Appendix C.pdf
PDF 32 MB Posted
- Attached to
- Tinker Air Force Base CE Services: Base Operations Management Industry Day Federal contract opportunity
- Solicitation number
- Not on record
About this file
This document appears to be a notice for an industry day event related to a federal contract opportunity for Tinker Air Force Base Civil Engineering (CE) Services: Base Operations Management. The purpose of the event is to identify potential sources with the expertise, capabilities, and experience to meet the requirements of maintaining and repairing the base's facilities and infrastructure, running physical plant operations, modernizing the installation, improving services and capabilities, and encouraging energy conservation. The industry day is scheduled for September 18, 2024 from 9:15 AM to 12:00 PM CST and will be held virtually via Microsoft Teams. Interested companies are instructed to email the Contracting Officer and Contract Specialist if they wish to attend or submit written questions prior to the event. The government will not reimburse participants for any expenses associated with the industry day, and participation does not guarantee participation in future solicitations or contract awards.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Operations Management Overview Slides_Sept_2024.pdf | ||
| Appendix B v1.docx | DOCX document | |
| Operations Management PWS v3.docx | DOCX document | |
| CLIN Structure.docx | DOCX document | |
| Exhibit A -DATA Requirements_v2.xlsx | XLSX spreadsheet | |
| Appendix A v2.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFTC.1. Acronyms and Abbreviations
ABET Accreditation Board for Engineering and Technology
ABW Air Base Wing
ACM Asbestos Containing Material
ADPE Automated Data Processing Equipment
AF Air Force
AFCAMS Air Force Critical Asset Management System
AFCEC Air Force Civil Engineer Center
AFCOLS Air Force Common Output Level Standard
AFEMS Air Force Equipment Management System
AFFF Aqueous Film Forming Foam
AFI Air Force Instruction
AFIMSC AF Installation and Mission Support Center
AFMAN Air Force Manual
AFMC Air Force Materiel Command
AFOSH Air Force Occupational Safety and Health
AFSC Air Force Sustainment Center
AG Agricultural
AMP Activity Management Program
AMPP Association for Materials Protection and Performance
ANSI American National Standards Institute
AOP Asbestos Operating Plan
APIMS Air Program Information Management System
ASME American Society for Mechanical Engineers
ASQ American Society for Quality
AST Aboveground Storage Tank
ASTM American Society for Testing and Materials
AT Analyst Team
DRAFTAWS American Welding Society
A/C Acquisition Cost
BCE Base Civil Engineer
BPL Business Process Library
CAC Common Access Card
CAP Contractor Acquired Parts or Corrective Action Plan
CAR Corrective Action Report
CAT Crisis Action Team
CA/CRL Custodian Authorization Custody Receipt Listing
CBCMS Computer Based Condition Monitoring System
CBM Conditioned Based Maintenance
CE Civil Engineer
CECRP Civil Engineer Contingency Response Plan
CEMIRT Civil Engineer Maintenace Inspection and Repair Team
CFC Chlorofluorocarbon
CFR Code of Federal Regulations
CLIN Contract Line Item Number
CM Corrective Maintenance
CMMS Computerized Maintenance Management System
CMRP Certified Maintenace Reliability Professional
CO Contracting Officer
COA Course(s) of Action
COM Change of Occupancy Maintenace
COMSEC Computer Security
COR Contracting Officer Representative
CP Cathodic Protection
CPC Consumer Protection Code
CPI Continuous Process Improvement
DRAFTCRE Certified Reliability Engineer
CSAG Consolidated Supply Activity Group
CVAMP Core Vulnerability Assessment Management Program
CY Calendar Year
DAFGM Department of the Air Force Guidance Memorandum
DAFI Department of the Air Force Instruction
DAFMAN Department of the Air Force Manual
DART Days Away Restricted and/or Transfer
DDC Direct Digital Control
DLA Defense Logistics Agency
DLA-DS Defense Logistics Agency Disposition Services
DoD Department of Defense
DoDI Department of Defense Instruction
DOT Department of Transportation
DPI Digital Printing and Imaging
DSN Defense Switched Network
EAID Equipment Authorization Inventory Data
ECP Entry Control Point
EESOH-MIS Enterprise, Environmental, Safety, Occupational Health Management
Information System
EMCS Energy Management Control System eMH Enterprise Military Housing
EOC Emergency Operations Center
EPA Environmental Protection Agency
ERMS Electronic Records Management System
ESP Emergency and Special Program
FAA Federal Aviation Administration
FAR Federal Acquisition Regulation
FFP Firm Fixed Price
DRAFTFIFRA Federal Insecticide, Fungicide and Rodenticide Act
FM Frequency Modulated
FMO Furnishings Management Office
FO Facility Operations
FOFP Facility Operations Facility Project
FOB Found on Base
FOD Foreign Object Debris
FOIA Freedom of Information Act
FOUO For Official Use Only
FP Facility Project
FRP Facility Response Plan
FSD Fire Safety Deficiency
FSRM Facility Sustainment, Restoration and Modernization
GFP Government Furnished Property
GFPE Government Furnished Plant Equipment
GSA General Services Administration
HAZMAT Hazardous Material
HCFC Hydrochlorofluorocarbon
HEPA High Efficiency Particulate Air
HHQ Higher Headquarters
HQ Headquarters
HVAC Heating Ventilation and Air Conditioning
IA Information Assurance
IAM Information Assurance Manager
IAT Information Assurance Training
IAW In Accordance With
IBC International Building Code
ICS Industrial Control System
DRAFTID Identification
IDP Integrated Defense Plan
IFS Installation Facilities Standard
IG Inspector General
IPC International Plumbing Code
IPMP Integrated Pest Management Program
ISO International Organization for Standardization
ISSO Information System Security Manager
IT Information Technology
ITAM Information Technology Asset Management
KPI Key Performance Indicator
LAN Local Area Network
LBP Lead Based Paint
LDD Loss, Damage, or Destruction
LoS Level(s) of Service
MAJCOM Major Command
MCM Machine Condition Monitoring
MCP Maintenance Control Plan
MFH Military Family Housing
MICT Management Internal Control Toolset msf million square feet
MTBF Mean Time Between Failure
MTTR Mean Time to Repair
MWR Morale Welfare and Recreation
NACB North American Crane Bureau
NEBB National Environmental Balancing Bureau
NEXGEN-IT Next Generation Information Technology
NFPA National Fire Protection Association
DRAFTNLT No Later Than
NOTAM Notice to Airmen
NR Natural Resources
OCWUT Oklahoma City Water Utilities Trust
OC-ALC Oklahoma City Air Logistics Complex
ODEQ Oklahoma Department of Environmental Quality
ODR Organizational Designated Representative
OJT On the Job Training
OMP Other Maintenance Provider(s)
OPDES Oklahoma Pollutant Elimination System
OPR Office of Primary Responsibility
OPSEC Operations Security
OSHA Occupational Safety and Health Administration
OWS Oil Water Separator
O&M Operations and Maintenance
PACM Presumed Asbestos Containing Material
PCS Property Control System
PdM Predictability Based Maintenance
PEC Program Element Code
PLC Programmable Logic Controller
PLCO Plant Clearance Officer
PM Preventive Maintenance
PEL Permissible Exposure Limit
PMP Preventive Maintenance Program
PMTL Preventive Maintenace Task List
PPE Personal Protective Equipment
PSIG Pounds per Square Inch Guage
PT&I Preventive, Testing and Inspection
DRAFTPWS Performance Work Statement
QA Quality Assurance
QCP Quality Control Plan
QEI Qualified Elevator Inspector
QPI Quality Performance Indicator
RAC Risk Assessment Code
RAM Radioactive Material
RCM Reliability Centered Maintenance
RF Radio Frequency
ROI Return on Investment
RP Real Property
RPIE Real Property Installed Equipment
RPSE Real Property Similar Equipment
R&O Requirements and Optimization
SAPR Sexual Assault and Prevention
SBSS Standard Base Supply System
SCADA Supervisory Control and Data Acquisition
SDS Safety Data Sheet
SIP Shelter in Place
SMART Security Management and Reporting Terminal
SME Subject Matter Expert
SMRP Society for Maintenace and Reliability Professionals
SMS Sustainment Management System
SOP Standard Operating Procedure
SP Service Provider
SPCC Spill Prevention, Control and Countermeasures
SR Service Request
STAR Storage Tank Accounting and Reporting
DRAFTTAFB Tinker Air Force Base
TCIR Total Case Incident Rate
TPO Thermoplastic Polyolefin
UFC Unified Facilities Criteria
UH Unaccompanied Housing
UID Unique Identifier
UP Utility Privatization
US United States
USAF United States Air Force
USORT Utility System Outage Reporting and Tracking Tool
UST Underground Storage Tank
VIP Very Important Person
VTC Video Teleconference
VTE Vertical Transportation Equipment
WRRB Work Request Review Board
WRT Work Request Team
WRWG Work Request Work Group
WT Work Task
DRAFTC.2. Work History
C.2.1. Infrastructure Quantities
Pavement
Runways: 4.2M SF of pavement surface; 11,100 feet and 10,000 feet
Taxiways: 2.7M SF of pavement
Aprons: 11.9M SF of pavement
Roads: 6M SF of pavement; ~46 lane miles
Parking Lots: 19.3M SF of pavement; ~58,000 parking spaces
Utilities
Natural Gas: 69 miles of gas line
Industrial Waste: 23 miles of waste lines; 45 lift stations
Septic Systems: 7
Fuel Pipeline Segments: 37 (37 with annual requirement, 31 with 5-year pressure test)
Facilities
Buildings and Structures: 1,151; 20.2M SF
Roofs: 16.7M SF
Vertical Transportation Equipment: 68 elevators and lifts
Kitchen Hoods: 23
Ladders: 853
Grease Traps: 12
Tanks: 17 Underground; 169 Aboveground
Oil/Water Separators: 47
The information provided in C.2. is historical information and may not reflect furure work load.
