Amendment A002.pdf
PDF 1 MB Posted
- Attached to
- OR FLAP DOUGLAS 251(1), Oregon Dunes National Recreation Area ‐ Umpqua Dunes Access Improvements
- Solicitation number
- 69056724B000025
About this file
This document is an Amendment (A002) to Solicitation No. 69056724B000025 for the OR FLAP DOUGLAS 251(1) project, specifically the Oregon Dunes National Recreation Area - Umpqua Dunes Access Improvements. The amendment, dated 06/18/2025, introduces revisions to multiple plan sheets: sheet A.1 revises the "Sheet Index", sheet F.1 revises the plan sheet, and sheets H.2a through H.2c are added. The project involves Off-Highway Vehicle (OHV) trail construction, highway realignment, grading, drainage, and safety improvements across two road segments totaling 2 miles ("ALI_MAIN_01" at 1.2 miles and "ALI_MAIN_02" at 0.8 miles). The project will utilize standard specifications for construction of roads and bridges on federal highway projects, with a design speed of 30 MPH and projected Average Daily Traffic (ADT) increasing from 1,843 in 2024 to 2,249 in 2044.
The amendment specifically details modifications to guardrail systems, including a Guardrail System MGS Type 2 with Class A Steel Posts (double-sided), weak-post W-beam median barrier, and associated technical specifications for bolt and washer configurations. The project is being prepared by the Federal Highway Administration's Western Federal Lands Highway Division in Vancouver, Washington, for implementation in Douglas County, Oregon. The technical revisions include precise engineering drawings for guardrail installation, post configurations, and mounting details, with specific notes on installation techniques such as terminal placement and flare adjustments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Tabulation_OR FLAP DOUGLAS 251(1).pdf | ||
| Bid Summary_OR FLAP DOUGLAS 251(1).pdf | ||
| QA_6-18-2025_2.pdf | ||
| QA_6-18-2025.pdf | ||
| Amendment A001.pdf | ||
| QA_6-16-2025.pdf | ||
| or-a1902511_superelevation_report_SHD.xlsx | XLSX spreadsheet | |
| or-a1902511_plans.pdf | ||
| Physical Data.zip | ZIP file | |
| IFB 69056724B000025_OR FLAP DOUGLAS 251(1).pdf | ||
| or-a1902511_control-points.xlsx | XLSX spreadsheet | |
| or-a1902511_earthwork.pdf | ||
| WFLHD Construction Contract Administration_FY 23 V2.pdf | ||
| or-a1902511_Alignments.pdf | ||
| or-a1902511_escp.pdf | ||
| or-a1902511_XS.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A002 06/18/2025 N/A OR FLAP DOUGLAS 251(1), Oregon Dunes National Recreation Area ‐ Umpqua Dunes Access Improvements
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
69056724B000025
9B. DATED (SEE ITEM 11)
05/22/2025
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
OR FLAP DOUGLAS 251(1), Oregon Dunes National Recreation Area - Umpqua Dunes Access Improvements
See page 2
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A002; dated 06-18-2025 OR FLAP DOUGLAS 251(1), Solicitation No. 69056724B000025 Oregon Dunes National Recreation Area ‐
Page 2 Umpqua Dunes Access Improvements
REVISIONS ARE AS FOLLOWS:
PLANS
Plan sheet A.1 Revises “Sheet Index”.
Plan sheet F.1 Revises plan sheet.
Plan sheet H.2a-H.2c Adds plan sheets.
ENCLOSURES
Plan Sheets:
A.1
F.1
H.2a through H.2c
PROJECT MANAGER
C. WARREN
R .1
W
R .1
E
R .6
W
R .5
W
R .1
W
R .1
W
T.15 S.
T.16 S.
T.20 S.
T.21 S.
:3
P
M
J u n e
T it le
S h e e t c p w w o r k \d
\o r a g e n .d g n
PROJECT
NUMBER
SHEET
A.1
OR FLAP DOUGLAS 251(1)
FEDERAL HIGHWAY ADMINISTRATION
U. S. DEPARTMENT OF TRANSPORTATION
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M
PLANS FOR PROPOSED PROJECT
"ALI_MAIN_02" LENGTH 0.8 MILES
"ALI_MAIN_01" LENGTH 1.2 MILES
TYPE OF CONSTRUCTION:
DESIGN DESIGNATION:
SPECIFICATION:
on Federal Highway Projects, FP-14
Construction of Roads and Bridges
Standard Specifications for
PLANS PREPARED BY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
APPROVED:
Western Federal Lands Highway Division
Chief of Engineering, DATE e (max)
V
ADT (2044)
ADT (2024)
0.060
30 MPH
2,249
1,843
OR FLAP DOUGLAS 251(1)
ACCESS IMPROVEMENTS
RECREATION AREA - UMPQUA DUNES
OREGON DUNES NATIONAL
OREGON
OUGLAS COUNTYD
OREGON DUNES NATIONAL RECREATION AREA
drainage, and safety improvements.
highway realignment construction, grading, Off-Highway Vehicle (OHV) trail construction, P A
C F
I C
I O
E C
A N
C
OLUMBIA R
IV
ER
S N
A K
E R I V
E R
Lake
Malheur Lake
Harney
Lake
Summer
D E S
C H
U T
E S
R I
V E
R
Lake
Klamath
Upper
Abert
Lake
LAKE N.P.
