This document is a Performance Work Statement (PWS) for the Civil Engineering (CE) Services at Tinker Air Force Base, Oklahoma. The PWS outlines the requirements for maintaining and repairing the base's facilities, infrastructure, and equipment, as well as operating physical plant operations, optimizing maintenance investments, and continuously improving services to meet the mission and vision. Key objectives include maintaining assets at current or improved condition, providing priority service to critical facilities and systems, performing heavy repair functions, maintaining infrastructure systems, and executing a Predictability Based Maintenance (PdM) Program. The PWS covers a wide range of activities such as demand maintenance, corrective maintenance, preventive maintenance, facility operations, and various ancillary programs. It also provides details on the required minimum team complement, work prioritization, and performance standards. The document indicates this is a mission-essential requirement that may require support during crises.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Operations Management Overview Slides_Sept_2024.pdf | ||
| Appendix C.pdf | ||
| CLIN Structure.docx | DOCX document | |
| Exhibit A -DATA Requirements_v2.xlsx | XLSX spreadsheet | |
| Appendix A v2.docx | DOCX document | |
| Appendix B v1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIVIL ENGINEERING SERVICES
TINKER BASE OPERATIONS SUPPORT SERVICE
TINKER AIR FORCE BASE, OK
Prepared by:
72d Civil Engineer Directorate
72 ABW/CEO
7535 5th St, Ste 101 Tinker Air Force Base, OK 73145-9010
June 2024
PREFACE
CIVIL ENGINEERING SERVICES
TINKER BASE OPERATIONS SUPPORT SERVICE
PERFORMANCE WORK STATEMENT
72d AIR BASE WING
TINKER AIR FORCE BASE, OKLAHOMA
Base Profile and Mission Tinker Air Force Base (TAFB) is centrally located in Oklahoma about 5 miles from downtown Oklahoma City in southeast Oklahoma County. It occupies 5,904 acres and is generally bounded on its north perimeter by I-40. Since the early 1940s, the base has been an important part of the state with a current annual economic impact of more than $4.5 billion.
TAFB’s primary mission is to manage, store, and maintain components, end items, and major weapon systems assigned to the Oklahoma City Air Logistics Center (OC-ALC), which is one of three Air Force Sustainment Center (AFSC) depot level maintenance facilities in the Air Force. The AFSC is headquartered at TAFB in the nearly mile-long building 3001.
The 72d Air Base Wing (72 ABW) is the host unit at TAFB. Their primary mission is to provide responsive installation and support services to HQ AFSC and 45 associate units assigned to six major commands—all of which comprise TEAM TINKER.
TAFB is home to three major flying wings to include the largest flying wing in Air Combat Command, the 552d Air Control Wing. The Navy’s Strategic Communications Wing ONE with more than 1,300 sailors, civilians, and contractors also headquartered on TAFB. Finally, the Air Force Reserve Command’s 507th Air Refueling Wing with 1,500 members.
Other major associate units on TAFB include the 38th Cyberspace Engineering Installation Group, responsible for planning, engineering, installing, removing and relocating communications and information systems worldwide for the Air Force. The Defense Logistics Agency, Defense Distribution Center Oklahoma City, Oklahoma, provides TEAM TINKER with 24-hour distribution support in more than 3.1 million square feet of space.
The 72d Civil Engineer Directorate (CE) enhances TAFB’s mission capability by providing world class, efficient and effective support to sustain, restore, modernize, and protect TAFB’s facilities, infrastructure, and environment. CE and other Wing organizations support over 31,000 military, civilian, and contractor personnel. There are over 20.2 million square feet in 1,151 facilities on TAFB.
Our objectives for this service contract reflect the above mission statement. Specifically, the provider shall:
· Maintain and repair TAFB’s facilities and infrastructure, both built and natural, to ensure the delivery of war-winning expeditionary capabilities to the war fighter.
· Effectively run physical plant operations and deliver high quality services.
· Continue to modernize the installation so that essential facilities and services are available to carry out assigned missions on-time and within budget.
· Continuously improve services and capabilities to meet our mission and achieve our vision.
· Encourage energy conservation and the efficient use of personnel and materials.
Ultimately, the Base Civil Engineering Government and Contractor team is responsible for proper stewardship and management of TAFB’s valuable resources and compliance with applicable laws, directives, and regulatory requirements. TAFB’s family housing, potable water, sanitary sewer system and primary electrical distribution systems have privatized; therefore, the Service Provider (SP) is responsible for coordinating work requirements with the various privatization contractors. The Performance Work Statement (PWS) which follows provides specific requirements.
