NORTH SASHABAW ELEMENTARY_FURNITURE PLAN.pdf
PDF 225 KB Posted
- Solicitation number
- RFP CLA 200000001042 1
- Issued by
- Berrien County, Michigan
About this file
This is a furniture plan document for North Sashabaw Elementary School, a facility improvement project under Clarkston Community Schools in Clarkston, Michigan. The document is a detailed architectural floor plan designated as Unit 'C' First Floor Furniture Plan (sheet F2.1C), dated January 31, 2019, and prepared for Bid Pack 7 of the school's improvements. The plan illustrates the layout and furniture placement across multiple classroom and support spaces, including kindergarten, first grade, and second grade classrooms, along with specialized areas such as the Learning Commons, discovery room, art room, speech therapy room, music room, and various work rooms and corridors. The architectural firm GMB Architecture + Engineering, with offices in Holland and Grand Rapids, Michigan, and Indianapolis, Indiana, prepared the plan at a scale of 1/8 inch equals 1 foot.
The document serves as a schematic reference for bidders responding to the furniture procurement component of the North Sashabaw Elementary School improvement project. No specific pricing information, contract terms, renewal options, funding sources, or bid response dates are detailed within this furniture plan document. The plan functions primarily as a visual specification and spatial layout guide to inform contractors and suppliers of the furniture placement requirements across the first floor of Unit C, enabling accurate estimation and delivery coordination for the school facility upgrade.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B F
B F
B F
KINDERGARTEN
2ND GRADE
1ST GRADEKINDERGARTEN
2ND GRADE 2ND GRADE
1ST GRADE
1ST GRADE
KINDERGARTEN
CLASSROOM
C106
CORRIDOR
C108
TOILET
C107
CLASSROOM
C104
TOILET
C105
TOILET
C103
CLASSROOM
C101
TOILET
C102
CORRIDOR
C100
CLASSROOM
C135
TOILET
C138
TOILET
C136
WORK ROOM
C137
TOILET
C134
TOILET
C133
CLASSROOM
C132
STORAGE
C131
CLASSROOM
C129
TOILET
C130
CLASSROOM
C127
TOILET
C128
TOILET
C126
CLASSROOM
C124
TOILET
C125
LRC
C123
LEARNING COMMONS
C115
DISCOVERY ROOM
A132WORK ROOM
A133
WORK ROOM
A134
TOILET
A131
CORRIDOR
A130
VESTIBULE
A100
CORRIDOR
C120
AUDIO / VISUAL
C119
WORK ROOM
C118
CORRIDOR
C114
TOILET
C113
SPEECH
C109
WORK ROOM
C111ART ROOM
C110
BREAK OUT
C117
KILN
C112
WORK ROOM
A149
WORK ROOM
A148
ESL
B125
MUSIC ROOM
B126
ELECTRICAL
B127
MECHANICAL
B128
JC / MECHANICAL
B129
LRC
A127
TOILET
A126
STORAGE
A124
BOYS
A128
GIRLS
A129
STORAGE
A125
MR4AMR4A MR4B MR5 MR5
MR1
LC2
MR6
MR3
MR2
LC3
LC5
TYP.
TYP.
TYP.
TYP.
TYP.
PROJECT ROOM
C116
UNIT A
UNIT C
UNIT B
UNIT A
PROJECT NO.
DRAWN
REVIEWED
GMB
No part of this drawing may be used or reproduced in any form or by any means, or stored in a database or retrieval system, without prior written permission of
Copyright 2018 All Rights Reservedc
ARCHITECTURE + ENGINEERING
85 East Eighth Street, Suite 200
P. 616.796.0200 F. 616.796.0201
HOLLAND LAB
www.gmb.com
N O
R
TH
KEYPLAN
Holland, Michigan 49423
2025 East Beltline SE, Suite 308
GRAND RAPIDS LAB
Grand Rapids, Michigan 49546
310 North Alabama Street, Suite 230
INDIANAPOLIS LAB
Indianapolis, Indiana 46204
225 South Main Street, Suite 200
ROYAL OAK LAB
Royal Oak, Michigan 48067
C L o c a l P ro je c ts
\5 -4
F
C E
N T
R A
L ju lia n .r v t
/7
/2
:4
:4
P M
F2.1C
5-4392
UNIT 'C' FIRST FLOOR
FURNITURE PLAN
MM
MM
C L
A R
K S
T O
N C
O M
M U
N
IT
Y S
C H
O O
L S
C L A
R K
S T
O N
M
IC
H
IG
A
N
N O
R T
H S
A S
H A
B A
W E
L E
M E
N T
A R
Y
IM
P
R O
V E
M E
N T
S
B
ID
P A
C K
N O
R
TH
1/8" = 1'-0"
UNIT 'C' FIRST FLOOR FURNITURE PLAN
01.31.2019 BIDS
| Sheets |
| F2.1C - UNIT 'C' FIRST FLOOR FURNITURE PLAN |
File details come from the government source that posted it. Updated .