OMB-MJ0217000003-BP5A-specs.pdf

PDF 6 MB Posted

Attached to
Customs House Renovation & Addition
Solicitation number
OMB-MJ0217000003-BP5A
Issued by
New Castle County, Delaware

About this file

This specification document is prepared by Tevebaugh Architecture for the State of Delaware, Office of Management and Budget (OMB), Division of Facilities Management (DFM) for the Customs House Renovation and Additions project located at 516 N. King Street, Wilmington, Delaware 19801. The project encompasses comprehensive renovation and new construction work on the historic Customs House building, organized into multiple bid packages released sequentially from September 2023 through September 2026. Bid Pack 5A, issued September 8, 2026, represents the ninth and most recent submission and includes detailed specifications across all building systems including structural, architectural, mechanical, plumbing, electrical, fire protection, communications, and security systems. The specifications address selective demolition, foundations, structural steel, site work, exterior enclosure systems, roofing, interior finishes, doors and windows, millwork, ceiling systems, stairs and elevators, and building equipment, with work coordinated across multiple levels including tunnel, Level 1, Level 2, Level 3, mezzanine, and roof areas.

The contract requires performance bonds and payment bonds under AIA A132-2019 standard agreement terms, with project management and coordination overseen by the State's construction manager. The specifications establish comprehensive submittal, testing, and quality requirements with detailed drawing packages including civil, structural, architectural, mechanical, electrical, plumbing, fire protection, technology, and signage plans. Professional design team members include Architect William J. Lenihan, AIA (Tevebaugh Associates); Civil Engineer Kenneth James Taylor, Jr., P.E. (Duffield Associates); Structural Engineer A. Paynter Ingram, P.E. (Baker, Ingram Associates); and MEP Engineer Timothy J. Zaloudek, P.E. (WSP USA). The project incorporates specialized systems including curtain wall and glazing assemblies, fire suppression and alarm systems, HVAC equipment with controls, advanced lighting systems with networking capabilities, audiovisual and security systems, and site improvements including paving, utilities, and landscape elements. Allowances, unit prices, and alternate bids are incorporated into the bid structure, with construction phasing and sequencing managed through detailed scheduling and coordination procedures.

View the file

Other files

File Type Posted
OMB-MJ0217000003-BP5A-Exemption.pdf PDF
OMB-MJ0217000003-BP5A-AD1.pdf PDF
OMB-MJ0217000003-BP5A-wages.pdf PDF
OMB-MJ0217000003-BP5A-rfp.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF DELAWARE

OMB/DIVISION OF FACILITIES MANAGEMENT

OMB/DFM CONTRACT # MJ0217000003-BP5A

SPECIFICATIONS FOR

Customs House Renovations and

Additions

AT

516 N. King Street

Wilmington, DE 19801

PREPARED

BY

TEVEBAUGH ARCHITECTURE

2 MILL RD, SUITE 210

WILMINGTON, DE 19806

ISSUED FOR

BID PACK 5A – GSS DFM SUBMISSION

September 8, 2026

Not F d

For B idd

5A e d s T

16 N. King S mingto

TE

CUSTOMS HOUSE RENOVATION AND ADDITION 516 N. KING ST, WILMINGTON DE 19801

#MJ0217000003-BP4 JULY 3, 2026

PROJECT TITLE PAGE TEVEBAUGH ARCHITECTURE

00 01 10 - 2 TA PROJECT NO. 21037

THIS PAGE LEFT INTENTIONALLY BLANK

#MJ0217000003-BP5A SEPTEMBER 8, 2026

Not F or B id

T INTENTIONALLYT INTENTIONAL

516 N. KING ST, WILMINGTON DE 19801 CUSTOMS HOUSE RENOVATION AND ADDITION

JULY 3, 2026 #MJ0217000003-BP5

TEVEBAUGH ARCHITECTURE SEALS PAGE

TA PROJECT NO. 21037 00 01 07 - 1

SECTION 00 01 07

SEALS PAGE

1.1 DESIGN PROFESSIONALS OF RECORD

Architect:

William J. Lenihan, AIA Tevebaugh Associates, Inc.

Two Mill Road, Suite 210 Wilmington, DE 19806 302-984-1400

DE License S5-7202

Civil Engineer:

Kenneth James Taylor, Jr., P.E.

Duffield Associates

5400 Limestone Road Wilmington, DE 19808 302-239-6634

DE License No. 21140 Robert Macintosh, P.E.

Macintosh Engineering DE License __________________

Structural Engineer:

A.Paynter Ingram, P.E.

Baker, Ingram Associates

1050 South State Street Dover, DE 19901 302-734-7400

DE License No. 6671 Robert Macintosh, P.E.

Macintosh Engineering DE License __________________

#MJ0217000003-BP5ASEPTEMBER 8, 2026

Not F or

P.E..E eeringring uctural Engineer:ctural Engineer:

.Paynter Ingram, P.ynter Ingram, P.

Baker, Ingram AssBaker, Ingram 1050 South 1050 South DoverD , DE 302302-73 LiceLice d

#MJ0217000003-BP5 JULY 3, 2026

SEALS PAGE TEVEBAUGH ARCHITECTURE

00 01 07 - 2 TA PROJECT NO. 21037

MEP Engineer:

Timothy J. Zaloudek, P.E.

WSP USA

7067 Columbia Gateway Drive, Suite 250 Columbia, Maryland 21046 410-579-8100

DE License 20591

END OF SECTION

#MJ0217000003-BP5A SEPTEMBER 8, 2026

Not F or BECTIONN

SEPTEMBER 8, 2026 #MJ0217000003-BP5A

TEVEBAUGH ARCHITECTURE TABLE OF CONTENTS

TA PROJECT NO. 21037 00 01 10 - 1

SECTION 00 01 10

TABLE OF CONTENTS

SUBMISSIONS:

1 Bid Pack 1 – Addendum 02 10.27.2023 2 Bid Pack 2 – GSS DFM Submission 02.09.2024 3 Bid Pack 2.1 – GSS DFM Submission 04.05.2024 4 Bid Pack 2.1A – GSS DFM Submission 07.03.2024 5 Bid Pack 3 – GSS DFM Submission 07.12.2024 6 Bid Pack 4 – Addendum 03 02.21.2025 7 Bid Pack 4A – GSS DFM Submission 04.29.2025 8 Bid Pack 4B – GSS DFM Submission 08.14.2025 9 Bid Pack 5A – GSS DFM Submission 09.08.2026

Sections issued in the current bid package are annotated with an “X”.

SECTION SECTION TITLE AUTHOR 1 2 3 4 5 6 7 8 9

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 01 PROJECT TITLE PAGE Tevebaugh X X X X X X X X X

00 01 07 SEALS PAGE Tevebaugh X X X X X X X X X

00 01 10 TABLE OF CONTENTS Tevebaugh X X X X X X X X X

00 01 15 LIST OF DRAWING SHEETS Tevebaugh X X X X X X X X X

00 11 16 INVITATION TO BID EDIS X X X X X X X X X

00 21 13 INSTRUCTIONS TO BIDDERS Tevebaugh X X X X X X X X X

00 31 24

ENVIRONMENTAL AND EXISTING

CONDITIONS INFORMATION

Harvard X X X X X X

00 31 32 GEOTECHNICAL DATA Verdantas X X X

00 40 00

PROCUREMENT FORMS AND

SUPPLEMENTS

Tevebaugh X X X X X X X X X

00 41 13 BID FORM 1-01 – SELECTIVE DEMOLITION EDIS X

00 41 13.2-01 BID FORM 2-01 – FOUNDATIONS EDIS X

00 41 13.2-02 BID FORM 2-02 – STRUCTURAL STEEL EDIS X

00 41 13.2.1-01 BID FORM 2.1-01 – SITEWORK EDIS X

00 41 13.2.1-02

BID FORM 2.1-01 – GROUND

IMPROVEMENT

EDIS X

00 41 13.2.1A-01 BID FORM 2.1-01A – SITEWORK EDIS X

00 41 13.3-01

BID FORM 3-01 – EXTERIOR STRUCTURAL

STUD ASSEMBLY

EDIS X

00 41 13.3-02 BID FORM 3-02 – ROOFING EDIS X

00 41 13.3-03

BID FORM 3-03 – JOINT SEALANTS AND

PREFORMED JOINT ASSEMBLIES

EDIS X

00 41 13.3-04

BID FORM 3-04 – CURTAIN

WALL/GLAZING/STOREFRONTS

EDIS X

B id

P ac k 4A

B id

P ac k 4B

B id

P ac k

Not F or B idB6 BBBBBX”.

