This document is a comprehensive set of engineering and construction plans for the Oregon Dunes National Recreation Area Umpqua Dunes Access Improvements project (OR FLAP DOUGLAS 251(1)). The project involves reconstructing and improving approximately 8.85 miles of Salmon Harbor Drive, including trail development, roadway rehabilitation, guardrail installation, erosion control, and associated infrastructure upgrades. Key elements include a full depth reconstruction from stations 486+25.45 to 487+25.45, mill and overlay sections, approach improvements for Discovery Point Lane, Lighthouse Road, Winchester Bay Sewer District, and two campground entrances, and the installation of an Off-Highway Vehicle (OHV) trail.
The project includes detailed plans for erosion control, drainage, safety features, temporary and permanent traffic control, and sign installations. Estimated quantities cover numerous construction activities such as clearing and grubbing, roadway excavation, aggregate base, asphalt concrete pavement, guardrail systems, turf establishment, and various traffic control measures. The project is being administered by the Federal Highway Administration's Office of Federal Lands Highway, with construction beginning in April 2025 and a targeted completion date of April 28, 2025. The total project area spans multiple stations along Salmon Harbor Drive in the Oregon Dunes National Recreation Area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Tabulation_OR FLAP DOUGLAS 251(1).pdf | ||
| Bid Summary_OR FLAP DOUGLAS 251(1).pdf | ||
| QA_6-18-2025_2.pdf | ||
| QA_6-18-2025.pdf | ||
| Amendment A002.pdf | ||
| Amendment A001.pdf | ||
| QA_6-16-2025.pdf | ||
| or-a1902511_superelevation_report_SHD.xlsx | XLSX spreadsheet | |
| IFB 69056724B000025_OR FLAP DOUGLAS 251(1).pdf | ||
| or-a1902511_control-points.xlsx | XLSX spreadsheet | |
| or-a1902511_earthwork.pdf | ||
| WFLHD Construction Contract Administration_FY 23 V2.pdf | ||
| Physical Data.zip | ZIP file | |
| or-a1902511_Alignments.pdf | ||
| or-a1902511_escp.pdf | ||
| or-a1902511_XS.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRENT L COE Digitally signed by BRENT L COE Date: 2025.04.21 15:00:18 -07'00'
BH TP
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
M.P.
M.L.
monument minimum thousand gallon maximum material mile post main line
W
RIP
DI
G W G WV
CP GPS
36 31
36 31
N
E
N 1000EL. 1234.56
TP
TP
SEC.
SEC.
NO SCALE
θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
between bearing bridge balance point bench mark back face back btwn brg.
br.
BP
BM
b.f.
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center
NOTE:
1.
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend
W west drwg(s).
dist.
diaph.
dia.
DHV
D exp. jt.
exc.
EW
EQ or eq.
EOP
emb.
elev.
El. 94.16 e.f.
e E expansion joint excavation edge of water equation edge of pavement embankment elevation elevation in feet each face superelevation rate east drawing(s) distance diaphragm diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge) jt.
IE
ID
joint invert elevation inside diameter ftg.
flg.
fin.
f.f.
footing flange finish front face
LW
lt. or LT Ls
LPSM
long.
LNFT
lat.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude length of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph V vertical point of intersection vehicles per hour design speed (velocity)
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sect.
SC
SADT
S point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
KSI
square inch thousand pounds per pvmt.
PT
PST
PSC
PSI
PSF
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve pounds per square inch pounds per square foot point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve
OHWM
OG
OD
o. to o.
o.c.
ordinary high water mark original ground outside diameter out to out on center
NC
N normal crown north
A A
DI
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Control Point (Terrestrial and GPS)
Gas & Water Meter; Gas & Water Valve
Flagpole; Fire Hydrant
Cooking Grate; Garbage Can; Picnic Table
Boulder; Well; Antenna; Grave
Above Ground Tank; Underground Tank
Spot Elevation; Coordinate Grid Tick
Material Source; Bore Hole; Test Pit
Treeline; Individual Trees
Spring or Seep
Section Line 4
Section Corner (Found, Projected) 4
Section Line 16
Section Corner (Found, Projected)16
Property Line
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Paved, Gravel)
Railroad
Trail
Fiber Roll
Silt Fence
Sandbag
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservior; Marshland
North Arrow
Slope Stake Limits Top of Cut
Toe of Fill
Construction Limits
Bottom of Ditch
Fence
Gate with Fence
Cattleguard
Guardrail (single-sided, double-sided)
Concrete Barrier and Guard Wall
Retaining Wall wall face
Signs (single, double post; portable)
Delineators
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Pipe Culvert with Drop Inlet
Box Culvert
Underdrain
Overhead/Above Ground Utilities
Underground Utilities
Light, Support w/Anchor) Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
Building
Right-of-Way Line
Permanent Easement
Construction Easement
Riprap
- no symbol -
Section A-A
EXISTING PROPOSED
STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, TP = telephone pedestal, TV = CATV pedestal,
- no symbol -
11/2001 DETAIL APPROVED FOR USE
6/2022
10/2014 10/2009 1/2007 9/2005 REVISED: 101-1W
ABBREVIATIONS
PLAN SYMBOLS AND
:0
P
M
M a rc h
D e t W
-1 c p w
-w o rk
\d \o r-a g e n .d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
NUMBER
SHEET
A.2
OR FLAP DOUGLAS 251(1)
"ALI_MAIN_01" 73+28.31
"ALI_MAIN_02" 527+13.75
8th St th S t
B ro a d w a y A v e
B e a c h B lv d
B ro a d w a y A v e
R d
S a lm o n
H a rb o r
D ri v e
D is c o ve r y
P o in te
L n
L ig h th o u s e
W in c h e s te r
C r e e k
:3
A
A p r il
V ic in it y
M a p p w w o r k \d
\o r a g e n .d g n
VICINITY MAP
PROJECT
A.3
BEGIN CONSTRUCTION
END CONSTRUCTION
END CONSTRUCTION
BEGIN CONSTRUCTION
Sanitary District
Winchester Bay
RV Park and Campground
Windy Cove A Windy Cove B
Umpqua Dunes RV Park
N
"ALI_MAIN_02" 486+25.45
"ALI_MAIN_01" 8+43.16
HALFMOON BAY
m ile s
To R ee ds po rt
Scale in miles
0.00.10.2 0.2
O rk
R ock Rd
S e e S h e e t A .4 tre a tm e n t a re a
O ff-s ite
W y
M a r in
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
Salmon Harbor Drive
M a r in a W a y
O r k R o c k R o a d
Umpqua River
:3 p r il
O ff -S it e T re a tm e n t A re a V ic in it y
M p p w w o r k \d
\o r a g e n .d g n
VICINITY MAP
OFF-SITE TREATMENT AREA
PROJECT
A.4
Off-site treatment areaN
"ALI_MAIN_01"
Scale in feet
05001000 1000
Sheet and Description
SECTION D SECTION E SECTION F SECTION H SECTION I SECTION J -
PLAN-PROFILE EROSION
CONTROL DRAINAGE SAFETY
FEATURES
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 1,060 60 1,120
A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 6,561 329 6,890
A0160 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION EACH 3 1 4
A0180 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT EACH 2 2
A0200 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A0220 20101-0000 CLEARING AND GRUBBING ACRE 1.7 0.1 1.8
A0240 20301-0100 REMOVAL OF BOLLARD EACH 188 12 200
A0260 20301-0200 REMOVAL OF BOULDER EACH 6 1 7
A0280 20301-1400 REMOVAL OF INLET EACH 1 1 2
A0300 20302-0300 REMOVAL OF CURB AND GUTTER, CONCRETE LNFT 460 25 485
A0320 20303-3000 REMOVAL OF SIDEWALK, ASPHALT SQYD 118 7 125
A0340 20310-1000 PLUG, EXISTING PIPE EACH 2 1 3
A0360 20401-0000 ROADWAY EXCAVATION CUYD 7,651 349 8,000
A0380 21101-1000 ROADWAY OBLITERATION, METHOD 1 SQYD 945 25 970
A0400 25126-0000 REMOVE AND RESET BOULDER EACH 57 3 60
A0420 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 6,763 337 7,100
A0440 30901-0000 EMULSIFIED ASPHALT TREATED AGGREGATE BASE TON 2,901 149 3,050
A0480 40301-0200 ASPHALT CONCRETE PAVEMENT, TYPE 2 TON 2,493 127 2,620
A0500 41201-0000 TACK COAT TON 5.9 0.3 6.2
A0520 41301-0000 ASPHALT PAVEMENT MILLING SQYD 659 41 700
A0540 60405-0000 MANHOLE ADJUSTMENT EACH 10 1 11
A0560 61109-5000 RELOCATE WATER METER EACH 4 1 5
A0580 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS LNFT 1,100.00 50.00 1,150.00
A0600 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS
(DOUBLE-SIDED) LNFT 5,237.50 262.50 5,500.00
A0620 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT EACH 18 2 20
A0640 61921-1000 REMOVE AND RESET FENCE LNFT 134 6 140
A0660 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 40 40
A0680 62201-0600 BACKHOE LOADER, 8 CUBIC FOOT MINIMUM RATED CAPACITY
BUCKET, 30-INCH WIDTH HOUR 40 40
A0700 62201-2050 ROLLER HOUR 40 40
A0720
62301-0000 GENERAL LABOR HOUR 80 80
MileStone: 100% Date Completed: 04/28/25 Report Date: 04/28/25
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES
-A pr
-2
:2
AM
Remarks and/or Determination of
Estimated Quantity Pay Item Description Unit
Estimated Quantities
C
U se rs \j os hu a.
