Exhibit A -DATA Requirements_v2.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
Tinker Air Force Base CE Services: Base Operations Management Industry Day Federal contract opportunity
Solicitation number
Not on record
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This document is an Exhibit A - Data Requirements detailing the deliverables required under a federal contract. It outlines over 50 different reports, logs, plans, and other deliverables that the contractor must provide on a monthly, quarterly, annually, or as-needed basis. The deliverables cover a wide range of areas including demand maintenance, customer service, plant operations, preventive maintenance, operations engineering, predictive maintenance, furnishings management, infrastructure systems, cathodic protection, storage tanks, HVAC, refrigerant management, pest management, vertical transportation equipment, industrial control systems, fire alarms, electrical systems, power production, and administrative/quality control requirements. Key details include the minimum required information, frequency of submissions, due dates, and the addressee for each deliverable. The document references various Air Force Instructions, Manuals, and other regulations that apply to the contract requirements.

View the file

Other files for this federal contract opportunity

Other files attached to Tinker Air Force Base CE Services: Base Operations Management Industry Day, newest first.
File Type Posted
Operations Management Overview Slides_Sept_2024.pdf PDF
Appendix B v1.docx DOCX document
Appendix C.pdf PDF
CLIN Structure.docx DOCX document
Appendix A v2.docx DOCX document
Operations Management PWS v3.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Reports & Deliverables

Exhibit A - Data Requirements
This paragraph provides details regarding the deliverables required under this contract. All deliverables will be submitted electronically. For deliverables that are not on a prescribed format or form, the contractor shall provide a proposed format to the addressee(s) no later than (NLT) 15 business days prior to the date of first submission.

All annual requirements are due prior to the end of each contract period. All semi-annual or quarterly requirements are due in the month immediately after the end of the semi-annual period or quarter, with the first semi-annual period and quarter beginning at the start of full performance.

Exhibit Line Item NumberPerformance CLINFunctional AreaTitleMinimum Required Information (reference PWS & additional references for additional requirements)FrequencyDate of First SubmissionDate of Subsequent SubmissionsAddresseePWS ReferencesAdditional References
A001X003Demand Maintenance / Customer ServiceCustomer ServiceAF Form 332 / Service Request Submission in NEXGEN-ITUpon RequestAs Needed72 ABW/CEO2.1-2.1.18AFI 32-1001
A002X003Demand Maintenance / Customer ServiceNEXGEN-IT DATA reviewSee PWS for requirements.Monthly5th calendar day of the 2nd month of full contract performanceNLT 5th calendar day of each month72 ABW/CEO2.1.3-2.1.6Government Directed
A003X003Demand Maintenance / Customer ServiceBase Civil Engineering Work Clearance RequestAF Form 103As requiredAs Needed72 ABW/CEO2.1.8, 2.5.2, 3.6.4AFI 32-1001
A004X003Demand Maintenance / Customer ServiceWritten EstimatesSee PWS for requirements.As requiredAs Needed72 ABW/CEO2.1.12, 2.6.6Government Directed
A005X003Demand Maintenance / Customer ServiceFacility Managers ListSee PWS for requirements.Upon RequestAs Needed72 ABW/CEO2.1.17Government Directed
A006X003Demand Maintenance / Customer ServiceFacility Manager TrainingSee PWS for requirements.Monthly5th calendar day of the 2nd month of full contract performanceNLT 5th calendar day of each month72 ABW/CEO2.1.17Government Directed
A007X003Demand Maintenance / Customer ServiceLifecycle Cost analysis reportSee PWS for requirements.Annually21 calendar days before end of first contract period21 calendar days before end of each contract period72 ABW/CEO2.2.1Government Directed
A008X003Demand Maintenance / Customer ServiceOutage Notifications and ReportingSee PWS for requirements.As requiredAs Needed72 ABW/CEO2.2.2, 4.2.1.4, 4.2.1.6, 4.2.1.8Government Directed
A009X003Demand Maintenance / Customer ServiceMaterial List for Priority 1 Work TasksSee PWS for requirements.Annually60 days after start of full contract performance21 calendar days before end of each contract period72 ABW/CEO2.2.3.5Government Directed
A00AX003Plant OperationsWater Treatment Operating Log for Cooling Tower SystemsAF Form 1457Monthly5th calendar day of the 2nd month of full contract performanceNLT 5th calendar day of each month72 ABW/CEO2.3.6AFI 32-1001 Chapter 14 and UFC 3-570-06
A00BX003Plant OperationsDaily Steam Plant Operating LogAF Form 1458Monthly5th calendar day of the 2nd month of full contract performanceNLT 5th calendar day of each month72 ABW/CEO2.3.7AFMAN 32-1068 Chapter 6
A00CX003Plant OperationsMonthly Steam Plant Operating LogAF Form 1458Monthly5th calendar day of the 2nd month of full contract performanceNLT 5th calendar day of each month72 ABW/CEO2.3.7AFMAN 32-1068 Chapter 6
A00DX003Plant OperationsWater Treatment Operating Log for Steam and Hot Water BoilersAF Form 1459Monthly5th calendar day of the 2nd month of full contract performanceNLT 5th calendar day of each month72 ABW/CEO2.3.7AFI 32-1001 Chapter 14 and UFC 3-570-06
A00EX003Plant OperationsBoiler Start-Up NotificationSee PWS for requirements.As requiredAs NeededAs Needed72 ABW/CEO
72 ABW/CEI2.3.7.1 2.3.8Government Directed
A00FX003Plant OperationsBoiler or Pressure Vessel Inspection ReportAF Form 1222Per AFIWithin 30 days of inspectionWithin 30 days of subsequent inspection72 ABW/CEO2.3.7.2AFMAN 32-1068
A00GX003Plant OperationsWastewater ReportSee PWS for requirements.Monthly5th calendar day of the 2nd month of full contract performanceNLT 5th calendar day of each month72 ABW/CEO
72 ABW/CEI2.3.9.6Government Directed
A00HX001Preventive Maintenance (PM)Preventive Maintenance Program PortfolioSee PWS and CE Playbook for requirementsAnnually2nd month of full contract performance21 calendar days before the end of every contract period72 ABW/CEO2.7-2.7.10Government Directed
A00JX001Preventive Maintenance (PM)Preventive Maintenance Annual Program Review - Quarterly UpdateSee CE Playbook for requirements.