AUTHOAUTH

orororororororor FoFoENT AND CONTRACoooFoFo

NTS FING SHEETS FTO BID O BID t F CTIONS TO BIDDERS TO BIDDtRONMENTAL AND EMENTAL AND E

NDITIONS INFORMAIONS INFORMot GEOTECHNICAL DAECHNICAL Dot

PROCUREMENT PROCUREMENT

SUPPLEMENTSUPPLEMENT

NoN13 BID FORM 113 BID FORNNNoN3.2-01 BID FOR3.2-01 BID FORNNNN02 02 BID FBNNNNBIBINNNN

#MJ0217000003-BP5A SEPTEMBER 8, 2025

TABLE OF CONTENTS TEVEBAUGH ARCHITECTURE

00 01 10 - 2 TA PROJECT NO. 21037

00 41 13.3-05

BID FORM 3-05 – ROOFTOP AIR-HANDLING

UNITS PRE-PURCHASE

EDIS X

00 41 13.3-06 BID FORM 3-06 – ELECTRICAL PRE-

PURCHASE PACKGAE

EDIS X

00 41 13.3-07 BID FORM 3-07 – ELEVATOR EDIS X

00 41 13.3-08 BID FORM 3-08 – METAL WALL PANELS EDIS X

00 41 13.3-09

BID FORM 3-09 – EXTERIOR MASONRY AND

CMU SHAFTS

EDIS X

00 41 13.4-01 BID FORM 4-01 – INTERIOR MASONRY EDIS X

00 41 13.4-02 BID FORM 4-02 – MISCELLANEOUS

METALS, STAIRS, AND RAILS

EDIS X

00 41 13.4-03 BID FORM 4-03 – CARPENTRY AND

GENERAL WORK

EDIS X

00 41 13.4-04 BID FORM 4-04 – DRYWALL AND INTERIOR

METAL FRAMING

EDIS X

00 41 13.4-05 BID FORM 4-05 – FIREPROOFING &

INTUMESCENT PAINT

EDIS X

00 41 13.4-06 BID FORM 4-06 – CURTAIN

WALL/GLAZING/STOREFRONTS

EDIS X

00 41 13.4-07 BID FORM 4-07 – CERAMIC TILING EDIS X

00 41 13.4-08 BID FORM 4-08 – ACOUSTICAL AND

SPECIALTY CEILINGS

EDIS X

00 41 13.4-09 BID FORM 4-09 – FLOORING EDIS X

00 41 13.4-10 BID FORM 4-10 – GENERAL LABOR AND

CLEANUP

EDIS X

00 41 13.4-11 BID FORM 4-11 – RESINOUS MATRIX

TERRAZZO FLOORING

EDIS X

00 41 13.4-12 BID FORM 4-12 – MISCELLANOUS

CONCRETE

EDIS X

00 41 13.4-13 BID FORM 4-13 – PAINTING EDIS X

00 41 13.4-14 BID FORM 4-14 – ROLLER WINDOW

SHADES

EDIS X

00 41 13.4-15 BID FORM 4-15 – CUSTOM MILLLWORK EDIS X

00 41 13.4-16 BID FORM 4-16 – MANUFACTURED

CASEWORK

EDIS X

00 41 13.4-17 BID FORM 4-17 – FIRE PROTECTION EDIS X

00 41 13.4-18 BID FORM 4-18 – PLUMBING EDIS X

00 41 13.4-19 BID FORM 4-19 – HVAC AND CONTROLS EDIS X

00 41 13.4-20 BID FORM 4-20 – TESTING, ADJUSTING,

AND BALANCING

EDIS X

00 41 13.4-21 BID FORM 4-21 – ELECTRICAL, LIGHTING,

AND FIRE ALARM SYSTEMS

EDIS X

00 41 13.4A-01 BID FORM 4A-01 – MISCELLANEOUS

METALS, STAIRS, AND RAILS

EDIS X X

00 41 13.4A-02 BID FORM 4A-02 – CARPENTRY AND

GENERAL WORK

EDIS X

00 41 13.4A-03 BID FORM 4A-03 – CURTAIN

WALL/GLAZING/STOREFRONTS

EDIS X

Not F or B id

XX

d

XX

ddddddd XX ddddddddddd X X dddddddddiididdd iiidididididddBBiBididd

BBBiBiBiBiBiiiBBBiBii DIS IS BBBBBBBBBBBBBEDIS BBBBBBBr BBB

EDIS Errr BBBr B EDIS EDrrrorG EEorororor

AL AND AL ooooING ING Fo NERAL LABOR ANDERAL LABFo

– RESINOUS MATRIS MAT

LOORING OOR F

4-12 – MISCELLANO2 – MIS

TE tORM 4-13 – PAINTIN4-13 – PAINTI ot D FORM 4-14 – ROLRM 4-14 – SHADES ES ot

BID FORM 4-15 – BID FORM 4-15 –

NoN

16 BID FORM 4-1BID FORM 4-1

CASEWORKCASEWONNNoN3.4-17 BID FORM3.4-17 BID FORNNNN-18 BID FO-18 BNNNNBIDBINNNN

TEVEBAUGH ARCHITECTURE TABLE OF CONTENTS

TA PROJECT NO. 21037 00 01 10 - 3

00 41 13.4A-04 BID FORM 4A-04 – ROLLER WINDOW

SHADES

EDIS X

00 41 13.4A-05 BID FORM 4A-05 – CUSTOM MILLLWORK EDIS X

00 41 13.4A-06 BID FORM 4A-06 – MANUFACTURED

CASEWORK

EDIS X

00 41 13.4A-07 BID FORM 4A-07 – TESTING, ADJUSTING,

AND BALANCING

EDIS X

00 41 13.4B-02 BID FORM 4B – 02 MISC. METALS, STAIRS,

AND RAILINGS

EDIS X

00 41 13.5-01 BID FORM 5-01 INTERIOR SIGNAGE EDIS X

00 41 13.5-02 BID FORM 5-02 AUDIO VISUAL EDIS X

00 41 13.5-03 BID FORM 5-03 STRUCTURED CABLING EDIS X

00 41 13.5-04 BID FORM 5-04 FINAL CLEANING EDIS X

00 43 13 BID BOND Tevebaugh X X X X X X X X X

00 50 00

CONTRACTING FORMS AND

SUPPLEMENTS Tevebaugh X X X X X X X X X

00 52 13

STANDARD FORM OF AGREEMENT

BETWEEN OWNER AND CONTRACTOR

A132-2019

Tevebaugh X X X X X X X X X

00 52 13.A

INSURANCE AND BONDS A132 – 2019

EXHIBIT A

Tevebaugh X X X X X X X X X

00 54 13

SUPPLEMENT TO AGREEMENT BETWEEN

OWNER AND CONTRACTOR A132-2019

Tevebaugh X X X X X X X X X

00 54 13.A

SUPPLEMENT TO A132-2019-EXHIBIT A,

INSURANCE AND BONDS

Tevebaugh X X X X X X X X X

00 61 13.13 PERFORMANCE BOND Tevebaugh X X X X X X X X X

00 61 13.16 PAYMENT BOND Tevebaugh X X X X X X X X X

00 62 11 SUBMITTAL COVER SHEET Tevebaugh X X X X X X X X X

00 62 76

AIA DOCUMENT G732 - 2019: APPLICATION

AND CERTIFICATION FOR PAYMENT

FORMS

Tevebaugh X X X X X X X X X

00 62 76A

AIA DOCUMENT G703 - 1992:

CONTINUATION SHEET Tevebaugh X X X X X X X X X

00 63 13 REQUEST FOR INFORMATION FORM Tevebaugh X X X X X X X X X

00 63 25 SUBSTITUTION REQUEST FORM Tevebaugh X X X X X X X X X

00 63 33

AIA DOCUMENT G710 - 2017:

SUPPLEMENTAL INSTRUCTION FORMS

Tevebaugh X X X X X X X X X

00 63 46

AIA DOCUMENT G733 - 2019:

CONSTRUCTION CHANGE DIRECTIVE Tevebaugh X X X X X X X X X

00 63 63

AIA DOCUMENT G731 - 2019: CHANGE

ORDER

Tevebaugh X X X X X X X X X

00 63 73 ALLOWANCE AUTHORIZATION FORM Tevebaugh X X X X X X X X X

00 65 16

AIA DOCUMENT G734 - 2019: CERTIFICATE

OF SUBSTANTIAL COMPLETION

Tevebaugh X X X X X X X X X

00 65 19.13

AIA DOCUMENT G706 - 1994:

CONTRACTOR'S AFFIDAVIT OF PAYMENT

OF DEBTS AND CLAIMS

Tevebaugh X X X X X X X X X

Not F or B dddd X Xdddddddiididdd iiidididididddddBBiBididdd

BBBiBiBidBidBidididddBBBiBididd

BBBBBiBiBiBiBiiiBBBiBii DIS IS BBBBBBBBBBBBBEDIS BBBBBBBBBBTevebaugh XX XXBBBBBr BB

Tevebaugh XTevrrr BBBr B TOR TevebaTevebrrror

2 – 2019 2 – 2019 TooooEMENT BETWEEN EMENT BETWEEN

CTOR A132-2019 CTOR A132-Fo

132-2019-EXHIBIT A2-2019-EX

BONDS FE BOND E BOND FBOND ND t F TAL COVER SHEET OVER SHEEtOCUMENT G732 - 2MENT G732 - 2

D CERTIFICATION FRTIFICAT

FORMS S ot

AIA DOCUMENT GAIA DOCUMENT G

CONTINUATIONCONTINUATION

NoN13 REQUEST F13 REQUESNNNoN3 25 SUBSTIT3 25 SUBSTITNNNNAIA DOA

SUPSUNNNNAANNNN

TABLE OF CONTENTS TEVEBAUGH ARCHITECTURE

00 01 10 - 4 TA PROJECT NO. 21037

00 65 19.16

AIA DOCUMENT G706A - 1994:

CONTRACTOR'S AFFIDAVIT OF RELEASE

OF LIENS

Tevebaugh X X X X X X X X X

00 65 19.19

AIA DOCUMENT G707 - 1994: CONSENT OF

SURETY TO FINAL PAYMENT

Tevebaugh X X X X X X X X X

00 72 13

GENERAL CONDITIONS TO THE CONTRACT

A232-2019

Tevebaugh X X X X X X X X X

00 73 13

SUPPLEMENTARY GENERAL CONDITIONS

A232-2019 Tevebaugh X X X X X X X X X

00 73 46 WAGE DETERMINATION SCHEDULE EDiS X X X X X X X X X

00 81 13 GENERAL REQUIREMENTS Tevebaugh X X X X X X X X X

00 81 14 DRUG TESTING FORMS Tevebaugh X X X X X X X X X

00 81 15

AFFIDAVIT FOR CRAFT TRAINING

COMPLIANCE

Tevebaugh X X X X X X X X X

00 82 00 DIGITAL RELEASE FORM Tevebaugh X X X X X X X X X

DIVISION 01 - GENERAL REQUIREMENTS

01 10 00 SUMMARY OF WORK EDIS X X X X X X X X X

01 14 00 WORK RESTRICTIONS Tevebaugh X X X X X X X X X

01 21 00 ALLOWANCES EDIS X X X X X X X X X

01 21 16 ALLOWANCE AUTHORIZATION FORM EDiS X X X X X X X X X

01 22 00 UNIT PRICES EDIS X X X X

01 23 00 ALTERNATES EDIS X X X X X

01 25 00 SUBSTITUTION PROCEDURES Tevebaugh X X X X X X X X X

01 26 00 CONTRACT MODIFICATION PROCEDURES Tevebaugh X X X X X X X X X

01 29 00 PAYMENT PROCEDURES Tevebaugh X X X X X X X X X

01 31 00

PROJECT MANAGEMENT AND

COORDINATION

Tevebaugh X X X X X X X X X

01 31 13 PROJECT COORDINATION MEETING EDiS X X X X X X X X X

01 31 19 PRE-INSTALLATION MEETINGS EDiS X X X X X X X X X

01 31 25

WEB-BASED PROJECT MANAGEMENT

SYSTEM

EDiS X X X X X X X X X

01 32 00

CONSTRUCTION PROGRESS

DOCUMENTATION

Tevebaugh X X X X X X X X X

01 32 16 SCHEDULE EDIS X X X X X X X X X

01 32 16.A SCHEDULE ATTACHMENT EDIS X X X X X X X X

01 32 26 CONTRACTOR DAILY REPORTS EDiS X X X X X X X X X

01 32 33 PHOTOGRAPHIC DOCUMENTATION Tevebaugh X X X X X X X X X

01 33 00 SUBMITTAL PROCEDURES Tevebaugh X X X X X X X X X

01 35 23

CONSTRUCTION MANAGER GENERAL

INFORMATION

EDIS X X X X X X

01 35 23.A CRANE LIFT PLAN CHECKLIST EDIS X X X X

Not F or B id

XX XX

ddX X XX XX XXdddddddddXX XX XX XX XXddddddddd BBiBididddXX XX XX XX X

BBBiBiBidBidBidididddBBBiBididdgh Xgh X XX XX XX

BBBBBiBiBiBiBiiiBBBiBii baugh Xbaugh X XX XX XBBBBBBBBBBBBBevebaugh Xgh X XXBBBBBBBBBBTevebaugh Xevebaugh XBBBBBr BB rrrror or UIREMrrrEDISED ororororTevororororooooATION FORM ATION FORM

