(O)Limitations on Subcontracting.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
OWTF Clean, Inspect, Repair Tanks 10-3-7
Solicitation number
ACQR6060340
Issued by

About this file

This document is a Limitations on Subcontracting Certification form for a federal contract opportunity. The prime contractor must complete and submit this form every 6 months for the base year and option periods of the contract, providing details on the prime labor cost, subcontractor labor cost, total labor cost, percentage of work performed by the prime contractor, and percentage of work performed by subcontractors.

The federal contract opportunity is for OWTF Clean, Inspect, Repair Tanks 10-3-7, solicitation number ACQR6060340, issued by the Department of the Navy Naval Facilities Engineering Command. The contract requires the contractor to provide labor, materials, and equipment to drain, clean, inspect, repair, prepare, and recoat Tanks 10, 3, and 7 at the Oily Water Treatment Facility, with the base contract for Tank 10 and two option periods for Tanks 3 and 7. Only contractors listed in the MACC solicitation are eligible to bid on this requirement.

View the file

Other files

File Type Posted
Amendment_0001.pdf PDF
General Requirements.pdf PDF
(A)SOW.pdf PDF
(L)Base Map.pdf PDF
(F)PriceProposalForm.docx DOCX document
(J)2016-R-0149.pdf PDF
(N) Base Access Pass Request.pdf PDF
(E)RFI Form.pdf PDF
(D)NEPA.pdf PDF
(C)CT20240024_6.7.24.pdf PDF
(K)Map to B135.pdf PDF
(G)ECMS.pdf PDF
(B)Bldg 553 Site Plan.pdf PDF
(M)General Requirements.pdf PDF
(I)Building Contractors Guide to Taxes.pdf PDF
(H)CERT-141.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

POST-AWARD CONTRACTOR'S LIMITATIONS
ON SUBCONTRACTING CERTIFICATION
From:Contractor Name
To:Nicole Fellers, Contract Specialist
PWD New London
Naval Facilities Engineering Command, Mid-Atlantic
Subj:Contract No. N40085-xx-x-xxxx/Task Order xx-x-xxxx
1. Prime contractor is to complete and submit the following for each reporting period (6 months) for each performance period (Base Year and Options).
Block 1Block 2Block 3Block 4Block 5Block 6Block 7
Period of PerformanceFFP &
Task Order # (list TO#)Prime
Labor CostSub
Labor CostTotal FFP or Task Order Labor Cost% Cost Performed by Prime% Cost Performed by Sub
FFP$0.00$0.00$0.00
CLIN 0001$0.00$0.00
CLIN 0002$0.00
CLIN0003$0.00
TOTAL FOR CURRENT REPORTING PERIOD$0.00$0.00$0.00
TO XXXX$0.00
TO XXXX$0.00
Etc.$0.00
** add rows here$0.00
TOTAL FOR PREVIOUS REPORTING PERIOD$0.00$0.00$0.00
Total$0.00
Total$0.00
Total$0.00
Total$0.00
Total$0.00
CONTRACT TOTAL$0.00$0.00$0.00
2. Furthermore, in accordance with the provisions of FAR 52.219-14, Limitations on Subcontracting (Nov 2011), 13 CFR 124.510 and 13 CFR 125.6, in the performance of this contract,
In the case of a contract for services (except construction), Contractor has expended at least 50 percent of the cost of the contract performance incurred for personnel with its own (prime contractor) employees.
In the case of a contract for services (except construction), Contractor has expended at least 50 percent of the cost of the contract performance incurred for personnel with its own (prime contractor) employees.
In the case of a contract for supplies or products (other than procurement from a non-manufacturer in such supplies or products Contractor has performed at least 50 percent of the cost of manufacturing the supplies or products (not including the costs of materials).

In the case of a contract for general construction, Cambridge Marine Construction has performed at least 15 percent of the cost of the contract with its own employees (not including the costs of materials).

In the case of a contract for construction by special trade contractors, contractor has performed at least 25 percent of the cost of the contract with its own employees (not including the cost of materials).

I certify that to the best of its knowledge and belief, the information provided in this report is accurate, complete, and current as of the date of report.

CONTRACTOR:

SIGNATURE DATE

NAME AND TITLE

Page &P of &N

Sheet2

Sheet3

File details come from the government source that posted it. Updated .