Minimum information required:

1) changes in the PM hours, frequencies, schedules, equipment additions and deletions implemented by respective equipment PMTLs for any additional (increase or decrease) equipment for the PM performance

2) listing of equipment for each shop, which is not currently on PM that may be used as PM replacement opportunities for equipment that cannot be serviced

3) equipment standard changes and PMTL changes

4) redundant work required in the PMP which overlaps the Predictive Maintenance Program (if applicable)Quarterlywithin 90 calendar days of full contract performanceNLT 14 days prior to the end of each quarter72 ABW/CEO2.7-2.7.10Government Directed
A00KX001Preventive Maintenance (PM)Deferred PM ListProvide list of PM that was not accomplished as scheduled with justifications for deferring PM or not accomplishing a task on the PMTL Minimum information required: PM, PMTL#, UID, UID Description, UID Location, Building number, Work Location, Shop POC.Monthly2nd month of full contract performance5th of each month72 ABW/CEO2.7-2.7.10Government Directed
A00LX001Preventive Maintenance (PM)Preventive Maintenance Task ListMinimum information required: PM, PMTL#, UID, UID Description, UID Location, Building number, Work Location, Shop POC, detail reason for the deferring any PM and /or not performing any tasks listed in the PMTL, Facility Manager contacted during the initial attempt..Monthly2nd month of full contract performance5th of each month72 ABW/CEO2.7-2.7.10Government Directed
A00MX003Operations EngineeringProvide Optimization Plans for all systems annuallySee PWS for requirements.Annually21 calendar days before end of first contract period21 calendar days before end of each contract period72 ABW/CEO3Government Directed
A00NX003Operations EngineeringTrend AnalysisSee PWS for requirements.Annually21 calendar days before end of first contract period21 calendar days before end of each contract period72 ABW/CEO3Government Directed
A00PX003Operations EngineeringMaterial CostsSee PWS for requirements.Monthly5th calendar day of the 2nd month of full contract performanceNLT 5th calendar day of each month72 ABW/CEO3.4-3.4.11Government Directed
A00QX003Operations EngineeringCAP InvoiceSee PWS for requirements.Monthly5th calendar day of the 2nd month of full contract performanceNLT 5th calendar day of each month72 ABW/CEO3.4-3.4.11Government Directed
A00RX003Operations EngineeringCAP InventorySee PWS for requirements.Monthly5th calendar day of the 2nd month of full contract performanceNLT 5th calendar day of each month72 ABW/CEO3.4-3.4.11Government Directed
A00SX003Operations EngineeringSelf-Inspection Check ListMICTAnnually21 calendar days before end of first contract period21 calendar days before end of each contract period72 ABW/CEO3.6.2-3.6.2.4DAFI 90-302
A00TX003Operations EngineeringBarcode PlanSee PWS for requirements.Annuallywithin 90 calendar days of full contract performanceNLT 21 calendar days before end of each contract period72 ABW/CEO3.6.5Government Directed
A00UX003Operations EngineeringWarranty PlanSee PWS for requirements.Annually21 calendar days before end of first contract period21 calendar days before end of each contract period72 ABW/CEO3.7-3.7.8Government Directed
A00VX005Predictability Based Maintenance (PdM) ProgramList of Critical Equipment for PdM ProgramSee PWS for the requirements (List must be approved by FAS 72 ABW/CEOE)Annuallywithin 90 calendar days of full contract performanceNLT 21 calendar days before the end of each contract period72 ABW/CEO3.8-3.8.8Government Directed
A00WX005Predictability Based Maintenance (PdM) ProgramPdM Program Quarterly ReportSee PWS for the requirements. Minimum information required: Key Performance Indicators (KPI), Leading and Lagging indicators, Reliability, Availability, Maintainability, and Overall Equipment Effectiveness, including metrics for Scheduled Maintenance Work Orders versus Unscheduled Maintenance Work Orders for Critical RPIE and Non Critical RPIE; Mean Time Between Failure (MTBF) and Mean Time To Repair (MTTR).Quarterlywithin 90 calendar days of full contract performanceNLT 14 days prior to the end of each quarter72 ABW/CEO3.8-3.8.8Government Directed
A00XX005Predictability Based Maintenance (PdM) ProgramPredictability Maintenance Program ReportDetailed report including metrics for Scheduled Maintenance Work Orders versus Unscheduled Maintenance Work Orders for Critical RPIE and Non Critical RPIE; Mean Time Between Failure (MTBF) and Mean Time To Repair (MTTR).Quarterlywithin 90 calendar days of full contract performanceNLT 14 days prior to the end of each quarter72 ABW/CEO3.8-3.8.8Government Directed
A00YX005Predictability Based Maintenance (PdM) ProgramCondition of Air Force RPIE ReportDetailed report includes predicting possible failure modes, condition and promote an effective planning/scheduling program in order to prevent failure of critical/high impact equipment and unscheduled outagesQuarterlywithin 90 calendar days of full contract performanceNLT 14 days prior to the end of each quarter72 ABW/CEO3.8-3.8.8Government Directed
A00ZX005Predictability Based Maintenance (PdM) ProgramMotor Management Program PlanSubmit the Motor Current Signature Analysis (MCSA) ultrasonic, vibration analysis, Energy Efficiency Analysis, ASD Economic Evaluation, and thermography analysis records for each motor identified for the Motor Management Program. Submit the records for the motor greasing and the root cause analysis