ch ri st op he r\ D es kt op or -a
1_
SO
Q
_r ev is ed
.x ls m ]S he et
PROJECT
B.1OR FLAP DOUGLAS 251(1)
SHEET
NUMBER
A0740
62201-3000 HYDRAULIC EXCAVATOR HOUR 40 40
Sheet and Description
SECTION D SECTION E SECTION F SECTION H SECTION I SECTION J -
PLAN-PROFILE EROSION
CONTROL DRAINAGE SAFETY
FEATURES
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
A0760 62402-0700 FURNISHING AND PLACING TOPSOIL, 12-INCH DEPTH ACRE 0.2 0.2
A0780 62406-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH ACRE 1.3 0.1 1.4
A0800 62501-0000 TURF ESTABLISHMENT ACRE 1.5 0.1 1.6
A0820 63302-0000 SIGN SYSTEM SQFT 109.5 7.5 117
A0840 63316-1000 REMOVE AND RESET SIGN EACH 41 41
A0860 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE STOP BAR) LNFT 20 5 25
A0880 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE EDGE LINE) LNFT 15,416 784 16,200
A0900 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (DOUBLE YELLOW
CENTERLINE) LNFT 15,240 760 16,000
A0920 63502-1050 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER EACH 80 5 85
A0940 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 40 5 45
A0960 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE
SIGN EACH 2 2
A0980 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT 16,352 16,352
A1000 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 373 27 400
A1020 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 2,000 100 2,100
A1040 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR DAY 90 5 95
-A pr -2
:2
AM
MileStone: 100% Date Completed: 04/28/25 Report Date: 04/28/25
C
U se rs \j os hu a.
ch ri st op he r\ D es kt op or -a
1_
SO
Q
_r ev is ed
.x ls m ]S he et
2)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
PROJECT
B.2OR FLAP DOUGLAS 251(1)
e d g e o f t r a v e le d w a y
S a lm o n H a r b o r D r iv e
C o n s tr u c ti o n l im it s a n
6" compacted depth
Emulsified asphalt treated aggregate base, TRAIL TYPICAL SECTION
"ALI_MAIN_01"
Profile grade
1:4
C o n s tr u c ti o n l im it s
1:2 1:
2 S lo p e s ta k e l im it s
8+43.16 to 73+28.31
LC
1:4
C o n s tr u c ti o n l im it s
1:2
S lo p e s ta k e l im it s class A steel posts (see H-sheets)
Guardrail system MGS, type 2, 41+92 to 45+79
14+17 to 22+29
Varieso f t r a v e le d w a y
S a lm o n H a r b o r D r iv e e d g
C o n s tr u c ti o n l im it s a
(see H-sheets)
Guardrail system MGS, type 2, class A steel posts (double-sided)
66+86 to 72+98
54+30 to 65+93
40+66 to 51+06
33+48 to 40+11
23+12 to 32+04
13+86 to 22+21
8+96 to 12+21
GUARDRAIL WIDENING LT
GUARDRAIL WIDENING RT
base, 6" compacted depth
Emulsified asphalt treated aggregate base, 6" compacted depth
Emulsified asphalt treated aggregate
Existing ground Existing ground
0.1% - 2%
Varies Varies
(see Sheet C.2 for details)
Salmon Harbor Drive
"ALI_MAIN_02"
0.1% - 2%
Varies
(see Sheet C.2 for details)
Salmon Harbor Drive
"ALI_MAIN_02"
Varies
Varies Varies
Varies
Varies
9.75"
7' Traveled Lane7' Traveled Lane
4-inch depth Placing conserved topsoil, 4-inch depth Placing conserved topsoil, Sheet 1 of 2
Varies
Varies
Turf establishment
4-inch depth Placing conserved topsoil, Turf establishment
4-inch depth Placing conserved topsoil, Turf establishmentTurf establishment
:4
A p r il
A
L I_
M A
IN
T
Y P
IC
A
L S
E C
T
IO
N p w w o r k
\d
\o r a ty p .d g n
TYPICAL SECTIONS
PROJECT
C.1
487+25.45 to 526+13.75
FULL DEPTH TYPICAL SECTION
"ALI_MAIN_02"
Varies 3' to 10'
1'
Profile grade
1.5% Crown 1.5% Crown
2' Shoulder Varies 3' to 10'
Existing ground
2' Shoulder
12" compacted depth Roadway aggregate, method 2 equal lifts 4" compacted depth, placed in two Asphalt concrete pavement, type 2
1' LC
526+13.75 to 527+13.75
486+25.45 to 487+25.45
MILL AND ASPHALT OVERLAY TYPICAL SECTION
"ALI_MAIN_02"
equal lifts 4" compacted depth, placed in two Asphalt concrete pavement, type 2
Profile grade
LC (match existing)
Shoulder varies 4'-6'
Asphalt pavement milling, 4-inch depth
Varies 1.5%-2% (match existing)
(match existing)
Shoulder varies 2'-4'
Varies 1.5%-2% (match existing)
Tack coat
Existing ground
Tack coat
(see Sheet C.1 for details)
OHV Trail
"ALI_MAIN_01"
(see Sheet C.1 for details)
OHV Trail
"ALI_MAIN_01"
1:2
Varies 12' Traveled Lane 12' Traveled Lane Varies
C o n s tr u c ti o n l im it s
C o n s tr u c ti o n l im it s
Varies 12' Traveled Lane 12' Traveled Lane Varies
C o n s tr u c ti o n l im it s
C o n s tr u c ti o n l im it s
S lo p e s ta k e l im it s
S lo p e s ta k e l im it s
Sheet 2 of 2
4-inch depth Placing conserved topsoil, Turf establishment
4-inch depth Placing conserved topsoil, Turf establishment
:2
A p r il
A
L I_
M A
IN
T Y
P
IC
A L
S E
C T
IO
S p w w o r k
\d
\o r a ty p .d g n
TYPICAL SECTIONS
PROJECT
NUMBER
OR FLAP DOUGLAS 251(1) C.2
:2
A p r il
T a b u la ti o n o f P la n Q u a n ti ti e s
S h e e t o f p w w o r k
\d
\o r a
P
L N ta b q u a n ti ti e s .d g n
(SHEET 1 OF 2)
PLAN QUANTITIES
TABULATION OF
PROJECT
D.1
[1]
[1]
FOOTNOTE:
Adjust to match design grade [1]
[1]
:2
A p r il
T a b u la ti o n o f P la n Q u a n ti ti e s
S h e e t o f p w w o r k
\d
\o r a
P
L N ta b q u a n ti ti e s .d g n
(SHEET 2 OF 2)
PLAN QUANTITIES
TABULATION OF
PROJECT
D.2
:1 a y
E
A R
T H
W O
R K
S U
M M
A R
Y p w w o r k \d
\o r a P
L N e a r th w o r k .d g n
EARTHWORK SUMMARY
PROJECT
D.3
T P
JB
P C
N
BEGIN CONSTRUCTION
"ALI_MAIN_01" 8+43.16
OHV TRAIL
EL = 14.97
E 3,943,147.531
N 750,755.745
SALMON H
ARBOR DRIV
E
"ALI_MAIN_01" Line to be constructed Edge of trail
Edge of trail Slope stake limit
Construction limit
Profile grade
Existing ground
Guardrail system MGS, type 2, class A steel posts (double-sided) 9+21 to 11+96 LT
8+43.16 TO 13+00.00
OHV TRAIL
in place
Existing barrier to remain
"ALI_MAIN_02"
tangent Terminal section, yype MGS, 8+96 to 9+21 tangent Terminal section, type MGS, 11+96 to 12+21 LT
"ALI_APPR_01"
Edge of guardrail widening
(See Sheet D.23) road approach. No trail work
Reconstruct Discovery Point Lane
Protect existing utility in place
PI 11+97.23
Δ = 69°02'35" (RT)
R = 166.00' T = 114.18' L = 200.04' e = N/A
PI 8+45.99
Δ = 03°32'22" (LT)
R = 507.00' T = 15.67' L = 31.32' e = N/A
P C
.3
P O
B
.2
N28°45 '19"E
N25°1 2'57
"E
S °4
'2
"E
P T
.6
PC 13+42.14
P C
.0
PT 12+83.08
.9
.1
.1
7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00
8 8
10 10
12 12
14 14
16 16
18 18
20 20
22 22
-0.39%
+0.68%
+0.60%
.0
.7
L P
.8
HLSD = INF'
K = 56
60' VC
:3
A p ri l
A L
I_ M
A
IN
P la n
S h e t] p w
-w o rk \d
\o r-a
P L
N
P P
IF
.d g n
PROJECT
D.4
SS
JB
EM
JBT
JB
Power
JB
Power Power
N
"ALI_MAIN_01" Line to be constructed
Edge of trail
Edge of trail
Slope stake limit
Profile grade
Existing ground
13+00.00 TO 19+00.00
OHV TRAIL
fence, since removed
Location of old
Construction limit
"ALI_MAIN_02"
"ALI_APPR_01"
Class A steel posts (double-sided) Guardrail system MGS, type 2, 14+11 to 21+86 LT
Guardrail system MGS, type 2, Class A steel posts 14+42 to 22+04 RT
L A
N E
P O
IN
T
D
IS
C O
V E
R Y during construction
Protect existing utility
(See Sheet D.23) road approach. No trail work
Reconstruct Discovery Point Lane widening
Edge of guardrail
A
L I_
A P
P R
14+17 to 14+42 RT Terminal section, type MGS, tangent
Protect existing utilities in place type MGS, tangent Terminal section, 13+86 to 14+11 LT
S85°44'28"E
PI 16+28.10
Δ = 48°49'37" (LT)
R = 630.00' T = 285.96' L = 536.88' e = N/A
P C
.1
P T
.0
5 1
.8
.8
.0
.5
H
.4
13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00
10 10
12 12
14 14
16 16
18 18
20 20
22 22
24 24
+0.42%
+0.60%
SSD = 1322'
K = 326
300' VC
:3
A p ri l
A L
I_ M
A
IN
P la n
S h e p w
-w o rk \d
\o r-a
P L
N
P P
IF
.d g n
PROJECT
D.5
C P
PK
PC
PC
N
"ALI_MAIN_01" Line to be constructed Edge of trail
Edge of trail
Slope stake limit
(See Sheet D.24)
No trail work
Reconstruct Lighthouse Road approach.
