The document is an Oregon Department of Transportation (ODOT) Standard Drawing RD312 for Subsurface Drain Installation, dated 2024 with an effective period from June 1, 2025 to November 30, 2025. The technical drawing provides detailed specifications for Type 1 Subsurface Drain Installation, including comprehensive diagrams and instructions for drain pipe placement, outlet protection blocks, and associated infrastructure components. The drawing includes multiple views - elevation, plan, section A-A - and details pipe dimensions ranging from 3 to 8 inches in diameter, with specific guidelines for drain pipe installation, mesh for rodent control, and outlet protection requirements.

The standard drawing is part of a broader highway infrastructure project in Jackson County, specifically related to the ESB Paving and Subgrade Drainage contract. The project is exclusively reserved for certified Emerging Small Businesses (ESB) through the Certification Office for Business Inclusion and Diversity (COBID), with a requirement that the selected contractor must perform at least 51% of labor using their own workforce. The procurement follows Oregon Revised Statute 279C.355(1)(g), which allows exemption from standard competitive bidding for public improvement contracts under $250,000 when awarded to certified ESB firms. Liquidated damages are set at $100 per calendar day for delays beyond the substantial completion date of June 30, 2025, with proposals due by May 21, 2025.

View the file

Other files

File Type Posted
00013850 ESB_RFCQ.docx DOCX document
Exhibit 2 Project Area Map and Details.pdf PDF
Attachment B Specifications~5.docx DOCX document
00013850 ESB_RFCQ_Attachments.docx DOCX document
00013850 Bid Results.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RD312

SUBSURFACE DRAIN

R D

.d g n

21-JUL-2015N/A

J U

L

(in)

DIA.

PIPE

(in)

NOM.

L

(in)

NOM.

W

TYPE 1 SUBSURFACE DRAIN INSTALLATION

OUTLET PROTECTION BLOCK

SUBSURFACE DRAIN DETAIL

SUBSURFACE DRAIN OUTLET SECTION

ELEVATION

SECTION A-APLAN

AA

PLAN

2. Mesh for rodent control to be galvanized wire or approved equal.

1. In guard rail areas extend outlet protection block to back of guard rail post min.

GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:

block protection Outlet

(As required) (Non-perforated) Drain pipe delineator Type W-1

6' rad. m in.

(As required) Drain pipe (Perforated) to be continuous.

& drainage geotextile Trench, drain matl.

delineator Type W-1 block protection Outlet

(As required) (Non-perforated) Drain pipe

6' rad. m in.

(Non-perforated) Drain Pipe dia.

Pipe

Sl. 1:3

P.C.C. slab

Outside panel

E d g e o f tr a v e l la n e

(As required) Variable

(As required) (Non-perforated) Drain pipe

Sl. varies delineator Type W-1 block protection Outlet n o m d it c h d e p th

(See general note 2) larger than pipe diameter.

" openings). Size to be 2"4 1(

Square piece of mesh

4"

"x i n c h d ra in p ip e

P a y i te m v a ri a b le

12' Var. 10' norm. Var. 15' norm.

2'

L

Drain Outlet"

Drain pipe P.C. conc.

W

L n o rm a l

V a ri a b le

6"

6"

Finish grade material 12" Overlap filter

Surfacing Subgrade

Granular drain backfill material

Drainage geotextile

(Size and material as reqd.)

Perforated drain pipe ecafrusbuS" meti y a

P the current Oregon Standard Specifications.

All materials shall be in accordance with

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

DATE

SDR

BOOK NO.

CALC.

Effective Date: June 1, 2025 - November 30, 2025

Professional Engineer.

first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with

Standard Drawing, while

The selection and use of this

File details come from the government source that posted it. Updated .