- Submit the report utilizing the Motor Master Software

- Submit a detail Motor Management Program PlanAnnually21 calendar days before the end of the first contract period21 calendar days before the end of every contract period72 ABW/CEOPara 3.8.4.1.3, 3.8.4.1.3.1Government Directed
A010X005Predictability Based Maintenance (PdM) ProgramMotor Inventory ReportSubmit the complete inventory list of all motors (50HP and above) new and existing on TAFB for FAS approval. Database includes list of facility number and location in the facility, Operating hours, motors, base line disable readings, model & serial number, lubrication type, bearing type, motor name plate data, L10 and L50 life. (See Table A2.1 and Figure A2.1, A2.2, AFPAM32-1192)Annuallywithin 180 calendar days of full contract performanceNLT 21 calendar days before the end of each contract period72 ABW/CEOPara 3.8.4.1.3, 3.8.4.1.3.1Government Directed
A011X003Furnishings ManagementMaster Inventory Log-Warehoused Furniture/Appliance ItemsMaster Inventory using eMH. Minimum information requirements: nomenclature, manufacturer, model #, serial #, number of backup items.Monthly5th calendar day of the 2nd month of full contract performanceNLT 5th calendar day of each month72 ABW/CEO
72 ABW/CEIHPara 4.1.5AFI 32-6000 with Tinker AFB Supplement
A012X003Furnishings ManagementFurniture/Appliance Repair LogFurniture/appliance repair log using eMH. Minimum information required: date, building number, room number, item removed, manufacture make, model number, serial number, if sent for disposal to DRMO (need to provide receipt of items received from DRMO with manufacture make, model #, and serial #), time spent on task, description of repair.Monthly5th calendar day of the 2nd month of full contract performanceNLT 5th calendar day of each month72 ABW/CEO
72 ABW/CEIHPara 4.1.5AFI 32-6000 with Tinker AFB Supplement
A013X003Furnishings ManagementFurniture Control LogFurniture control log using eMH. Minimum information required: date, quantity, building number, room number, item removed, manufacture make, model number, serial number, if sent for disposal to DRMO (need to provide receipt of items received from DRMO with manufacture make, model #, and serial #).Monthly5th calendar day of the 2nd month of full contract performanceNLT 5th calendar day of each month72 ABW/CEO
72 ABW/CEIHPara 4.1.5AFI 32-6000 with Tinker AFB Supplement
A014X001Infrastructure SystemsSwimming Pool Operational LogAF Form 708Monthly5th calendar of the month following pool openingNLT 5th calendar day of each month pool is open72 ABW/CEO4.2.5-4.2.5.4AFMAN 48-114 and UFC 3-230-02
A015X001Infrastructure SystemsBackflow Prevention Inspection DataAF Form 843Monthly5th calendar of the month following pool openingNLT 5th calendar day of each month pool is open72 ABW/CEO4.2.6-4.2.6.5AFMAN 32-1067 Ch 4
A016X001Infrastructure SystemsBackflow Prevention Vacuum Inspection DataAF Form 844Monthly5th calendar of the month following pool openingNLT 5th calendar day of each month pool is open72 ABW/CEO4.2.6-4.2.6.5AFMAN 32-1067 Ch 4
A017X001Infrastructure SystemsCross Connection InformationAF Form 845Monthly21 calendar days before the end of the first contract period21 calendar days before end of each contract period72 ABW/CEO4.2.6-4.2.6.5AFMAN 32-1067 Ch 4
A018X001Infrastructure SystemsInventory of Cross Connection and Backflow DevicesAF Form 848 - Update inventory with newly installed or removed devicesAnnually21 calendar days before the end of the first contract period21 calendar days before end of each contract period72 ABW/CEO4.2.6-4.2.6.5AFMAN 32-1067 Ch 4