Profile grade
Existing ground
19+00.00 TO 25+00.00
OHV TRAIL
Construction limit
"ALI_MAIN_02"
"ALI_APPR_02"
Guardrail system MGS, type 2, Class A steel posts (double-sided) 14+11 to 21+86 LT
Guardrail system MGS, type 2, class A steel posts 14+42 to 22+04 RT class A steel posts (double-sided) Guardrail system MGS, type 2, 23+37 to 32+00 LT type MGS, tangent Terminal section, 23+12 to 23+37 LT
Terminal section, type MGS, tangent 22+04 to 22+29 RT
R O
A D
L
IG
H T
H O
U S E
Edge of guardrail widening
Terminal section, type MGS, tangent 21+86 to 22+11 LT
A
L I_
A P
P R
Protect existing utility in place
0 2
N45°25'55"E N51°47'12"E
PI 21+27.14
Δ = 06°21'18" (RT)
R = 1,000.00' T = 55.51' L = 110.91' e = N/A
P C
.6
P C
.6
P T
.5
2 2 3 2 4 2
.0
.0
.8
.8
SSD = 1326'
K = 60
50' VC
19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00
10 10
12 12
14 14
16 16
18 18
20 20
22 22
24 24
26 26
-0.50% +0.16%
+1.06%
+0.23%
-0.20%
.0
.8
.0
.8
L P
.7
K = 76
50' VC
:4
A p ri l
A L
I_ M
A
IN
P la n
S h e p w
-w o rk \d
\o r-a
P L
N
P P
IF
.d g n
PROJECT
D.6
S S
P o w e r
N to be constructed
"ALI_MAIN_01" Line
Edge of trail
Slope stake limit
Profile grade
Existing ground
23+37 to 32+00 LT Guardrail system MGS, type 2, class A steel posts (double-sided)
25+00.00 TO 31+00.00
OHV TRAIL
"ALI_MAIN_02"
Construction limit
Manhole adjustment Manhole adjustment
PI 26+38.58
Δ = 31°55'16" (LT)
R = 650.00' T = 185.90' L = 362.13' e = N/A
N19°51'5 7"E
P T
.8
P C
.0
25+50 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29+50 30+00 30+50 31+00
10 10
12 12
14 14
16 16
18 18
20 20
22 22
24 24
26 26
+0.23%
-0.08%
-0.83%
+0.65%
.0
.8
.0
.6
.0
.0
H P
.2
SSD = 1515'
K = 83
60' VC
SSD = 1481'
K = 81
60' VC
HLSD = INF'
K = 121
50' VC
:4
A p ri l
A L
I_ M
A
IN
P la n
S h e p w
-w o rk \d
\o r-a
P L
N
P P
IF
.d g n
PROJECT
D.7
JB
T P S
S S S
N
"ALI_MAIN_01" Line to be constructed
Edge of trail Construction limit
Profile grade
31+00.00 TO 37+00.00
OHV TRAIL
Slope stake limit
"ALI_MAIN_02"
Edge of trail
Existing ground class A steel posts (double-sided) Guardrail system MGS, type 2, 23+37 to 32+00 LT type MGS, tangent Terminal section, 33+48 to 33+73 LT
Removal of boulder
33+73 to 39+86 LT Guardrail system MGS, type 2, class A steel posts (double-sided)
Remove and reset boulder (typ.)
to remain in place
Protect existing culvert type MGS, tangent Terminal section, 32+00 to 32+25 pedestal in place
Protect existing
PI 32+60.22
Δ = 22°11'54" (RT)
R = 1,000.00' T = 196.18' L = 387.43' e = N/A
P T
.4
31+50 32+00 32+50 33+00 33+50 34+00 34+50 35+00 35+50 36+00 36+50 37+00
8 8
10 10
12 12
14 14
16 16
18 18
20 20
22 22
24 24
-0.83%
-0.83%
.0
.0
L P
K = 217
255' VC
:4
A p ri l
A L
I_ M
A
IN
P la n
S h e p w
-w o rk \d
\o r-a
P L
N
P P
IF
.d g n
PROJECT
D.8
S S P K
T P
T
P JB
Pow er
C P
S E
W E R
S E
W E
RS
E W
E R
N Line to be constructed
"ALI_MAIN_01"
Edge of trail
Edge of trail
Slope stake limit
Profile grade
Existing ground
37+00.00 TO 43+00.00
OHV TRAIL
Construction limit
"ALI_MAIN_02"
"ALI_APPR_03"
Guardrail system MGS, type 2, class A steel posts (double-sided) 33+73 to 39+86 LT
Terminal section, type MGS tangent 39+86 to 40+11 LT
Guardrail system MGS, type 2, class A steel posts (double-sided) 40+91 to 50+81 LT type MGS tangent Terminal section, 40+66 to 40+91
MGS, type 2, class A steel posts Guardrail system 42+17 to 45+54 RT type MGS tangent Terminal section, 41+92 to 42+17 RT
SEWER DISTRICT BUILDING
WINCHESTER BAY
BUILDING
SEWER DISTRICT
WINCHESTER BAY
guardrail widening
Edge of culvert to remain in place
Protect existing pipe culvert to remain in place
Protect existing pipe
Remove and reset fence
A
L I_
A P
P R
(See Sheet D.25) driveway approach. No trail work
Reconstruct Winchester Bay Sewer District
Construction limit
PI 41+63.71
Δ = 06°42'29" (RT)
R = 750.00' T = 43.95' L = 87.81' e = N/A
N42°03'51"E
N48°46'19"E
P C
.7
P T
.5
2 4
L P
37+50 38+00 38+50 39+00 39+50 40+00 40+50 41+00 41+50 42+00 42+50 43+00
8 8
10 10
12 12
14 14
16 16
18 18
20 20
22 22
+0.35% -0.29% -0.24%+0.35%
.0
.9
HLSD = INF'
K = 82
114' VC
:2
A p ri l
A L
I_ M
A
IN
P la n
S h e p w
-w o rk \d
\o r-a
P L
N
P P
IF
.d g n
PROJECT
D.9
N
Profile grade
Existing ground to be constructed
"ALI_MAIN_01" Line
Slope stake limit
Edge of trail
Edge of guardrail widening
Edge of trail class A steel posts Guardrail system MGS, type 2, 42+17 to 45+54 RT
Edge of guardrail widening
40+91 to 50+81 LT Guardrail system MGS, type 2, class A steel posts (double-sided)
43+00.00 TO 49+00.00
OHV TRAIL
Construction limit type MGS tangent Terminal section, 45+54 to 45+79 RT
End of "ALI_MAIN_02"
Protect utility in place
Construction limit
N48°46'19"E N40°20'33"E
N61°58'12"EPI 48+24.53
Δ = 21°37'39" (RT)
R = 400.00' T = 76.40' L = 150.99' e = N/A
PI 44+37.43
Δ = 08°25'47" (LT)
R = 1,000.00' T = 73.70' L = 147.12' e = N/A
P C
.7
P T
.8
P C
.1
P T
.1
.6
3 4
43+50 44+00 44+50 45+00 45+50 46+00 46+50 47+00 47+50 48+00 48+50 49+00
8 8
10 10
12 12
14 14
16 16
18 18
20 20
22 22
-0.50%
-0.57%
+1.15%
.0
.5
.0
.3
H P
SSD = 705'
K = 61
100' VC SSD = 14522'
K = 1205
90' VC
:4
A p ri l
A L
I_ M
A
IN
P la n
S h e p w
-w o rk \d
\o r-a
P L
N
P P
IF
.d g n
PROJECT
D.10
TPTP
WATER
WATERWATER
BC
EM
JBJB
WATER
WATERWATER
TP
SS
SS
SS
36"
N to be constructed
"ALI_MAIN_01" Line
Edge of trail
Slope stake limit
Profile grade
Existing ground bollard (typ.)