Table of Contents
| 1. OPERATIONS MANAGEMENT. | 7 |
| 1.1. Description of Services. | 7 |
| 1.2. General Requirements. | 7 |
| 1.3. Imperatives. | 9 |
| 1.3.1. Overall. | 9 |
| 1.3.2. Operations Management. | 10 |
| 1.3.3. Operations Engineering. | 10 |
| 1.3.4. Operations and Maintenance. | 10 |
| 1.4. Levels of Service (LoS). | 11 |
| 1.5. Minimum Team Complement. | 11 |
| 2. REQUIREMENTS & OPTIMIZATION (R&O). (FO: CLIN X003) | 11 |
| 2.1. Demand Maintenance / Customer Service. (FO: CLIN X003) | 12 |
| 2.2. Corrective Maintenance Work Task Requirements. (FSRM: CLIN X001) | 14 |
| 2.3. Priority 2A. Plant Operations (Boilers, Chilled Water, Industrial Wastewater Treatment Plant) and Preventive Maintenance (PM). (FO: CLIN X003) | 15 |
| 2.4. Scheduled Sustainment Corrective Maintenance – Priority 3. (FSRM: CLIN X001) | 18 |
| 2.5. Facility Operations Facility Projects (FOFPs). (FO: CLIN X003) | 19 |
| 2.6. Enhancement 4A/4B. (FO/FSRM Funds: CLINs X001, X003) | 20 |
| 2.7. Preventive Maintenance (PM). (FSRM: CLIN X001). | 20 |
| 2.8. Work Request Work Group / Work Request Review Board. (FO: CLIN X003) | 21 |
| 3. OPERATIONS ENGINEERING. (FO: CLIN X003) | 22 |
| 3.1. In-House Maintenance & Repair Capability/Planning. (FO: CLIN X003) | 23 |
| 3.2. Building Automation Energy Analysis. (FO: CLIN X003) | 24 |
| 3.3. BUILDER Sustainment Management System (SMS). (FO: CLIN X003) | 24 |
| 3.4. Material Control. (FO: CLIN X003) | 24 |
| 3.5. U-Fix-It Program Management. (FO: CLIN X003) | 25 |
| 3.6. Ancillary Programs. (FO: CLIN X003) | 26 |
| 3.6.1. Special Event Support. | 26 |
| 3.6.2. Operations Self-Assessment Program. | 27 |
| 3.6.3. RP Asset Disposal. | 27 |
| 3.6.4. Work Clearance. | 27 |
| 3.6.5. Barcode Program. | 27 |
| 3.7. Warranty Management. (FO: CLIN X003) | 27 |
| 3.8. Predictability Based Maintenance (PdM) Program. (CSAG: CLIN X005) | 28 |
| 4. OPERATIONS AND MAINTENANCE | 31 |
| 4.1. Heavy Repair. (FSRM: CLIN X001) | 31 |
| 4.1.1. Pavements/Grounds. (FSRM: CLIN X001) | 32 |
| 4.1.2. Structural. (FSRM: CLIN X001) | 33 |
| 4.1.3. Pavement Sustainment / Clearance. (FO: CLIN X003) | 35 |
| 4.1.4. Combat Support Activity Group (CSAG) Snow and Ice Control. (CSAG: CLIN X007) | 36 |
| 4.1.5. Furnishings Management. (FO: CLIN X003) | 36 |
| 4.1.6. Unaccompanied Housing (UH) Maintenance. (FO: CLIN X003) | 36 |
| 4.1.7. Playground Equipment and Exercise Stations. (FSRM: CLIN X001) | 36 |
| 4.2. Infrastructure Systems. | 38 |
| 4.2.1. Inspect, maintain, and repair all infrastructure systems. (FSRM: CLIN X001) | 38 |
| 4.2.2. Energy Management Control System (EMCS) Management / Operations. (FO: CLIN X003) | 39 |
| 4.2.3. Water/Wastewater, Natural Gas and Fuel Systems Maintenance. (FSRM: CLIN X001) | 40 |
| 4.2.4. Fire Deluge / Pumps. (FSRM: CLIN X001) | 40 |
| 4.2.5. Swimming Pools. (FSRM: CLIN X001) | 40 |
| 4.2.6. Backflow Prevention. (FSRM: CLIN X001) | 41 |
| 4.2.7. Grease Traps. (FSRM: CLIN X001) | 41 |
| 4.2.8. Oil Water Separators. (FSRM: CLIN X001) | 41 |
| 4.2.9. Pipelines / Manholes. (FSRM: CLIN X001) | 41 |
| 4.2.10. Wastewater Systems. (FSRM: CLIN X001) | 42 |
| 4.2.11. Hydrants. (FSRM: CLIN X001) | 42 |
| 4.2.12. Gas Distribution Systems. (FSRM: CLIN X001) | 42 |
| 4.2.13. Chilled Water System. (FSRM: CLIN X001) | 42 |
| 4.2.14. Liquid Fuels System Maintenance. (FSRM: CLIN X001) | 42 |
| 4.2.15. HVAC. (FSRM: CLIN X001) | 43 |
| 4.2.16. Asbestos and Lead Based Paint. (FSRM: CLIN X001) | 44 |
| 4.2.17. Kitchen Hoods, Exhaust and Fire Suppression Systems. (FSRM: CLIN X001) | 45 |
| 4.2.18. Entomology/Pest Management. (FO: CLIN X003) | 45 |
| 4.2.19. Vertical Transportation Equipment (VTE). (FSRM: CLIN X001) | 47 |
| 4.3. Facility Systems | 48 |
| 4.3.1. Facility System. (FSRM: CLIN X001) | 48 |
| 4.3.2. Industrial Control Systems (ICS). (FSRM: CLIN X001) | 48 |
| 4.3.3. Fire Alarms. (FSRM: CLIN X001) | 48 |
| 4.3.4. Electrical Systems. (FSRM: CLIN X001) | 49 |
| 4.3.5. Power Production. (FSRM: CLIN X001) | 50 |
| 4.3.6. Entry Gate (Vehicle) Denial Barriers. (FSRM: CLIN X001) | 51 |
| 4.3.7. Fire Suppression Pumps. (FSRM: CLIN X001) | 51 |
| 5. CONTRACT PERFORMANCE STANDARDS. | 52 |
| 5.1. SERVICES SUMMARY TABLE: | 53 |
| 5.2. GOVERNMENT SURVEILLANCE. | 61 |
| 5.2.1. Government Quality Assurance. | 61 |
| 5.2.2. Government Observations. | 62 |
| 6. RELATED PUBLICATIONS. | 65 |
EXHIBIT A – DATA REQUIREMENTS
APPENDIX A – CONTRACTOR SERVICES
APPENDIX B – GOVERNMENT SERVICES
APPENDIX C
C.1. ACRONYMS AND ABBREVIATIONS.
C.2. HISTORICAL DATA.
C.3. ENVIRONMENTAL REQUIREMENTS.
C.4. MAPS AND FACILITY DRAWINGS.
C.5. GOVERNMENT-FURNISHED ITEMS.
OPERATIONS MANAGEMENT.
Description of Services.