A019X001Infrastructure SystemsBackflow Prevention Cross Connection SurveyAF Form 848Every five (5)-years21 calendar days before the end of the first contract period5-years after completion of previous inventory72 ABW/CEO4.2.6-4.2.6.5AFMAN 32-1067 Ch 4
A01AX001Infrastructure SystemsValve and Hydrant Maintenance Record.Facility Operating LogsAnnually21 calendar days before the end of the first contract period21 calendar days before end of each contract period72 ABW/CEO4.2.3, 4.2.4.3, 4.2.11AFMAN 32-1067, UFC 3-230-02, Mil HDBK 1164 & 1168
A01BX001Infrastructure SystemsHydrant Flow Test RecordsAF Form 1027Monthly5th day of the 4th month of full contract performance5th of each month72 ABW/CEO4.2.11AFI 32-2001, Mil HDBK 1164 & 1168
A01CX001Infrastructure SystemsAnnual Natural Gas Leak ReportSee AFMAN 32-1067 para 8.2.2. Minimum information required: description of location (include map) and classification of the leak.Annually1st of September1st of September72 ABW/CEO4.2.3, 4.2.12AFMAN 32-1067, UFC 3-430-09
A01DX001Infrastructure SystemsNatural Gas PlanSee requirements in PWS and UFC 3-430-09Annually3 months after start of full performance21 calendar days before the end of every contract period72 ABW/CEO4.2.3, 4.2.12AFMAN 32-1067, DOT-PHMSA
A01EX001Cathodic Protection and Corrosion ControlCathodic Protection Annual Performance Booklet ReportBooklet and electronic formatAnnually21 calendar days before the end of the first contract period21 calendar days before end of each contract period72 ABW/CEO4.2.1-4.2.1.2, 4.2.14, 4.3.4AFI 32-1001 Chapter 14 and UFC 3-570-06
A01FX001Cathodic Protection and Corrosion ControlCathodic Protection Operating Log for Impressed Current System (NOT LOCAL REPRODUCTION AUTHORIZED)AF Form 491Annually21 calendar days before the end of the first contract period21 calendar days before end of each contract period72 ABW/CEO4.2.1-4.2.1.2, 4.2.14, 4.3.4AFI 32-1001 Chapter 14 and UFC 3-570-06
A01GX001Cathodic Protection and Corrosion ControlCathodic Protection Operating Log for Sacrificial Anode System (NOT LOCAL REPRODUCTION AUTHORIZED)AF Form 1686Annually21 calendar days before the end of the first contract period21 calendar days before end of each contract period72 ABW/CEO4.2.1-4.2.1.2, 4.2.14, 4.3.4AFI 32-1001 Chapter 14 and UFC 3-570-06
A01HX001Cathodic Protection and Corrosion ControlLeak/Failure Data Record Resource Advocacy/Corrosion Control MetricAF Form 1687Annually21 calendar days before the end of the first contract period21 calendar days before end of each contract period72 ABW/CEO4.2.1-4.2.1.2, 4.2.14, 4.3.4AFI 32-1001 Chapter 14 and UFC 3-570-06
A01JX001Cathodic Protection and Corrosion ControlAnnual Cathodic Protection Performance Survey (NOT LOCAL REPRODUCTION AUTHORIZED)AF Form 1688Annually21 calendar days before the end of the first contract period21 calendar days before end of each contract period72 ABW/CEO4.2.1-4.2.1.2, 4.2.14, 4.3.4AFI 32-1001 Chapter 14 and UFC 3-570-06
A01KX001Storage Tanks and Liquid FuelsReplaced Components on DLA Capitalized AssetsSee PWS for requirements.Quarterlywithin 90 calendar days of full contract performanceNLT 14 days prior to the end of each quarter72 ABW/CEO4.2.14.4Government Directed
A01LX001Storage Tanks and Liquid FuelsTank Inspection SummaryStorage Tank Accountability and Reporting (STAR) DatabaseMonthly5th calendar day of the 2nd month of full contract performanceNLT 5th calendar day of each month72 ABW/CEO