Remove existing
Edge of guardrail widening
49+00.00 TO 55+00.00
OHV TRAIL
Construction limit
Guardrail system MGS, type 2, class A steel posts (double-sided) 40+91 to 50+81 LT
Terminal section, type MGS tangent 50+81 to 51+06 LT
54+30 to 54+55 LT Terminal section, type MGS tangent
Guardrail system MGS, type 2, class A steel post (double-sided) 54+55 to 65+68 LT
Manhole adjustments
(See Sheet D.26)
Windy Cove West Campground Entrance boulder (typ.)
Remove and reset
A
L I_
A P
P R
Protect utility in place
Protect utility in place
"ALI_APPR_04"
Construction limit
PI 49+72.38
Δ = 07°04'07" (RT)
R = 400.00' T = 24.71' L = 49.35' e = N/A
PI 51+14.61
Δ = 22°21'43" (RT)
R = 300.00' T = 59.30' L = 117.09' e = N/A
N61° 58'
12" E
N69°0 2'19
"E
P T
.1
P C
.6
P T
.0
P C
.3
P T
.4
1 5
49+50 50+00 50+50 51+00 51+50 52+00 52+50 53+00 53+50 54+00 54+50 55+00
6 6
8 8
10 10
12 12
14 14
16 16
18 18
20 20
-0.57%
-0.36% +1.05%
.0
.2
.0
.5
L P
.6
K = 418
90' VC
HLSD = INF'
K = 35
50' VC
:4
A p ri l
A L
I_ M
A
IN
P la n
S h e p w
-w o rk \d
\o r-a
P L
N
P P
IF
.d g n
PROJECT
D.11
FP
WATER
SS
SS
TP
TP
TP
W
JBWM
N
"ALI_MAIN_01" Line to be constructed
Edge of trail Slope stake limit
Profile grade
Existing ground bollard (typ.)
Remove existing
55+00.00 TO 61+00.00
OHV TRAIL
Construction limit
Guardrail system MGS, type 2, class A steel posts (double sided) 54+55 to 65+68 LT
Remove and reset boulder (typ.)
Remove and reset boulder (typ.)
Relocate water meter (potable)
Edge of guardrail widening
Protect utility in place
Construction limit
Abandon in place (water valve)
S88°35'59"E
H P
.2
SSD = 806'
K = 36
50' VC
55+50 56+00 56+50 57+00 57+50 58+00 58+50 59+00 59+50 60+00 60+50 61+00
6 6
8 8
10 10
12 12
14 14
16 16
18 18
20 20
-0.33% +0.33% -0.30%
.0
.2
.0
.0
.0
.3
L P
.9
.0
SSD = 1761'
K = 143
90' VC
HLSD = INF'
K = 152
100' VC
:4
A p r il
A
L I_
M A
IN
P la n
S h e p w w o r k \d
\o r a P
L N
P
P I F
.d g n
PROJECT
D.12
GPS
SS
SS
WF
JB
JB
WF
VALVE
WATER
JB
WF
JB
VALVE
WATER
WF WFWV
V
C V
C
DI
21102
N
"ALI_MAIN_01" Line to be constructedEdge of trail
Slope stake limit
Profile grade
Existing ground
61+00.00 TO 67+00.00
OHV TRAIL
Construction limit
Guardrail system, type 2, class A steel posts (double sided) 54+55 to 65+68 LT type MGS tangent Terminal section, 65+68 to 65+93 LT
(irrigation)
Relocate water meter
Abandon in place
Abandon in place Abandon in place
Removal of bollard (typ.)
Removal of boulder
(See Sheet D.27)
Campground Entrance
Windy Cove East
A
L I_
A P
P R
66+86 to 67+11 Terminal section, type MGS tangent
Removal of boulder
Removal of boulder
"ALI_APPR_05"
Construction limit
S88°35'59"E
61+50 62+00 62+50 63+00 63+50 64+00 64+50 65+00 65+50 66+00 66+50 67+00
6 6
8 8
10 10
12 12
14 14
16 16
18 18
20 20
+0.10% +0.65%
+0.29%
-0.30%
.0
.2
L P
.1
K = 124
50' VC
:4
A p r il
A
L I_
M A
IN
P la n
S h e p w w o r k \d
\o r a P
L N
P
P I F
.d g n
PROJECT
D.13
GPS
SS
WATER
WATER
WATER
WATERWATER
WATER
SS
PK
WF
TP
WF
WV
WV
WF
WF
JB
V
C Power
DI
JB
DI
N
"ALI_MAIN_01" Line to be constructed
Edge of trail
Slope stake limit
Profile grade
Existing ground
67+00.00 TO 73+00.00
OHV TRAIL
Plug existing pipe
Protect existing drop inlet in place
67+01 to 71+55
Removal of curb and gutter, concrete
Construction limit
Guardrail system MGS, type 2, class A steel posts (double-sided) 67+11 to 72+73 LT type MGS tangent Terminal section, 72+73 to 72+98 LT
Removal of boulder
Remove inlet
66+86 to 67+11 LT Terminal section, type MGS tangent asphalt
Removal of sidewalk, drop inlet to remain in place
Protect existing to remain in place
Protect existing pipe culvert
Plug existing pipe
Abandon in place
Abandon in place
Abandon in place
(irrigation)
Relocate water meter
Abandon in place
Manhole adjustment
Manhole adjustment
Construction limit
PI 71+48.60
Δ = 54°23'14" (RT)
R = 150.00' T = 77.07' L = 142.39' e = N/A
S34°12'45"E
S48°15'13"E
PI 72+64.79
Δ = 14°02'28" (LT)
R = 150.00' T = 18.47' L = 36.76' e = N/A
PC
72+
46.31
P T
.0
P C
.5
PT 72+
13.92
HLSD = 299'
K = 22
60' VC
.0
.8
67+50 68+00 68+50 69+00 69+50 70+00 70+50 71+00 71+50 72+00 72+50 73+00
6 6
8 8
10 10
12 12
14 14
16 16
18 18
20 20
22 22
+0.29%
+0.29%
:4
A p ri l
A L
I_ M
A
IN
P la n
S h e p w
-w o rk \d
\o r-a
P L
N
P P
IF
.d g n
PROJECT
D.14
F
E
B
JB
Po w er
D I
N
END CONSTRUCTION
"ALI_MAIN_01" 73+28.14
OHV TRAIL
EL = 16.96
E 3,948,237.989
N 753,400.386
Profile grade
Existing ground
Line to be constructed
"ALI_MAIN_01"
Edge of trail
Existing curb existing sidewalk
Saw cut and match
SALMON
H
ARBOR
D
RI
VE
73+00.00 TO 73+28.14
OHV TRAIL
asphalt
Removal of sidewalk, Construction limit
S48°15'13"E
(LT)
P O
E
.8
73+50
8 8
10 10
12 12
14 14
16 16
18 18
20 20
22 22
24 24
+2.9 8%
:5
A p r il
A
L I_
M A
IN
P la n
S h e p w w o r k \d
\o r a P
L N
P
P I F
.d g n
PROJECT
D.15
JB
T P
C P
C P
C P
T P
JB
BEGIN CONSTRUCTION
"ALI_MAIN_02" 486+25.45
SALMON HARBOR DRIVE
BEGIN MILL AND FILL
EL.= 14.766
E= 3,943,035.837
N= 750,640.353 to be constructed
"ALI_MAIN_02" line
Edge of pavement
Edge of aggregate shoulder
Slope stake limit
"ALI_MAIN_01"
Profile grade
Existing ground
Saw cut pavement
486+25.45 TO 491+50
SALMON HARBOR DRIVE
Construction limit
"ALI_MAIN_02" 487+25.45
SALMON HARBOR DRIVE
RECONSTRUCTION
BEGIN FULL DEPTH
END MILL AND FILL
Edge of traveled way
EL.= 14.785
E= 3,943,099.626
N= 750,717.141
N25°3 1'24"
E e = 0.060
'212.46L =
'120.57T =
'180.00R =
(RT)67°37'44"Δ =
491+47.99PI
e = 0.050 '226.51L = '115.23T = '500.00R =
(LT)25°57'22"Δ =
486+88.58PI
.3
T
492+39.89
PT
6 4
486+00 486+50 487+00 487+50 488+00 488+50 489+00 489+50 490+00 490+50 491+00 491+50
8 8
10 10
12 12
14 14
16 16
18 18
20 20
22 22
24 24
-0.22% +0.53%
+1.12%
+2.12%
.0
.0
.0
.6
0 4
.0
.7
7 4
.0
.8
L P
SSD = 406'
K = 30
90' VC
HLSD = INF'
K = 133
100' VC
HLSD = INF'
K = 119
70' VC
HLSD = INF'
K = 40
40' VC
.7
CONNECTION DETAIL
Existing Roadway
Tack coat face Vertical saw cut
Proposed pavement structure
:5
A p ri l
A L
I_ M
A
IN
P la n
S h e p w
-w o rk \d
\o r-a
P L
N
P P
IF
.d g n
PROJECT
D.16
EM
JB
PK
Power Power
JB
CABLE
SS
PK
EM
JB
TJB
Power Power
"ALI_MAIN_02" line to be constructed
Edge of aggregate shoulder
Slope stake limit
"ALI_APPR_01"
"ALI_MAIN_01"
Profile grade
491+50 TO 497+50
SALMON HARBOR DRIVE
(See Sheet D.23) road approach
Discovery Point Lane
Construction limit
Edge of pavement Edge of traveled way
Approach match line
