OPC Homeport Build New Pier Industry Day Flyer.pdf
PDF 347 KB Posted
- Attached to
- Industry Day for USCG Offshore Patrol Cutters (OPC) Homeport Pier, Naval Station Newport, Newport RI
- Solicitation number
- N4008526R0001
About this file
This document is an Industry Day announcement for the OPC Homeport Pier project issued by Naval Facilities Engineering Systems Command, Mid-Atlantic (NAVFAC MIDLANT). The event will be held on Thursday, 04 December 2025, at the Crowne Plaza Providence-Warwick in Warwick, Rhode Island, with check-in beginning at 8:30 AM. The project involves demolishing an existing US Navy pier (1,570' long x 100' wide) and constructing a new pier (1,000' long x 80' wide) for four Offshore Patrol Cutters, along with associated infrastructure including a new bulkhead, laydown area, parking, utilities, and stormwater management.
The project's estimated cost range is $100M - $250M, and the industry day aims to provide an overview of the project, answer questions, and collect feedback from potential contractors. Both prime and subcontractors are invited to attend. The presentation will cover the Coast Guard Mission, Project Overview, and Project Schedule, followed by a Q&A period. Registration is encouraged but not mandatory, and interested parties should email a completed registration form to Kristy Gerrek at kristy.l.gerrek.civ@us.navy.mil by Monday, 01 December 2025, indicating whether their firm is a prime contractor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| USCG OPC Homeport Pier Industry Day Sign In Sheet.pdf | ||
| USCG OPC Homeport Pier Industry Day Slides.pptx | PPTX presentation | |
| Attachment 1 - Registration Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Industry Day OPC Homeport Pier
Naval Station Newport Newport, Rhode Island
When:
Where:
Thursday, 04 December 2025 Check-in for the event begins at 8:30AM
Crowne Plaza Providence-Warwick (Airport) 801 Greenwich Ave Warwick, RI 02886
What:
Naval Facilities Engineering Systems Command, Mid-Atlantic (NAVFAC MIDLANT) invites contractors to attend the Industry Day event for the USCG OPC Homeport New Pier project.
The intent is to provide industry with an overview of the project, answer any reasonable questions, and collect feedback from industry about the project.
Who:
Interested parties for the OPC Homeport Pier project. Both prime and subcontractors are welcomed to attend.
Project Scope:
This project will demolish an existing condemned US Navy pier (1,570’ long x 100’ wide) and construct a new pier (1,000’ long x 80’ wide) for four Offshore Patrol Cutters (OPCs), along with a new bulkhead (360’ long), laydown area, parking, stormwater management, fire/potable water, electrical, telecommunications & compressed air utilities, etc.
More detail will be provided during the Industry Day presentation.
Project Cost Range:
$100M - $250M
Anticipated questions/comments:
The Government anticipates to discuss the following:
1. The Coast Guard Mission
2. Project Overview
3. Project Schedule
*There will be a Q&A period at the conclusion of the presentation.
Registration Information:
Registration for attending the industry day is encouraged but not required:
Company name, physical address, email address(es), POC, and telephone number(s), and anticipated list of attendees Please identify if your firm is a prime contractor
Email completed registration form (Attachment 1) to Kristy Gerrek at kristy.l.gerrek.civ@us.navy.mil no later than Monday, 01 December 2025.