72 ABW/CEI4.2.1.14-4.2.1.14.5AFI 32-1067, para 9.6.3, UFC 3-460-03
A01MX001Storage Tanks and Liquid FuelsTank Entry Supervisor CertificationAF Form 483As requiredAs Needed72 ABW/CEO4.2.1.14-4.2.1.14.5AFMAN 32-1067 Ch 7, UFC 3-460-03
A01NX001Storage Tanks and Liquid FuelsStorage Tank Compliance PlanSee PWS, AFI 32-1067 and Base Environmental for requirements.Annuallywithin 90 calendar days of full contract performance21 calendar days before end of each contract period72 ABW/CEO
72 ABW/CEI4.2.14.5Government Directed
A01PX001HVAC and Refrigerant ManagementRefrigerant Management Standard Operating ProceduresSee requirements in the PWSAnnually60 days after start of full contract performance21 calendar days before the end of every contract period72 ABW/CEO4.2.15-4.2.15.14AFMAN 32-7002 with Tinker Supplement
A01QX001HVAC and Refrigerant ManagementList of initial refrigerant recovery and recycling equipmentSee requirements in the PWSAnnually60 days after start of full contract performance21 calendar days before the end of every contract period72 ABW/CEO4.2.15-4.2.15.14AFMAN 32-7002 with Tinker Supplement
A01RX001HVAC and Refrigerant ManagementTraining and certifications recordsSee requirements in the PWSAnnuallyNLT 14 days of full contract performance14 calendar days before the start of every contract period72 ABW/CEO4.2.15-4.2.15.14AFMAN 32-7002 with Tinker Supplement
A01SX001HVAC and Refrigerant ManagementData for refrigerant consumption - Tinker Refrigerant Management
Data Sheets, Leak Report, and Inventory dataSee requirements in the PWSMonthly2nd month of full contract performance5th of each month72 ABW/CEO4.2.15-4.2.15.14AFMAN 32-7002 with Tinker Supplement
A01TX001HVAC and Refrigerant ManagementRefrigerant Equipment Service Records and Maintenance and Repair RecordsInclude records for equipment service records and maintenance and repair requirementsQuarterlywithin 90 calendar days of full contract performanceNLT 14 days prior to the end of each quarter72 ABW/CEO4.2.15-4.2.15.14AFMAN 32-7002 with Tinker Supplement
A01UX001HVAC and Refrigerant ManagementAnnual Excessive Leakage Rate ReportSee requirements in the PWSQuarterlywithin 90 calendar days of full contract performanceNLT 14 days prior to the end of each quarter72 ABW/CEO4.2.15-4.2.15.14AFMAN 32-7002 with Tinker Supplement
A01VX001HVAC and Refrigerant ManagementEquipment Inventory ReportSee requirements in the PWSQuarterlywithin 90 calendar days of full contract performanceNLT 14 days prior to the end of each quarter72 ABW/CEO4.2.15-4.2.15.14AFMAN 32-7002 with Tinker Supplement
A01WX001HVAC and Refrigerant ManagementRefrigerant Inventory Level ReportMinimum information required: refrigerant inventory levels and consumption for each type of refrigerantMonthly2nd month of full contract performance5th of each month72 ABW/CEO4.2.15-4.2.15.14AFMAN 32-7002 with Tinker Supplement
A01XX001HVAC and Refrigerant ManagementHVAC air quality complianceDocument within Air Program Information Management System (APIMS)As requiredAs Needed72 ABW/CEO4.2.15-4.2.15.14AFMAN 32-7002, par 2.16.16.4.
A01YX001HVAC and Refrigerant ManagementCall for CEMIRT RequirementsIdentify Requirement for HVAC Re-Commissioning, Generator Rebuilds, etc.Quarterlywithin 90 calendar days of full contract performanceNLT 14 days prior to the end of each quarter72 ABW/CEO4.2.15-4.2.15.14Higher Headquarters “Call Letter"