Existing ground
492+00 492+50 493+00 493+50 494+00 494+50 495+00 495+50 496+00 496+50 497+00 497+50
8 8
10 10
12 12
14 14
16 16
18 18
20 20
22 22
24 24
-0.87%
-0.72% -0.51% +0.71% -0.32% +0.74% -0.33%
.0
.6
.0
.0
.0
.1
.0
.5
.0
.0
.0
.3
L P
L
.5
SSD = 1069'
K = 48
50' VC
SSD = 1029'
K = 37
40' VC
HLSD = INF'
K = 265
40' VC
HLSD = INF'
K = 184
40' VC
HLSD = INF'
K = 49
60' VC
HLSD = INF'
K = 38
40' VC
:3
A p r il
A
L I_
M A
IN
P la n
S h e p w w o r k \d
\o r a P
L N
P
P I F
.d g n
PROJECT
D.17
PK
S S
C P
PK
497+50 TO 503+50
SALMON HARBOR DRIVE
"ALI_MAIN_02" line to be constructed
"ALI_MAIN_01"
Profile grade
Existing ground
"ALI_APPR_02"
Approach match line
(See Sheet D.24) road approach
Lighthouse Road
Edge of traveled way Construction limit
Edge of aggregate shoulder
Edge of pavement
Slope stake limit to remain in place
Protect existing culvert obliteration (See Sheet D.34)
Perform roadway
2 2 3 2
498+00 498+50 499+00 499+50 500+00 500+50 501+00 501+50 502+00 502+50 503+00 503+50
10 10
12 12
14 14
16 16
18 18
20 20
22 22
24 24
26 26
-0.33% +0.69%
-0.21% +0.69%
.0
.6
.0
.6
.0
.0
L P
.9
SSD = 1253'
K = 101
90' VC
HLSD = INF'
K = 89
90' VC
HLSD = INF'
K = 101
90' VC
:4
A p r il
A
L I_
M A
IN
P la n
S h e p w w o r k \d
\o r a P
L N
P
P I F
.d g n
PROJECT
D.18
P o w e r
S S
S S
S S
P o w e r
503+50 TO 509+50
SALMON HARBOR DRIVE
line to be constructed
"ALI_MAIN_02"
"ALI_MAIN_01"
Slope stake limit
Profile grade
Existing ground
Construction limit Edge of traveled way
Edge of aggregate shoulder
Edge of pavementPerform roadway obliteration (see Sheet D.34)
N49°06'21"E
N22°0 3'21"
E e = 0.050
'236.06L =
'120.27T =
'500.00R =
(LT)27°03'00"Δ =
505+82.65PI
e = 0.036 '124.08L = '62.07T = '1,600.00R =
(LT)04°26'36"Δ =
508+89.57PI
5 5
504+00 504+50 505+00 505+50 506+00 506+50 507+00 507+50 508+00 508+50 509+00 509+50
10 10
12 12
14 14
16 16
18 18
20 20
22 22
24 24
26 26
+0.69%
+0.41% -0.30%5
.0
.2
.0
.1
H
P
SSD = 3954'
K = 362
100' VC
SSD = 1568'
K = 141
100' VC
:5
A p ri l
A L
I_ M
A
IN
P la n
S h e p w
-w o rk \d
\o r-a
P L
N
P P
IF
.d g n
PROJECT
D.19
S S
T P
C P
C P
T P
S S
S S
509+50 TO 515+50
SALMON HARBOR DRIVE
"ALI_MAIN_02" line to be constructed
"ALI_MAIN_01"
Edge of pavement Slope stake limit
Profile grade
Existing ground
Construction limit
Edge of aggregate shoulder
Edge of traveled way
Slope stake limit
Removal of boulder
N17° 36'4
6"E e = 0.042
'325.91L =
'165.57T =
'750.00R =
(RT)24°53'52"Δ =
512+04.37PI
510+00 510+50 511+00 511+50 512+00 512+50 513+00 513+50 514+00 514+50 515+00 515+50
10 10
12 12
14 14
16 16
18 18
20 20
22 22
24 24
26 26
-0.68%
-1.47%
+0.67%
.0
.5
.0
.6
.0
.8
L P
SSD = 2919'
K = 266
100' VC
SSD = 1391'
K = 63
50' VC
HLSD = 801'
K = 47
100' VC
:0
A p ri l
A L
I_ M
A
IN
P la n
S h e p w
-w o rk \d
\o r-a
P L
N
P P
IF
.d g n
PROJECT
D.20
JB
S E
W E R
T P
JB
S E
W E R
S E
W E R
C P
C P
Pow er
S S
C P
S S
JB
T P
T
P JB
Pow er
C P
S E
W E R
S E
W E R
S E
W E R
515+50 TO 521+50
SALMON HARBOR DRIVE
"ALI_MAIN_02" line to be constructed
"ALI_MAIN_01"
Slope stake limit
Existing ground
Profile grade
"ALI_APPR_03"
Approach match line
(see Sheet D.25) driveway approach
Winchester Bay Sewer District
Sheet D.34) obliteration (see
Perform roadway
Construction limit
Slope stake limit
Edge of aggregate shoulderEdge of pavement Edge of traveled way to remain in place
Protect existing culvert to remain in place
Protect existing culvert
Manhole adjustment Manhole adjustment
516+00 516+50 517+00 517+50 518+00 518+50 519+00 519+50 520+00 520+50 521+00 521+50
8 8
10 10
12 12
14 14
16 16
18 18
20 20
22 22
24 24
+0.67%
+0.54% -0.30%5
.0
.0
.0
.1
H P
SSD = 8438'
K = 700
90' VC
SSD = 1343'
K = 120
100' VC
:4
A p r il
A
L I_
M A
IN
P la n
S h e p w w o r k \d
\o r a P
L N
P
P I F
.d g n
PROJECT
D.21
K
S S
S S
P K
END CONSTRUCTION
521+50 TO 527+13.75
SALMON HARBOR DRIVE
"ALI_MAIN_02" 527+13.48
SALMON HARBOR DRIVE
END MILL AND FILL
EL.= 18.491
E= 3,945,766.014
N= 753,446.731
"ALI_MAIN_02" 526+13.48
SALMON HARBOR DRIVE
BEGIN MILL AND FILL
RECONSTRUCTION
END FULL DEPTH
EL.= 18.957
E= 3,945,700.504
N= 753,371.200
"ALI_MAIN_02" line to be constructed
"ALI_MAIN_01"
Slope stake limit
Profile grade
Existing ground obliteration (see Sheet D.34)
Perform roadway
Edge of traveled way
Edge of pavement Edge of aggregate shoulder
Construction limit4
522+00 522+50 523+00 523+50 524+00 524+50 525+00 525+50 526+00 526+50 527+00 527+50
8 8
10 10
12 12
14 14
16 16
18 18
20 20
22 22
24 24
+0.44%
-0.54%
.0
.0
.0
.2
L P
SSD = 1152'
K = 102
100' VC
HLSD = INF'
K = 135
100' VC
CONNECTION DETAIL
Existing Roadway
Tack coat face
Vertical saw cut
Proposed pavement structure
:4
A p r il
A
L I_
M A
IN
P la n
S h e p w w o r k \d
\o r a P
L N
P
P I F
.d g n
PROJECT
D.22
Power
JB
4189 H&T
244° 28.44'
STOP
CABLE
N
BEGIN CONSTRUCTION
END CONSTRUCTION
11.00' RT
"ALI_MAIN_02" 492+75.66,
"ALI_APPR_01" 0+12.00 =
APPROACH
DISCOVERY POINT LANE
"ALI_APPR_01" 0+86.17
APPROACH
DISCOVERY POINT LANE
"ALI_APPR_01" line to be constructed
Construction limit
Construction limits
Slope stake limit
Slope stake limit
Edge of pavement
Edge of pavement
Approach match line
"ALI_MAIN_02"
Profile grade
Existing ground
Match existing grade
Elev. 17.73
E 3,943,442.137
N 751,076.174
Elev. 17.348
E 3,943,439.179
N 751,001.061
0+00 TO 0+86.17
DISCOVERY POINT LANE APPROACH
"ALI_MAIN_01"
S '1
W
-0+50 0+00 0+50
14 14
16 16
18 18
20 20
.6
-1.20% +0.50% -1.14%
.4
.6
.0
.4
SSD = 669'
K = 11
18' VC
HLSD = INF'
K = 14
24' VC
:0
A p r il
A
L I A
P P
R
P la n
S h e p w w o r k \d
\o r a P
L N
P
P I F
.d g n
PROJECT
D.23
PK
BEGIN CONSTRUCTION
END CONSTRUCTION
502+10.99. 11.00' RT
= "ALI_MAIN_02"
"ALI_APPR_02" 2+11.17
APPROACH
LIGHTHOUSE ROAD
"ALI_APPR_02" 2+69.76
APPROACH
LIGHTHOUSE ROAD
El. 17.96
E 3,944,236.327
N 751,511.508
El. 18.311
E 3,944,265.315
N 751,460.594
2+00.00 TO 2+69.76
LIGHTHOUSE ROAD APPROACH
Approach match line
Construction limit
Construction limit
Slope stake limit
Slope stake limit
Edge of pavement
Edge of pavement
Existing ground
Profile grade
"ALI_MAIN_02"
"ALI_MAIN_01"
"ALI_APPR_02" line to be constructed
Match existing grade
POB 2+00.00
POE 2+69.76
S '1
E
2+00 2+50
14 14
16 16
18 18
20 20
+1.03% +0.49%
.0
.0
SSD = 2021'
K = 37
20' VC
.9
:0 p r il
A
L I A
P P
R
P la n
S h e p w w o r k \d
\o r a P
L N
P
P I F
.d g n
PROJECT
D.24
3+98.83 TO 4+42.65