The Operations activity is responsible for effectively and efficiently operating, maintaining, and repairing Air Force real property (RP) and Real Property Installed Equipment (RPIE) through employment of asset management principles at any attached, geographically separated or other related properties. This is accomplished by providing execution, management, and oversight of facility and infrastructure operations, maintenance and repair, materiel control, work planning, customer service, service contract management, and operations engineering capabilities. Also includes capability to respond to and mitigate any infrastructure-related emergency conditions and contingency operations when necessary.
This requirement has been determined to be mission essential and does require support during a crisis as defined in DFARS 252.237-7023.
The functional organization chart is designed to provide a reference to how the Air Force Civil Engineer community organizes and labels both trade crafts as well as overall operations maintenance management. This PWS will make use of this convention in order to provide consistency with all other published guidance and training for civil engineers. The service provider (SP) is not required to organize their staff in this manner. The SP is required to follow standard maintenance work record keeping using trade focused ‘shop’ assignments using standard workgroup conventions used in NEXGEN- IT to ensure enterprise, MAJCOM, and base data supports data analytical requirements and preserves maintenance history in a consistent manner.
General Requirements.
Service Provider (SP) shall:
Provide all management, labor, tools, vehicles, equipment, fuel, services, and training required to fulfill all life-cycle operations and maintenance of facilities, non-privatized infrastructure, RP, RPIE, real property similar equipment (RPSE), equipment authorization inventory data (EAID) equipment, and geographically separated properties to support the local missions. Comply with all applicable and most current Occupational Health and Safety Administration (OSHA), Environmental Protection Agency (EPA), National Fire Protection Association (NFPA), International Building Code, International Plumbing Code (IPC), Unified Facilities Criteria (UFC), Department of Defense (DoD), AF, federal, state and local codes and requirements, and environmental regulations as well as higher headquarters standards and instructions.
Note: Government furnished property (GFP), Appendix C.5, is provided for the purpose of reducing contract costs incurred by the Government. GFP does not relieve the SP of the requirement to provide tools, equipment, and vehicles. The SP is responsible for all costs associated with using GFP, including fuel and maintenance.
Populate, maintain, update, generate, and manage data and reports from current and government designated replacement database system(s), including but not limited to Next Generation Information Technology (NEXGEN-IT), Air Program Information Management System (APIMS), Storage Tank Accounting and Reporting (STAR), EESOH-MIS, Enterprise Military Housing (eMH), Management Internal Control Toolset (MICT), Air Force Equipment Management System (AFEMS), Standard Base Supply System (SBSS), and Electronic Records Management System (ERMS), ensuring data is complete and accurately updated.
Generate, distribute, file, and maintain records of all required inspections, testing, training, certifications, operating instructions, appointments, and policy letters.
Provide data, reports, information and support to government designated CE representatives or higher headquarters upon request.
Conduct and participate in ad hoc meetings, teleconferences, briefings, and information exchange with base and higher headquarters staff when needed.
Complete all applicable MICT checklists assigned by the Government and submit for Government validation in accordance with (IAW) the Commanders Inspection Program.
Develop and implement a self-inspection program for respective functions to address the areas outlined in the current AF Inspector General (IG) Inspection Guidance take appropriate action(s) to comply with the IG Guidance.
Provide courteous, responsive and professional customer service and ensure personnel are timely in support of scheduled appointments.
Provide efficient and economic professional inspection, maintenance, repair, operations, and minor alterations, taking into account total system life cycle costs and impact on the quality of service received by the customers.
Accomplish services in a timely manner using standardized work methods and procedures IAW commercial practices and continuously evaluate practices to improve their effectiveness.
Provide priority service to non-privatized infrastructure, RP, RPIE, RPSE, EAID equipment, and systems designated as critical by the Government.
Ensure and document proper coordination of all maintenance and alterations on facilities listed on the historic registry.
Effectively utilize new technology and engineering methods to reduce operational and maintenance cost and maximize the use of highly efficient products and maintenance processes wherever practical and as warranted by life cycle analysis.
Ensure finished work request meets customer requirements.
Be aware of asbestos, lead based paint and Polychlorinated Biphenyls (PCBs) during construction, maintenance, repair activities, and take necessary actions in coordination with the Environmental Activity.
Provide refuse collection, disposal and recycling of self-generated construction and demolition debris.
Ensure worksite is clean and free of work material debris upon completion of work.
Ensure Controlled Unclassified Information and Privacy Act information are properly marked and protected from unauthorized access, disclosure, or manipulation IAW DoDI 5200.48_DAFI 16-1403, Controlled Unclassified Information (CUI). Implement appropriate Operations Security (OPSEC), IAW AFI 10-701, Operations Security (OPSEC).
Participate in and support government provided assessments, for example, Civil Engineer Maintenance Inspection and Repair Team (CEMIRT), Functional Configuration Audit, Asset Visibility Team, Energy Audits, Airfield Pavement Evaluation and related support requirements.
Participate in and support Base exercises when required.
Provide continuous emergency support 24/7.
Perform base recovery operations following man-made and natural disasters by quickly identifying damage, establishing repair priorities, and determining and reporting estimated cost for securing temporary and permanent repairs and completing facility and infrastructure restorations.
Document all damages in the Damage Assessment Tool database.
Support Special events such as Air Shows, Picnics, Distinguished Visitor visits, etc.
Imperatives.
Overall.
· SP shall:
· Respond to emergencies and mitigate (refer to para 2.2.2.).
· Provide government with Courses of Action (COAs) resulting in cost effective lifecycle management of maintenance and repair investments.
· Maintain assets at current condition, if rated deficiency free, or improve condition and performance over Period of Performance, if not rated deficiency free.
· Life cycle management planning feeding activity management (AMP, sub-AMP) optimizing maintenance investment of in-house (Contractor) vs third party contracted (Capital Project) actions (see para 2.8).
· Respond to established planned timelines to meet and resolve Customer/mission needs.