The Contractor is responsible for performing all requirements in the PWS.
DRAFTC.2.2. Work by Priority – FY23
Work Task Priority Work Tasks Hours Materials ($) Priority 1 706 2278.15 $3,314.69 Priority 2A - Plant Operations 13 12858.1 $0.00 Priority 2A - Preventive Maintenance 32802 38490.9 $5,468.50 Priority 3A 2800 9265.75 $14,858.59 Priority 3B 10679 88951.53 $1,211,940.22 Priority 3C 8682 83499.58 $66,727.96 Priority 4A 178 7431.8 $152,791.27 Total – FY23 55860 242775.81 $1,455,101.23
C.2.3. Work by Priority – FY24 (October – July, 10 months)
Work Task Priority Work Tasks Hours Materials ($) Priority 1 673 2346.80 $4,820.11 Priority 2A - Preventive Maintenance 29416 47632.24 $89,841.28 Priority 3A 1916 5955.45 $31,595.04 Priority 3B 8304 72735.85 $848,452.46 Priority 3C 8083 93500.92 $832,421.02 Priority 4A 156 8618.60 $84,020.75 Total – FY24 48548 230789.86 $1,891,150.66
C.2.4. Contractor Acquired Parts by Fiscal Year and Funds Source
FY23 FY24 (Oct-Jul) Funds Source Quantity Cost Quantity Cost
Facility Operations 63 $694,170.46 48 $793,518.80
FSRM 2001 $4,130,671.59 3035 $6,543,499.50
CSAG 878 $2,844,117.15 1126 $4,838,009.30
Total 2942 $7,668,959.20 4209 $12,175,027.60
DRAFTC.2.5. Work by Shop – FY23 Shop Name Work Tasks Hours Material ($)
Alarm Shop 4595 6573.52 $1,830.35 Electrical Systems - After Hrs 45 113.8 $134.15 Electrical Systems - Cathodics 122 1223.8 $8.41 Electrical Systems - Exterior 293 3377.8 $2,519.51 Electrical Systems - Interior 2803 20022.29 $19,316.25 Electrical Systems - Sprinklers 453 3834 $592.67 Engineering Flight 5 30.5 $0.00 Environmental Control Systems - Controls 892 15419.5 $728.88 Environmental Control Systems - Sub 19 29.7 $0.00 Facility Controls - Other 917 2920.7 $685.07 Facility Operations - Pavement Clearance 72 2127.2 $0.00 HVAC Shop - A 1910 16543.95 $207,388.40 HVAC Shop - After Hrs 230 1110.8 $2,524.59 HVAC Shop - C 1753 25430 $503,327.41 HVAC Shop - Pm 136 1784.35 $1,103.71 HVAC Shop - Sub - Boiler 1356 809.6 $0.00 Material & Inventory Control 0 0 $0.00 Operations Engineering & Staff 1 4 $0.00 Operations Planning 13 4.4 $439,016.80 Pest Management 1681 3952.55 $3,651.77 Plant Ops - Industrial Wastewater Trmt - Maint 69 1476.5 $0.00 Plant Ops - Industrial Wastewater Trmt - Ops 13 2391.7 $0.00 Plant Ops - Other 2 3.25 $0.00 Power Production Shop 4456 6575.4 $739.13 Protective Coating (Paint) 276 3454.7 $214.85 Spec Mx - Facility Projects 166 8291.2 $9,611.51 Spec Mx Tm - Air Compressors 1078 2179.4 $6.05 Spec Mx Tm - Insulator 125 3478.1 $112.70 Spec Mx Tm - Machine Maint Metal 5005 14011.8 $12,844.87 Spec Mx Tm - Smart Electric 364 1158.5 $788.33 Spec Mx Tm - Smart HVAC 560 3283.45 $2,042.12 Spec Mx Tm - Smart Paint 206 1505.5 $2,501.37 Spec Mx Tm - Smart Plumbing 609 1333.2 $1,866.61 Spec Mx Tm - Smart Structure 1002 3036.05 $4,473.25 Spec Mx Tm - Sub - Chem Vent Hoods 8 8.5 $0.00 Spec Mx Tm - Sub - Elevator 717 891.9 $0.00 Spec Mx Tm - Sub - Grease Traps 118 172.18 $0.00 Spec Mx Tm - Sub - Kitchen Hoods 84 69.6 $0.00 Spec Mx Tm - Sub - Mold Remed 3 9 $202.24 Spec Mx Tm - TAC Alarms 1746 1424.5 $0.00 Spec Mx Tm - TAC Controls 14 339.5 $0.00 Spec Mx Tm - TAC HVAC 2377 8422.02 $1,985.14 Spec Mx Tm - TAC Structures 1147 2845.5 $442.53 Structure Shop 8451 12760.55 $7,255.25 Structure Shop - Locks 1393 2094.65 $45,309.94 Structure Shop - Roof 343 2297.1 $1,217.43 Structure Shop - Sheet Metal 281 4223.45 $572.06 Structure Shop - Welding 228 2290.4 $372.46 Sustainment - Pavements 644 12332 $146,964.43 Sustainment Service Contract Management 2 2.5 $0.00 Water and Fuels System Mx - Fuels 494 3261 $553.98 Water and Fuels System Mx - Pipe Fitting 183 6278 $8,331.96 Water and Fuels System Mx - Plumb After Hrs 154 290.8 $625.29 Water and Fuels System Mx - Plumb Ext 187 6540.65 $44.71 Water and Fuels System Mx - Plumb Int 6059 18730.8 $23,195.05 Total 55860 242775.81 $1,455,101.23
DRAFTC.2.6. Work by Shop – FY24 (October – July, 10 months) Shop Name Work Tasks Hours Material ($)
Alarm Shop 1161 5714.40 $39,856.53 Electrical Systems - After Hrs 52 246.25 $500.92 Electrical Systems - Cathodics 230 1251.10 $406.13 Electrical Systems - Exterior 2539 6444.60 $20,309.69 Electrical Systems - Interior 4560 24056.55 $216,375.06 Electrical Systems - Sprinklers 594 4282.60 $19,230.95 Engineering Flight 8 35.50 $0.00 Environmental Control Systems - Controls 723 5387.35 $22,662.04 Environmental Control Systems - Sub 6 11.70 $0.00 Facility Controls - Other 682 2530.20 $24,441.07 Facility Operations - Pavement Clearance 113 125.40 $0.00 HVAC Shop - A 1396 14420.70 $112,169.10 HVAC Shop - After Hrs 168 1823.00 $195.26 HVAC Shop - C 1223 20382.80 $287,349.77 HVAC Shop - Pm 6137 13127.15 $87,768.23 HVAC Shop - Sub - Boiler 969 690.30 $3,673.97 Material & Inventory Control 1 1.50 $0.00 Operations Engineering & Staff 2 18.00 $0.00 Operations Planning 19 81.00 $181,653.27 Pest Management 1204 3804.30 $0.00 Plant Ops - Industrial Wastewater Trmt - Maint 119 3409.80 $38,426.86 Plant Ops - Industrial Wastewater Trmt - Ops 20 66.00 $0.00 Plant Ops - Other 4 4.00 $0.00 Power Production Shop 3325 4554.90 $4,165.84 Protective Coating (Paint) 244 2952.00 $1,926.47 Spec Mx - Facility Projects 109 8779.40 $36,400.87 Spec Mx Tm - Air Compressors 1019 2385.45 $33,441.09 Spec Mx Tm - Insulator 85 3209.00 $11,284.45 Spec Mx Tm - Machine Maint Metal 3872 11644.90 $63,881.69 Spec Mx Tm - Smart Electric 401 1283.30 $7,353.39 Spec Mx Tm - Smart HVAC 458 3064.60 $64,018.92 Spec Mx Tm - Smart Paint 165 1141.00 $1,647.54 Spec Mx Tm - Smart Plumbing 623 1266.80 $19,767.67 Spec Mx Tm - Smart Structure 519 2443.10 $21,743.73 Spec Mx Tm - Sub - Chem Vent Hoods 16 34.20 $0.00 Spec Mx Tm - Sub - Elevator 527 701.40 $0.00 Spec Mx Tm - Sub - Grease Traps 103 167.31 $0.00 Spec Mx Tm - Sub - Kitchen Hoods 45 26.10 $0.00 Spec Mx Tm - Sub - Mold