DRIVEWAY APPROACH
WINCHESTER BAY SEWER DISTRICT
BEGIN CONSTRUCTION END CONSTRUCTION
11.00' RT
= "ALI_MAIN_02" 519+87.07,
"ALI_APPR_03" 4+09.83
DRIVEWAY APPROACH
WINCHESTER BAY SD
"ALI_APPR_03" 4+42.65
DRIVEWAY APPROACH
WINCHESTER BAY SD
EL = 17.42
E = 3,945,267.224
N = 752,920.634
EL = 16.08
E = 3,945,290.448
N = 752,897.454
Construction limit
Slope stake limit
Edge of pavement existing pavement
Saw cut and match
Edge of pavement
Approach match line
"ALI_MAIN_01"
"ALI_MAIN_02"
"ALI_APPR_03" line to be constructed
Construction limit
P O
B
.8
S45°03'14"E
P O
E
.6
3+00 3+50 4+004+00
12 12
14 14
16 16
18 18
20 20
3+00 3+50 4+004+00
12 12
14 14
16 16
18 18
20 20
.4
-4.93%
-2.75%
.0
.4
HLSD = 520'
K = 9
20' VC
:2
A p r il
A
L I A
P P
R
P la n
S h e p w w o r k \d
\o r a P
L N
P
P I F
.d g n
PROJECT
D.25
N
5+20.31 TO 5+48.48
CAMPGROUND ENTRANCE
WINDY COVE WEST
BEGIN CONSTRUCTION
8' LT
= "ALI_MAIN_01" 54+12.06
"ALI_APPR_04" 5+20.31
CAMPGROUND ENTRANCE
WINDY COVE WEST
END CONSTRUCTION
"ALI_APPR_04" 5+48.48
WINDY COVE WEST CAMPGROUND ENTRANCE
"ALI_APPR_04" Line to be constructed
Profile grade
Existing ground
"ALI_MAIN_01"
Harbor Drive) of pavement (Salmon
Match existing edge match trail grade
Edge of pavement;
Slope stake limit
Slope stake limit
Match existing pavement
Construction limit
Edge of trail
EL.= 13.883
E 3,946,382.754
N 753,577.395
EL.= 13.576
E 3,946, 382.754
N 753,577.395 limit
Construction
S00°00'00"E
-1.09%
.8
4+50 5+00
10 10
12 12
14 14
16 16
:3
A p r il
A
L I A
P P
R
P la n
S h e p w w o r k \d
\o r a P
L N
P
P .d g n
PROJECT
D.26
SS
F
JB
JB
W F
VALVE
WATER
JB
W F
JB
NBEGIN CONSTRUCTION
END CONSTRUCTION
8' LT
= "ALI_MAIN_01" 66+36.21,
"ALI_APPR_05" 6+34.68
CAMPGROUND ENTRANCE
WINDY COVE EAST
"ALI_APPR_05" 6+88.63
WINDY COVE EAST CAMPGROUND ENTRANCE
EL = 13.964
E = 3,947,606.738
N = 753,568.890
EL = 13.430
E = 3,947,651.080
N = 753,538.154
Existing ground
Profile grade to be constructed
"ALI_APPR_05" Line
Edge of approach
Edge of pavement
Slope stake limit
Slope stake limit
Construction limit
6+00.00 TO 6+88.63
CAMPGROUND ENTRANCE
WINDY COVE EAST
"ALI_MAIN_01"
Edge of pavement
(Salmon Harbor Drive)
Match existing edge of pavement
Construction limit
S55°16'18"E
P O
B
.0
P O
E
.6
5+50 6+00 6+50
10 10
12 12
14 14
16 16
5+50 6+00 6+50
10 10
12 12
14 14
16 16
.9
-0.99%
:5
A p r il
W
C E a s t
P la n
S h e p w w o r k \d
\o r a P
L N
P
P .d g n
PROJECT
D.27
'20.59
"ALI_APPR_01 "0+86.17
'15.84
"ALI_APPR_01 "0+86.17
'0.00
"ALI_APPR_01 "0+86.17
'20.62
"ALI_APPR_01 "0+66.09
'86.74
"ALI_APPR_01 "0+10.85
'110.54
"ALI_APPR_01 "0+26.59
'20.66
"ALI_APPR_01 "0+82.43
'0.00
"ALI_APPR_01 "0+00.00
R = 72'
R = 63'
17.53El.=
17.35El.=
17.33El.=
17.70El.=
17.39El.=
17.41El.=
17.51El.=
18.05El.=
17.43El.=
'0.00
"ALI_APPR_01 "0+11.00
"ALI_MAIN_01"
"ALI_MAIN_02"
"ALI_APPR_01"
Edge of pavement
(Salmon Harbor Drive)
Edge of pavement
Approach match line
(roadway)
Edge of pavement
:5
A p r il
D
IS
C
O V
E R
Y P
O
IN
T L
A N
E A
P P
R O
A C
H L
A Y
O U p w w o r k
\d
\o r a
L
A Y
O U
T
I F
.d g n
APPROACH LAYOUT
DISCOVERY POINT LANE
PROJECT
D.28
'16.80
"ALI_APPR_02 "2+69.76
'0.00
"ALI_APPR_02 "2+69.76
'17.16
"ALI_APPR_02 "2+69.76
'69.15
"ALI_APPR_02 "2+21.27
'64.89
"ALI_APPR_02 "2+01.90
'0.00
"ALI_APPR_02 "2+11.17
'0.00
"ALI_APPR_02 "2+00.00
18.14El.=
18.31El.=
18.18El.=
18.11El.=
17.60El.=
18.37El.=
18.02El.=
17.96El.=
17.76El.=
'17.08
"ALI_APPR_02 "2+67.42
'17.76
"Edge of pavement"2+53.17
18.16El.=
0.00El.=
'34.96
"ALI_APPR_02 "2+29.81
'31.52
"AL_MAIN_01"2+19.81
R = 55'
R = 45'
"ALI_MAIN_01"
"ALI_MAIN_02"
Edge of pavement
Edge of pavement
(roadway)
Edge of pavement
(roadway)
Edge of pavement
Approach match line
N52°12'3 7"E
:2
A p r il
L
IG
H
T H
O U
S E
R O
A D
A P
P R
O A
C H
L A
Y O p w w o r k
\d
\o r a
L
A Y
O U
T
I F
.d g n
APPROACH LAYOUT
LIGHTHOUSE ROAD
PROJECT
D.29
16.19El.=
' RT8.26
"ALI_APPR_03 "4+42.65
' LT7.63
"ALI_APPR_03 "4+42.65
' LT8.67
"ALI_APPR_03 "4+34.55
' LT37.57
"ALI_APPR_03 "4+08.37
' RT22.36
"ALI_APPR_03 "4+10.79
' RT13.15
"ALI_APPR_03 "4+18.03
' RT11.37
"ALI_APPR_03 "4+26.99
'0.00
"ALI_APPR_03 "3+98.83
'0.00
"ALI_APPR_03 "4+42.65
16.08El.=
15.98El.=
16.04El.=
16.84El.=
17.10El.=
16.95El.=
16.68El.=
16.38El.=
'0.00
"ALI_APPR_03 "4+09.84
16.89El.=
16.28El.=
' LT11.15
"ALI_APPR_03 "4+25.86
R = 9'
R = 30'
"ALI_MAIN_01"
"ALI_MAIN_02"
match line
Approach
Edge of pavement
Edge of pavement
"ALI APPR 03"
:1 p r il
W
IN
C
H E
S T
E R
B A
Y S
D D
R
IV
E W
A Y
A P
P R
O A
C H
L A
Y O p w w o r k
\d
\o r a
L
A Y
O U
T
I F
.d g n
APPROACH LAYOUT
WINCHESTER BAY SD DRIVEWAY
PROJECT
D.30
' LT18.37
"ALI_APPR_04 "5+48.48
'0.00
"ALI_APPR_04 "5+48.48
' RT16.11
"ALI_APPR_04 "5+48.48
14.10El.=
13.81El.=
13.70El.=
13.79El.=
13.89El.=
14.09El.=
13.37El.=
13.58El.=
13.51El.=
' LT16.16
"ALI_APPR_04 "5+42.46
13.30El.=
'0.00
"ALI_APPR_04 "5+20.31
13.88El.=
' LT17.19
"ALI_APPR_04 "5+45.71
' RT16.11
"ALI_APPR_04 "5+46.55
' RT16.55
"ALI_APPR_04 "5+41.66
13.60El.=
13.41El.=
13.55El.=
R = 27.5'
R = 17.5'
' LT33.78
"ALI_APPR_04 "5+21.32
' LT19.88
"ALI_APPR_04 "5+27.54
' LT16.15
"ALI_APPR_04 "5+35.46
' RT18.89
"ALI_APPR_04 "5+34.60
' RT23.84
"ALI_APPR_04 "5+27.44
' RT42.92
"ALI_APPR_04 "5+19.06
Edge of pavement
Edge of pavement
Edge of trail
"ALI_APPR_04"
"ALI_MAIN_01"
Edge of Salmon Harbor Drive
:2 p r il
W
IN
D
Y C
O V
E W
E S
T C
A M
P G
R O
U N
D E
N T
R A
N C
E L
A Y
O p w w o r k
\d
\o r a
L
A Y
O U
T
I F
.d g n
ENTRANCE LAYOUT
WINDY COVE WEST CAMPGROUND
PROJECT
D.31
LT' 12.46
"ALI_APPR_05 "6+80.75
LT' 11.16
"ALI_APPR_05 "6+88.63
'0.00
"ALI_APPR_05 "6+88.63
RT' 11.16
"ALI_APPR_05 "6+88.63
RT' 11.16
"ALI_APPR_05 "6+76.52
RT' 11.84
"ALI_APPR_05"6+64.86
RT' 16.66
"ALI_APPR_05 "6+23.83
'0.00
"ALI_APPR_05 "6+49.24
13.73El.=
13.61El.=
13.53El.=
13.54El.=
13.44El.=
13.42El.=
13.29El.=
13.45El.=
0.00El.=
RT' 28.48
"ALI_APPR_05 "5+91.37
R = 9'
R = 75'
R = 100'
' LT28.92
"ALI_APPR_05 "6+77.36
14.02El.=
RT' 14.83
"ALI_APPR_05"6+39.43
LT' 16.64
"ALI_APPR_05 "6+74.54
13.63El.=
'0.00
"ALI_APPR_05 "6+34.04
"ALI_APPR_05"
Edge of trail
Edge of trail
"ALI_MAIN_01"
Edge of pavement
(Salmon Harbor Drive)
Match existing edge of pavement
Edge of pavement
:2 p r il
W
IN
D
Y C
O V
E E
A S
T C
A M
P G
R O
U N
D E
N T
R A
N C
E L
A Y
O p w w o r k
\d
\o r a
L
A Y
O U
T
I F
.d g n
ENTRANCE LAYOUT
WINDY COVE EAST CAMPGROUND
PROJECT
D.32
NO SCALE
NOTES:
(typ.)