AFI 32-1001 Ch 12

A01ZX001HVAC and Refrigerant ManagementStatus of Corrective Actions Identified by CEMIRT HVAC TeamProvide update on CEMIRT recommendations.Monthly2nd month of full contract performance5th of each month72 ABW/CEO4.2.15-4.2.15.14Higher Headquarters “Call Letter"
A020X001HVAC and Refrigerant ManagementKitchen Hood and Fire Suppression Inspection and Cleaning ReportSee requirements in AFI 91-203 and NFPA 96Monthly5th calendar day of the first month of full contract performanceNLT 5th calendar day of each month72 ABW/CEO 72ABW/CEXF4.2.17AFI 91-203, NFPA 96
A021X003Pest ManagementPest Control Certificate of CompetencyDD Form 1826 or Equivalent for Contractor ApplicatorAnnuallyAug 1stAug 1st72 ABW/CEO4.2.18-4.2.18.6Government Directed
A022X003Pest ManagementIPMIS Monthly ReportSee requirements in the PWSMonthly or As Required60 days after start of full contract performance5th of each month72 ABW/CEO
MAJCOM PMC4.2.18-4.2.18.6AFMAN 32-1053
A023X003Pest ManagementInstallation Pest Management Plan UpdateSee AFI 32-1053 and DoD Directive 4150.07 for detailed requirements. Submit for natural resources compliance review/signature during annual plan review. 72 ABW approval required every 5 years.AnnuallyAug 1stAug 1st72 ABW/CEO
AFSC/PZIOC4.2.18-4.2.18.6AFMAN 32-1053

DOD Directive 4150-07I A024 X003 Pest Management Pesticide Use Reduction Report See DOD Directive 4150-07I for requirement. Monthly 5th calendar day of the 2nd month of full contract performance NLT 5th calendar day of each month 72 ABW/CEO 4.2.18-4.2.18.6 AFMAN 32-1053 DOD Directive 4150-07I