Remed 4 6.50 $0.00 Spec Mx Tm - TAC Alarms 615 1040.60 $8,421.90 Spec Mx Tm - TAC Controls 0 0.00 $0.00 Spec Mx Tm - TAC HVAC 1883 6624.45 $31,930.05 Spec Mx Tm - TAC Structures 561 2508.35 $11,700.04 Structure Shop 2600 12815.15 $78,890.79 Structure Shop - Locks 1062 2034.30 $49,415.26 Structure Shop - Roof 404 3472.80 $5,583.96 Structure Shop - Sheet Metal 264 3943.60 $33,799.24 Structure Shop - Welding 197 1906.20 $2,201.17 Sustainment - Pavements 642 14821.45 $32,699.18 Sustainment Service Contract Management 1 0.00 $235.00 Water and Fuels System Mx - Fuels 478 4190.40 $42,754.54 Water and Fuels System Mx - Pipe Fitting 193 4552.50 $34,080.06 Water and Fuels System Mx - Plumb After Hrs 195 360.00 $2,519.70 Water and Fuels System Mx - Plumb Ext 163 5138.20 $18,688.90 Water and Fuels System Mx - Plumb Int 5845 15807.70 $217,580.36 Total 48548 230789.86 $1,891,150.66
DRAFT
C.2.7. Preventive Maintenance by Shop
Shop Name Hours
(Annualized) Records Alarm Shop 6496.9 472 Electrical Systems - Cathodics 191.8 118 Electrical Systems - Exterior 5876.0 805 Electrical Systems - Interior 13255.6 4810 Electrical Systems - Sprinklers 7117.5 953 Environmental Control Systems - Controls* 4947.9 3588 Facility Controls - Other 982.4 57 HVAC Shop - Pm 19417.4 6770 HVAC Shop - Sub - Boiler 1055.5 138 Pest Management 1528.8 93 Plant Ops - Industrial Wastewater Trmt - Maint* 1403.2 107 Plant Ops - Industrial Wastewater Trmt - Ops* 1792.0 156 Power Production Shop 4002.3 202 Spec Mx Tm - Air Compressors 1364.8 151 Spec Mx Tm - Machine Maint Metal 6492.7 1629 Spec Mx Tm - Smart Electric 172.5 109 Spec Mx Tm - Smart Plumbing 66.2 15 Spec Mx Tm - Smart Structure 49.6 170 Spec Mx Tm - Sub - Chem Vent Hoods 58.2 10 Spec Mx Tm - Sub - Elevator 755.4 59 Spec Mx Tm - Sub - Grease Traps 232.0 12 Spec Mx Tm - Sub - Kitchen Hoods 41.7 18 Spec Mx Tm - TAC Alarms 479.7 28 Spec Mx Tm - TAC HVAC 2183.8 726 Spec Mx Tm - TAC Structures 1390.1 516 Structure Shop 1921.0 3088 Structure Shop - Roof 8966.7 1291 Spec Mx Tm - Sub - Duct Cleaning 60.0 24 Sustainment - Pavements 115.8 16 Water And Fuels System Mx - Fuels* 13409.9 1367 Water And Fuels System Mx - Pipe Fitting 52.1 10 Water And Fuels System Mx - Plumb Ext 265.1 66 Water And Fuels System Mx - Plumb Int 2593.1 853
TOTALS 108737.7 28427
* These shops have not transitioned to NexGen IT for preventive maintenance
C.2.8. Preventive Maintenance Summary by PMTL
AFPMTL PMTL Description Frequency Hours
(Annualized) Records B20351101950 Door, sliding, electric S- 215.4 88 B20351102950 Hanger doors, sliding A-Q- 266.2 118 B2035110295001 Hangar Doors, Sliding, Large A- 6.0 2 B20352251950 Door, emergency egress, swinging TE-(A-) 50.3 2394 B2035225195007 Ladders, Fixed A-S- 2034.2 965 B20353001950 Door, revolving, manual S- 1.3 1 B20354101950 Door, overhead, electric, roll up, to 24' high x 25' wide S- 4334.6 1065 B2035450195001 Doors, Igloo/Blast, Hinged/Sliding (2 person task) A- 246.8 141 B2035450195005 Fabric Roll-Up Door A-Q- 262.3 27 B3015225195001 Roof, Low Sloped, Small (< 5000sf, min 2 person task) A- 3666.3 606 B3015225195002 Roof, Low Sloped - Medium (5k sf - 10k sf, min 2 person task) A- 2140.6 239 B3015225195003 Roof, Low Sloped, Large (up to 15k sf, min 2 person task) A- 2730.0 230 B3015225195004 Roof, Steep Slope, Small (< 5k sf, min 2 person) A- 747.5 216 B3015225195005 Roof, Steep Slope, Medium (5k sf - 10k sf, min 2 person task) A- 376.3 74 B3015225195006 Roof, Steep Slope, Lg (up to 15k sf, min 2 person task) A- 355.7 53 C10251101950 Fire doors, swinging Q- 68.6 175 C10251102950 Fire doors, sliding Q- 119.8 72 C10251103950 Fire doors, overhead A-Q- 585.5 205 D10151001950 Elevator, cable, electric, passenger / freight A-Q-M- 380.9 8 D10151101950 Elevator, hydraulic, passenger / freight A-Q-M- 460.0 45 D10153101950 Wheelchair lift S- 9.7 8 D2015100495001 Winterize Water Systems A- 20.0 8 D20252601950 Water heater, gas, to 120 gal. A-S- 180.5 105 D2025260495001 Water Heater, Steam Coil, Instantaneous A-Q- 273.8 20 D20252651950 Valve, pressure regular, above 4" A- 6.1 17 D2025268195001 Pressure Balancing Mixing Valve (Leonard) A- 49.5 36 D20252701950 Valve, sediment strainer, above 4" W-(A-) 13.8 44 D2025410195001 BackFlow Prevention (BFP) Device DCVA (Double check valve assembly) Class I or II A- 5.6 9 D2025410295001 BPRP Device RPZ (Reduced pressure backflow preventor) Class III S- 337.9 277 D20959101950 Submersible, 1 H.P. and over S- 462.0 120 D30251101950 Boiler, electric, to 1500 gal. A-S- 826.8 216 D30251301950 Boiler, hot water, oil, gas, or comb. fired, up to 120 MBH A-Q-M- 112.8 9 D30251302950 Boiler, hot water, oil, gas, or comb. fired, 120 to 500 MBH A-Q-M- 1207.0 76 D30251303950 Boiler, hot water, oil, gas, or comb. fired, 500 to 1000 MBH A-Q-M- 225.9 13 D30251304950 Boiler, hot water, oil, gas, or comb. fired, over 1000 MBH A-Q-M- 472.8 24 D30251401950 Boiler, steam, oil, gas, or comb. fired, up to 120 MBH A-Q-M- 64.8 4
C.2.8. Preventive Maintenance Summary by PMTL – Continued
AFPMTL PMTL Description Frequency Hours