Ripper shank
3'2.5' Minimum
20%
ROADWAY OBLITERATION, METHOD 1
Existing ground
Existing ground surfacing
Existing asphalt
4. Place excavated shoulder material against back slope.
3. Outslope roadbed 20% minimum.
2. Excavate outside shoulder 3' deep.
of two ripper shanks.
1. Rip the inside lane using two passes with a minimum
Placing conserved topsoil, 4-inch depth
Turf establishment
:2 p r il
R
O A
D W
A Y
O B
L
IT
E R
A T
D
T
IL
p w w o r k
\d
\o r a f f .d g n
DETAIL
ROADWAY OBLITERATION
PROJECT
D.34
Control Finalized: February, 2021
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
21101 753517.066 3948250.977 16.578 43°40'32.012882"N 124°10'44.685785"W -66.3428 0.999936892 5/8" IR W/FHWA ALUM CAP 1.
21102 753626.861 3947513.844 13.544 43°40'32.776390"N 124°10'54.772451"W -69.4357 0.999937073 5/8" IR W/FHWA ALUM CAP
21103 753557.278 3945842.767 18.357 43°40'31.363814"N 124°11'17.448335"W -64.7569 0.999936788 5/8" IR W/FHWA ALUM CAP
21104 752943.273 3945248.318 16.806 43°40'25.046838"N 124°11'25.161501"W -66.3555 0.999936594 5/8" IR W/FHWA ALUM CAP
21105 752218.010 3944673.951 19.418 43°40'17.640669"N 124°11'32.534510"W -63.7884 0.999936155 5/8" IR W/FHWA ALUM CAP
21106 751531.568 3944213.153 17.358 43°40'10.666876"N 124°11'38.386553"W -65.8846 0.999935959 5/8" IR W/FHWA ALUM CAP
21107 751087.339 3943295.032 19.205 43°40'05.883620"N 124°11'50.599923"W -64.1134 0.999935672 5/8" IR W/FHWA ALUM CAP
21108 750637.435 3943053.360 15.129 43°40'01.339043"N 124°11'53.614699"W -68.2086 0.999935676 5/8" IR W/FHWA ALUM CAP
21109 750358.656 3942661.526 14.624 43°39'58.417447"N 124°11'58.773209"W -68.7462 0.999935578 5/8" IR W/FHWA ALUM CAP
C181 753676.075 3946324.678 15.603 43°40'32.745485"N 124°11'10.968133"W -67.4724 0.999936977 Brass cap
PROJECT :Oregon Dunes-Umpqua dunes access improvements DATE OF FIELD WORK : January, 2021
PROJECT UNITS : International foot COORDINATE SYSTEM : Oregon South SPCS NAD83 2011
EPOCH DATE : 2010.0000
VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID18
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
C
U se rs \j os hu a.
ch ri st op he r\ D es kt op
O re go n_
D un es _C on tr ol sh ee t.
xl sx
]S he et
-A pr
-2
:5
W
FL
H D
S ur ve y
W
FL
H D
S ur ve y
D es ig ne d by
C he ck ed b y:
PROJECT
D.35
SHEET
NUMBER
SURVEY CONTROL
"8
Outside margin =
"8
Border radius = 1
"8
Border thickness =
3'-6"
2" C
2"
2" C
3"
" B2
"2
4" C
3"
14" specific project information background. Adjust text to match
Black border and text on white
Refer to Subsection 107.01A
ESCP Sign
:5
A p r il
T
A B
U L
A T
IO
N
O F
E R
O S
IO
N
C O
N T
R O
L Q
U A
N T
IT
IE
p w w o r k
\d
\o r a
E
S C
Q
T A
B .d g n
CONTROL QUANTITIES
TABULATION OF EROSION
PROJECT
E.1
DI
N
Sheet 1 of 6
LEGEND:
Fiber roll
Silt fence
Inlet protection
"ALI_MAIN_01"
"ALI_MAIN_01"
"ALI_MAIN_02"
"ALI_MAIN_02"
Slope stake limit
Slope stake limit
Slope stake limit
Slope stake limitConstruction limit
Construction limit
Construction limit
Construction limit
Edge of pavement
Edge of trail
:1
A p r il
A
L I_
M A
IN
P la n
S h e p w w o r k \d
\o r a E
S C
P la n .d g n
EROSION CONTROL PLAN
PROJECT
E.2
2 2
N
Sheet 2 of 6
LEGEND:
Fiber roll
Silt fence
Inlet protection
"ALI_MAIN_01"
"ALI_MAIN_01"
"ALI_MAIN_02"
"ALI_MAIN_02"
Slope stake limit
Slope stake limit
Slope stake limit
Slope stake limit
Construction limit
Construction limit
Construction limit
Construction limit
Edge of pavement
Edge of trail
Edge of pavement
Edge of trail
:1
A p r il
A
L I_
M A
IN
P la n
S h e p w w o r k \d
\o r a E
S C
P la n .d g n
EROSION CONTROL PLAN
PROJECT
E.3
2 3
S E
W E R
N
LEGEND:
Inlet protection
Silt fence
Fiber roll
Sheet 3 of 6
"ALI_MAIN_01"
"ALI_MAIN_01"
"ALI_MAIN_02"
"ALI_MAIN_02"
Slope stake limit
Slope stake limit
Slope stake limit
Slope stake limit
Construction limit
Construction limit
Construction limit
Construction limit
Edge of pavement
Edge of pavement
Edge of trail
Edge of trail
:2
A p r il
A
L I_
M A
IN
P la n
S h e p w w o r k \d
\o r a E
S C
P la n .d g n
EROSION CONTROL PLAN
PROJECT
E.4
W E R
S E
W E R
S E
W E R
N
2 4
3 4
N
LEGEND:
Inlet protection
Silt fence
Fiber roll
Sheet 4 of 6
"ALI_MAIN_01"
"ALI_MAIN_01"
"ALI_MAIN_02"
"ALI_MAIN_02"
Slope stake limits
Slope stake limit
Slope stake limit
Slope stake limit
Construction limit
Construction limit
Construction limit
Construction limit
Edge of pavement
Edge of pavement
Edge of trail
Edge of trail
8 4
:2
A p r il
A
L I_
M A
IN
P la n
S h e p w w o r k \d
\o r a E
S C
P la n .d g n
EROSION CONTROL PLAN
PROJECT
E.5
PROPANE
PROPANE
N
N
LEGEND:
Inlet protection
Silt fence
Fiber roll
Sheet 5 of 6
"ALI_MAIN_01"
"ALI_MAIN_01"
Slope stake limit
Slope stake limitConstruction limit
Construction limit
Edge of trail
Edge of trail
Construction limit
Construction limit
:2
A p r il
A
L I_
M A
IN
P la n
S h e p w w o r k \d
\o r a E
S C
P la n .d g n
EROSION CONTROL PLAN
PROJECT
E.6
DI
DI
N
D I
N
LEGEND:
Inlet protection
Silt fence
Fiber roll
Sheet 6 of 6
"ALI_MAIN_01"
"ALI_MAIN_01"
Slope stake limit
Slope stake limit
Construction limit
Construction limit
Edge of trail
Edge of trail
Construction limit
Construction limit
:2
A p r il
A
L I_
M A
IN
P la n
S h e p w w o r k \d
\o r a E
S C
P la n .d g n
EROSION CONTROL PLAN
PROJECT
E.7
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
Fi ll slo pe
T o e o f s lo p e
PLAN
ELEVATION
4.