CRATER
REFUGE
WILDLIFE
NATIONAL
MALHEUR
RANGE
ANTELOPE
NATIONAL
HART MT.
20 20
395197
Ashland
Roseburg
EUGENE
Bend
Corvallis
Newport
SALEM
PORTLAND
Astoria
Pendleton
La Grande
Ontario
Burns
Falls
Klamath
Bend
North
City
Baker
Dalles
The
WASHINGTON
I D
A H
O
NEVADACALIFORNIA
OREGON KEY MAP
Grants Pass
MEDFORD
N
010 10 3020
Scale in miles
LOCATION
PROJECT
EUGENE
SPRINGFIELD
FLORENCE
Lake
Ridge
Fenn
Lake
Dorena
REEDSPORT
WINCHESTER BAY
ELKTON
COTTAGE GROVE
PACIFIC
JUNCTION CITY
SIUSLAW
NATIONAL
FOREST
See Sheet A.3
OCEAN
CLASS A STEEL POSTS (DOUBLE-SIDED)
GUARDRAIL SYSTEM MGS, TYPE 2,
Revised by Amendment A001
H.2c
H.2a, H.2b, Revised by Amendment A002
10.4 x 16 20301 -1400
20310 -1000
Station
ES
TI
M A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
R
EM
O V A L
O F
IN
LE
T
PL
U
G
EX
IS
TI
N
G P
IP
E
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD EACH EACH Lt Rt 67+06 --- --- --- 1 N/A N/A --- ---
12" existing pipe69+31 --- --- 1 1 N/A N/A --- ---
PROJECT TOTAL 0 1 2
Allowable Pipe Material
NOTE: A Aluminum
1. Steel pipe culvert minimum wall thickness is the larger of ____" or the thickness 4. Plastic pipe is not allowed when final installation is exposed. Furnish metal end sections for AS Aluminized steel required by the Std. 602-1 fill height table. all plastic pipe including those specified with bevels. See Std. 602-5 for acceptable cell class. C Concrete
2. Aluminized steel pipe culvert minimum wall thickness is the larger of ____" or the 5. See Std. 602-7 for acceptable concrete cell class. RC Reinforced Concrete thickness required by the Std. 602-1 fill height table (steel). 6. Structural excavation quantity based on material excavated inside the vertical planes located P Plastic
3. Aluminum pipe culvert minimum wall thickness is the larger of ____" or the 18 inches outside and parallel to the limits of footings or foundations. (blank) Any appropriate material thickness required by the Std. 602-1 fill height table. x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
c:
\p w
-w or k\ d0 or -a
1_
D ra in _T ab s.
xl sx
]S he et
-J un
-2
9:
A
M K Pa rk er
1/
M
M ad ar
1/
D es ig ne d by
C he ck ed b y:
PROJECT
F.1
SHEET
NUMBER
OR FLAP DOUGLAS 251(1)
Note: The quantities shown hereon are approximate and are subject to field adjustments.
12" existing pipe joshua.christopher Polygon joshua.christopher Stamp joshua.christopher Stamp
2 Revised by Amendment A002
NOTES
Field fit the 1' flare according to the CO.2.
according to the manufacturer's recommendations.
end farther from the edge of shoulder, or use a taper
Install terminal at a 1:25 taper or flatter to position the1.
2-SPACE W-BEAM GUARDRAIL
:4
J u n e
G
U A
R D
R A
IL
S
Y S
T E
M M
G S
T Y
P E
C
L A
S S
A S
T E
E L
P O
S T
S
D O
U B
L E
-S
ID
E D p w w o r k \d
\o r a s a f e ty
.d g n
(DOUBLE-SIDED)
TYPE 2 CLASS A STEEL POSTS
GUARDRAIL SYSTEM MGS
PROJECT
H.2a
MEDIAN BARRIER
WEAK-POST W-BEAM
POST & WELDED SOIL PLATE
WEAK POST GUARDRAIL
:4
J u n e
G
U A
R D
R A
IL
S
Y S
T E
M M
G S
T Y
P E
C
L A
S S
A S
T E
E L
P O
S T
S
D O
U B
L E
-S
ID
E D
(S
H E
E T
O
F p w w o r k \d
\o r a s a f e ty
.d g n
(DOUBLE-SIDED)
TYPE 2 CLASS A STEEL POSTS
GUARDRAIL SYSTEM MGS
PROJECT
H.2b
SQUARE GUARDRAIL WASHER
CLASS 4.6 HEX BOLT & NUT
GUARDRAIL BOLT AND RECESSED NUT
:4
J u n e
G
U A
R D
R A
IL
D
E T
A
IL
S
S H
E E
T
O F p w w o r k \d
\o r a s a f e ty
.d g n
(DOUBLE-SIDED)
TYPE 2 CLASS A STEEL POSTS
GUARDRAIL SYSTEM MGS
PROJECT
H.2c
| A002 - or-a1902511_Drain_Tabs.pdf |
| Sheet |
File details come from the government source that posted it. Updated .