(Annualized) Records D30251402950 Boiler, steam, oil, gas, or comb. fired, 120 to 500 MBH A-Q-M- 94.9 5 D30251403950 Boiler, steam, oil, gas, or comb. fired, 500 to 1000 MBH A-Q-M- 41.4 2 D30251404950 Boiler, steam, oil, gas, or comb. fired, over 1000 MBH A-Q-M- 89.8 4 D3025140595002 Steam Generators (un-fired) S-M-W- 144.6 1 D30252101950 Deaerator tank S- 4.5 3 D3025210195002 Expansion Tank S- 15.3 14 D3025210195003 Refrigerated Compressed Air Driers for Breathing Air Q- 13.6 1 D3025210195005 Compressed Air Filtration Unit for Breathing Air S- 15.7 4 D30253102950 Pump, condensate return, over 1 H.P. S- 10.1 9 D30253103950 Pump, condensate return unit, 2 pumps S- 11.4 10 D3035110195004 Cooling Tower Chilled Water Testing and Treatment W- 762.9 17 D3035110195005 Water Treatment Filter Side Stream Centrifugal S-M- 37.6 3 D3035110195006 Water Treatment Filter Side Stream Granular Media A-M- 53.7 2 D30351102950 Water cooling tower, 50 thru 500 tons S- 158.6 16 D30351103950 Water cooling tower, 500 thru 1000 tons S- 195.0 11 D30351301950 Chiller, recip., air cooled, up to 25 tons A-S-(A-)Q- 116.5 12 D30351402950 Chiller, centrif., water cooled, over 100 tons A-S-M-W- 700.6 21 D30351601950 Chiller, screw, water cooled, up to 100 tons A-S-M- 29.5 2 D30351602950 Chiller, screw, water cooled, over 100 tons A-S-M- 66.9 4 D3035160295002 Boiler/Chilled Water loops, Chemical Treatment -Monthly A-S-Q-M- 140.4 13 D3035160295002A Boiler/Chilled Water loops, Chemical Treatment -ANNUAL ONLY A- 80.0 80 D3035160295002Q Boiler/Chilled Water loops, Chemical Treatment -QUARTERLY ONLY Q- 180.0 45 D3035160295005 Chiller, Scroll, Air Cooled 30 to 130 Ton A-M- 2161.7 68 D30352101950 Condenser, air cooled, 3 tons to 25 tons A-Q- 42.2 24 D30352102950 Condenser, air cooled, 26 tons through 100 tons A-Q- 15.9 8 D30352103950 Condenser, air cooled, over 100 tons A-Q- 4.4 2 D30352201950 Condensing unit, air cooled, 3 to 25 tons A-Q- 690.9 270 D30352202950 Condensing unit, air cooled, 26 to 100 tons A-Q- 44.6 15 D30352203950 Condensing unit, air cooled, over 100 tons A-Q- 7.0 2 D30352401950 Condensing unit, water cooled, 3 to 24 tons A-Q- 5.3 4 D30352402950 Condensing unit, water cooled, 25 to 100 tons A-Q- 2.8 1 D30451101950 Air handling unit, 3 thru 24 tons A-Q- 1596.5 775 D30451102950 Air handling unit, 25 thru 50 tons A-Q- 594.4 278 D30451103950 Air handling unit, over 50 tons A-Q- 931.7 285 D30451121950 Air handling unit, computer room A-Q- 293.8 86 D30451201950 Fan coil unit S- 2747.7 941
AFPMTL PMTL Description Frequency Hours
(Annualized) Records D3045120195001 Walk-In Refrigeration Fan Coils System Medium and Low Temp S-Q- 44.4 8 D30451601950 VAV Boxes A- 1532.7 1641 D3045160195002 Motorized Louvers-All Sizes A- 886.1 339 D3045160195003 Motorized Louvers- Specialty-Industrial Q- 57.3 5 D30451701950 Fire dampers AF4- 781.0 675 D30451801950 AHU Filter Bank 2 Stage S-Q 302.1 39 D30451801950M AHU Filter Bank 2 Stage-MONTHLY S-Q-M-(Q) 286.6 37 D30452102950 Fan, axial, 5,000 to 10,000 CFM S- 1668.0 1293 D30452103950 Fan, axial, over 10,000 CFM S- 469.8 338 D30452501950 Hood and blower A-Q- 41.7 18 D30454101950 Centrifugal, over 1 HP S- 665.0 556 D30456001950 Heat exchanger, steam S- 4.6 5 D3045600195001 Heat Exchanger, Plate Type A-S- 51.5 8 D30551101950 Unit heater, gas radiant A- 294.3 292 D30551102950 Unit heater, gas infrared A- 866.3 576 D30551103950 Unit heater, steam A- 289.0 344 D3055110495001 Unit Heater Electric Heat Kit A- 274.9 227 D30551221950 Forced air heater, oil or gas fired, up to 120 MBH A-Q- 464.0 80 D30551222950 Forced air heater, oil or gas fired, over 120 MBH A-Q- 303.7 41 D30552101950 Package unit, air cooled, 3 thru 24 ton A-Q- 326.7 136 D30552102950 Package unit, air cooled, 25 thru 50 ton A-Q- 9.8 3 D30552301950 Package unit, computer room S-Q- 290.5 67 D30552401950 Package unit with duct gas heater A-Q- 898.1 181 D30552501950 Air conditioning,split system,DX air cooled,to 10 tons A-Q- 435.8 123 D30651001950 Controls, central system, electro/pneumatic BE-(A) 1560.7 815 D3065100195001 Frequency Drive Controllers A- 46.2 61 D3065100195003 CO/CO2/NO2/LEL Sensor Calibration A- 22.0 14 D3095110195003 Dryer Ventilation Ducting Maintenance S- 60.0 24 D3095110195007 Refrigerant Monitor and Alarm, All Types A- 5.2 5 D30951141950 Air compressor, centrifugal, to 40 H.P. Q- 13.6 4 D30951142950 Air compressor, centrifugal, over 40 H.P. A-S-M- 14.9 1 D30951181950 Air compressor, reciprocating, less than 5 H.P. Q- 350.1 73 D30951182950 Air compressor, reciprocating, 5 to 40 H.P. Q- 204.0 42 D30951183950 Air compressor, reciprocating, over 40 H.P. Q- 34.3 6 D3095122195001 Air Compressor, Rotary Screw, 5 to 40 H.P A-Q- 32.8 7 D3095122295002 Air Compressor, Rotary Screw, over 40 H.P A-Q- 86.3 17
AFPMTL PMTL Description Frequency Hours
(Annualized) Records D30952101950 Steam humidification system S- 30.5 12 D30952102950 Evaporative pan with heating coil humidification system S- 68.0 36 D3095210295001 Humidification System,Evaporative Pan with Infrared Bulbs Q- 386.6 42 D3095210295003 Air Dryer -Refrigerated-15 CFM A-S-(M-) 420.5 36 D3095220195001 Desiccant Dryer A-Q-M- 79.5 7 D3095300195004 Paint Booth Breathing Air Compressor A-BM- 36.0 3 D40151001950 Backflow prevention device, up to 4" A- 29.3 88 D40151002950 Backflow prevention device, over 4" A- 0.5 1 D4015150195001 Fire System - Stand Pipes AF4-BE- 3.4 2 D4015150195002 Wet Pipe Sprinkler System AF6-AF4-A- 4739.2 661 D4015150195006 Fire Suppression System Wet Pipe Medical Facilities A-S-Q- 68.2 10 D4015180195001 Deluge Sprinkler System AF6-AF4-A-M- 30.1 3 D4015180195002 Pre-Action Automatic Sprinkler System AF6-AF4-A- 39.4 11 D4015180195003 Water Mist System AF4-A- 107.1 17 D4015210195001 Fire System (Electric Motor Pump) AF4-BE-M- 186.4 18 D4015250195002 Diesel Engine Driven Fire Pump A-M- 1596.4 78 D4015250195002MED Medical FACS Diesel Engine Driven Fire Pump A-M-W-(M-) 81.5 1 D4015310195001 Dry Pipe Automatic Sprinkler System AF6-AF4-A- 560.3 51 D4065100195011 DDC Cabinet, Primary/Secondary Controller A- 1.1 1 D4095100195001 Carbon Dioxide Systems AF4-A-S 13.4 2 D4095210195006 Test AFFF Storm Water Diverter Valve Q- 94.2 14 D4095400195001 Dry & Wet Chemical Systems AF4-A-S 58.2 10 D5015210195001 Inspect Distribution Panel - 1201 to 2000 Amps AF5-TE- 2340.4 896 D5015211195001 Disconnect LT600V, All Sizes A- 431.6 400 D5015212195001 Exterior Busway Inspection LT600V A- 7.5 9 D5015212195002 Busway Assembly, LT600V, 200 ft A- 2347.5 172 D5015234195001 Automatic Transfer Switch (ATS) A-S-J- 1003.6 115 D5015240185001 Transformer, Dry Type, <500KVA A- 1090.0 811 D50152401950 Transformer, dry type 500 KVA and over TE-(A-) 73.9 96 D50152402950 Transformer, oil pad mounted TE-(A-) 32.5 30 D5015240295005 Drawout Type Power Circuit Breaker, High Voltage TE-(A-) 356.0 75 D5015240295006 Inspect HV Pad Mount Air Switch TE-(AF4-) 410.2 318 D5015260195001 Inspect Sub Panel - 225 Amps and Smaller AF5-TE- 2607.0 1896 D50152801950 Motor control center, over 400 A A- 66.9 172 D50356101950 Central clock systems M-(A-) 308.4 39 D5035710195002 FACP 101 to 300 Heat Devices AF4-BE- 1331.0 53
