Statement of Work (SOW) for the High Power Transmit Power Amplifier Shelter

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2015/08/31

Draft Statement of Work High Power Transmit Power Amplifier Equipment

1.0 Introduction

Radar Division 5300 / Advanced Radar Systems Branch 5320 / Systems Section 5324 The Radar Division staff consists of full-time employees as well as intermittent employees. A number of other personnel work on site in the Division, including summer students, exchange students, cooperative programs, gifted and talented high school students, research apprentices, and contract scientists. This broad spectrum of scientific talent completes the total complement of approximately 100 personnel who work daily in the Division. Their diverse technical backgrounds include not only electrical engineering, but also physics, mathematics, and computer science. The numerous awards reflect the scientific quality and productivity of this rich mixture of talent and recognition accorded members of the Radar Division.

1.1 Mission

The research program of the Systems Section (5324) primarily consist of basic and applied research pertaining to high frequency (HF) over-the-horizon radar systems. Current areas of focus include advanced array and sensor signal processing techniques, novel antenna design, ionospheric propagation and ray-tracing, system performance analysis, hardware technology development, and existing system support.

1.2 Scope

The purpose of this contract is to procure two (2) transportable HF high power multi-channel transmit power amplifier shelters (HPA’s). These HPA should have the following characteristics.

a) Containerized Packaging

The amplifier equipment shall be installed in a modular shipping container enclosure with a lockable double swing door at one end. In addition to the amplifier equipment the enclosure shall have the following features: Electrical box and internal wiring, ceiling lights, cooling/heating system, 19’’ equipment rack shock mounted to floor and ceiling.
Container dimensions: Outside – 20ft(L) x 8ft(W) x 8ft(T)

Container Attributes: Door opening on 1 of the small ends (8ft(W) x 8ft(T)) w/locking mechanism Anti-Static flooring Airvents – 1 per side Forklift Pockets Material: Corten Steel with Marine Grade Epoxy Paint or similar Fully Insulated Fire Extinguisher and Smoke Detector

Figure 1 - Example picture of desired enclosure – 20ft High-Cube Shipping Container.

Power Amplifier Units x 10 Power Amplifier Units x 10 Equipment Rack Wall Mount AC and Electrical Box ~20ft ~8ft Swing Out Doors Ceiling Lights Ceiling Lights

Figure 2 - Notional internal layout of enclosure.

HVAC: The enclosure shall have internal and external mounting space for two split air conditioning systems similar in size and capacity to the LG 33,000BTU ductless unit, model #LSN360HV3/LSU360HV3. The enclosure will come pre-fitted with the required air conditioning coolant tubing required for this size system (liquid line: 3/8’’, vapor line: 5/8’’). Electrical wiring will be installed for the AC units. If alternative HVAC system is required and/or recommended based on different equipment needs, then it shall be considered.

Electrical Wiring: All electrical equipment and wiring will be configured to run of 60Hz power. The enclosure shall contain an electrical distribution system capable of supporting the simultaneous operation of the full 20kW transmit power, AC cooling, and 20A of additional power for auxiliary hardware. At least two ceiling lights will be installed on the internal ceiling of the enclosure to provide working light. The lights shall be capable of being switched off when not in use. The electrical system will be capable of being powered from an external source of 208/120 Y 3 phase power. A complete electrical wiring schematic will be provided for the enclosure electrical system.

Equipment Rack: The enclosure shall contain an equipment rack capable of storing standard 19’’ wide rack mountable equipment. The internal depth of the rack will be 630mm. It will be mounted to both the floor and ceiling, ideally with shock mounting. The total height shall be at least 48U tall (internal height). All amplifier modules will be pre-wired with input port terminals wired to a common area near the equipment rack.

b) Amplifier Module Capabilities Each amplifier module/channel will be capable of the following specifications.

Independent amplifier channels: 16-20 (total number of channels)
Frequency Range: 3-30MHz, 2-45MHz possible with relaxed specs as noted.
Output power per channel: >=1kW peak envelope power into 2:1 VSWR load
Input Drive levels:2dBm ± 0.5dB (3-30MHz)
3.5dBm ± 2.5dB (2-45MHz)

Reverse Power Handling: Automatic shutdown for >250W reverse power Duty Cycle: 100% at 1kW peak output power Modulation Type: CW, AM, FM, pulsed.

Input Impedance: 50 ohms, 1.6:1 VSWR Max Output Impedance: 50 ohms RF Noise: <-165dBc/Hz @ 1kW output level Phase Noise: <-95dBc/Hz at 0.1Hz center frequency offset at 1kW output power Spurious Emissions: <-110dBc @ 1kW output level per channel Harmonic Levels: <-20dBc @ 1kW output level, without additional output filtering Output Filter Bank: selectable harmonic filter yielding <-70dBc @ 1kW output level, filters can be installed manually, but electronically controlled switchable filter bank is prefered . Suggested filter cutoff points are: 4.2MHz, 5.88MHz, 8.23MHz, 11.52MHz, 16.13MHz, 22.59MHz, 31.4MHz. Alternative cutoff frequencies possible so long as the range 3-30MHz is covered with required harmonic rejection.

Temperature: 0◦C-45◦C (Operating), -40◦C-60◦C (Non-Operating) Humidity: 0-90% Relative humidity, non-condensing Cooling: Amplifier Heatsinks –cooled via forced air at 160L/s, Electronics – cooled via ambient, environmental air conditioning. Other cooling mechanisms acceptable so long as performance specifications are met.

Acoustic Noise: ~65dBA SPL Power Supply: Triple Switch Mode power supply 200-240VAC, maximum input of 4kVA Front display: Dual graphical touch screen displays with selectable information Control: Electronic microprocessor control internal to amplifier module with 100BaseT Ethernet connection external interface.

Dimensions: maximum dimensions per module - 250cm (H) x 40cm (D) x 37.5cm (W) Weight: ~65kg per amplifier module Documentation: Functional block diagrams, circuit-schematics, interface control documentation (ICD) for Ethernet based control functionality.

1.3 Personnel Administration

The Offeror shall assign a single point of contact, also known as the Program Manager (PM), who must work closely with the government Contracting Officer and Contracting Officers Representative (COR), as applicable.

The Offeror PM must ultimately be responsible for ensuring that the Offeror’s performance meets all government contracting requirements within cost and schedule. PM must have the requisite authority for full control over all company resources necessary for contract performance. As appropriate, the role of PM may be a full time management position, or a collateral duty assigned to a technical team member.

The Offeror shall maintain the adequacy of their employees by providing initial and refresher training to meet the SOW requirements.

1.3.1 Contract Administration

The Offeror shall establish processes and assign appropriate resources to effectively administer this contract.

The Offeror shall respond in writing to Government requests for contractual actions within five work days.

1.3.2 ProgramManagement Plan (PMP)

The Offeror must submit a Program Management Plan (PMP) defining the Offeror's approach to implementing the contract. The PMP provides the Government insight to the systems, processes, and structure within which the Offeror operates. The PMP should include, as applicable and if not defined in a separate plan: quality control, risk management, systems engineering, software development, configuration management, and subcontract management.

A draft PMP must be delivered with the Offeror’s proposal. Three copies of the complete version must be submitted to the KO and COR 30 days after contract award, and within 5 working days when changes are made thereafter.

1.3.3 Intellectual Property

The Offeror shall create source data where source data is not available or the existing data is determined by the Government to be inadequate for use. The Offeror shall present data requirements for Government approval as part of the Integrated Product and Process Development (IPPD). All source data shall be created or modified using commercially available non-proprietary tools. All Government rights shall be unlimited unless otherwise stated.

1.3.4 Contractor Acquired Equipment, Materials, Subcontracts and Supplies Equipment and unexpended materials and supplies purchased by the Offeror under this contract become the property of the Government at the end of the performance period, including all options.

The Offeror shall provide supplies for Offeror personnel.

The Offeror shall provide any other equipment, material, and supplies, not furnished by the Government, but required to perform the work defined.

The Offeror shall be responsible for any subcontract management necessary for performing efforts described in Section 3, Performance Requirements, below.

Vendor Item Control Drawings The Offeror shall prepare vendor item control drawings for commercial item(s) approved for use in the design and not covered by Government or nationally recognized industry association specifications and standards. The parts must comply with the requirements of the applicable part documentation. Existing test data (such as supplier originated objective evidence of compliance or Government/Industry Data Exchange Program (GIDEP) reports shall be used to the maximum extent practicable.

Shipping The Offeror shall be responsible for the management and movement of all Government Acquired Property required for this effort. The Offeror shall plan, coordinate, and provide for all transposition either shipped or received.

Lifecycle Support The Offeror is not responsible for any lifecycle support.

2.0 Deliverables

The Offeror shall provide the following deliverables upon completion of contract works

1) Two (2) high power transmit power amplifier shelters.

2) Documentation – Interface control documents for equipment, baseline instructions for operation, pre-delivery test verification results, system level circuit diagarams.