A025X003Pest ManagementPesticide Usage DataUpon annual submission of pesticide measures of merit, submit base-wide pesticide usage data for natural resources review prior to submission to requesting organization.AnnuallyAug 1stAug 1st72 ABW/CEO4.2.18-4.2.18.6AFMAN 32-1053, DOD Directive 4150-07, DD Form 1532, DD Form 1826, DD Form 1826-1
A026X003Pest ManagementPest Control ReportDD Form 1532 or Electronic System of RecordMonthly5th calendar day of the 2nd month of full contract performanceNLT 5th calendar day of each month72 ABW/CEO4.2.18-4.2.18.6AFMAN 32-1053
A027X003Pest ManagementTrapped or Removed Nuisance Animal Control ReportMinimum information required: type of animal, count and date trapped or removed.AnnuallyJan 5thJan 5th72 ABW/CEO4.2.18-4.2.18.6Government Directed
A028X003Pest ManagementAgriculture InspectionsSee requirements in the PWSMonthlyMonthlyGovernment Directed, para 4.2.18.672 ABW/CEO4.2.18.6Government Directed
A029X001Vertical Transportation EquipmentVTE Inspection ReportSee requirements in the PWSAs required5 days after inspection72 ABW/CEO4.2.19-4.2.19.7Government Directed
A02AX001Industrial Control SystemsIndustrial Control System (ICS) ReportSpreadsheet and SchematicAs requiredWhen a New System Comes on Line72 ABW/CEO
72 ABW/CEN4.2.2-4.2.2.11.10
4.3.2-4.3.2.2AFGM 2023-32-01
A02BX001Industrial Control SystemsICS Upgrade listList of systems that need upgradeAnnually21 calendar days before the end of the first contract period21 calendar days before end of each contract period72 ABW/CEO
72 ABW/CEN4.2.2.3, 4.3.2-4.3.2.2Government Directed
A02CX001Fire AlarmsInspection, Test and Maintenance Documentation of Fire SystemsSee requirements in UFC 3-601-02. Report all ITM tasks completed in the previous month.Monthly5th calendar day of the 2nd month of full contract performanceNLT 5th calendar day of each month72 ABW/CEO4.3.3-4.3.3.6UFC-3-601-02
A02DX001Electrical SystemsHigh Voltage Rubber Gloves/Sleeves Test and in use Sticks (Live-Line Tools)See requirements in UFC 3-560-01Semi-Annually5th calendar day of the 2nd month of full contract performance6-months after previous submission72 ABW/CEO4.3.4-4.3.4.9UFC 3-560-01, OSHA 29 CFR 1910.137
A02EX001Electrical SystemsCivil Engineer Energized Electrical Work PermitAF Form 1213As requiredAs Needed72 ABW/CEO4.3.4-4.3.4.9AFMAN 32-1065 Chapter 15
A02FX001Electrical SystemsElectrical Facilities Safe ClearanceAF Form 269As requiredAs Needed72 ABW/CEO4.3.4-4.3.4.9AFMAN 32-1065 Chapter 17
A02GX001Electrical SystemsGrounding System TestSee requirements in UFC 3-560-01As requiredAs Needed72 ABW/CEO4.3.4.3-4.3.4.5AFMAN 32-1065
A02HX001Electrical SystemsLightning Protection for MunitionsSee requirements in UFC 3-575-01Annually21 calendar days before the end of the first contract period21 calendar days before end of each contract period72 ABW/CEO4.3.4.4-4.3.4.5UFC 3-575-01
A02JX001Electrical SystemsVisual Air Navigation Systems Inspection ReportSee requirements in the Chapter 5 AC 150-5340-26C & UFC 3-535-01Monthly5th calendar day of the first month of full contract performanceNLT 5th calendar day of each month72 ABW/CEO4.3.4.8FAA Advisory Circular (AC) 150-5340-26C, 150-5340-30G, 150-5340-21, NESC, NEC, TAFB