AFPMTL PMTL Description Frequency Hours
(Annualized) Records D5035710195003 FACP 50 or Less Heat Devices AF4-BE- 1378.6 124 D5035710195004 FACP 51 to 100 Heat Devices AF7-AF4-BE-A- 4260.8 319 D5095210295001 Diesel Generator, >500 KW BE-A-S-M-J- 369.2 8 D5095210295002 Diesel Generator, >5 - 25 KW BE-A-S-M-J- 283.9 9 D5095210295003 Diesel Generator, 250 - 499 KW BE-S-M-J- 534.9 13 D5095210295004 Diesel Generator, 26 - 249 KW BE-S-M-J- 1557.3 44 D5095210295006 EAID Generator BE-A-Q-M- 155.0 4 D5095210295007 POL Fuels Generator BE-A-Q-M- 101.0 5 D5095220195001 400 Hz Power System S- 36.1 19 D5095250195002 Inspect Airfield Lights (Runway, Taxiway, & Threshold) W- 987.6 6 D5095250195003 Inspect Airfield Signs (Distance/Barrier/Taxiway) Q- 44.3 13 D5095250195004 Inspect Approach Lights W- 2025.8 14 D5095250195005 Inspect Obstruction Lights - 25 Lights - No Special Equipment M- 106.6 3 D5095250195006 Inspect Obstruction Lights - 10 Lights - Special Equipment M- 106.6 3 D5095250195007 Inspect PAPI Lights A-S-Q-M-W- 103.3 4 D5095250195008 Inspect Rotating Beacon A-S-BM-D- 267.3 1 D5095250195009 Inspect Wind Cones M- 46.1 4 D5095250195010 Inspect Static Grounding System - POL,LOX Storage - Per Facility, (Aircraft Parking Apron - Optional) A-Q- 15.2 8 D5095250195011 Inspect Lightning Protection System BE-A- 132.0 128 D5095250195012 Surge Protection Devices (SPD) A- 167.1 218 D5095250195014 Airfield Lighting Constant Current Regulator A-M-W- 984.5 32 D5095250395001 Inspect Exterior/Area/Street Lights - Pole Mounted M- 61.1 8 D5095250395002 Perform Grounding Checks AF System Facility -Per Facility AF4- 40.4 202 D5095250395004 Perform Grounding Checks Comm Facility -Per Facility AF2- 1.0 2 D5095250495001 Light, Emergency, Central System A- 33.3 15 D5095252195001 Bay Lighting Inspect and Relamp 80 K SF Q- 3806.2 36 E1035100195003 Vehicle Barriers, Pop-Up Q- 143.3 5 E1035100195007 Vehicle Barrier, Retractable Cable Net A-S-Q-M-W- 343.8 12 E10353101950 Hydraulic lift, loading dock S- 75.1 46 E10951221950 Crane, electric bridge, up to 5 ton A- 11.7 4 E10951222950 Crane, electric bridge, 5 to 15 ton A-Q- 95.6 12 E1095123395004 Crane, Manual Monorail (Up to 25' in Length) A- 10.2 4 E1095123395005 Crane, Manual Monorail (25'-50' in Length) A- 8.6 3 E1095123395007 Crane, Electric Bridge A- 14.4 4 E10951251950 Hoist, pneumatic A- 9.2 7 E10951261950 Hoist / winch, chain / cable, electric A- 18.1 11
AFPMTL PMTL Description Frequency Hours
(Annualized) Records G20451501950 Manual swing gate S- 1.7 1 G2045150195002 Inspect Paved Roads (per 1 mile) A-S- 48.0 6 G2045150195006 Airfield Pavement (per 10000 sqyds) A-S- 60.0 4 G2045150195007 Chainlink Fence Inspection (per 1000 LF) Q- 6.3 5 G20451503950 Manual slide gate S- 1.5 1 G20451504950 Electric slide gate S-Q- 66.7 14 G3015108195003 Fire Water Storage Tanks AF4-TE-M- 345.9 11 G3015612195002 Termite Inspections A- 99.0 66 G3015612195006 Food Facility Surveillance - Per Facility M- 168.2 13 G3015612195010 Rodent Surveillance - Per Facility W- 1261.6 14 G30156321950 Reverse osmosis system Q- 7.5 2 G30156501950 Water softner W(Q-) 318.1 57 G30156701950 Chlorinator Q- 3.7 1 G3025420195002 Lift Station Wet Well A-M-W- 1628.2 79 G3025536195001 Inspect/Clean Grease Traps M- 232.0 12 G3025536195002 Oil Water Seperators (Sewer) Q- 105.1 26 G3025536195004 Industrial Oil Water Separator A-W- 187.8 12 G3025544195010 Inlet Pumps, Waste Plant A- 147.8 18 G3025544195017 Industrial Waste Exterior Piping Manhole to Manhole A- 210.4 44 G3025546195001 Anti-grease Chemical Injection System M- 142.6 13 G3035070195001 Storm Water Flood Gate - Per Gate S-Q- 463.1 12 G30653101950 Fuel oil storage tank, above ground A- 226.0 69 G3065310195002 Control Panels, Master Control/Pump control S-Q-W- 1019.6 20 G3065310195007 Fuel pump, Self-priming centrifugal, electric motor driven A-Q- 558.1 103 G3065310195010 Gauge, Pressure/Vacuum A-S-Q-M- 90.8 17 G3065310195016 Natural Gas (Distribution System - Leakage Survey) A- 16.3 9 G3065310195017 Natural Gas (DS-Valve & Patrol) A-S- 34.5 12 G3065310195020 Suppressor, Surge Q- 5.3 2 G3065310195029 Valve, Automatic, above 4", Hydrant Control Valve (362AF-8) Q- 513.6 116 G3065310195030 Valve, Automatic, above 4", Rate of Flow, non-surge Check Valve (41AF-1A) S- 8.2 6 G3065310195053 Valve, Manual Ball, above 2" A-S-Q-W- 10846.6 481 G3065310195055 Valve, Pressure (Safety) Relief, All A-M- 952.7 190 G3065310195062 Fuel Pump, Rotary Vane, Electric Motor A-S-Q- 139.1 17 G4095110195001 Cathodic Protection-Original (NOT USED - SEE GA, R, WT, BND, IC, AN A- 191.8 113 G4095110195001WT Cathodics Protection-WATER TANK CALIBRATION A- 5 G9095210195001 Clarifier and Aeration Wastewater Tanks Maintenance A-S- 165.8 2
DRAFTC.2.9. Buildings and Structures by Facility Analysis Code (FAC)
Facility Analysis Code
(FAC)
Description Quantity Area (SF)
1311 Communications Building 6 18,762 1405 Secure Operational, Storage, and Information Technology Building 1 82,025 1412 Aviation Operations Building 10 447,788 1413 Air Control Tower 1 17,585 1442 Operations Support Lab 2 374,373 1444 Miscellaneous Operations Support Building 11 61,619 1445 Working Animal Support Building 1 2,676 1459 Overhead Cover 15 22,558 1498 Security Support Building 19 13,763 1711 General Purpose Instruction Building 8 132,431 1714 Reserve Training Facility 7 45,583 1718 Indoor Firing Range and Supporting Facility 2 9,452 1721 Flight Simulator Facility 4 162,919 1726 Enclosed Fire Fighter Trainer Facility 1 3,916 1795 Unenclosed Fire Fighter Trainer Facility 1 15,543 2111 Aircraft Maintenance Hangar 10 1,145,608 2112 Aircraft Maintenance Shop 12 591,005 2113 Aircraft Corrosion Control Hangar 7 432,411 2114 Aircraft Engine Test Building 1 64,518 2115 Aircraft Maintenance Hangar, Depot 9 1,553,028 2116 Aircraft Maintenance Shop, Depot 17 6,700,159 2141 Vehicle Maintenance Shop 6 71,505 2145 Vehicle Maintenance Facility 1 6,003 2162 Ammunition Maintenance Shop, Depot 1 2,824 2171 Electronic and Communication Maintenance Shop 8 216,567 2181 Installation Support Vehicle Maintenance Shop 3 47,169 2182 Installation Support Equipment Maintenance Facility 1 14,325 2184 Parachute and Dingy Maintenance Shop 1 25,195 2191 Facility Engineer Maintenance Shop 12 89,159 4122 Liquid Oxygen Storage 5 12,090 4221 Ammunition Storage, Installation 8 14,771 4411 Covered Storage Building, Depot 19 3,106,026 4412 Covered Storage Shed, Depot 12 212,249 4413 Hazardous Materials Storage, Depot 13 121,693 4421 Covered Storage Building, Installation 10 63,102 4422 Covered Storage Shed, Installation 10 11,282 4423 Hazardous Materials Storage, Installation 12 10,136 4427 Small Arms Storage, Installation 1 47
DRAFTC.2.9. Buildings and Structures by Facility Analysis Code (FAC) - Continued
Facility Analysis Code
(FAC)
Description Quantity Area (SF)
4428 Storage and Customer Issue 12 424,584 5304 Veterinary Facility 1 4,244 5306 Medical Warehouse 2 10,496 5307 Ambulance Building 1 8,000 5500 Dispensary and Clinic 3 235,378 6100 General Administrative Building 20 284,817 6102 Large Unit Headquarters Building 10 241,456 6104 Automated Data Processing Center 1 99,429 7210 Enlisted Unaccompanied Personnel Housing 9 455,453 7220 Dining Facility 2 28,667 7234 Latrine/Shower Facility 6 6,013 7311 Fire Station Facility 1 22,069 7313 Police Station 9 86,827 7344 Postal Facility 1 3,001 7346 Exchange Sales Facility 4 199,674 7347 Bank and Credit Union 1 13,528 7349 Commissary 1 87,027 7350 Car Wash Structure 2 25,521 7361 Chapel Facility 1 18,022 7362 Religious Education Facility 1 7,993 7371 Nursery and Child Care Center 3 63,742 7372 Family Service Center 1 29,208 7383 Air Raid/Fallout/Storm Shelter 10 3,400 7383 Air Raid/Fallout/Storm Shelter 56 16,803 7385 Public Restroom/Shower 2 3,663 7412 Automobile Craft Center 1 13,792 7413 Golf Club House and Sales 5 26,943 7415 Bowling Center 1 20,217 7417 Recreation Center 4 33,809 7421 Indoor Physical Fitness Facility 5 71,365 7431 Auditorium and Theater Facility 1 12,831 7440 Community Activities/Conference Center 2 31,811 7447 MWR Storage Building 3 80,224 7448 Recreational Support Building 1 37 7531 Pavilion 28 23,197 8331 Refuse Collection and Recycling Structure 2 50,375
DRAFTC.2.10. In-Use Storage Tanks
Tank Contents Total
Aboveground Storage
Tank (AST)
Underground Storage
Tank (UST) Deicing Fluid 1 1 0 Diesel Fuel 126 119 7 Empty 1 1 0 Ethanol 1 1 0 Gasoline 11 8 3 Jet A/A-1 31 29 2
JP-10 2 0 2
JP-8 1 1 0
Lubricationg Oil 3 3 0 Off-Spec Fuel 1 0 1 Preservation Oil 6 4 2 Used Oil 2 1 1 Total 186 168 18
C.2.11. Standard Operating Procedure Listing
Number Title 031 B821 No 1 Chiller Shut-Down 032 B821 Chiller No 2 Normal Start-Up 033 B821 No 2 Chiller Shut-Down 034 B821 Air Compressor (Atlas Capco) Operations 055 Sewer and Industrial Waste Line Dye Tracing 056 IWTP Daily Lift Sation Inspections 057 IWTP Inspection of Oil-Water Separators 061 IWTP Lift Station No 2 067 IWTP East and West Storage Tanks 069 IWTP North and South Equalization Basins 070 IWTP North Solids Contact Clarifier 071 IWTP Final Pressure Filters 074 IWTP Sludge Thickener 076 IWTP South Solids Contact Clarifier 077 Surge Tank 078 Wet Well and Pump Station 079 IWTP Blending Tanks D1 and D2 080 IWTP Mixing Basins No 1, 2 and 3 081 IWTP Oil Separators 082 IWTP Paint Stripping Clarifier 083 IWTP Sludge Press Conditioning Tank 087 IWTP Base Pools Start-Up and Maintenance 110 B821 Cooling Tower Operation 115 B2280 Air Compressor Start-Up and Operation 119 Internal/External Hydro-Boiler Inspection (All Plants) 125 B2102 Air Dryer Start-Up and Operation 167 Septic Tank Inspection 177 IWTP Chemical Treatment Filters (CTF) 184 Fire Pump Station 1032 Weekly Testing 191 IWTP Operation Under Extraordinary Situations
C.2.12. Furniture and Appliance Management
Dorm Assets
Building Rooms Day Rooms Baths
Shared Kitchens Notes
5903 69 2 35 0 5913 34 2 15 0 13 shared and 2 private baths 5929 192 5 96 96 5942 144 3 72 72 5946 144 3 72 72 5947 144 3 72 72 Total 727 18 362 312
* Average of 668 dormitory residents in the 6 buildings
Appliances in Base Dorms
Building Refrigerators Microwaves Cooktops Vacuums Dehumidifiers 5903 Small - 69 69 0 36
As Needed
5913 Small - 34 34 0 36 5929 Large - 96 96 96 96 5942 Large - 72 72 72 72 5946 Large - 72 72 72 72 5947 Large - 72 72 72 72
Furniture Repairs and Replacements
Year Repairs / Replacements per Month
CY24 29
CY23 32
CY22 25
CY21 21
Change of Occupancy Maintenance (COM): 275 occupancy changes per year; 104 total room paints per year (others touch-up paint), not to exceed 53 total room carpet replacements per year
General Officer Homes: Support 3 GOHs with 448 Items
C.2.13. Outages
Outage Category Annual Quantity
Normal Hours 350 Afterhours 13 Weekend 88 Holiday 16
C.2.14. Dig Permits: 306 per year
C.2.15. Base Equipment Asset List
Insert Table
INVENTORY OF CROSS-CONNECTION AND BACKFLOW PREVENTION DEVICES AIR FORCE BASE
FACILITY
NUMBER
CONTROL
NUMBER
DATE LOCATION
POTENTIAL
CONTAMINATION
DEVICE
POTENTIAL
CONTAINMENT
OR POLLUTANT
DEGREE OF
HAZARD
BACK
PRESSURE
POTENTIAL
BACK
SIPHONAGE
POTENTIAL
TYPE
CONTROL
INSTALLED
TYPE
CONTROL
REQUIRED
PROPER
INSTALLATION?