3.
2.
1.
T o e o f s lo p e
Fi ll sl op e
ELEVATION
PLAN
PLAN
PLAN
END DETAIL
END POSTS DETAIL
POSTS AT JOINTS
Varies
Varies
Geotextile
Steel or wood post
Backfilled and compacted soil f o r s p a c in g
S e e N o te
Limits of clearing
(undisturbed)
Existing ground
Silt fence reinforcement
NOTE:
Staple or tie
Section B
Geotextile fabric, Tie top of posts together driven tightly together.
Steel or wood posts
Steel or wood post
Staple or tie
Geotextile fabric
Fasten fabric to posts around each post one full turn.
Fold geotextile fabric See Note 3
End Posts Detail
End posts, see
End Posts Detail
End posts, see
See Note 3 fabric, Section A
Geotextile
Flow
Flow
Flow running around the ends.
Curve ends of silt fence upgrade to prevent water from as possible.
Install silt fence to follow the ground contours as closely does not slide down, supporting posts.
All types must ensure silt fence remains attached to, and manufacturer's recommendations for installation procedures.
as long as specified dimensions are satisfied. Follow
Alternate preassembled silt fence options will be allowed m in m in m in
6-foot (max.) spacing without silt fence reinforcement.
10-foot (max.) spacing with silt fence reinforcement.
4" min.
6" min. trench
DETAIL APPROVED FOR USE 10/2016
REVISED:
157-1W
WFLHD DETAIL
SILT FENCE
:4
A p r il
D e t
W p w w o r k
\d
\W
.d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
E.8
OR FLAP DOUGLAS 251(1) E.9
OR FLAP DOUGLAS 251(1) E.10
Existing ground
Fiber roll
3' (min.)
ELEVATION
3' min. or as specified in plans
Runoff from disturbed areas
PLAN
Existing ground (typ.)
I lg_
--- Flow direction
INSTALLATION BEYOND TOE OF SLOPE
ALTERNATE FIBER ROLL .JOINT DETAIL
SLOPE PROTECTION INSTALLATION
Excavate trench 2" larger than fiber roll
Step 1: Excavate trench and install fiber rolls
Backfilled and compacted soil to match ground level
Step 2: Backfill soil against fiber rolls
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
FIBER ROLL SPACING STAKES REQUIRED
Slope Spacing
(FT)
Fiber roll length Stakes required (FT) for each roll
1:4 or flatter 40 25 8 1:3 30 20 6
1:2 20 12 4 1:1 10
PROJECT
OR FLAP DOUGLAS 251(1)
NOTE:
1. Drive stakes at each end and at 4-foot spacing until fiber roll is secure to slope. Live stakes may be used for permanent installations. Do not crush fiber roll while staking.
2. Overlap fiber rolls 12-inch minimum. Drive stakes at 6-inches from fiber roll end angles towards the adjacent fiber roll and space stakes at 4-foot max.
Slope
1" x 1" Wood stake
SHEET
NUMBER
E.11
FIBER ROLL STAKING DETAIL
Stagger joints (typ.) Place excavated material on uphill side of fiber roll 1" x 1" or 1" 0 wood stakes. See Note 2.
FIBER ROLL LAPPING DETAIL
Install fiber rolls along contours
INSTALLATION ALONG SLOPES
NO SCALE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
WFLHD DETAIL
FIBER ROLL
DETAIL APPROVED FOR USE 10/2014 DETAIL
REVISED: 7/2016
W157-21
Vegetated dispersion and infiltration area
PROJECT
OR FLAP DOUGLAS 251(1)
OFF-SITE EROSION
CONTROL PLAN
SHEET
E.12
10.4 x 16 20301 -1400
20310 -1000
Station
ES
TI
M A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
R
EM
O V A L
O F
IN
LE
T
PL
U
G
EX
IS
TI
N
G P
IP
E
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD EACH EACH Lt Rt 67+06 --- --- --- 1 N/A N/A --- --- N/A 69+31 --- --- 1 1 N/A N/A --- --- N/A
PROJECT TOTAL 0 1 2
Allowable Pipe Material
NOTE: A Aluminum
1. Steel pipe culvert minimum wall thickness is the larger of ____" or the thickness 4. Plastic pipe is not allowed when final installation is exposed. Furnish metal end sections for AS Aluminized steel required by the Std. 602-1 fill height table. all plastic pipe including those specified with bevels. See Std. 602-5 for acceptable cell class. C Concrete
2. Aluminized steel pipe culvert minimum wall thickness is the larger of ____" or the 5. See Std. 602-7 for acceptable concrete cell class. RC Reinforced Concrete thickness required by the Std. 602-1 fill height table (steel). 6. Structural excavation quantity based on material excavated inside the vertical planes located P Plastic
3. Aluminum pipe culvert minimum wall thickness is the larger of ____" or the 18 inches outside and parallel to the limits of footings or foundations. (blank) Any appropriate material thickness required by the Std. 602-1 fill height table. x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
c:
\p w
-w or k\ d0 or -a
1_
D ra in _T ab s.
xl sx
]S he et
-A pr
-2
1:
P
M K Pa rk er
1/
M
M ad ar
1/
D es ig ne d by
C he ck ed b y:
PROJECT
F.1
SHEET
NUMBER
OR FLAP DOUGLAS 251(1)
Note: The quantities shown hereon are approximate and are subject to field adjustments.
:3
M a r c h
T
A B
U L
A T
IO
N
O F
S A
F E
T Y
Q U
A N
T
IT
p w
-w o rk
\d \O
R -A
S
A F
T
A B
.d g n
SAFETY QUANTITIES
TABULATION OF
PROJECT
H.1
SECTION A-A
BACKUP PLATE
DETAIL D
W-BEAM RAIL ELEMENT AT MID-SPAN SPLICE
SOIL PLATE
DETAIL C
GUARDRAIL POST
SECTION B-B
DETAIL A
SQUARE WASHER
DETAIL B
1¾"
¾
⅜" dia.
approx equal ⅛" thick or
SPLICE BOLT NUT
"16
"32
1¼"
⅝ oval shoulder " 16
15 ⅝" x
"16
1¼" heavy hex nut M ⅝" x 11 modified deep16 1 1" dia. x
Recess both sides
.2
.4
¼
TYP
0.25" R
8" x 24" x ¼" post plate Extruded
0.15"
.2
.2
.1
90° ±1.5° (TYP)
8" x 24" ¼" Post plate
-0.063" 3.375" +0.125"
-0.063" 2.25" +0.125"
-0.0" 0.375" R +0.125"
S 3" x 5.7"
1½"
7½"
½
TYP
1" dia.
½
TYP
T Y
P
W-Beam
Class 4.6
ASTM F568
Double Nuts
Round washer
S 3" x 5.7"See Detail B 2 square washers, " long8 3Class 4.6 bolt, 2
" Ø ASTM F56816
@ 12' - 6" C to C S 3" x 5.7" post
12" - 6" length rail element, 12 gage W-Beam
B
B a wrench, then secure with second nut.
the post and then tightened at least one full turn with Engage top and bottom edges of backup plate with and one round washer. Nuts shall be put on finger tight.
2⅜" long fully threaded double nuts, two square washers, " Ø post bolt and nut, ASTM F568, Class 4.6.16
"16
3¼"
10° "16
" R16
¼
2" R8
" R16
"32
2�about
Symmetrical galvanized steel 12" gage thick
Neutral axis
A
A
¼
6"6"
12" for post bolt slotted hole
" x 2½" 4
½
½
⅜" Ø
" Ø8
1⅛"
2 - 11¼"
2 - 11¼"
1⅝"¼"
1⅝"¼" for driving cut alongthese lines Post plate may be
A
A
⅛
¼
2"
4¼"4¼"
End of W-Beam
12' - 6" installation at post detail post bolts, see typical ¾" x 2½" slotted holes for for splice bolts, see Detail A " x 1⅛" slotted holes32
TYP
PLAN
PLAN
PLAN
ELEVATION
TYPICAL INSTALLATION
ELEVATION SIDE
see Detail D and Note 1 12 gage W-Beam backup plate, *Ungalvanized steel
TRAFFIC DIRECTION
to top of post ⅜" top of rail
NOTES
For delineator placement and spacing, see Sheet H.7.2.
element, except at the post identified on Sheet H.3.
at all posts with the same section as the W-Beam rail Use 12" backup plates for the W-Beam rail elements 1.
3⅜" x 2¼" COLD FORMED CHANNEL POST than the splice bolt detail for clarity *Nut detail is shown proportionally larger
8" x 24" x ¼" Post plate
:2
M a rc h
T
Y P
E
W E
A K
P O
S T
G U
A R
D R p w
-w o rk
\d \o r-a s a fe ty .d g n
(MEDIAN, DOUBLE-SIDED)
TYPE 2 WEAK…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .