Notice_to_Proceed.docx

DOCX document 16 KB Posted

Attached to
SW Juniper Terrace Waterline Improvements
Solicitation number
26-079
Issued by
Washington County, Barlow City, Oregon

About this file

This is a Notice to Proceed form issued by the City of Beaverton, Oregon, for the SW Juniper Terrace Waterline Improvements project. The document serves as the official authorization for a contractor to commence work on the water main replacement project, which involves replacing approximately 3,500 feet of aging 8-, 6-, and 4-inch water mains, residential service lines, and hydrants throughout the Juniper Terrace neighborhood. The infrastructure, which dates to the 1960s, requires replacement to prevent leaks and ensure long-term water reliability for residents. The form establishes that work must be substantially completed within a specified number of consecutive calendar days from the notice date, with the project manager responsible for tracking commencement, progress, and completion milestones through three separate notifications.

The Notice to Proceed includes required documentation fields for contractor performance bonds and general liability insurance information, ensuring the contractor maintains adequate coverage throughout the project duration. The form establishes a structured notification process whereby the project manager documents the start date, intermediate completion of remaining tasks and cleanup activities, and final project completion including all corrective work and required submittals. All claims for additional compensation must be submitted by a specified deadline. The document requires signatures from both the City of Beaverton representative and the contractor, with distribution copies provided to the prime contractor at each notification stage to maintain clear communication regarding project timeline and completion status.

View the file

Other files

File Type Posted
SW_Juniper_Terrace_Waterline_Improvements_(Addendum_#1_Revision).pdf PDF
SW_Juniper_Terrace_Waterline_Improvements.pdf PDF
Juniper_Terrace_Waterline_Replacement_Bid_Set_Flat.pdf PDF
Construction_Contract_-_Sample.docx DOCX document
LABOR_AND_MATERIAL_PAYMENT_BOND.docx DOCX document
Laws_to_be_Observed.docx DOCX document
BLANK_Sole_Source_Justification_Form.pdf PDF
Locates.docx DOCX document
Performance_Bond.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTICE TO PROCEED

Project: _______________________________________________________Contract No. _________________
Project Manager Name: __________________________________________Contract P.O. No. _____________

To: __________________________________________________________

You are hereby given official Notice to Proceed (Notice) to commence Work on _______________, 20__, in accordance with the Contract dated ________________________, 20__. All Work must be Substantially Completed within ___ consecutive Calendar Days following the date of this Notice. Therefore, the date of Substantial Completion for the Work is _____________________, 20__.

The City of Beaverton

By: ______________________________________ Name: ___________________________________ Title: ____________________________________

ACCEPTANCE OF NOTICE TO PROCEED

Receipt of this Notice is hereby acknowledged on __________________, 20__.

Contractor

By: ______________________________________ Name: ___________________________________ Title: ____________________________________

Contractor’s Performance Bond Co.:

Bond No.: ________________________________________ Contact Person: ___________________________________ Address: _________________________________________ Phone No.: _______________________________________

Contractor’s General Liability Ins. Co.:

Policy No.: _______________________________________ Contact Person: ___________________________________ Address: _________________________________________ Phone No.: _______________________________________

NOTIFICATION OF COMMENCEMENT AND COMPLETION DATES FOR CONTRACT

Project Name:________________________________________________________________________
Contractor Name:________________________________________________________________________
Contract No.__________________________________________Fiscal Year: ____________
Project Manager Name:__________________________________________Date of Award:_______

FIRST NOTIFICATION

Date: ____________________________ Project Manager: Enter the date when the performance of Contract began.

_______________________________________________________
Project Manager SignatureDate

SECOND NOTIFICATION

Project Manager: Enter the date the time charges stopped, any final trimming and cleanup tasks, equipment to be removed from the Project Site, any minor corrective work not involving additional payment to be completed; and any submittals, including, but not limited to any required certifications, bills, forms, and other documents. See 00180.50(g) for more information.

Date Time Charges Stopped:

Remaining Tasks for Contractor:

All claims for additional compensation must be submitted by: ____________________________, 20______.

(See 00199.30 for additional requirements)

_______________________________________________________
Project Manager SignatureDate of Signature

THIRD NOTIFICATION

Date: ____________________________Project Manager: Enter the date when all Contract Work was completed,
including corrective work, equipment and plant removal, site cleanup, and
receipt of all certifications, bills, and other documents required under the
Contract.
_______________________________________________________
Project Manager SignatureDate of Signature

Distribution

Prime Contractor:
· 1st Notification:______ (Place initials here) _______ Date

· 2nd Notification: ______ (Place initials here) _______ Date

· 3rd Notification: ______ (Place initials here) _______ Date

File details come from the government source that posted it. Updated .