PROPER
PROTECTION
DATA ON DEVICE INSTALLED PIPE
SIZE
PIPE
MATERIAL
1 1 1/7/2010 U Shaped Mechanical Room Heating/ Cooling System Chemicals High Yes Yes RPPBFP RPPBFP Yes Yes Watts 909 1" 1" Copper
1 2 1/7/2010 Chill Water Tank Heating/ Cooling System Chemicals High Yes Yes HBVB HBVB Yes Yes Wilkins 34H 3/4" 3/4" Copper
1 3 1/7/2010 Chill Water Tank U Shaped Mechanical Room
Heating/ Cooling System Chemicals High No Yes HBVB HBVB Yes Yes Wilkins N/A 3/4" 3/4" Copper
1 4 1/7/2005 U Shaped Outside Mechanical Room Hose Bibb Chemicals High No Yes None HBVB N/A No N/A N/A N/A 3/4" Copper
1 5 1/7/2010 Mechanical Room Next To Photo Lab Boiler Chemicals High Yes Yes RPPBFP RPPBFP Yes Yes Wilkins 975 XL 3/4" 3/4" Copper
1 6 1/7/2010 Photo Lab Janitor Sink Utility Faucet Chemicals High No Yes HBVB HBVB Yes Yes Wilkins 34H 3/4" 3/4" Copper 1 7 1/7/2010 Photo Lab Developer Photo Processor Chemicals High No Yes AVB AVB Yes Yes Wilkins 35 1/2" 1/2" Galvanized
1 8 1/7/2010 Janitor Sink Outside Training Mech Room E. End Utility Faucet Chemicals High No Yes AVB AVB Yes Yes Wilkins 35 3/4" 3/4" Galvanized
1 9 1/7/2010 Photo Lab Sink Utility Faucet Chemicals High No Yes AVB AVB Yes Yes T&S B-0969 3/4" 3/4" Galvanized 1 10 1/7/2010 Photo Lab Hot Hose Bibb Chemicals High No Yes AVB AVB Yes Yes T&S B-0969 1/2" 1/2" Copper 1 11 1/7/2010 Photo Lab Cold Hose Bibb Chemicals High No Yes AVB AVB Yes Yes T&S B-0969 1/2" 1/2" Copper 1 12 1/7/2010 Photo Lab Developer Photo Processor Chemicals High Yes Yes DBLCK DBLCK Yes Yes Watts 705 3/4" 3/4" Copper 1 13 1/7/2010 Photo Lab Developer Photo Processor Chemicals High Yes Yes DBLCK DBLCK Yes Yes Watts 705 3/4" 3/4" Copper 1 14 1/7/2010 Photo Lab Hot Water Tank Hot Water Tank Chemicals High No Yes HBVB HBVB Yes Yes Wilkins 34H 3/4" 3/4" Copper
1 15 1/7/2010 S.Side Front Of Door B Lawn Sprinkler Chemicals High Yes Yes AVB PVB No No Watts N/A 1 1/2" 1 1/2" Copper
1 16 1/7/2010 Environmental Janitor Sink Door B Utility Faucet Chemicals High No Yes AVB AVB Yes Yes T&S B-0969 1/2" 1/2" Copper
1 17 1/7/2010 Environmental Janitor Sink Door D Utility Faucet Chemicals High No Yes AVB AVB Yes Yes T&S B-0969 1/2" 1/2" Copper
1 18 1/7/2005 Janitor Closet Hot Water Tank Door B Hot Water Tank Chemicals High No Yes None HBVB N/A No N/A N/A N/A 3/4" Copper
1 19 1/7/2010 S. Side Front Of Door D Lawn Sprinkler Chemicals High Yes Yes AVB PVB No No Watts N/A 1 1/2" 1 1/2" Copper
1 20 1/7/2010 Rm 84 U Shaped Door 33 Hose Bibb Chemicals High No Yes HBVB HBVB Yes Yes Wilkins 34H 3/4" 3/4" Copper
1 21 1/7/2010 U Shaped Door 33 Rm 84 Men's Room Hot Water Tank Hot Water Tank Chemicals High No Yes HBVB HBVB Yes Yes Wilkins 34H 3/4" 3/4" Copper
1 22 1/7/2010 U Shaped Door 33 Next To Rm 84 Cold Water Line
Heating/ Cooling System Chemicals High No Yes HBVB HBVB Yes Yes Wilkins 34H 3/4" 3/4" Copper
1 23 1/7/2010 Tech Door 9 Service Sink Utility Faucet Chemicals High No Yes HBVB HBVB Yes Yes Wilkins 34H 3/4" 3/4" Copper
1 24 1/7/2010 U Shaped Door 58 Men's Room Janitor Sink Utility Faucet Chemicals High No Yes AVB AVB Yes Yes T&S B-0968 3/4" 3/4" Copper
1 25 1/7/2010 U Shaped Door 58 Men's Room Hot Water Tank Hot Water Tank Chemicals High No Yes HBVB HBVB Yes Yes Wilkins 34H 3/4" 3/4" Copper
1 26 1/7/2005 Water Supply Line U Shaped Door 51 Hose Bibb Chemicals High No Yes None HBVB N/A No N/A N/A N/A 3/4" Copper
Tinker AFB
C.2.16. Inventory of Cross-Connection and Backflow Devices
INVENTORY OF CROSS-CONNECTION AND BACKFLOW PREVENTION DEVICES AIR FORCE BASE
FACILITY
NUMBER
CONTROL
NUMBER
DATE LOCATION
POTENTIAL
CONTAMINATION
DEVICE
POTENTIAL
CONTAINMENT
OR POLLUTANT
DEGREE OF
HAZARD
BACK
PRESSURE
POTENTIAL
BACK
SIPHONAGE
POTENTIAL
TYPE
CONTROL
INSTALLED
TYPE
CONTROL
REQUIRED
PROPER
INSTALLATION?
PROPER
PROTECTION
DATA ON DEVICE INSTALLED PIPE
SIZE
PIPE
MATERIAL
Tinker AFB
1 27 1/7/2005 E. Wall Door 51 Water Supply E.
Side Of U Shape Hose Bibb Chemicals High No Yes None HBVB N/A No N/A N/A N/A 3/4" Copper
1 28 1/7/2005 Door 80 Water Supply Front Of Office
Heating/ Cooling System Chemicals High No Yes None HBVB N/A No N/A N/A N/A 3/4" Copper
1 29 1/7/2010 Door 80 Next To Office Ice Machine Ice Machine Chemicals High No Yes HBVB HBVB Yes Yes Wilkins 34H 3/4" 3/4" Copper
1 30 1/7/2010 Door 68 Next To Drinking Fountain Drinking Fountian Chemicals High No Yes HBVB HBVB Yes Yes Wilkins 34H 3/4" 3/4" Copper
1 31 1/7/2010 Door 64 Next To Eyewash Hose Bibb Chemicals High No Yes HBVB HBVB Yes Yes Wilkins 34H 3/4" 3/4" Copper
1 32 1/7/2010 Door 68 Fleet Maintenance N.
Wall Hose Reel Door 68 Hose Bibb Chemicals High No Yes HBVB HBVB Yes Yes Wilkins 34H 3/4" 3/4" Copper
1 33 1/7/2005 Mech Room South of Snake Bar Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Black Carbon
1 34 1/7/2005 Hallway Next To Photo Shop Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Black Carbon
1 35 1/7/2005 West Side of U shaped Door Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 4" Black Carbon
1 36 1/7/2005 West Side of U shaped Door Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Galvanized
1 37 1/7/2005 West Side of U shaped Door Hallway North of Door 36 Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Black Carbon
1 38 1/7/2005 West Side Dock Door 32 Mech Room Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Black Carbon
1 39 1/7/2005 West Side Dock Door 32 Mech Room Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Black Carbon
1 40 1/7/2005 West Side Dock Door 29 Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Black Carbon
1 41 1/7/2005 West Side Dock U Shaped Door 24 Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Black Carbon
1 42 1/7/2005 West Side Dock Door 21 Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Black Carbon
1 43 1/7/2005 East Side of Dock U Shaped Door 58 Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Black Carbon
1 44 1/7/2005 East Side of Dock U Shaped Door 56 Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Black Carbon
1 45 1/7/2005 East Side Dock Door 51 Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Black Carbon
1 46 1/7/2005 East side dock u shaped Door 51 Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Black Carbon
1 47 1/7/2005 East Side Dock U Shaped Door 50 Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Black Carbon
1 48 1/7/2005 East Side Dock Door 49 Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Black Carbon
C.2.16. Inventory of Cross-Connection and Backflow Devices
INVENTORY OF CROSS-CONNECTION AND BACKFLOW PREVENTION DEVICES AIR FORCE BASE
FACILITY
NUMBER
CONTROL
NUMBER
DATE LOCATION
POTENTIAL
CONTAMINATION
DEVICE
POTENTIAL
CONTAINMENT
OR POLLUTANT
DEGREE OF
HAZARD
BACK
PRESSURE
POTENTIAL
BACK
SIPHONAGE
POTENTIAL
TYPE
CONTROL
INSTALLED
TYPE
CONTROL
REQUIRED
PROPER
INSTALLATION?
