOV'T FURNISHED SEEDS) ACRE 0.3 0.3 0.2 0.1 0.9

MileStone: 100% Date Completed: In Progress Report Date: 03/26/25

A M E N D

Line Item No.

Pay Item Number

SUMMARY OF QUANTITIES

-M ar

-2

2:

P

M

Remarks and/or Determination of Estimated QuantityPay Item Description Unit

Estimated Quantities c:

\p w _w or k_ w fl\ d0 or

-e f-um pq u6

-2

2- 2-

1_ qs um .x ls m

]S he et

PROJECT

B.1OR ERFO FS UMPQU 615-2022-2(1)

SHEET

Sheet and Description

SECTION C SECTION D SECTION E SECTION F SECTION G

SITE 4710-2.7 SITE 4711-1.7 SITE 3220-1.42 DRAINAGE

EROSION AND

SEDIMENT

CONTROL

Allowance Bid Schedule

A0660 62901-0000 ROLLED EROSION CONTROL PRODUCT SQYD 778 152 930

A0680 62901-1100 ROLLED EROSION CONTROL PRODUCT, TYPE 4 SQYD 281 19 300

A0700 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 2 2 2 6

A0720 63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 36-INCH EACH 6 6 6 2 20

A0740 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C EACH 2 2 2 6

A0760 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 20 20 20 10 70

-M ar -2

2:

P M

MileStone: 100% Date Completed: In Progress Report Date: 03/26/25 c:

\p w _w or k_ w fl\ d0 or

-e f-um pq u6

-2

2- 2-

1_ qs um .x ls m

]S he et

2)

SUMMARY OF QUANTITIES

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated Quantity

PROJECT

B.2OR ERFO FS UMPQU 615-2022-2(1)

SHEET

10.4 x 16 25101 -0200

25101 -0300

60201 -0600

60201 -1000

Station

ES

TI

M A

TE

D M

A X

IM

U M

C O

V

ER

S

TR

U C

TU

R A L

EX

C A V A

TI

O N

PL

A C

ED

R

IP

R A P, M

ET

H O

D A

C

LA

S S

PL

A C

ED

R

IP

R A P, M

ET

H O

D A

C

LA

S S

-I

N C H

P

IP

E C U

LV

ER

T

-I

N C H

P

IP

E C U

LV

ER

T

S K

EW

A N

G

LE

A llo w ab le P ip e

M at er ia l (S ee k ey b el ow

B

EV

EL

S

1V :n

H

B

EV

EL

S

1V :n

H

REMARKS

See below for numbered notes

FEET CUYD CUYD CUYD LNFT LNFT Lt Rt

SITE 4711-1.7

200+99 3 8 6 24 GS

203+68 1 31 20 37 17 GS

SITE 3220-1.42

300+64 1 7 4 22 GS

301+88 1 20 4 29 GS

PROJECT TOTAL 66 8 26 75 37

Allowable Pipe Material

NOTE: A Aluminum

1. Steel pipe culvert minimum wall thickness is the thickness required by the Std. 602-1 fill height table. AS Aluminized steel

2. Structural excavation quantity based on material excavated inside the vertical planes located C Concrete 18 inches outside and parallel to the limits of footings or foundations. GS Galvanized steel

P Plastic (blank) Any appropriate material x/__ Any appropriate material except __

PAY ITEM NUMBER

-M ar -2

4:

P M c:

\p w _w or k_ w fl\ d0 or

-e f-um pq u6

-2

2- 2-

1_ Ta bu la tio n of D ra in ag e

Q ua nt iti es .x ls x]

S he et

TABULATION OF DRAINAGE QUANTITIES

PROJECT

F.1OR ERFO FS UMPQU 615-2022-2(1)

SHEET

NUMBERNote: The quantities shown hereon are approximate and are subject to field adjustments.