· Materiel Management – acquire all materiel necessary to meet work requirements and enter costs into government owned IT system.
Operations Management.
· Manage and perform all demand maintenance activities and functions related to operations maintenance and repair of RPIE, RPSE and EAID IAW para 2.1 of this document.
· Utilize government standardized asset data collection and Sustainment Management Systems/analysis tools.
Operations Engineering.
· Manage, train, and perform all activities and functions related to requirements and optimization, customer service, facility manager program, work task planning, systems engineering, material control, vehicle management, U-Fix It Program, and associated tasks IAW para 3 of this document.
Operations and Maintenance.
· Provide professional inspection, proactive/reactive maintenance, repair, operations, and minor alterations.
· Provide priority service to facilities and systems designated as significant by the Government.
· Perform Plant Operations (as required).
Heavy Repair.
· Employ Asset Management Principles to provide Heavy Repair functions associated with horizontal, structural and pavements activities as directed in para 4.1 of this document.
Infrastructure Systems.
· Employ Asset Management Principles to provide Infrastructure Systems functions associated with Entomology, HVAC, Water and Fuels Systems, and Energy Management Control System activities as directed in para 4.2 of this document.
Facility Systems.
· Employ Asset Management Principles to provide Facility Systems functions associated with Alarms, Electrical (interior/exterior), Power Production, and Airfield Lighting System activities as directed in para 4.3 of this document.
Levels of Service (LoS).
· The LoS funded by Government will establish the workload effort for a given contract period. SP shall recommend workload and prioritizations for execution in accordance with applicable regulations and guidance for specific requirements. Government reserves the right to recommend, change, and validate recommended workload and prioritization prior to execution as long as Government recommendations do not exceed level of effort identified in the LoS. Government will provide 60-day notice prior to changing between various LoS level. If a change is required in less than 60 calendar days, negotiation will begin between the CO and Contractor. Each LoS will have a specific minimum team complement (MTC) and performance objectives. Mission essential services is defined as execution at LoS 4.
Minimum Team Complement.
MTC is defined as the required minimum amount of staffing necessary for effective performance as determined by the Government. The MTC encompasses all on-site employees of the SP. SP shall provide Minimum Team Complement Report (ELIN A031).
SP is required to meet the MTC, as identified below. If a SP is not meeting the MTC (excluding Holiday Leave, Annual Leave, Sick Leave, FMLA Leave, and Temporary Military Duty) then the CO may request consideration that considers the hourly rate of the skill set as well as the length of time the MTC is not being met. The PCO will seek consideration by any means that are determined to be in the best interest of the Government for the SP's inability to successfully meet the MTC, unless it was determined to be at the fault of the Government.
The Government considers only SP personnel who are physically on-site and working (i.e., not in an approved leave status) as countable towards the MTC. SP personnel who are on leave (outside of the above listed) will not be counted towards meeting the MTC.
The MTC for each LoS are as follows:
| · LoS 1: | 410 employees |
| · LoS 2: | 395 employees |
| · LoS 3: | 370 employees |
| · LoS 4: | 340 employees |
REQUIREMENTS & OPTIMIZATION (R&O). (FO: CLIN X003)
Main categories. SP shall:
· Provide all supervision, leadership, and management required to satisfactorily fulfill all operations and maintenance (O&M) activities for RP and RPIE in accordance with this PWS
· Perform supporting work associated with the acquisition of real property or RPIE including all maintenance design reviews, document preparation, inspection, commissioning of new equipment prior to the acceptance of work, and attend operational familiarization training, walk throughs and related activities.
· Ensure facility and infrastructure system updates are recorded in respective IT system/database within 60 calendar days after completion of all work activities. Examples: inventory, condition assessment, maintenance actions etc.
· Perform all requisite coordination efforts to ensure a timely response to information requests as identified in the PWS from authorized government personnel to include, but not limited to, records of inspections, testing documentation, training reports, proof of certifications, operating instructions, appointment letters, and policy letters.
· Advocate for all operations-related activities.
Demand Maintenance / Customer Service. (FO: CLIN X003)
Operate a centralized customer request center 7 days per week/24 hours per day.
Comply with Work Management Playbook (https://usaf.dps.mil/teams/10041/CEPlaybooks/WM/Pages/Overview.aspx) and NEXGEN-IT specific guidance on AFCEC/COOM Business Process Library (BPL) (https://usaf.dps.mil/sites/11252/24048/CO%20Support%20TRIRIGA%20Deploy/TRIRIGA%20Ops%20Wiki/Home.aspx) Receive, enter data into NEXGEN-IT, and process Service Request (SR)/Work Task (WT) IAW work task prioritization specified in Work Management Playbook and associated process map. SP shall provide Customer Service Report (ELIN A001) Record keeping shall ensure timely and accurate ability to track and monitor customer requests accepted for CE maintenance action from receipt to completion. Additionally, record keeping for Operations internal maintenance requirements without SRs, like system generated preventive maintenance (PM) work tasks or continuous work documentation of plant operations or street sweeping, shall support appropriate work management requirements. Rejected customer requirements shall be appropriately documented in NEXGEN-IT.
Record keeping shall accurately capture costs of all labor and materiel on a per task basis and correctly assign the work task record to both the correct real property asset and end-customer ensuring that accumulated real property annual operating costs are captured and enable cost reimbursement billing when applicable.
Record keeping shall capture and preserve maintenance history in NEXGEN-IT using standard system enforced maintenance/outage reason codes and SP entered maintenance notes. SP data entry directly supports CE enterprise advocacy of maintenance requirements and life-cycle investment decision-making. Data analytical tools developed by the Air Force rely on this data and will be provided to the SP.
The SP shall adhere to all data entry quality and accuracy standards in NEXGEN-IT and BUILDER SMS as specified by AF policy, NEXGEN-IT procedures, technical guidance, SMS Playbooks and AFCEC BPL SharePoint.