FoFoFN PROCEDURES ES FMODIFICATION PRODIFICt F NT PROCEDURES OCEDUREStECT MANAGEMENTMANAGEMENT

ORDINATION INATION ot PROJECT COORDINECT COORDoPRE-INSTALLATPRE-INSTALLAT

NoN2525

WEB-BASED PWEB-BASED

SYSTEM SYSTEM NNNoN0000

CONSTRCONSTR

DOCUNNNNSCHSCNNNNN

TEVEBAUGH ARCHITECTURE TABLE OF CONTENTS

TA PROJECT NO. 21037 00 01 10 - 5

01 35 23.B DEMO PRE-START SURVEY EDIS X

01 35 23.C STAR SHEET EDIS X X X

01 35 23.D

COMPETENT/QUALIFIED PERSON

DESIGNATIONS FORM EDIS X X X

01 35 23.E SAFETY PROGRAM EDIS X X X X X X X X

01 35 23.F SITE FILL PLAN EDIS X X X X X X X

01 35 23.G SITE EXCAVATION PLAN EDIS X

01 35 23.H SITE LOGISTICS DRAWING EDIS X X

01 35 23.I SHEETING AND SHORING PLAN EDIS X

01 37 00 3D COORDINATION SPECIFICATION EDIS X X X X X X

01 40 00 QUALITY REQUIREMENTS Tevebaugh X X X X X X X

01 42 00 REFERENCES Tevebaugh X X X X X X X

01 43 25

EXTERIOR ENCLOSURE PERFORMANCE

MOCKUP

Tevebaugh X X

01 45 23 TESTING AND INSPECTION SERVICES Tevebaugh X X X X X X X

01 45 25

EXTERIOR ENCLOSURE TESTING

SERVICES

Tevebaugh X X

01 50 00 TEMPORARY FACILITIES AND CONTROLS Tevebaugh X X X X X X X

01 60 00 PRODUCT REQUIREMENTS Tevebaugh X X X X X X X

01 73 00 EXECUTION Tevebaugh X X X X X X X

01 73 29 CUTTING AND PATCHING Tevebaugh X X X X X X X

01 74 19

CONSTRUCTION WASTE MANAGEMENT

AND DISPOSAL

Tevebaugh X X X X X X X

01 75 00 STARTING AND ADJUSTING Tevebaugh X X X X

01 77 00 CLOSEOUT PROCEDURES Tevebaugh X X X X X X X

01 78 23 OPERATION AND MAINTENANCE DATA Tevebaugh X X X X X X X

01 78 39 PROJECT RECORD DOCUMENTS Tevebaugh X X X X X X X

01 79 00 DEMONSTRATION AND TRAINING Tevebaugh X X X X X X X

01 83 16

EXTERIOR ENCLOSURE GENERAL

REQUIREMENTS

Tevebaugh X X

01 91 13

GENERAL COMMISSIONING

REQUIREMENTS

WSP X

DIVISION 02 - EXISTING CONDITIONS

02 15 00 UNDERPINNING AND SHORING Baker

Ingram X

02 41 19 SELECTIVE DEMOLITION Tevebaugh X idd dddddddX XX X XX XXdddddddddiididddX X XX XX XX XXiiidididididddddBBiBididdd X X

BBBiBiBidBidBidididBBBiBidid DIS IS BBBBBBBBBBBBBEDIS BBBBBBBBBBEDIS E BBBr B

TevebaughTevrrrorTevebaTevebororororORMANCE ANCE TeorororoON SERVICES ON SERVICES

FooE TESTING E TESTING Fo

CILITIES AND CONTAND CFQUIREMENTS QUIREMENTS F

N tG AND PATCHING D PATCHINGtSTRUCTION WASTEUCTION WASTE D DISPOSAL SPOSAL ot

STARTING AND ADSTARTING AND AoCLOSEOUT PROCLOSEOUT PRO

NoN23 OPERATION23 OPERATNNNoN8 39 PROJECT8 39 PROJECTNNNN0 DEMO0 DNNNNEXTEX

RNNNN

TABLE OF CONTENTS TEVEBAUGH ARCHITECTURE

00 01 10 - 6 TA PROJECT NO. 21037

DIVISION 03 - CONCRETE

03 20 00 CONCRETE REINFORCING Verdantas X X X X

03 30 00 CAST-IN-PLACE CONCRETE

Baker Ingram X X

03 49 00

GLASS-FIBER-REINFORCED CONCRETE

(GFRC)

Tevebaugh X X X

03 54 16 HYDRAULIC CEMENT UNDERLAYMENT Tevebaugh X

DIVISION 04 – MASONRY

04 01 00 BRICK REPAIR Tevebaugh X X

04 01 10 MASONRY CLEANING Tevebaugh X X

04 01 41 STONE MASONRY REPAIR Tevebaugh X X

04 20 00 UNIT MASONRY Tevebaugh X

04 42 00 EXTERIOR STONE CLADDING Tevebaugh X

04 73 13 CALCIUM SILICATE MASONRY VENEER Tevebaugh X

DIVISION 05 – METALS

05 01 70 METAL RESTORATION Tevebaugh X X

05 12 00 STRUCTURAL STEEL FRAMING

Baker In-gram X X

05 31 00 STEEL DECKING

Baker In-gram X

05 40 00 COLD-FORMED METAL FRAMING Tevebaugh X X

05 50 00 METAL FABRICATIONS Tevebaugh X X X

05 51 00 METAL STAIRS Tevebaugh X X X

05 53 13 BAR GRATING Tevebaugh X X X

05 73 13 GLAZED DECORATIVE METAL RAILINGS Tevebaugh X X X

05 75 00 DECORATIVE FORMED METAL Tevebaugh X X X

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 00 50 REPAIR OF EXTERIOR CARPENTRY Tevebaugh X X X

06 10 53 MISCELLANEOUS ROUGH CARPENTRY Tevebaugh X X X

06 10 73 EXTERIOR MISC ROUGH CARPENTRY Tevebaugh X X X

06 16 00 SHEATHING Tevebaugh X

06 40 23 INTERIOR ARCHITECTURAL WOODWORK Tevebaugh X X

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 01 50 PREPARATION FOR REROOFING Tevebaugh X

07 11 13 BITUMINOUS DAMPPROOFING Tevebaugh X

07 13 00 WATERPROOFING Tevebaugh X X

07 16 16 CRYSTALLINE WATERPROOFING Tevebaugh X X

Not F dd XX XX XXddddddddd X Xdddddddddiididdd iiidididididdddBBiBididdBidBidBBBiBiBidBidBidididddugh ugh

BBBBBiBiBiBiBiiiBBBiBii baugh baugh BBBBBBBBBBBBBevebaugh ugh BBBBBBBBBBTevebaugh BBBBBr BBTevebaugh Tevrrr BBBr B

R TevebaughTevrrrrrrrororor– METALSororor TooooAMING AMIN

FooooFo METAL FRAMING AMINGFRICATIONS CATIONS t F

TAIRS S tGRATING ING tAZED DECORATIVED DECORAot DECORATIVE FORMDECORATIVE FORo

NoNNoNoNNNo

0 50 REPAIR O0 50 REPAIR ONNNN3 MISCE3 MNNNNEXEXNNNN

TEVEBAUGH ARCHITECTURE TABLE OF CONTENTS

TA PROJECT NO. 21037 00 01 10 - 7

07 21 00 THERMAL INSULATION Tevebaugh X X X

07 21 19 FOAMED IN PLACE INSULATION Tevebaugh X X

07 21 29 SPRAY APPLIED FIBROUS INSULATION Tevebaugh X

07 27 13 AIR/MOISTURE BARRIERS Tevebaugh X

07 41 14

STANDING-SEAM METAL ROOF AND WALL

PANELS

Tevebaugh X

07 42 15 INSULATED METAL WALL PANELS Tevebaugh X

07 42 19 ALUMINUM PLATE WALL PANELS Tevebaugh X X

07 53 00 SINGLE PLY ROOFING Tevebaugh X

07 56 00

COLD FLUID-APPLIED FLASHING AND

TRAFFIC COATING

Tevebaugh X

07 62 00 SHEET METAL FLASHING AND TRIM Tevebaugh X

07 62 10

SHEET METAL MAINTENANCE AND

REPAIRS

Tevebaugh X

07 71 13

MANUFACTURED COPINGS, FASCIAS, AND

ROOF SPECIALTIES

Tevebaugh X

07 72 00 ROOF ACCESSORIES Tevebaugh X X

07 81 00 APPLIED FIRE PROTECTION Tevebaugh X

07 84 13 PENETRATION FIRESTOPPING Tevebaugh X

07 84 46 CURTAIN WALL FIRE RESISTANT JOINT

SYSTEM

Tevebaugh X X X

07 92 00 JOINT SEALANTS Tevebaugh X X X

07 92 05 EXTERIOR JOINT SEALANT Tevebaugh X X X

07 95 10 EXTERIOR EXPANSION CONTROL Tevebaugh X X X

DIVISION 08 - OPENINGS

08 01 52 WOOD WINDOWS RESTORATION Tevebaugh X X X

08 11 10

EXTERIOR HOLLOW METAL DOORS AND

FRAMES

Tevebaugh X X X

08 11 13

INTERIOR HOLLOW METAL DOORS AND

FRAMES

Tevebaugh X X

08 14 16 FLUSH WOOD DOORS Tevebaugh X X

08 31 13 ACCESS DOORS AND FRAMES Tevebaugh X X

08 36 13 SECTIONAL DOORS Tevebaugh X X X

08 41 15

INTERIOR ALUMINUM FRAMED

STOREFRONTS

Tevebaugh X

08 42 13 ALUMINUM-FRAMED ENTRANCES Tevebaugh X X X

08 43 13 GLAZED ALUMINUM STOREFRONT Tevebaugh X X X

08 44 13 GLAZED ALUMINUM CURTAIN WALL Tevebaugh X X X

08 56 53 BULLET-RESISTANT (BR) WINDOWS Tevebaugh X X X

08 71 00 DOOR HARDWARE Tevebaugh X X

08 80 10 EXTERIOR GLASS AND GLAZING Tevebaugh X X X

08 83 00 MIRRORS Tevebaugh X X

NotOD WINDOWS RESTWINDOWS RESTt For B id

XX

d

XX

dddddd XX dddddddiididdd XX iiidididididddddiididdd X XiiidididididddBBiBididdh Xh

BBBiBiBiBiBiiiBBBiBii baugh baugh BBBBBiBiBiBiBiBBBiBi evebaugh ugh BBBBBBBBBBTevebaugh evebaugh BBBBBr BB

ND

Tevebaugh TerrrrTevebauTevebrrrorTeveTeveorororor NG TNG ooooSTANT JOINT STANT JOINT