PROPER
PROTECTION
DATA ON DEVICE INSTALLED PIPE
SIZE
PIPE
MATERIAL
Tinker AFB
1 49 1/7/2005 U Shaped East South End Door 38 Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Black Carbon
1 50 1/7/2005 Between Dock 2 and 3 U Shaped Mech Room Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Black Carbon
3 1 1/102010 U shaped mech room Heating/ Cooling System Chemicals High Yes Yes RPPBFP RPPBFP Yes Yes Watts 909 3/4" 3/4" Copper
3 2 1/10/2010 Mechanical Room In The U Machinery Room Hose Bibb Chemicals High No Yes HBVB HBVB Yes Yes Wilkins 34H 3/4" 3/4" Copper
3 3 1/10/2010 Bathroom Stock Room A Door 4 Hose Bibb Chemicals High No Yes HBVB HBVB Yes Yes Wilkins 34H 3/4" 3/4" Galvanized
3 4 1/10/2005 Door 13 W. Wall Next To Door Hose Bibb Chemicals High No No None HBVB N/A No N/A N/A N/A 3/4" Copper
3 5 1/10/2010 Rm 109 Men's Room Hot Water Tank Hot Water Tank Chemicals High No Yes HBVB HBVB Yes Yes Wilkins 34H 3/4" 3/4" Copper
3 6 1/10/2010 Break Room Next To 109 Utility Faucet Chemicals High No Yes AVB AVB Yes Yes T&S B-0968 3/4" 3/4" Galvanized
3 7 1/10/2010 Janitor Closet Next To Rm 134 Utility Faucet Chemicals High No Yes AVB AVB Yes Yes T&S B-0968 3/4" 3/4" Galvanized
3 8 1/10/2005 Door 48 Mech. Room Hot Water Tank Hot Water Tank Chemicals High No Yes None HBVB N/A No N/A N/A N/A 3/4" Copper
3 9 1/10/2010 Door 48 Next To Women's Room Janitor Closet Sink Utility Faucet Chemicals High No Yes AVB AVB Yes Yes T&S B-0968 3/4" 3/4" Galvanized
3 10 1/10/2005 Door 56 N.E. End Of U Shape Service Sink Utility Faucet Chemicals High No Yes None HBVB N/A No N/A N/A N/A 1/2" Copper
3 11 1/10/2010 Cold Water Supply To Humidifier Heating/ Cooling System Chemicals High No Yes HBVB HBVB Yes Yes Wilkins 34H 3/4" 3/4" Copper
3 12 1/10/2010 N.E. Mech Room U Shaped C.W.
Supply
Heating/ Cooling System Chemicals High Yes Yes RPPBFP RPPBFP Yes Yes Wilkins 975 XL 3/4" 3/4" Copper
3 13 1/10/2010 N.E. Mech Room U Shaped C.W.
Supply
Heating/ Cooling System Chemicals High Yes Yes RPPBFP RPPBFP Yes Yes Wilkins 975 XL 3/4" 3/4" Copper
3 14 1/10/2005 N.E. Mech Room C.W. Supply Hose Bibb Hose Bibb Chemicals High No Yes None HBVB N/A No N/A N/A N/A 3/4" Copper
3 15 1/10/2005 N.E. Mech Room Condensate Pump Boiler Drain Boiler Chemicals High No Yes None HBVB N/A No N/A N/A N/A 3/4" Copper
3 16 1/10/2005 South of Building Door D Room 132 Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Black Carbon
3 17 1/10/2005 Next To Break Room 111 Hallway South End of Building Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Black Carbon
3 18 1/10/2005 Hallway Next To BreakRoom 111 South End of Building Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Black Carbon
3 19 1/10/2005 Sout End Warehouse West Wall Post cc14 Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Black Carbon
3 20 1/10/2005 South End West Wall Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Black Carbon
C.2.16. Inventory of Cross-Connection and Backflow Devices
INVENTORY OF CROSS-CONNECTION AND BACKFLOW PREVENTION DEVICES AIR FORCE BASE
FACILITY
NUMBER
CONTROL
NUMBER
DATE LOCATION
POTENTIAL
CONTAMINATION
DEVICE
POTENTIAL
CONTAINMENT
OR POLLUTANT
DEGREE OF
HAZARD
BACK
PRESSURE
POTENTIAL
BACK
SIPHONAGE
POTENTIAL
TYPE
CONTROL
INSTALLED
TYPE
CONTROL
REQUIRED
PROPER
INSTALLATION?
PROPER
PROTECTION
DATA ON DEVICE INSTALLED PIPE
SIZE
PIPE
MATERIAL
Tinker AFB
3 21 1/10/2005 South End West Side Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Black Carbon
3 22 1/10/2005 North End West Side Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Black Carbon
3 23 1/10/2005 East Side of Building South End Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Black Carbon
3 24 1/10/2005 East Side Of Building Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Black Carbon
3 25 1/10/2005 East Side of Building Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Black Carbon
3 26 1/10/2005 East Side of Building Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Black Carbon
3 27 1/10/2005 North End of Building Inside Building Mech Room Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 4" Black Carbon
3 28 1/10/2005 North End of Building Mech Room Inside Building Fire System Chemicals Low Yes Yes None DBLCK N/A No N/A N/A N/A 6" Black Carbon
10 1 1/10/2010 Janitor Closet N. End Mop Sink Utility Faucet Chemicals High No Yes AVB AVB Yes Yes T&S B-0968 3/4" 3/4" Galvanized
10 2 1/10/2005 Janitor Closet Hose Bibb Hose Bibb Chemicals High No Yes None HBVB N/A No N/A N/A N/A 3/4" Copper
10 3 1/10/2010 N. End Of Building Mech Room C.W.
Heating/ Cooling System Chemicals High Yes Yes RPPBFP RPPBFP Yes Yes Watts 909 3/4" 3/4" Copper
10 4 1/10/2010 N. Mech Room Hose Bibb E. Wall Hose Bibb Chemicals High No Yes HBVB HBVB Yes Yes Wilkins 34H 3/4" 3/4" Copper
10 5 1/10/2010 N. Mech Room E. Wall Hose Bibb Hose Bibb Chemicals High No Yes HBVB HBVB Yes Yes Wilkins 34H 3/4" 3/4" Copper
10 6 1/10/2005 Heating Water Supply Line Boiler Drain N. Mech Room Boiler Chemicals High No Yes None HBVB N/A No N/A N/A N/A 3/4" Copper
10 7 1/10/2010 Battery Charging Area N. End Of Bldg. Battery Wash System Chemicals High Yes Yes PVB PVB Yes Yes Watts 720A 3/4" 3/4" Copper
10 8 1/10/2010 Battery Charging Area N. End Of Bldg. Hose Bibb Chemicals High No Yes HBVB HBVB Yes Yes Wilkins 34H 3/4" 3/4" Copper
10 9 1/10/2010 Battery Charging Area N. End Of Bldg. Fire System Chemicals Low Yes Yes DBLCK DBLCK Yes Yes Ames DC200 6" 6" Black Carbon
10 10 1/10/2010 Stock Room B Janitor Closet Mop Sink Utility Faucet Chemicals High No Yes HBVB HBVB Yes Yes Wilkins 34H 3/4" 3/4" Galvanized
10 11 1/11/2010 Stock Rook B Janitor Closet Hot Water Tank Hot Water Tank Chemicals High No Yes HBVB HBVB Yes Yes Wilkins 34H 3/4" 3/4" Copper
10 12 1/11/2010 Stock Room B Janitor Closet Hose Bibb Hose Bibb Chemicals High No Yes HBVB HBVB Yes Yes Wilkins 34H 3/4" 3/4" Copper
10 13 1/11/2010 Sprinkler System Next To W. Wall Battery Station Fire System Chemicals High Yes Yes RPPBFP RPPBFP Yes Yes Watts 909 6' 6' Copper
10 14 1/11/2010 Water Supply Line Hose Bibb W.
Wall Stock Room B Hose Bibb Chemicals High No Yes HBVB HBVB Yes Yes Wilkins 34H 3/4" 3/4" Copper