The SP shall train IT system users on data entry standards (e.g., cost accounting, type of work, prioritization, asset coding, maintenance performed, failure descriptions, and direct inspections) and actively maintain an up-to-date training roster.
At a minimum, the SP shall conduct a monthly review of each shop’s data entry quality, timeliness, and accuracy, and address corrections through cognizant shop leadership. Provide summary to the government no less than quarterly. SP shall provide NEXGEN-IT DATA review (ELIN A002) The SP shall develop unique reports required for local needs or HHQ taskers upon request.
Provide, receive and process completed Work Clearance Requests (including but not limited to: AF Form 103, locally developed work clearance requests, road closure permits, and utilities outages). For planned utilities outages, coordination with the appropriate agencies must be complete a minimum of 14 calendar days in advance. SP shall provide Base Civil Engineering Work Clearance Request (ELIN A003).
Provides coordinated work tasks and/or facility projects for Work Request Work Group (WRWG) / Work Request Review Board (WRRB) review and approval.
Communicates Work Task decisions, investment plans, repair timelines, and status updates to customers and briefings within established timelines/battle rhythm directed by the government.
Initiate and develop work schedules to include coordination with sub-AMP managers.
Develop written estimates on work tasks when directed by the Government. SP shall provide written estimates (ELIN A004).
Under normal operations, classify and prioritize the work requirements received. The Government retains the right to require prioritization of special interest work. The special interest work shall not supersede Emergency or Preventive Maintenance Tasks.
Executes Work Task closeout actions within 30 calendar days of work task completion, to include, but not limited to, coordination with the Government to update base maps and applicable floor plans; submit RP capitalization (draft, interim and final as required) and supporting documents; maintenance resolution actions; warranty management; and accurately accounts for all costs.
Process all service requests (accept or reject) within 1 business day of receipt unless otherwise approved by the government.
Classify and prioritize Work Task IAW AFI 32-1001 allowing scarce resources to be applied in a manner that most effectively addresses life-cycle management and mission critical assets first.
Develop and administer a customer-focused Facilities Manager’s Program that ensures cost effective expenditures of resources and provides functional oversight and provide annually or upon request a Primary and Alternate Facility Manager List. Key tasks include:
· Oversees Facility Manager assignment process and maintains the facility managers list. SP shall provide Facility Managers List (ELIN A005).
· Shall conduct an initial and refresher training once per month for facility managers. SP shall provide Facility Manager Training Report (ELIN A006).
· Establishing a working relationship with facility managers
· Providing necessary training to include Work Requirements, NEXGEN-IT Service Requests (SR), Identification of facility abuse/misuse, Key/Lock control, U-Fix-It Program
· Coordination with other Government stakeholders, who will also provide training to facility managers during this training Maintain accountability of resources to include for example, equipment, personnel, and facilities.
Ensure 100% appropriate SMS inventory adjustments and condition assessments in conjunction with all work actions are completed and updated before work closeout actions. This provides “real time” adjustments to BUILDER data as work is being accomplished. Refer to Work Management Playbook for work closeout process Corrective Maintenance Work Task Requirements. (FSRM: CLIN X001)
The SP shall use asset management principles to develop, implement, and execute a proactive and predictive corrective maintenance program with goal of sustaining assets at lowest life cycle cost. In developing this program, the SP may use, but not limited to: NEXGEN-IT, SMS, GeoBase, shop knowledge, RS Means, etc. The SP shall leverage data to drive decisions in work task prioritization to cost effectively optimize sustainment, maintenance, and repair activities. The SP shall execute corrective maintenance concurrently with preventive maintenance and daily plant operations. In addition to self-identified work requirements, the corrective maintenance program will also include requests by others to include but not limited to Facility Managers. SP shall provide Lifecycle Cost Analysis Report (ELIN A007).
Notify the BCE and Facility Manager or their designated government representative at least 10 business days (two (2) weeks) in advance of scheduled outages. Notification for unscheduled outages shall be within one hour during normal duty hours and within 3 hours, but no later than one hour before beginning of the affected work areas’ next shift start, for non-duty hour responses. SP shall provide Outage Notification Report (ELIN A008).
Unscheduled Corrective Maintenance - Emergency / Priority 1. (FSRM: CLIN X001) Provide 24 hours a day, seven (7) days a week emergency response capability to sustain or ensure continued mission operations, prevent significant additional damage to facilities and infrastructure or protect the safety and security of the installation, mission, or personnel. Only those actions necessary to mitigate the emergency are accomplished on the emergency work task. Additional work needed to restore complete functionality is identified and scheduled as a lower priority corrective maintenance work task consistent with requirements of similar scope and nature. The SP shall capture all emergency work activities in the Air Force mandated IT system for maintenance management.
Additional work needed to restore complete functionality is identified and scheduled as a lower priority corrective maintenance work task, consistent with requirements of similar scope and nature.
Response to all emergency work takes precedence over all other Preventive Maintenance, Corrective Maintenance, and enhancement work as directed by the government.
During normal duty hours/operations, respond to 95% of Emergency Corrective Maintenance (CM) work, also referred to as Work Priority 1 within 30 minutes from time of notification. Complete or eliminate emergency condition with labor and/or materials as required within 24 hours of notification.
After normal duty hours/operations, SP shall provide standby or emergency response capability to respond to 95% of Emergency Corrective Maintenance work request within 60 minutes after notification. Complete or eliminate emergency condition with labor and/or materials as required within 24 hours after notification.
SP shall provide a projected priority materials list by system (electrical, exterior plumbing etc.) supporting rapid response to Priority 1 activities for Government approval within 60 days contract award. Upon approval, SP shall acquire materials and sustain minimum levels. Priority material list will be reviewed/validated annually. SP shall provide Material List for Priority 1 Work Tasks Report (ELIN A009).