FooFo SEALANTNT FPANSION CONTROPANSION CONTROFtot ot DItotXTERIOR HOLLOW IOR HOLLO

FRAMES FRAMES ot

INTERIOR HOLLINTERIOR HOLL

FRAMES FRAME

NoN4 16 FLUSH WO4 16 FLUSH WNNNoN13 ACCES13 ACCESNNNNSECSENNNNININNNNN

TABLE OF CONTENTS TEVEBAUGH ARCHITECTURE

00 01 10 - 8 TA PROJECT NO. 21037

08 91 19 FIXED LOUVERS Tevebaugh X X X

DIVISION 09 - FINISHES

09 01 90 MAINTENANCE EXTERIOR REPAINTING Tevebaugh X X

09 05 61

COMMON WORK RESULTS FOR FLOORING

PREPARATION

Tevebaugh X

09 21 16.23 GYPSUM BOARD SHAFT WALL ASSEMBLY Tevebaugh X

09 22 16 NON-STRUCTURAL METAL FRAMING Tevebaugh X

09 24 00 STUCCO REPLACEMENT Tevebaugh X X

09 29 00 GYPSUM BOARD Tevebaugh X

09 30 00 TILING Tevebaugh X

09 51 13 ACOUSTICAL PANEL CEILINGS Tevebaugh X

09 64 29 WOOD STRIP AND PLANK FLOORING Tevebaugh X

09 65 13 RESILIENT BASE AND ACCESSORIES Tevebaugh X

09 65 19 RESILIENT TILE FLOORING Tevebaugh X

09 66 23 RESINOUS MATRIX TERRAZZO FLOORING Tevebaugh X

09 68 13 TILE CARPETING Tevebaugh X

09 72 00 WALL COVERINGS Tevebaugh X

09 83 00 ACOUSTIC FINISHES Tevebaugh X X

09 90 00 PAINTING AND COATING Tevebaugh X

09 96 10

EXTERIOR HIGH PREFORMANCE

COATINGS

Tevebaugh X X

09 96 46 INTUMESCENT PAINTING Tevebaugh X

09 97 26 MINERAL SILICATE COATINGS Tevebaugh X X

09 97 33 CONCRETE FLOOR SEALER Tevebaugh X

DIVISION 10 - SPECIALTIES

10 14 23 PANEL SIGNAGE Tevebaugh X

10 21 13.14

STAINLESS-STEEL TOILET

COMPARTMENTS

Tevebaugh X X

10 26 00 WALL AND DOOR PROTECTION Tevebaugh X X

10 28 00

TOILET, BATH, AND LAUNDRY

ACCESSORIES

Tevebaugh X X

10 44 13 FIRE PROTECTION CABINETS Tevebaugh X X

10 44 16 FIRE EXTINGUISHERS Tevebaugh X X

10 82 13 METAL SCREEN WALL Tevebaugh X X X X

DIVISION 11 - EQUIPMENT

11 14 00 PEDESTRIAN CONTROL EQUIPMENT Tevebaugh X X

11 24 23 MAINTENANCE SAFETY EQUIPMENT Tevebaugh X X dd

XX XX

dddddd X X dddddddiididdd X Xiiidididididddddiididdd X iiidididididddBBiBididdh Xh

BBBiBiBiBiBiiiBBBiBiiaugh augh BBBBBiBiBiBiBiBBBiBi vebaugh augh BBBBBBBBBBBTevebaugh h BBBBBBBBBBTevebaugh Tevebaugh BBBBBr BB

Tevebaugh TevrrrrTevebaugTeverrrorLOORING TevebaRING Teveborororor TevorororoFooooFo

TING NG Fo REFORMANCE RMANCFNT PAINTING T PAINTING t F

SILICATE COATINGCATE CtRETE FLOOR SEALE FLOOR SEALtot NoNooNoN23 PANEL SIGN23 PANEL SNNNoN3.14 3.14

STAINLESSTAINLES

COMPAPANNNNWALWANNNNTTNNNN

TEVEBAUGH ARCHITECTURE TABLE OF CONTENTS

TA PROJECT NO. 21037 00 01 10 - 9

DIVISION 12 - FURNISHINGS

12 24 13 ROLLER WINDOW SHADES Tevebaugh X X

12 36 00 COUNTERTOPS Tevebaugh X X

12 48 13 ENTRANCE FLOOR MATS AND FRAMES Tevebaugh X

12 59 00 SYSTEMS FURNITURE Tevebaugh

DIVISION 13 - SPECIAL CONSTRUCTION – NOT USED

DIVISION 14 - CONVEYING EQUIPMENT

14 21 00 CONVEYING EQUIPMENT Tevebaugh X

DIVISION 21 - FIRE SUPPRESSION

21 00 10 FIRE PROTECTION GENERAL PROVISIONS WSP X X

21 00 50

FIRE PROTECTION BASIC MATERIALS AND

METHODS

WSP X X

21 08 00

COMMISSIONING OF FIRE PROTECTION

SYSTEMS

WSP X X

21 10 00 SPRINKLER AND STANDPIPE SYSTEMS WSP X X

21 31 13

ELECTRIC-DRIVE, CENTRIFUGAL FIRE

PUMPS

WSP X X

DIVISION 22 - PLUMBING

22 00 10 PLUMBING GENERAL PROVISIONS WSP X X

22 00 50

PLUMBING BASIC MATERIALS AND

METHODS WSP X X

22 05 33 HEAT TRACING FOR PLUMBING PIPING WSP X X

22 05 93

TESTING, ADJUSTING AND BALANCING

FOR PLUMBING SYSTEMS WSP X X

22 07 00 PLUMBING PIPING INSULATION WSP X X

22 08 00 COMMISSIONING OF PLUMBING SYSTEMS WSP X X

22 11 10 PUMPS WSP X X

22 13 00 PLUMBING SPECIALTIES WSP X X

22 34 00 DOMESTIC WATER HEATERS WSP X X

22 42 13 PLUMBING FIXTURES WSP X X

DIVISION 23 - HEATING VENTILATING AND AIR CONDITIONING

23 00 10 MECHANICAL GENERAL PROVISIONS WSP X X

23 00 50 HVAC BASIC MATERIALS AND METHODS WSP X X

23 05 33 HEAT TRACING FOR HVAC PIPING WSP X X

23 05 93

TESTING, ADJUSTING, AND BALANCING

FOR HVAC

WSP X X

23 07 00 MECHANICAL SYSTEMS INSULATION WSP X X

Not FFF VISIONFor B d X X dddddd ddddddddddd dddddddddiididddBidBidiiidididididdddd

BBBiBiBidBidBidididddBBBiBididdBiBiT

BBBBBiBiBiBiBiii baugh baugh BBBBBBBBBBBBB BBBBBBBBBBr BBBBBBBS WSP Wrrr BBBr B

AND

WSP rrrorCTION N WSWSorororor

SYSTEMS SYSTEMS ooooIFUGAL FIRE IFUGAL FIRE

FooooFoFNERAL PROVISIONNERAL PROVISIONFBASIC MATERIALS ASIC M S tTRACING FOR PLUING FOR PLUtSTING, ADJUSTING G, ADJUSTING

OR PLUMBING SYSLUMBING Sot PLUMBING PIPINGPLUMBING PIPINoN

COMMISSIONCOMMISSION

NNNoN 10 PUMPS 10 PUMPS NNNoN00 PLUMB00 PLUMBNNNNDOMDONNNNPPNNNN

TABLE OF CONTENTS TEVEBAUGH ARCHITECTURE

00 01 10 - 10 TA PROJECT NO. 21037

23 08 00 COMMISSIONING OF HVAC SYSTEMS WSP X X

23 09 00

INSTRUMENTATION AND CONTROL FOR

HVAC

WSP X X

23 09 23 GAS INSTRUMENTS WSP X X

23 21 23 HYDRONIC PUMPS WSP X X

23 25 00 HVAC WATER TREATMENT WSP X X

23 29 23

VARIABLE FREQUENCY MOTOR

CONTROLLER

WSP X X

23 33 00 DUCTWORK AND ACCESSORIES WSP X X

23 34 00 FANS AND VENTILATORS WSP X X

23 36 00 AIR TERMINAL UNITS WSP X X

23 52 16 CONDENSING BOILERS WSP X X

23 74 16 PACKAGED ROOFTOP UNITS WSP X X X

23 81 00

PACKAGED AND SPLIT SYSTEM AIR

CONDITIONING UNITS

WSP X X

23 82 00

HEATING AND AIR CONDITIONING

TERMINAL EQUIPMENT

WSP X X

DIVISION 26 - ELECTRICAL

26 00 10 ELECTRICAL GENERAL PROVISIONS WSP X X

26 05 19

LOW-VOLTAGE ELECTRICAL POWER

CONDUCTORS AND CABLES

WSP X X

26 05 26

GROUNDING AND BONDING FOR

ELECTRICAL SYSTEMS

WSP X X

26 05 29

HANGERS AND SUPPORTS FOR

ELECTRICAL SYSTEMS

WSP X X

26 05 33

RACEWAYS AND BOXES FOR ELECTRICAL

SYSTEMS

WSP X X

26 05 43

UNDERGROUND DUCTS AND RACEWAYS

FOR ELECTRICAL SYSTEMS

WSP X X

26 05 44 SLEEVES AND SLEEVE SEALS FOR

ELECTRICAL RACEWAYS AND CABLING

WSP X X

26 05 53

IDENTIFICATION FOR ELECTRICAL

SYSTEMS

WSP X X

26 05 73

OVERCURRENT PROTECTIVE DEVICE

COORDINATION STUDY

WSP X X X

26 09 23 LIGHTING CONTROL DEVICES WSP X X

26 09 43

CENTRALIZED NETWORKABLE LIGHTING

CONTROLS

WSP X X

26 22 00 LOW-VOLTAGE TRANSFORMERS WSP X X

26 23 00 LOW-VOLTAGE SWITCHGEAR WSP X X X

26 24 16 PANELBOARDS WSP X X

26 25 50

DUAL PURPOSE GENERATOR DOCKING

STATION

WSP X X X

26 27 26 WIRING DEVICES WSP X X

26 28 13 FUSES WSP X X

26 28 16

ENCLOSED SWITCHES AND CIRCUIT

BREAKERS WSP X X

Not F ooor B id X X ddd X Xddddddddd X X XXdddddddddiididdd X XiiidididididddddBBiBididdd

BBBiBiBidBidBidididddBBBiBididd

BBBBBiBiBiBiBiiiBBBiBii SP SP BBBBBBBBBBBBBWSP BBBBBBBBBBWSP BBBBBr BB

WSP Wrrr BBBr B WSP WrrrorororELECTRICAororor

VISIONS VISIONS ooooAL POWER AL POWER BLES BLESFooONDING FOR NDING FOR

EMS Fo

SUPPORTS FOR S FOR

SYSTEMS YST F

S AND BOXES FOR AND BO

S tRGROUND DUCTS AUND DUCTS R ELECTRICAL SYSTECTRICAL SYSTot

LEEVES AND SLEEES AND SL

ELECTRICAL RACELECTRICAL RACot

IDENTIFICATIONIDENTIFICATION

SYSTEMS SYSTEMS

NNoN5 735 73

OVERCUROVERCU

COORDICOORDNNNoN LIGHT LNNNNCECENNNN

TEVEBAUGH ARCHITECTURE TABLE OF CONTENTS

TA PROJECT NO. 21037 00 01 10 - 11

26 29 13 ENCLOSED CONTROLLERS WSP X X

26 32 13 ENGINE GENERATORS WSP X X X

26 36 00 TRANSFER SWITCHES WSP X X X

26 41 13

LIGHTNING PROTECTION FOR

STRUCTURES

WSP X X

26 51 00 INTERIOR LIGHTING WSP X X

26 83 13 RADIANT-HEATING ELECTRIC CABLES WSP X X

DIVISION 27 - COMMUNICATIONS

27 05 26

GROUNDING AND BONDING FOR

COMMUNICATIONS SYSTEMS

WSP X

27 05 28

PATHWAYS FOR COMMUNICATIONS

SYSTEMS

WSP X

27 05 29

HANGERS AND SUPPORTS FOR

COMMUNICATIONS SYSTEMS

WSP X

27 05 36

CABLE TRAYS FOR COMMUNICATIONS

SYSTEMS WSP X

27 05 43

UNDERGROUND PATHWAYS AND

STRUCTURES FOR COMMUNICATION

SYSTEMS

WSP X

27 05 44

SLEEVES AND SLEEVE SEALS FOR

COMMUNICATIONS PATHWAYS AND

CABLING

WSP X

27 05 53

IDENTIFICATION FOR COMMUNICATIONS

SYSTEMS

WSP X

27 11 00 COMMUNICATIONS EQUIPMENT ROOM

FITTINGS

WSP X

27 11 16

COMMUNICATIONS RACKS, FRAMES, AND

ENCLOSURES

WSP X

27 13 23

COMMUNICATIONS OPTICAL FIBER

BACKBONE CABLING

WSP X

27 15 13

COMMUNICATIONS COPPER HORIZONTAL

CABLING

WSP X

27 41 00 AV GENERAL CONDITIONS SMW X

27 41 16 AUDIOVISUAL SPECIFICATION SMW X

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 00 00 ELECTRONIC SAFETY AND SECURITY SMW X

28 05 13

ELECTRONIC SECURITY CONDUCTORS

AND CABLING

SMW X

28 13 26 ACCESS CONTROL FIELD DEVICES SMW X

28 13 33 ACCESS CONTROL SYSTEM INTERFACES SMW X

28 23 00 VIDEO SURVEILLANCE SMW X

28 23 29 VIDEO SURVEILLANCE FIELD DEVICES SMW X

28 26 00

ELECTRONIC PERSONAL PROTECTION

SYSTEMS

SMW X

28 41 00 DIGITAL, ADDRESSABLE FIRE-ALARM & WSP X

Not F or B id

XX

d X Xddddddd X X XXdddddddddiididdd X XiiidididididddddiididddBidBidiiidididididdd

BBBiBiBiBiBiiiBBBiBii WSP SP BBBBBBBBBBBBBBWSP BBBBBBBr BBB WSP Wrrr BBBr B

ON WSPWSrrror

S FOR S

AYS AND AYS AND ooooCOMMUNICATIONSCOMMUNICAFo

S EQUIPMENT ROOPMENTFATIONS RACKS, FRAIONS RACKS, FRA

RES S t F

NICATIONS OPTICATIONS OPTI

BONE CABLING E CABLING tMMUNICATIONS COUNICATION CABLING NG ot

AV GENERAL COAV GENERAL CO

NoN

AUDIOVISUALAUDIOVISUA

NNNoN NNNoN NNNNNNNNNEENNNN

TABLE OF CONTENTS TEVEBAUGH ARCHITECTURE

00 01 10 - 12 TA PROJECT NO. 21037

DETECTION SYSTEM

28 48 00 EMERGENCY RESPONSE SYSTEMS WSP X

28 52 20 SECURITY COMMUNICATION SYSTEMS SMW X

DIVISION 31 – EARTHWORK

31 05 13 EARTHWORK Verdantas X X

31 10 00 SITE CLEARING Verdantas X X

31 23 16.13 TRENCHING Verdantas X X

31 60 00 FOUNDATION GROUND MODIFICATION Verdantas X

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 16 FLEXIBLE PAVING REHABILITATION Verdantas X X

32 05 13 SOILS FOR EXTERIOR IMPROVEMENTS Verdantas X X

32 11 23 AGGREGATE BASE COURSES Verdantas X X

32 12 16 ASPHALT PAVING Verdantas X X

32 13 13 CONCRETE PAVING Verdantas X X

32 14 16 BRICK UNIT PAVING Verdantas X X

32 16 23 SIDEWALKS Verdantas X X

32 17 23 PAVEMENT MARKINGS Verdantas X X

32 91 13 SOIL PREPARATION Verdantas X X

32 91 19 LANDSCAPE GRADING Verdantas X X

32 92 19 LANDSCAPE ACCESSORIES Verdantas X X

32 92 19 SEEDING Verdantas X X

32 92 23 SODDING Verdantas X X

32 93 00 PLANTS Verdantas X X

32 93 10 SOIL CELL SYSTEM Verdantas X X

DIVISION 33 – UTILITIES

33 01 30.11 TELEVISION INSPECTION OF SEWERS Verdantas X X

33 05 05.36 VACUUM TESTING Verdantas X X

33 05 05.41 AIR TESTING Verdantas X X

33 05 33.16 HDPE DRAINAGE PIPING Verdantas X X 33 14 17 SITE WATER SERVICE UTILITY LATERALS Verdantas X X 33 31 00 SANITARY SEWERAGE PIPING Verdantas X X

33 31 11 PUBLIC SANITARY SEWERAGE GRAVITY

PIPING Verdantas X X

33 42 00 STORMWATER CONVEYANCE Verdantas X X

DIVISION 34 – TRANSPORTATION – NOT USED

END OF SECTION

ddddddX X dddddddddddX XX dddddddddiididdd XX X iiidididididddddBBiBididdd X X

BBBiBiBidBidBidididddBBBiBididdBiBiTS

BBBBBiBiBiBiBiii antas Xantas XBBBBBBBBBBBBBerdantas Xas BBBBBBBBBBVerdantas BBBBBr BBVerdantas Verrrr BBBr B

Verdantas VerrrrVerdantVerdarrrorVerderdorororor VooooFooooG G Fo

SSORIES RIES FFt FtCELL SYSTEM SYSTEM tot NoNooTELEVISION INSTELEVISION INS

NoN.36.36 VACUUM TEACUUMNNNoN05.4105.41 AIR TESTAIR TESTNNNN1616 HDPEHNNNNSITSITNNNNN

SEPTEMBER 8, 2025 #MJ0217000003-BP5A

TEVEBAUGH ARCHITECTURE LIST OF DRAWING SHEETS

TA PROJECT NO. 21037 00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

SUBMISSIONS:

1 Bid Pack 1 – Bid Submission 09.25.2023 2 Bid Pack 2 – Bid Submission 02.09.2024 3 Bid Pack 3 – Bid Submission 07.12.2024 4 Bid Pack 2.1 – Bid Submission 04.05.2024 5 Bid Pack 4 – Addendum 3 02.21.2025 6 Bid Pack 2.1A – Bid Submission 07.03.2024 7 Bid Pack 4A – GSS DFM Submission 04.29.2025 8 Bid Pack 4B – GSS DFM Submission 08.14.2025 9 Bid Pack 5A – GSS DFM Submission 09.08.2026

Sections issued for record are annotated with an “X”.

Sections listed without any annotation are anticipated future sections.

Sheet Number Sheet Name 1 2 3 4 5 6 7 8 9

GENERAL

CS01.5 COVER SHEET BP5A X X X X X X X X X

CS02.5 DRAWING LIST BP5A X X X X X X X X X

CIVIL

C001 INDEX SHEET X X X

C101 EXISTING CONDITIONS/DEMOLITION PLAN X X

C102 DEMOLITION PLAN X X

C201 SITE PLAN X X

C301 UTILITY PLAN X X

C302 STORM PROFILE X X

C303 SANITARY SEWER PLAN X X

C304 SANITARY PROFILES X X

C401 GRADING PLAN X X

C501 SEDIMENT AND STORMWATER INDEX SHEET X X

C502

PRE-CONSTRUCTION SITE STORMWATER

MANAGEMENT PLAN

X X

C503

CONSTRUCTION SITE STORMWATER MANAGEMENT

PLAN

X X

C504 CONSTRUCTION DETAILS & NOTES X X

C505 CONSTRUCTION DETAILS & NOTES X X

C506 CONSTRUCTION DETAILS & NOTES X X

C507 CONSTRUCTION DETAILS & NOTES X X

B id

P ac k 4A

B id

P ac k 4B

B id

P ac k 5A

Not F or B id ons.

ororor FoFooFoFoFoFFA FFt FFt Ft FET t F ot otCONDITIONtototTION PLAN otototPLAN ot NNNoNoLITY PLAN oNNNNoNoSTORM PRO

NNNoNNNNoNoSANITNNNoNNNNNSANITNNNNNNNNNNNNNNNNNNN

LIST OF DRAWING SHEETS TEVEBAUGH ARCHITECTURE

00 01 15 - 2 TA PROJECT NO. 21037

Sheet Number Sheet Name 1 2 3 4 5 6 7 8 9

C508

POST-CONSTRUCTION SITE STORMWATER

MANAGEMENT PLAN

X X

C509

POST-CONSTRUCTION SITE STORMWATER

MANAGEMENT PLAN FACILITY

X X

C510

POST-CONSTRUCTION SITE STORMWATER

MANAGEMENT PLAN FACILITY

X X

C511

POST-CONSTRUCTION SITE STORMWATER

MANAGEMENT PLAN X X

C601 SIGNAGE AND STRIPING PLAN X X

C901 CONSTRUCTION DETAILS X X

C902 CONSTRUCTION DETAILS X X

C903 CONSTRUCTION DETAILS X X

C904 CONSTRUCTION DETAILS X X

C905 CONSTRUCTION DETAILS X X

L101 LANDSCAPE PLAN X X

L102 LANDSCAPE PLAN X X

L103 LANDSCAPE PLAN X X

L104 LANDSCAPE PLAN SPECIFICATIONS X X

FM101 FIRE MARSHALL PLAN X X

ENV101 VAPOR MITIGATION PLAN VIEWS O X X

ENV102 VAPOR MITIGATION PLAN VIEWS O X X

ENV103 VAPOR MITIGATION PLAN VIEWS O X X

ENV104 VAPOR MITIGATION PLAN VIEWS O X X

ENV105 VAPOR MITIGATION PLAN VIEWS O X X

ENV106 VAPOR MITIGATION DETAILS X X

ENV107 VAPOR MITIGATION DETAILS X X

ENV108 VAPOR MITIGATION DETAILS X X

ENT001 INDEX SHEET X X

ENT002 OVERALL PLAN X X

ENT101 ENTRANCE PLAN - EXISTING PLAN X X

ENT201 ENTRANCE PLAN - CONSTRUCTION PLAN X X

ENT301 UTILITY PLAN X X

ENT401 GRADING PLAN X X

ENT601 STRIPPING PLAN X X

ENT801 SECTIONS PLAN X X

ENT802 SECTIONS PLAN X X

ENT803 SECTIONS PLAN X X

ENT901 ENTRANCE PLAN - DETAILS X X

ENT902

ENTRANCE PLAN - PEDESTRIAN MAINTNANCE OF

TRAFFIC PLAN

X X

ENT903 TRAFFIC CONTROL PLAN - LONG TERM LANE CLOSURE X

NoNNNoNot For B iddd

X ddddddddddX ddddX dddddddddddiidiididididX ddddX ddddddddddddiididdddBiBBidBiBidBidididXddddiiidididididddddBiBididddBBBiBBidBiBidBidididXdd BiBiBidBidBidididddBBiBididdBBBiBBiBiBiBiiiXBBBiBiBiBiBiiiBBiBiiBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBr Br BBBBBBBBBBBr Br BBr BBBBr r rororrororor

FoFoVIEWS oFoFoAN VIEW

FoFoFo PLAN VIEWFoFFPLAN VFt Ft FAN VIEWFt Ft FIGATION DETAILSt FttIGATIOtot ot MITIGATION DtototX SHEET ot ERALL PLANoNNNNoNoENTRANCE P

NNNoNNNNoNoENTRNNNoNNN1 NNUTILITNNNNNNNNNNNNNNNNNNNN

TEVEBAUGH ARCHITECTURE LIST OF DRAWING SHEETS

TA PROJECT NO. 21037 00 01 15 - 3

Sheet Number Sheet Name 1 2 3 4 5 6 7 8 9

STRUCTURAL

S100 STRUCTURAL NOTES X

S101 FOUNDATION PLAN X

S102 LEVEL 2 FLOOR FRAMING PLAN X

S103 LEVEL 3 FLOOR & LOW ROOF FRAMING PLAN X

S104 ROOF FRAMING PLANS X

S105 EXISTING BUILDING FRAMING PLANS X

S200 EXISTING BUILDING SECTIONS & DETAILS X

S200A EXISTING BUILDING SECTIONS & DETAILS X

S201 TYPICAL FOUNDATION SECTIONS & DETAILS X

S202 TYPICAL FRAMING SECTIONS & DETAILS X

S203 TYPICAL SECTIONS & DETAILS X

S301 TYPICAL CONCRETE SECTIONS & DETAILS X

S302 TYPICAL STEEL SECTIONS & DETAILS X

S303 TYPICAL STAIR AND ELEVATOR SECTIONS & DETAILS X

S304

TYPICAL COLD FORMED FRAMING SECTIONS &

DETAILS

X

S305 TYPICAL MASONRY SECTIONS & DETAILS X

S400 FOUNDATION DESIGN INFORMATION X

ARCHITECTURAL

D100 SELECTIVE DEMO PLANS X

D110 SELECTIVE DEMO REFLECTED CEILING PLANS (RCP) X

D201 EXTERIOR ELEVATIONS PHOTOS X

D202 INTERIOR PHOTOS X

D203 EXTERIOR ELEVATIONS X

A001 LIFE SAFETY PLAN - LEVEL 1 & TUNNEL PLAN X X X X

A002 LIFE SAFETY PLAN - LEVEL 2 X X X X

A003 LIFE SAFETY PLAN - LEVEL 3 X X X X

A004 LIFE SAFETY PLAN - MEZZANINE & ATTIC X X X X

A040 LIFE SAFETY AND CODE SUMMARY X X X

A050 UL ASSEMBLIES X X X

A051 UL ASSEMBLIES X X X

A052 UL ASSEMBLIES X X X

A053 UL ASSEMBLIES X X X

A070 INTERIOR PARTITION TYPES X X X

A071 CMU PARTITION DETAILS X X X

A091 ARCHITECTURAL SITE PLAN X X X X X X X

A092 ARCHITECTURAL SITE DETAILS X X X X X X X

A093 ARCHITECTURAL SITE DETAILS X X X X X X X

A094 EXTERIOR DOOR, GATE & FENCE DETAILS X X X X X X

Noot F or B iddddddddddddddddddddddddddddddidiididididdddddddddddddididdddiidiX ididididddddidididididddddiididddBBiBBidBiX

BidBidididdddiiidididididddddBBiBididddBBBiBBiBiBiBiiiBBBiBiBiBiBiiiBBiBiiBBBiBBiBiX BiBiiBBBiBiBiBiBiiiBBiBiiBBBBBBX BBBBBBBBBBBBBBBBBBXBBBBBBBr Br BBBBBBBrrror or S & DErorSECTIONS & oror FoFoONS & DETAILS oFoFoNFORMATION

FoFoFFoFFANS Ft Ft FDEMO REFLECTEDFttELEVAtot PHOTOStototRIOR ELEVATIOototot SAFETY Pot

NNNoNoE SAFETY PoNNNNoNoLIFE SAFET

NNNoNNNNoNo LIFE SNNNoNNNNNLIFENNNNNNNNNNNNNNNNNNN

LIST OF DRAWING SHEETS TEVEBAUGH ARCHITECTURE

00 01 15 - 4 TA PROJECT NO. 21037

Sheet Number Sheet Name 1 2 3 4 5 6 7 8 9

A095 SITE DETAILS X X X

A101 FLOOR PLAN – LEVEL 1 X X X X X X X

A101A

FLOOR PLAN - LEVEL 1 – EDGE OF SLAB &

FOUNDATION TREATMENT

X X X X X X X

A101B FLOOR PLAN - LEVEL 1 - DIMENSIONING PLAN X X X

A102 FLOOR PLAN – LEVEL 2 X X X X X

A102A FLOOR PLAN - LEVEL 2 - EDGE OF SLAB X X X X X

A102B FLOOR PLAN - LEVEL 2 - DIMENSIONING PLAN X X X

A103 FLOOR PLAN – LEVEL 3 X X X X X

A103A FLOOR PLAN - LEVEL 3 - EDGE OF SLAB X X X X X

A103B FLOOR PLAN - LEVEL 3 - DIMENSIONING PLAN X X X

A104 ROOF & MEZZANINE PLANS X X X X X

A105 UPPER ROOF & ATTIC PLANS X X X X X

A111 REFLECTED CEILING PLAN - LEVEL 1 X X X

A112 REFLECTED CEILING PLAN - LEVEL 2 X X X

A113 REFLECTED CEILING PLAN - LEVEL 3 X X X

A114

REFLECTED CEILING PLAN - TUNNEL, MEZZANINE, AND

TOWER LEVEL

X X X

A116 MOCK-UP WALL X X X

A201 BUILDING ELEVATIONS X X X X X X X

A202 BUILDING ELEVATIONS X X X X X X X

A203 BUILDING ELEVATION DETAILS (DELETED) X

A204 EXISTING BUILDING ELEVATIONS – DEMOLITION X X X X

A205

EXISTING BUILDING ELEVATIONS – NEW

CONSTRUCTION

X X X X X

A301 BUILDING SECTIONS X X X X X

A302 BUILDING SECTIONS X X X X X

A303 BUILDING SECTIONS X X X X X

A304 RTU CURB ROOF SECTION X X X X X

A310 EXTERIOR WALL ASSEMBLIES X X X X X

A311 WALL SECTIONS X X X X X X X

A312 WALL SECTIONS X X X X X X X

A313 WALL SECTIONS X X X X X X X

A314 WALL SECTIONS X X X X X X X

A315 WALL SECTIONS X X X X X X X

A316 WALL SECTIONS AND DETAILS X X X X X

A321 WALL SECTION DETAILS X X X X X X X

A322 WALL SECTION DETAILS X X X X X

A323 WALL SECTION DETAILS X X X X

A324 WALL SECTION DETAILS X X X X

A325 EXPANSION JOINT DETAILS X X X X

A326 EXPANSION JOINT DETAILS X X X X

Not Ft FEVATIOFor B idddddddd

X ddddddddddddX ddddddddddidiididididdddddd XdddddddididdddiidiididididddX ddidididididddddiididddBBiBBidBiX

BidBidX ididddXdiiidididididddddBBiBididddBBBiBBiBiBiBiXiiBBBiBiBiBiBiiiBBiBiiBBBiBBiBiBiBiiBBBiBiBiBiBiiiBBiBiiBBBBBBX BBBBBBBBBBBBBBBBBBXBBBBBBBr Br BBBBBBBrrror or rorEL, MEZZANINE oror FoFooFoFoS

FoFoFoONS FoFFN DETAFFt FUILDING ELEVATItCTION t F ot ot SECTIONS tototNG SECTIONSototot

LDING SECTot NNNoNoU CURB ROoNNNNoNoEXTERIOR

NNNoNNNNoNo WALL NNNoNNNNNWALNNNNNNNNNNNNNNNNNNN

TEVEBAUGH ARCHITECTURE LIST OF DRAWING SHEETS

TA PROJECT NO. 21037 00 01 15 - 5

Sheet Number Sheet Name 1 2 3 4 5 6 7 8 9

A327A TYPICAL ENCLOSURE DETAILS X X X X

A327B TYPICAL ENCLOSURE DETAILS X X X X

A331

TUNNEL/FOUNDATION - EXTERIOR WALL PLAN

DETAILS

X X X X X

A332 EXTERIOR WALL PLAN DETAILS X X X X X

A333 EXTERIOR WALL PLAN DETAILS X X X X X

A334 EXTERIOR WALL PLAN DETAILS X X X X

A340

ELEVATIONS - ROOF SCREEN & METAL PANEL

CLADDING

X X X X X

A341 ROOF DETAILS X X X X X

A342 EXISTING ROOF RENOVATION DETAILS X X X X X

A343 HISTORICAL BALCONY DETAILS X X X X X

A401 ENLARGED PLANS - LOBBY X X X

A402 ENLARGED RCP - LOBBY X X X

A403 ENLARGED PLANS - LOBBY X X X

A404 ENLARGED ELEVATIONS - LOBBY X X X

A405 ENLARGED ELEVATIONS - LOBBY X X X

A412 ENLARGED PLANS - COURTROOM X X X

A413 ENLARGED ELEVATIONS - COURTROOM X X X

A421

RESTROOM ENLARGED PLANS & ELEVATIONS - LEVEL

X X X

A422

RESTROOM ENLARGED PLANS & ELEVATIONS - LEVEL

X X X

A423

RESTROOM ENLARGED PLANS & ELEVATIONS - LEVEL

02 Cont.

X X X

A424

RESTROOM ENLARGED PLANS & ELEVATIONS - LEVEL

X X X

A425 RESTROOM ENLARGED PLANS & ELEVATIONS - LEVEL

03 Cont.

X X X

A426 CASEWORK ENLARGED PLANS & ELEVATIONS X X X

A427 CASEWORK ENLARGED PLANS & ELEVATIONS X X X

A428 CASEWORK ENLARGED PLANS & ELEVATIONS X X X

A430 ENLARGED PLANS - EXISTING BUILDING X X X

A431 EXISTING INTERIOR ELEVATIONS X X X

A432 EXISTING INTERIOR ELEVATIONS X X X

A433 EXISTING INTERIOR ELEVATIONS X X X

A434 EXISTING INTERIOR ELEVATIONS X X X

A435 EXISTING INTERIOR ELEVATIONS & SECTIONS X X X

A501 MILLWORK PLANS & ELEVATIONS X X X

A502 MILLWORK PLANS & ELEVATIONS X X X

A503 MILLWORK PLANS & ELEVATIONS X X X

A511 MILLWORK SECTIONS X X X

A512 MILLWORK SECTIONS X X X

A515 MILLWORK DETAILS X X X

Notot M ENLARGE otnt.

r Bidddddddd X ddddddddddddX ddddddddddidiididididdddddd XdddddddididdddBiBidiX

BididXididddX ddidididididddddBiBididddBBBiBBidBiBidBidX ididddBiBiBidBidBidididddBBiBididdBBBiBBiBiX

BiBiiiBBBiBiBiBiBiiiBBiBiiBBBBBBX BBBBBBBBBBBBBBBBBBBBBBBBBBBBBr BBBBBBBBBBBBr Br BBr BBBBr rrororrororM or FoFoCOURTROOM oFoD PLANS & ELEVATI