Standards, AFI 13--204, V2 & V3, UFC 3-535-01

A02KX001Power ProductionGenerator Run Time Form and Fuel Usage ReportOC-ALC Form 153 and Document within Air Program Information Management System (APIMS)Annually15th of January15th of January72 ABW/CEO
72 ABW/CEI4.3.5-4.3.5.9AFI 32-1062, AFI 32-1063, 40 CFR Part 63, CFR Part 60, OAC 252:100, NFPA 70B, 3-5-6 Generators, NFPA 70B & 70C
A02LX001Power ProductionGenerator Inventory ReportInclude all information in the "Generator Report" attachmentAnnually15th of January15th of January and as number changes72 ABW/CEO
72 ABW/CEN4.3.5-4.3.5.9AFI 32-1062, AFI 32-1063, 40 CFR Part 63, CFR Part 60, OAC 252:100, NFPA 70B, 3-5-6 Generators, NFPA 70B & 70C
A02MX001Power ProductionGenerator RevalidationValidate inventoryAnnually21 calendar days before the end of the first contract period21 calendar days before end of each contract period72 ABW/CEO
72 ABW/CEN4.3.5-4.3.5.9AFMAN 32-1062
A02NX001Power ProductionEmergency Generator Operating Log (Inspection and Testing)AF Form 487Monthly5th calendar day of the 2nd month of full contract performanceNLT 5th calendar day of each month72 ABW/CEO4.3.5-4.3.5.9AFMAN 32-1062 UFC 3-540-07
A02PX001Power ProductionHistorical Records - Diesel Electric Generator SystemAF Form 719Annually or When Part Changed21 calendar days before the end of the first contract period21 calendar days before end of each contract period72 ABW/CEO4.3.5-4.3.5.9AFMAN 32-1062 UFC 3-540-07
A02QX001Fire Suppression PumpsFire Pump Runtime/Fuel Usage Form1) Total annual hours of operation (from Fire Pumps Runtime Forms located at each fire house).
2) Annual fuel usage for each fire pumpAnnuallyFirst January 15thSubsequent January 15ths72 ABW/CEO
72 ABW/CEI4.3.7UFC 3-601-02
A02RX003AdministrativeQPI Supporting Documents and InformationInclude required supporting documents along with the detailed
calculation for each QPI (Quality Performance Indicator)Monthly5th calendar day of the 2nd month of full contract performanceNLT 5th calendar day of each month72 ABW/CEO5.FAR 52.246-4, FAR 52.246-2
A02SX003AdministrativeAir Force Common Output Level Standards and Key Performance IndicatorsAs directed by GovernmentAs requiredAs Needed72 ABW/CEOAppendix A 3.3-3.5Government Directed
A02TX003AdministrativeMeeting MinutesRecord of Meeting/MinutesAs requiredwithin 5 working days of every meetingwithin 5 working days of every meeting72 ABW/CEOAppendix A 3.1.2Only if requested by government or contractor
A02UX003AdministrativeAd Hoc ReportsAs directed by GovernmentAs requiredAs Needed72 ABW/CEOAppendix A 3.3-3.5Government Directed
A02VX003AdministrativeLong Range PlansAs directed by GovernmentAs requiredAs Needed72 ABW/CEOAppendix A 3.3-3.5Government Directed
A02WX003AdministrativeContractor Demographics DataSubmit percentages of the workforce as follows:

Single - No family members/dependents Single with family members/dependents Married - No Children

Married - With ChildrenAnnually60 days after start of full contract performance21 calendar days before the end of every contract period72 ABW/CEOAppendix A 3.5Government Directed
A02XX003Quality ControlQuality Control PlanSee PWS for detailed requirements.Annually15 calendar days before start of first contract period.21 calendar days before end of each contract period72ABW/CEO
AFSC/PZIOCAppendix A 5-5.3.11FAR 52.246-4, FAR 52.246-2
A02YX003Quality ControlStandard Operating Procedures and Maintenance Control PlanSee PWS for detailed requirements.As required60 days after start of full contract performanceAs needed when requested by government (New and updated plans)72 ABW/CEO4.2.19.3, Appendix A 5.3.9-5.3.9.5Government Directed
A02ZX003Quality ControlInspection ScheduleMinimum information required: name of the QC Inspector, phone number, items to be checked (UID), PMTL #, PWS paragraph reference, bldg. number, location and the approximate time of the performance including the DSW#, WO#, PM# and related information.WeeklyMonday of first week of full contract performanceMonday of each week72ABW/CEO
AFSC/PZIOCAppendix A 5-5.3.11FAR 52.246-4, FAR 52.246-2
A030X003AdministrativeUpdate Recall RosterMaintain recall roster with current address and contact information.As requiredAs Needed72 ABW/CEOAppendix A 9.6Government Directed
A031X003AdministrativeMinimum Team ComplementMinimum information required: Personnel name, skill classification, hours worked, certification or license number and state/city of issue, and notes/commentsMonthly5th calendar day of the first month of full contract performanceNLT 5th calendar day of each month72ABW/CEO
AFSC/PZIOC1.5-1.5.3Update required for any personnel that are newly hired and/or replaced.

File details come from the government source that posted it. Updated .