Priority 2A. Plant Operations (Boilers, Chilled Water, Industrial Wastewater Treatment Plant) and Preventive Maintenance (PM). (FO: CLIN X003)
Day-to-day operation of plants is accomplished as work task priority code 2A - Plant Operations work. This category of work allows for simplified recordkeeping under a degree of control and oversight desired by the supervisor.
Generally, 2A - Plant Operations work is internally identified, approved, and accomplished with minimized record keeping within NEXGEN-IT as a Facility Operation Facility Project (FOFP). Refer to the AFCEC/COOM BPL for details.
The 2A - Plant Operations FOFP can be opened for a full year fiscal year (1 Oct - 30 Sep). These FOFPs are only intended to capture activities directly related to the daily operation of the plant, they are not intended to capture emergency work, 2A - PM, or corrective maintenance.
Within the work task priority code of 2A, there are two sub-categories tracked in NEXGEN-IT.
· One is “2A – PM” and the other is “2A - Plant Operations” and each have different Program Element Codes (PEC) that translate to funding. Workgroups typically tasked with plant operations, such as the Chilled Water Plant are funded by PEC 79.
· Those workgroups not typically assigned plant ops duties are funded by PEC 78. In the end Plant Ops is PEC 79, and normal sustainment activities fall under PEC 78. Priority 2B shall not be used by the SP.
Operate, maintain, modify, conduct inspections, repair and replace plant system components. Monitor on a 24-hour, seven-day a week basis. Plants shall be operated under appropriate licensing and certifications.
Water/Chilled Water. (FO: CLIN X003) Operate, maintain, repair, modify, and inspect water systems to include Thermal Energy Storage, closed-loop chilled water, boiler water, and fire protection water. Monitor the system on a 24-hour, seven (7) days a week basis, and ensure compliance with DoD, AF, federal, state, local, and environmental regulations. Manage and perform activities and functions related to Thermal Storage operations, and associated tasks. Maintain, repair, replace, and collect data from constant monitoring systems such as, chlorine, pH, conductivity, fluoride, and other water readings, as applicable. SP shall provide Water Treatment Operating Log for Cooling Tower Systems (ELIN A00A).
Steam Production. (FO: CLIN X003) The SP shall operate, inspect, test, maintain, repair, and record data for steam plants and ancillary equipment including supply and condensate return piping (excluding systems maintained by others). SP shall meet the requirements of AFMAN 32-1068, Heating Systems and Unfired Pressure Vessels, UFC 3-430-07, O&M: Inspection and Certification of Boilers and Unfired Pressure Vessels, with Change 5, UFC 3-430-02FA, Central Steam Boiler Plants, with Change 1, and UFC 3-430-08N, Central Heating Plants, in its entirety. SP shall operate the steam plants to meet thermal heating/cooling load requirements (pressure, temperature, and mass flow rate) to all connected facilities. SP shall provide Daily Steam Plant Operations Log (ELIN A00B), Monthly Steam Plant Operating Log (ELIN A00C), and Water Treatment Operating Log for Steam and Hot Water Boilers (ELIN A00D).
Perform boiler tune-ups and calibrations IAW 40 CFR 63 Subpart DDDDD and AFMAN 32-1068, Heating Systems and Unfired Pressure Vessels. SP shall provide Boiler Start-Up Notification (ELIN A00E) Perform high-pressure boiler inspections IAW AFMAN 32-1068, Heating Systems and Unfired Pressure Vessels. SP shall provide attached boiler notification to 72 ABW/CEIE on the day the boiler starts continuously to process hot water. 72 ABW/CEIE only has 10 days after start up to submit notification to ODEQ and EPA. SP shall provide Boiler or Pressure Vessel Inspection Report (ELIN A00F).
Compressed Air Loop. (FO: CLIN X003) SP shall operate, maintain, and repair the compressed air systems including distribution to provide safe, reliable, clean, and dry compressed air. SP shall ensure equipment are operated, repaired and overhauled to meet compressed air load and pressure requirements, maintain 100 PSIG shop air at customer using point and 100 PSIG for breathing air 24-hours-per-day, 7-days-per-week, unless directed by Government. SP shall efficiently operate compressed air systems, including cycling compressors on/off, to ensure minimum energy consumption without detrimental impact to mission. SP shall manage the unfired pressure vessels program IAW AFMAN 32-1068, Heating Systems and Unfired Pressure Vessels.
Industrial Wastewater Treatment Plant. (FO: CLIN X003) The SP shall operate, maintain, inspect, test, and repair primary, secondary, and tertiary plant processes, equipment, sewer system and lift stations. SP’s facility operations, maintenance, solids handling operations, and effluent discharge practices shall comply with all applicable Air Force, federal, state, and local regulatory standards and agreements, including the OPDES Permit OK0000809, and Industrial Wastewater Discharge Permit 0029-FC and Permit 0029-TAC requirements.
SP shall maintain the industrial wastewater treatment plant, plant process components and sewer system in an operational condition at all times. The treatment plant shall operate 24-hours-per-day, 7-days-a-week, including weekends and holidays.
Personnel shall be crossed trained to perform both maintenance and plant operation duties to maximize the work force efficiency.
When weather is expected to be below freezing, SP shall ensure that all operational and standby equipment, piping, plumbing fixtures, chemical storage tanks and contents, and indoor chemical storage areas and contents are protected from freeze damage.
SP shall ensure all operations and maintenance meets the requirements of UFC 3-240-03 and all applicable equipment and process manufacturer specifications.
Operate, calibrate, maintain, and repair plant control and monitoring equipment with qualified personnel. Qualified personnel shall be minimum of Control Tech II with SCADA and PLC control experience.
