NSCC FA and FP Pricing sheets 6-13-23~1.xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- BD-23-1075-110-010-89055
- Issued by
- Essex County, Massachusetts
About this file
This document is a pricing sheet for a fire alarm and fire protection services contract opportunity for the State of Massachusetts. The contract covers a range of services including fire alarm programming, installation, repair, and testing as well as fire sprinkler fitter services. The services are broken down by hourly rates for normal business hours and all other hours on weekends and holidays. The contract also includes provisions for replacement parts with a cost-plus markup not to exceed 15%. The contract covers a 5-year term from FY 2024 to FY 2028 with two 1-year option years.
Pricing is provided for fire alarm and fire protection services per building at the Danvers and Lynn campuses. This includes yearly costs to test all fire alarm and fire protection devices, fire pumps, and tamper switches per NFPA standards. There is also a one-time cost for an internal piping condition and obstruction investigation per NFPA 25 for the Danvers and Lynn campuses.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA Proposal Form
| Service | FY 2024 | FY 2025 | FY 2026 | FY 2027 (option yr) | FY 2028 (option yr) | Notes |
| A. Rate Per hour, for work performed Monday thru Friday, during normal hours | ||||||
| Fire Alarm Programmer | $ | $ | $ | $ | $ | Hourly Rate |
| Fire Alarm Installer | $ | $ | $ | $ | $ | Hourly Rate |
| Fire Alarm Repair | $ | $ | $ | $ | $ | Hourly Rate |
| Apprentice Helper | $ | $ | $ | $ | $ | Hourly Rate |
| Elevator Recall Testing Danvers | $ | $ | $ | $ | $ | Per Year |
| Elevator Recall Testing Lynn | $ | $ | $ | $ | $ | Per Year |
| Stand by Tech | $ | $ | $ | $ | $ | Hourly Rate |
| B. Rate Per hour, for all other hours including Saturday, Sunday, and all legal holidays | ||||||
| Fire Alarm Programmer | $ | $ | $ | $ | $ | Hourly Rate |
| Fire Alarm Installer | $ | $ | $ | $ | $ | Hourly Rate |
| Fire Alarm Repair | $ | $ | $ | $ | $ | Hourly Rate |
| Apprentice Helper | $ | $ | $ | $ | $ | Hourly Rate |
| Stand by Tech | $ | $ | $ | $ | $ | Hourly Rate |
| C. Replacement Parts | ||||||
| Replacement Parts Cost Plus Mark Up … Not to exceed 15% | Percentage mark up |
FP Proposal Form
| Service | FY 2024 | FY 2025 | FY 2026 | FY 2027 (option yr) | FY 2028 (option yr) | Notes |
| A. Rate Per hour, for work performed Monday thru Friday, during normal hours | ||||||
| Fire Sprinkler Fitter | $ | $ | $ | $ | $ | Hourly Rate |
| Fire Sprinkler Fitter | $ | $ | $ | $ | $ | Hourly Rate |
| Apprentice / Helper | $ | $ | $ | $ | $ | Hourly Rate |
| B. Rate Per hour, for all other hours including Saturday, Sunday, and all legal holidays | ||||||
| Fire Sprinkler Fitter | $ | $ | $ | $ | $ | Hourly Rate |
| Fire Sprinkler Fitter | $ | $ | $ | $ | $ | Hourly Rate |
| Apprentice / Helper | $ | $ | $ | $ | $ | Hourly Rate |
| C. Replacement Parts | ||||||
| Replacement Parts Cost Plus Mark Up … Not to exceed 15% | Percentage mark up | |||||
| D. Please provide one cost for each campus for a one time Internal Piping Condition and Obstruction Investigation NFPA 25 ( Chapter 14 ) | ||||||
| 5 yar Obstruction Investigation (Danvers Campus) | $ | Hourly Rate | ||||
| 5 year Obstruction Investigation (Lynn Campus) | $ | One Test for 5 years |
FA Per Building
| Service | FY 2024 | FY 2025 | FY 2026 | FY 2027 (option yr) | FY 2028 (option yr) | Notes |
| A. Yearly Cost per building to test all Fire Alarm Devices (NFPA 72) | ||||||
| Berry Building | $ | $ | $ | $ | $ | |
| Math & Science Building | $ | $ | $ | $ | $ | |
| HPSS Building | $ | $ | $ | $ | $ | |
| Friends Building | Friends devices included in Math & Science building Master Box | |||||
| McGee Building | $ | $ | $ | $ | $ | |
| Lynn South Building | Lynn South devices included in McGee Building Master Box | |||||
| Modular Building | $ | $ | $ | $ | $ | |
| Lynn Greenlhouse | Lynn Greenhouse devices included in McGee Building Master Box | |||||
| B. Yearly cost per building to test all Fire Protection Devices , Fire Pump and Tamper Switches (NFPA 25) | ||||||
| Berry Building | $ | $ | $ | $ | $ | |
| Math & Science Building | $ | $ | $ | $ | $ | |
| HPSS Building | $ | $ | $ | $ | $ | |
| Friends Building | Friends devices included in Math & Science building Master Box | |||||
| McGee Building | $ | $ | $ | $ | $ | |
| Lynn South Building | Lynn South devices included in McGee Building Master Box | |||||
| Modular Building | $ | $ | $ | $ | $ | |
| Lynn Greenlhouse | Lynn Greenhouse devices included in McGee Building Master Box |