FoFoFoGED PLANFFo t F PLANS t FFtM ENLAttototot EWORK ENot

NNNoNoCASEWORK EoNNNNoNoCASEWOR

NNNoNNNNoNENLARNNNoNNNNNEXISNNNNNNNNNNNNNNNNNN

LIST OF DRAWING SHEETS TEVEBAUGH ARCHITECTURE

00 01 15 - 6 TA PROJECT NO. 21037

Sheet Number Sheet Name 1 2 3 4 5 6 7 8 9

A521 CEILING DETAILS X X X

A522 CEILING DETAILS X X X

A523 CEILING DETAILS X X X

A524 CEILING DETAILS - EXISTING BUILDING - LEVEL 01 X X X

A525 CEILING DETAILS - EXISTING BUILDING - LEVEL 02 X X X

A526 CEILING DETAILS - EXISTING BUILDING - LEVEL 03 X X X

A528 TYPICAL CEILING DETAILS X X X

A529 CEILING DETAILS X X X

A531 INTERIOR WALL DETAILS X X X

A532 INTERIOR WALL DETAILS X X X

A551 INTERIOR COLUMN ENCLOUSRES X X X

A552 INTERIOR COLUMN ENCLOUSRES X X X

A553 INTERIOR COLUMN ENCLOUSRES X X X

A554 INTERIOR COLUMN ENCLOSURES & PLAN DETAILS X X X

A601A EXTERIOR DOOR TYPES, SCHEDULE & DETAILS X X X X X

A601B EXTERIOR DOOR DETAILS X X X X X

A602A INTERIOR DOOR SCHEDULES X X X

A602B INTERIOR DOOR DETAILS X X X

A602C INTERIOR DOOR DETAILS X X X

A603 WINDOW / CURTAIN WALLS / STOREFRONT TYPES X X X X

A604 WINDOW DETAILS - EXTERIOR X X X X

A605 WINDOW DETAILS - EXTERIOR X X X X

A606 CURTAIN WALL DETAILS - EXTERIOR X X X X

A607A EXISTING WINDOW DETAILS - EXTERIOR X X X X

A607B EXISTING WINDOW DETAILS - EXTERIOR X X X X

A615 WINDOW SCHEDULE & DETAILS - INTERIOR X X X

A616 INTERIOR WINDOW TYPES X X X

A701 STAIR A ENLARGED PLANS & SECTIONS X X X X X

A702 STAIR A - SECTIONS X X X X X

A703 STAIR B ENLARGED PLANS & SECTIONS X X X X X

A704 STAIR C ENLARGED PLANS, SECTIONS & DETAILS X X X X X

A705 STAIR DETAILS X X X X X X X

A706 HOISTWAY 'A' PLANS & SECTIONS X X X X X

A707 HOISTWAY 'B-C' PLANS & SECTIONS X X X X X

A708 ELEVATOR DETAILS X X X X X

A709 RAMPS & EGRESS DOOR DETAILS X X X X

A710 ENLARGED PLAN & SECTIONS - GRAND STAIR X X X

A711 GRAND STAIR DETAILS X X X

A801 FINISH PLAN - LEVEL 1 X X X

A802 FINISH PLAN - LEVEL 2 X X X

Nototototot F or B iddddd X dddddd X dddddddddddddddXdddddddddddddddiidiididididddddddddddddddddiididdddBiBBidBiBidBidididddX ddiiidididididddddBiBididddBBBiBBidBiBidBidididddBiBiBidBidBidididddBBiBididdBBBiBBiBiBiBiiiBBBiBiBiBiBiiiBBiBiiBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBr BBBBBBBBBBBBr Br BDETA Br BBBBr rETAILrororrororor FoFooFoFoLS

FoFoFoWALLS / STFoFFEXTERIOFt Ft FTERIORFt Ft FALL DETAILS - EXt FttWINDOtWINDOW DEtototDOW SCHEot NNNoNoERIOR WINoNNNNoNoSTAIR A ENLA

NNNoNNNNoNoSTAI

NNNoNNNNNSTAIR NNNNNNNNNNNNNNNNNNNNNN

TEVEBAUGH ARCHITECTURE LIST OF DRAWING SHEETS

TA PROJECT NO. 21037 00 01 15 - 7

Sheet Number Sheet Name 1 2 3 4 5 6 7 8 9

A803 FINISH PLAN - LEVEL 3 X X X

A804 FINISH PLAN - LEVEL MEZZANINE X X X

A805 ROOM FINISH SCHEDULE X X X

A806 WIFI ACCESS POINT PLANS X

A820 FINISH LEGEND & DETAILS X X X

A822 CASEWORK SECTIONS X X X

MECHANICAL

MPP001

MECHANICAL LEGEND, CONVENTIONS, AND

ABBREVIATIONS

X

MPP118

FLOOR PLAN - OVERALL ROOF - NEW WORK - HVAC

PRE-PURCHASE

X

MPP603 MECHANICAL SCHEDULES PRE-PURCHASE X

MPP703 MECHANICAL ATC PRE-PURCHASE X

M000

MECHANICAL LEGEND, CONVENTIONS, AND

ABBREVIATIONS

X X

M111 LEVEL 1 COMPOSITE PLAN - NEW WORK - HVAC X X

M111.A

PART FLOOR PLAN - TUNNEL AND LEVEL 1 - NEW

WORK - HVAC

X X

M111.B PART FLOOR PLAN - LEVEL 1 - NEW WORK - HVAC X X

M111.D PART FLOOR PLAN - LEVEL 1 - NEW WORK - HVAC X X

M112 LEVEL 2 COMPOSITE PLAN - NEW WORK - HVAC X X

M112.A PART FLOOR PLAN - LEVEL 2 - NEW WORK - HVAC X X

M112.B PART FLOOR PLAN - LEVEL 2 - NEW WORK - HVAC X X

M112.C PART FLOOR PLAN - LEVEL 2 - NEW WORK - HVAC X X

M112.D PART FLOOR PLAN - LEVEL 2 - NEW WORK - HVAC X X

M113 LEVEL 3 COMPOSITE PLAN - NEW WORK - HVAC

M113.A PART FLOOR PLAN - LEVEL 3 - NEW WORK - HVAC X X

M113.B PART FLOOR PLAN - LEVEL 3 - NEW WORK - HVAC X X

M113.C PART FLOOR PLAN - LEVEL 3 - NEW WORK - HVAC X X

M113.D PART FLOOR PLAN - LEVEL 3 - NEW WORK - HVAC X X

M114 FLOOR PLAN - LEVEL 4 - NEW WORK - HVAC X X

M115 FLOOR PLAN - ATTIC - NEW WORK - HVAC X X

M116 PART FLOOR PLAN - ROOF - NEW WORK - HVAC X X

M117 FLOOR PLAN - OVERALL ROOF - NEW WORK - HVAC X X

M501 MECHANICAL DETAILS X X

M502 MECHANICAL DETAILS X X

M601 MECHANICAL SCHEDULES X X

M602 MECHANICAL SCHEDULES X X

M701 MECHANICAL ATC X X

M702 MECHANICAL ATC X X

M801 MECHANICAL RISERS X X

M802 MECHANICAL RISERS X X

Not F or B iddddddddddd X dddddddddddddddXdddddddddddddddiidi ididididdddddddddddddddddddddBBBiBidBiBidBidX ididdddiiiidididididididddddddBBiBididddBBBBiBBiBiBiBiiiBBBiBiBiBiBiiiBBiBiiBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBr Br Br BBBBBBr r - HVAror - NEW orr FooEW WORK -oFoFoVEL 1 - NEW WORK

FoFoFoPLAN - NEW WORFoFoF- LEVEL 2 FoFFEVEL 2Ft Ft FR PLAN - LEVEL 2 -FttOR PLAtot ot OMPOSITE PtototFLOOR PLAN - ototot T FLOOR Pot

NNNoNoRT FLOOR oNNNNoNoPART FLOO

NNNoNNNNoNFLOORNNNoNNNNNFLOONNNNNNNNNNNNNNNNNNN

LIST OF DRAWING SHEETS TEVEBAUGH ARCHITECTURE

00 01 15 - 8 TA PROJECT NO. 21037

Sheet Number Sheet Name 1 2 3 4 5 6 7 8 9

ELECTRICAL

EPP000

ELECTRICAL LEGEND, CONVENTIONS, AND

ABBREVIATIONS

X

EPP401

PART PLANS - FIRST FLOOR - NEW WORK -

ELECTRICAL X

EPP402

FLOOR PLAN - OVERALL ROOF - NEW WORK -

ELECTRICAL PREPURCHASE

X

EPP701 ELECTRICAL SINGLE LINE DIAGRAM AND SCHEDULES X

E000

ELECTRICAL LEGEND, CONVENTIONS, AND

ABBREVIATIONS

X X

E101

LEVEL 1 COMPOSITE PLAN - NEW WORK - LIGHTING

AND FIRE ALARM

X X

E101.A

PART FLOOR PLAN - TUNNEL AND LEVEL 1 - NEW

WORK - LIGHTING AND FIRE ALARM

X X

E101.B

PART FLOOR PLAN - LEVEL 1 - NEW WORK - LIGHTING

AND FIRE ALARM

X X

E101.D

PART FLOOR PLAN - LEVEL 1 - NEW WORK - LIGHTING

AND FIRE ALARM

X X

E102 LEVEL 2 COMPOSITE PLAN - NEW WORK - LIGHTING

AND FIRE ALARM

X X

E102.A

PART FLOOR PLAN - LEVEL 2 - NEW WORK - LIGHTING

AND FIRE ALARM

X X

E102.B

PART FLOOR PLAN - LEVEL 2 - NEW WORK - LIGHTING

AND FIRE ALARM

X X

E102.C

PART FLOOR PLAN - LEVEL 2 - NEW WORK - LIGHTING

AND FIRE ALARM

X X

E102.D

PART FLOOR PLAN - LEVEL 2 - NEW WORK - LIGHTING

AND FIRE ALARM

X X

E103

LEVEL 3 COMPOSITE PLAN - NEW WORK - LIGHTING

AND FIRE ALARM X X

E103.A

PART FLOOR PLAN - LEVEL 3 - NEW WORK - LIGHTING

AND FIRE ALARM

X X

E103.B

PART FLOOR PLAN - LEVEL 3 - NEW WORK - LIGHTING

AND FIRE ALARM

X X

E103.C

PART FLOOR PLAN - LEVEL 3 - NEW WORK - LIGHTING

AND FIRE ALARM

X X

E103.D

PART FLOOR PLAN - LEVEL 3 - NEW WORK - LIGHTING

AND FIRE ALARM

X X

E104

FLOOR PLAN - LEVEL 4 - NEW WORK - LIGHTING AND

FIRE ALARM X X

E105

PART FLOOR PLAN - ATTIC - NEW WORK - LIGHTING

AND FIRE ALARM

X X

E106

PART FLOOR PLAN - ROOF - NEW WORK - LIGHTING

AND FIRE ALARM

X X

E111

LEVEL 1 COMPOSITE PLAN - NEW WORK - POWER AND

COMMUNICATION

X X

E111.A

PART FLOOR PLAN - TUNNEL AND LEVEL 1 - NEW

WORK - POWER AND

X X

E111.B COMMUNICATIONS X X

E111.D

PART FLOOR PLAN - LEVEL 1 - NEW WORK - POWER

AND COMMUNICATIONS

X X ototot r BidddddddddddddddddidiididididdddddddddddddididdddBiBBidBiBidBidXididddddidididididddddBiBididddBBBBiBBidBiBidBidididddBiBiBidBidBidididddBBiBididdBBG BBiBBiBBiBiBBBiBiBiBiBiiiBBiBiiBBBBBBBBBBBBBBBBBBr Br Br BBBBBBBrK - L or rorORK - LIGHTI oror FoL 2 - NEW WORK -