Operate the industrial waste treatment plant’s analytical laboratory with qualified personnel to provide formal advanced chemical analysis in support of waste treatment plant operations. SP shall provide laboratory analytical services in support of daily and regular treatment operations, provide laboratory analytical services for purposes of emergency sampling, grab sampling, and sampling in support of any treatment study or batch treatment. SP shall provide capability and a means for performance of laboratory tests including operating, repairing, and maintaining all laboratory analytical systems, equipment, and fixtures. SP shall submit monthly chemical analysis and usage for treatment plant by the first week of each month to the COR or CO’s designated representative. SP shall keep a complete set of laboratory records for all laboratory tests to include date and time of sampling, type of sample, name of sample, locations of sample test performed, and test results. Laboratory records shall always be available. SP shall provide Wastewater Report (ELIN A00G).
Repair and alter waste treatment plant process piping and tanks in such a manner as to prevent cross connections, using certified personnel. SP shall prevent contamination of the base water supply resources due to back-siphon, infiltration, and flooding in compliance with AFMAN 32-1067, Water and Fuel Systems.
Perform daily inspections of each industrial waste lift station to determine and correct any discrepancies to ensure continuous operation of the system.
React and respond to any changes in the waste stream indicating incursion of waste material including raw plating waste containing chromium or cyanide, aircraft hangar AFFF foam, or any substance which may cause detrimental effect on the waste treatment facility. Mitigate and report incursions of such toxic or hazardous waste from facility collection systems to prevent from exceeding the minimum pretreatment discharge standards that meet the requirements of TAFB 19-2 and TAFB 19-3. Any change that could result in a discharge violation shall be treated as a Priority 1 – Emergency work task.
SP shall ensure all materials are available to support continuous plant operations.
Scheduled Sustainment Corrective Maintenance – Priority 3. (FSRM: CLIN X001)
Work Task Priority Code 3 is maintenance or repair, including repair by replacement, of Real Property that does not require detailed planning, may require capitalization of the Real Property records and is needed to sustain and restore complete functionality.
Priority 3A categorizes and prioritizes all work carrying an unabated Risk Assessment Code (RAC) 1-3 or unabated Fire Safety Deficiency (FSD) code 1 and 2. Priority 3A is also scheduled sustainment work for Tier 1 and 2 assets (CVAMP, IDP, AFCAMS, critical utility nodes, statutory requirements, Tactical Mission Dependency Index > 80) as this represents the greatest mission risk if not completed, therefore the highest level of scheduled sustainment work.
Respond to and complete all directed Work Task Priority 3A Corrective Maintenance work within 30 calendar days of receipt, excluding material delays unless otherwise approved by the Government.
Priority 3B categorizes and prioritizes all work carrying an unabated RAC 4 and 5 or scheduled sustainment work for Tier 3 assets (Company Commander Focus items or Mission Dependency Index 79-69).
Respond to and complete all directed Work Priority 3B CM work within 60 calendar days of receipt, excluding material delays unless otherwise approved by the Government.
Priority 3C categorizes and prioritizes scheduled sustainment work for Tier 4 assets (all other sustainment work as defined and prioritized through the Facility Utilization Board process).
Respond to and complete all directed Work Priority 3C CM work within 120 calendar days of receipt, excluding material delays unless otherwise approved by the Government.
The following chart provides guidance on category description and prioritization:
Material requirements for all Work Priority 3 Corrective Maintenance work shall be processed for acquisition within 14 calendar days.
No more than 50% of any sustainment corrective maintenance, Priority 3s, may be assigned annually to a single Priority 3 sub-category unless approved by the Government. (Example: 75% applied to Work Priority 3C).
Facility Operations Facility Projects (FOFPs). (FO: CLIN X003)
When there is little benefit from the repeated creation of individual Work Tasks for an activity performed throughout the year, Facility Operations Facility Projects (FOFPs) provide an alternative application of the Facility Project Form to reduce this administrative burden. There are also instances where it may not be feasible to create a Work Task for each facility or when essential mission support work is not a sustainment activity performed on real property. For guidance when these situations arise, Pseudo Locations and FOFPs provide the solutions. Details may be found at https://usaf.dps.mil/sites/11252/24048/co support tririga deploy/tririga ops wiki/facility operations facility projects (fofps).aspx and https://usaf.dps.mil/sites/11252/24048/co support tririga deploy/tririga ops wiki/pseudo real property records.aspx. The FOFP process is intended to package Work Tasks shops can use for labor and in some cases materiel, for up to an entire FY. R&O creates FOFPs and their associated Work Tasks on a Fiscal Year (FY) basis; it is done this way for two primary reasons.
The following activities are most often recorded on FOFPs:
· Snow Removal Operations
· Street and Airfield Sweeping Operations
· Utility Plant Operations
· Work Clearance/AF Form 103 shop support when needed for requirements that are not going to be executed by the Operations Flight
· ESP Code or Natural Disaster FOFPs Go to the ESP Code or Natural Disaster FOFPs library, BPL Page (https://usaf.dps.mil/sites/11252/24048/co support tririga deploy/tririga ops wiki/esp code or natural disaster fofps.aspx for more information The SP shall use FOFPs and associated Work Task to track all work in these respective activities IAW Government direction. FOFP work tasks are NOT required to follow established timelines of other corrective maintenance work described above.
Enhancement 4A/4B. (FO/FSRM Funds: CLINs X001, X003)
Priority 4A/B work is classified as Enhancement and/or discretionary non-real property maintenance work. Enhancement defined as work that is required to enhance missions or infrastructure, therefore NOT sustainment. Because this category does not sustain the installation’s as-is state, provide recommendation and justification for WRWG/WRRB approval decision of execution of Priority 4 work by on-site workforce that shows ROI of accomplishment versus impact to all other.
Priority 4A. (FSRM: CLIN X001) Priority 4A work is classified as Restoration and Modernization or work required for facility/infrastructure enhancement/mission sustainment/support work. These requests could also be for a new mission requirement when an addition (add new) or modification to RPIE is required. Examples include replacement of carpet with different material, lighting upgrades, installation of additional electrical circuits, or repair of aesthetic appurtenances, such as landscape lighting. Work tasks in this category may require capitalization. Coordination is required with the Real Property Officer to make the final determination of whether capitalization is required and if so, SP shall create the Draft, Interim and Final DD Form 1354, if required.
Priority 4B. (FO: CLIN X003) Priority 4B work is also classified as discretionary (non-RPIE maintenance) work such as Airshows, Ceremonies, etc.
All Priority 4 work execution (to include execution timelines) must be approved by the Government. There might be situations when completing Priority 4 enhancement work ahead of Priority 3 sustainment work is required and were approved by the Government.
No more than 10% of Work Priority 4 work (hours) annually shall be assigned and completed unless approved by the government. Funding for enhancement labor and material will be direct funded by the requesting organization, as determined by the WRWG.
Develop written estimates on work 4A/B category when directed by the Government. SP shall provide written estimates.
Preventive Maintenance (PM). (FSRM: CLIN X001).
The SP shall:
Accurately record the inventory and condition of all real property assets and real property installed equipment (RPIE) in in the appropriate Sustainment Management System (SMS) to facilitate PM investment determination processes. Establish PM records in NEXGEN-IT.
The SP shall examine the unconstrained asset inventory and develop an executable portfolio of PM requirements, for government review and approval, to sustain the assets, support the mission, and yield an effective Return on Investment. The PM program (PMP) shall comply with the AFI 32-1001, Chapter 3, the PM Playbook, and the AFCEC/COOM PM BPL (Commercial and Air Force specific PM task lists and associated PM execution frequencies are contained in NEXGEN-IT to provide estimated completion times and support NEXGEN-IT PM execution). The SP’s PM program shall provide as a minimum:
· Policy driven maintenance requirements
· Criticality of how the asset supports the mission
· ROI and cost effectiveness of the PM investment
· The condition of the asset and its expected life cycle
· Impacts of warranties that are tied to the asset
· Annual review and Gov’t approval Any deviations/recommendations to set PM frequencies must be approved by the Government prior to adjustments. SP shall provide sound business case for recommended frequency change.
If a required PM task is, absent from Appendix C, SP shall refer to the PM Playbook and/or AFI 32-1001 as necessary to determine required actions.
Preventive maintenance for all assets in the PM Program must be prioritized over all other forms of work, except for Priority 1 Emergency Work defined in the PWS.
Execute a minimum of 95% of the scheduled PM requirements for assets included in the PM program, except for Government-approved deviations.
These deviations are limited to issues outside the SP’s control, such as a lack of access by facility occupants, facility/equipment under renovation, or other Government determinations.
Shall account for the fluctuations of assets, e.g., additions and deletions, throughout the life of the contract.
SP shall ensure all materials are available to meet PM schedule requirements.
The SP shall provide Preventative Maintenance Program Portfolio (ELIN A00H), Preventive Maintenance Annual Program Review - Quarterly Update (ELIN A00J), Deferred PM List (ELIN A00K), and Preventive Maintenance Task List (ELIN A00L).
Work Request Work Group / Work Request Review Board. (FO: CLIN X003)
The WRWG is the body of stakeholders (actors) who perform actions in evaluating and preparing a work requirement for possible presentation to the WRRB.
The WRWG includes personnel both internal and external to the Civil Engineer Unit with each individual contributing specific inputs relevant to their areas of responsibility to determine the optimal course of action to be taken for each requirement.
SP shall develop and execute WRWG duties as described in Work Management Playbook.
The WRRB is a formal meeting that reviews work requirements. The WRRB makes execution decisions on work execution. Not all work requirements require a WRRB decision, but all WRRB decisions require varying levels of WRWG input.
The Government chairs the WRRB and all other respective offices (CEN, CEO, CEI etc.) are also represented in the WRRB. The WRRB may invite Facility Managers when there is a need to defend or explain the requirement. The WRRB may be virtual or held as a physical meeting at a specified location, date, and time.
SP shall conduct recurring (i.e., weekly) WRRB meetings, process, assess and present means of accomplishment for all work task request for WRRB unless otherwise approved by the Government.
Use the following process map as a reference to develop WRWG/WRRB capability/process:
OPERATIONS ENGINEERING. (FO: CLIN X003)
SP shall be responsible for proactive systems performance analysis, resource optimization, life-cycle requirements, and customer interface for facility and infrastructure maintenance and repair requirements, in support of Operations Engineering.
SP shall provide one engineer or engineering technician specializing in each of the following fields:
· Civil, Mechanical, and Electrical: Provide technical engineering oversight for respective portfolios (i.e. Activities).
· Industrial: Provide technical engineering oversight for workforce efficiency and effectiveness opportunities and maintenance optimization as it pertains to entire Asset Management Process and Principles. This person would be expected to lead data analytics processes.
All Mechanical, Civil, and Electrical engineers shall possess ABET accredited degrees and a minimum of three (3) years of experience post-graduation in the facility engineering (infrastructure maintenance and repair) field of expertise.
All Engineer Technicians shall have a minimum of 5 years’ experience in their field of expertise.
The Operations Engineering purpose is to ensure the government makes the right investment at the right time to provide the maximum life-cycle value at the lowest overall ownership cost. The SP shall develop an optimization analytical capability that:
· Provides Optimization Plans for all systems annually to the Government. SP shall provide Optimization Plans for All Systems Report (ELIN A00M).
· Manages the capture of data and ensures data quality and currency
· Analyzes all maintenance responses to inform future sustainment and repair actions based on factors such as but not limited to mission risk, maintenance risk and sustainability, and system performance
· Integrates preventive maintenance resource investments into the life cycle return on investment and risk evaluations
· Develops an integrated and balanced approach on use of on-site versus programmed engineering opportunities to accomplish proactive work
· Documents and reports the optimization strategy and provides for measurability of overall goals and trend improvements. SP shall provide Trend Analysis (ELIN A00N).
· Provide PM analysis that drives Optimization that…