This document is a Questions and Answers (Q&A) file for the Umpqua ERFO Repairs 2022 federal contract opportunity. The file contains two technical questions and their corresponding answers related to the project. The first question asks about using Hilfiker Retaining Walls as an alternative to the MSE Walls specified in the plans, to which the response clarifies that Hilfiker Retaining Walls is not a specified brand name product and contractors should perform MSE Wall work according to solicitation documents. The second question inquires about site accessibility, with the response confirming that downed timber and slides blocking project sites and staging areas will be removed prior to the Notice to Proceed (NTP) being issued. The document is dated 5/13/2025 and 6/4/2025 for the respective questions and answers.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OR ERFO FS UMPQU 615-2022-2(1)
Umpqua ERFO Repairs 2022
# General Technical Question Answer Date
1 X
I was curious if Hilfiker Retaining Walls was an approved alternative to the MSE Walls called out in the plans?
Hilfiker Retaining Walls is not specified as a
Brand Name Product. Perform MSE Wall work and submit bids according to the solicitation documents.
5/13/2025
2 X
Will all the downed timber and slides that block access to the project sites and staging areas be removed prior to project start date?
Yes the site will be accessible before NTP is issued.
6/4/2025