FooFoEVEL 2 - NEW WOR

FoFoF- LEVEL 2FFt FEL 2 -t FLARM FtOMPOS ot ALARM tLOOR PLAN - L otFIRE ALARot NNNoNoRT FLOOR P

NoAND FIRE ALAoNNNNoNoPART FLOO

NoAND FNNNoNNNNNPART FNDNNNNNNNNNNNN

TEVEBAUGH ARCHITECTURE LIST OF DRAWING SHEETS

TA PROJECT NO. 21037 00 01 15 - 9

Sheet Number Sheet Name 1 2 3 4 5 6 7 8 9

E112

LEVEL 2 COMPOSITE PLAN - NEW WORK - POWER AND

COMMUNICATION

X X

E112.A

PART FLOOR PLAN - LEVEL 1 - NEW WORK - POWER

AND COMMUNICATIONS

X X

E112.B

PART FLOOR PLAN - LEVEL 2 - NEW WORK - POWER

AND COMMUNICATIONS

X X

E112.C

PART FLOOR PLAN - LEVEL 2 - NEW WORK - POWER

AND COMMUNICATIONS X X

E112.D

PART FLOOR PLAN - LEVEL 2 - NEW WORK - POWER

AND COMMUNICATIONS

X X

E113

LEVEL 3 COMPOSITE PLAN - NEW WORK - POWER AND

COMMUNICATION

X X

E113.A

PART FLOOR PLAN - LEVEL 2 - NEW WORK - POWER

AND COMMUNICATIONS

X X

E113.B

PART FLOOR PLAN - LEVEL 3 - NEW WORK - POWER

AND COMMUNICATIONS

X X

E113.C

PART FLOOR PLAN - LEVEL 3 - NEW WORK - POWER

AND COMMUNICATIONS

X X

E113.D PART FLOOR PLAN - LEVEL 3 - NEW WORK - POWER

AND COMMUNICATIONS

X X

E114

FLOOR PLAN - LEVEL 4 - NEW WORK - POWER AND

COMMUNICATIONS

X X

E115

FLOOR PLAN - ATTIC - NEW WORK - POWER AND

COMMUNICATIONS

X X

E116

FLOOR PLAN - ROOF - NEW WORK - POWER AND

COMMUNICATIONS

X X

E117

FLOOR PLAN - OVERALL ROOF - NEW WORK -

ELECTRICAL

X X

E301 SITE PLAN - NEW WORK - ELECTRICAL X X

E401 PART PLANS -NEWWORK -ELECTRICAL X X

E402 ELECTRICAL -CONDUIT PLANS -STAIR A X X

E403 ELECTRICAL -CONDIUT PLANS -STAIR B X X

E404 ELECTRICAL -CONDUIT PLANS -STAIR C X X

E501 ELECTRICAL SINGLE LINE DIAGRAM X X

E601 ELECTRICAL DETAILS -SITE PLAN DETAILS X X

E602 ELECTRICAL DETAILS -EQUIPMENT DETAILS X X

E603 ELECTRICAL DETAILS X X

E604 ELECTRICAL DETAILS -LIGHTING DETAILS X X

E605 ELECTRICAL DETAILS -LIGHTING DETAILS X X

E606 ELECTRICAL DETAILS -LIGHTING DETAILS X X

E607 ELECITRCAL DETAILS -FIRE ALARM DETAILS X X

E701 ELECTRICAL SCHEDULES X X

E702 ELECTRICAL SCHEDULES X X

E703 ELECTRICAL SCHEUDLES X X

E704 ELECTRICAL SCHEDULES X X

E705 ELECTRICAL SCHEDULES X X

oototRICAL -CONDIU or B iddddd

X ddddddddddXdddddddddddddiidiididididddddddddddddddddiididdddBBBiBBidBiBidBidididddiiidididididddddBBiBididddBB R

BBiBBiBiBiBiiiBBBiBiBiBiBiiiBBiBiiBBER BBBBBBBBBBBBBBBBr BBr BBBBBBBBBBBrK - PO or rorPOWER AN ororoK - POWER

FooFoNEW WORK - POW

FoFoFRALL ROOFFt Ft F- ELECFt Ft FS -NEWWORK -Et F ot otAL -CONDUtotototCTRICAL -Cot

NNNoNoCTRICAL SoNNNNoNoELECTRICAL

NNNoNNNNoNoELECTNNNoNNNNNELECTNNNNNNNNNNNNNNNNNNN

LIST OF DRAWING SHEETS TEVEBAUGH ARCHITECTURE

00 01 15 - 10 TA PROJECT NO. 21037

Sheet Number Sheet Name 1 2 3 4 5 6 7 8 9

PLUMBING

P000

PLUMBING LEGEND, CONVENTIONS, AND

ABBREVIATIONS

X X

P100

UNDERSLAB COMPOSITE PLAN - NEW WORK -

PLUMBING

X X

P100.A

PART FLOOR PLAN - TUNNEL AND UNDERSLAB - NEW

WORK - PLUMBING X X

P100.B

PART FLOOR PLAN - UNDERSLAB - NEW WORK -

PLUMBING

X X

P100.C

PART FLOOR PLAN - UNDERSLAB - NEW WORK -

PLUMBING

X X

P100.D

PART FLOOR PLAN - UNDERSLAB - NEW WORK -

PLUMBING

X X

P101 LEVEL 1 COMPOSITE PLAN - NEW WORK - PLUMBING X X

P101.A PART FLOOR PLAN - LEVEL 1 - NEW WORK - PLUMBING X X

P101.B PART FLOOR PLAN - LEVEL 1 - NEW WORK - PLUMBING X X

P101.D PART FLOOR PLAN - LEVEL 1 - NEW WORK - PLUMBING X X

P102 LEVEL 2 COMPOSITE PLAN - NEW WORK - PLUMBING X X

P102.A PART FLOOR PLAN - LEVEL 2 - NEW WORK - PLUMBING X X

P102.B PART FLOOR PLAN - LEVEL 2 - NEW WORK - PLUMBING X X

P102.C PART FLOOR PLAN - LEVEL 2 - NEW WORK - PLUMBING X X

P102.D PART FLOOR PLAN - LEVEL 2 - NEW WORK - PLUMBING X X

P103 LEVEL 3 COMPOSITE PLAN - NEW WORK - PLUMBING X X

P103.A PART FLOOR PLAN - LEVEL 3 - NEW WORK - PLUMBING X X

P103.B PART FLOOR PLAN - LEVEL 3 - NEW WORK - PLUMBING X X

P103.C PART FLOOR PLAN - LEVEL 3 - NEW WORK - PLUMBING X X

P103.D PART FLOOR PLAN - LEVEL 3 - NEW WORK - PLUMBING X X

P104 FLOOR PLAN -LEVEL 4 -NEW WORK -PLUMBING X X

P105 FLOOR PLAN -ATTIC -NEW WORK PLUMBING X X

P106 PART FLOOR PLAN - ROOF - NEW WORK - PLUMBING X X

P107

FLOOR PLAN - OVERALL ROOF - NEW WORK -

PLUMBING

X X

P501 PLUMBING DETAILS X X

P601 PLUMBING SCHEDULES X X

P701 PLUMBING RISERS X X

FIRE

PROTECTION

FP000 FIRE PROTECTION LEGEND, CONVENTIONS, AND

ABBREVIATIONS

X

FP101 FLOOR PLAN - LEVEL 1 - NEW WORK - FIRE

PROTECTION

X

FP102 FLOOR PLAN - LEVEL 2 - NEW WORK - FIRE

PROTECTION

X ot F or B iddddd X ddddddddddXdddddddddddddiidiididididddddddddddddddddiididdddBBBiBBidBiBidBidididddiiidididididddddBBiBididddBBBBiBBiBiBiBiiiBBBiBiBiBiBiiiBBiBiiBBNG BBBBBBBBBBBBBBBBBNG BBBBBBBBBBBr Br BPL BBBBBBrrK - Pror or - PLUMrororW WORK - PLUMor FoFoEW WORK -oFoFoVEL 2 - NEW WORK

FoFoFoLEVEL 2 - NEW WOFoFoFTE PLAN - NFoFFEVEL 3Ft Ft FR PLAN - LEVEL 3 -FttOR PLAtot ot OR PLAN - LtototR PLAN -LEVELototot OR PLAN -Aot

NNNoNoPART FLOOR oNNNNoNoFLOOR PLA

NoPLUMNNNoNNNNNPLUMNNNNNNNNNNNNNNNNNNNN

TEVEBAUGH ARCHITECTURE LIST OF DRAWING SHEETS

TA PROJECT NO. 21037 00 01 15 - 11

FP103 FLOOR PLAN - LEVEL 3 - NEW WORK - FIRE

PROTECTION

X

FP104 FLOOR PLAN - LEVEL 4 - NEW WORK - FIRE

PROTECTION

X

FP105 FLOOR PLAN - ATTIC - NEW WORK - FIRE PROTECTION X

FP106 PART FLOOR PLAN - NEW WORK - DETAILS X

TECHNOLOGY

TA000 AUDIO VISUAL LEGEND X

TA001 AUDIOVISUAL SCHEDULES X

TA101 AUDIOVISUAL OVERALL PLAN - LEVEL 1 X

TA102 AUDIOVISUAL OVERALL PLAN - LEVEL 2 X

TA103 AUDIOVISUAL OVERALL PLAN - LEVEL 3 X

TA104 AUDIOVISUAL OVERALL PLAN - ROOF X

TA201 AUDIOVISUAL OVERAL RCP - LEVEL 1 X

TA202 AUDIOVISUAL OVERAL RCP - LEVEL 2 X

TA203 AUDIOVISUAL OVERALL RCP - LEVEL 3 X

TA301 AUDIOVISUAL ENLARGED PLANS - LEVEL 1 X

TA302 AUDIOVISUAL ENLARGED PLANS - LEVEL 2 X

TA303 AUDIOVISUAL ENLARGED PLANS - SEMINAR X

TA304 AUDIOVISUAL ENLARGED PLANS - COURTROOM X

TA305 AUDIOVISUAL ENLARGED PLANS - LEVEL 3 X

TA401 AUDIOVISUAL DETAILS X

TA501 AUDIOVISUAL FUNCTIONAL DRAWINGS X

TA502 AUDIOVISUAL FUNCTIONAL DRAWINGS X

TA503 AUDIOVISUAL FUNCTIONAL DRAWINGS X

TY000 SECURITY LEGEND X

TY100 SECURITY OVERALL PLAN - TUNNEL X

TY101 SECURITY OVERALL PLAN - LEVEL 1 X

TY102 SECURITY OVERALL PLAN - LEVEL 2 X

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .