Noise Variance App.pdf

PDF 5 MB Posted

Attached to
STP-0377(008) Seismic Retrofit, Haleakala Hwy, 3 Bridges, Maui
Solicitation number
B27000415
Issued by
Maui County, Hawaii

About this file

This is an Application for Community Noise Variance submitted by the State of Hawaii Department of Transportation (HDOT) to the Department of Health Indoor and Radiological Health Branch Noise Section. The application requests authorization for noise-generating construction activities outside standard permitted hours for the Seismic Retrofit of Haleakala Highway Route 377, which involves three bridges on Maui: Alae Bridge, Pohakuokala Bridge, and Waiale Bridge. The project scope includes seismic retrofitting, debris removal from bridge piers, carbon fiber wrapping, pier footing upgrades, creep block replacement, and bridge abutment construction. The proposed project is anticipated to commence on November 1, 2026, and be substantially completed by October 31, 2028, with a two-year variance period requested. HDOT is seeking authorization to conduct abutment construction work during nighttime and weekend hours for up to 90 total days (30 consecutive days per bridge) to minimize the duration of full bridge closures. The requested work hours include Saturday 6:00 p.m. to Monday 7:00 a.m., Monday through Friday 6:00 p.m. to 7:00 a.m., and Friday 6:00 p.m. to Saturday 9:00 a.m. The project is located along Haleakala Highway in Kula, Maui, within HDOT rights-of-way, with staging areas adjacent to each bridge. The immediate impact area consists of residential properties and undeveloped agricultural land within a 500-foot radius of the project sites.

HDOT's noise abatement procedures include equipment maintenance requirements, muffler installation on all gas or air exhaust equipment, job-site monitoring by HDOT personnel and the general contractor, instructional meetings for construction crews and truck drivers, designation of a job-site representative for complaint response, and implementation of a corrective action program. The application specifies variance requests from Hawaii Administrative Rules Title 11, Chapter 46, Sections 7-(j)-(1), (2), and (3), which normally prohibit construction noise before 7:00 a.m. and after 6:00 p.m. Monday through Friday, before 9:00 a.m. and after 6:00 p.m. on Saturdays, and on Sundays and holidays. HDOT has identified the alternative of limiting construction to daytime hours only but notes this would extend bridge closure durations and create greater inconvenience to the motoring public. Public notification procedures include newspaper advertisements in The Maui News, direct mailings to residents and businesses within 500 feet of project sites, notification to Maui County Council Upcountry Representative and Hawaii State representatives, message boards at project locations, and advance notices with contact information and website updates. Abutment construction is proposed to avoid the seabird fledging season (September 15 to December 15), and HDOT typically suspends construction road closures during State holidays and the holiday season.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

State of Hawaii Department of Health

Indoor and Radiological Health (IRH) Branch Noise Section

591 Ala Moana Boulevard, Room 133 Honolulu, Hawaii 96813

(808) 586-4700

APPLICATION FOR COMMUNITY NOISE VARIANCE

Refer to “Guide to Application for Community Noise Variance” for instructions. Submit attachments if necessary. Application form and attachments must be submitted in triplicate.

1. Applicant Identification

Company Name: State Department of Transportation Telephone:

Authorized Individual: Henry Kennedy Telephone: (808) 692-7550

Title: Engineering Program Manager, Design Branch

Mailing Address: 601 Kamokila Boulevard, Room 609 Honolulu, HI 96707

2. Type and purpose of activity The State of Hawaii Department of Transportation (HDOT) will be undertaking the Seismic Retrofit, Haleakala Highway, Route 377, Waiale Gulch, Alae (Naalae Gulch, and Pulehu Gulch (Pohakuokala) Bridges project, located along Haleakala Highway, Kula, Maui. See Attachment 1 Location Map.

The project’s purpose is to rehabilitee and seismic retrofit three bridges (Alae Bridge, Pohakuokala Bridge and Waiale Bridge) along Haleakala Highway.

Full roadway closures of each bridge will be required to construct the bridge abutments as this will require excavation behind the abutment approaches, filling in the excavated area with concrete and the installation of soil nails. This work will require full closure of each bridge for up to thirty (30) days per bridge.

Since the abutment construction will require the closure of each bridge, we are also proposing to cover the following work during day, nighttime and weekend hours:

Pier construction including removing debris from the bridge piers, wrapping piers with carbon fiber and pier footing upgrades

Replacement of creep blocks at the bridge bents See Attachment 2 Scope of Work for project plans.

3. Location of activity The project is located at Alae Bridge, Pohakuokala Bridge and Waiale Bridge along Haleakala Highway in Kula on the island of Maui.

All work proposed during Noise Variance hours will be within the State of Hawaii Department of Transportation’s right-of-way. The Project also includes a staging area to support construction activities. Staging areas are places where equipment would be parked / stored during the day and would be mobilized at the beginning of work activities during Noise Variance hours; staging areas may be used during a portion of or throughout the Project’s construction duration.

The proposed project’s staging areas are located within HDOT rights-of-way adjacent to each bridge. See Attachment 1 Location Map for details regarding the Project location, including Staging Area.

4. Time of activity The project’s anticipated start date is as early as November 1, 2026 and major construction activities are expected to be completed within 2 years.

The project requires night and weekend work for the construction of the bridge abutments. The construction of the three bridge’s abutments are proposed to be performed through the daytime, nights and weekends for up to thirty consecutive days of bridge closures at each bridge, a total of 90 days over the duration of the entire project.

The abutment construction would not be scheduled during the seabird fledging season (September 15 to December 15). In addition, HDOT typically suspends construction-related road closures on major state highways during State holidays and during the Holiday season.

We are requesting a Community Noise Variance for two years, from November 1, 2026 to October 31, 2028.

A breakdown of the proposed work hours per day for which the variance is being requested is as follows:

Saturday 6:00 p.m. to Monday 7:00 a.m.

Monday 6:00 p.m. to Tuesday 7:00 a.m.

Tuesday 6:00 p.m. to Wednesday 7:00 a.m.

Wednesday 6:00 p.m. to Thursday 7:00 a.m.

Thursday 6:00 p.m. to Friday 7:00 a.m.

Friday 6:00 p.m. to Saturday 9:00 a.m.

5. Estimated duration of construction activity (Specify dates) The construction duration is estimated to occur from November 1, 2026 to approximately October 31, 2028. A Community Noise Variance is being requested for a two-year duration.

6. Schedule of activity (Submit as attachment) The construction of the entire project is anticipated to be from November 1, 2026 to approximately October 31, 2028. The abutment construction will require the bridge to be closed for up to thirty consecutive days at each bridge. Once construction commences at each bridge, the abutment construction will be performed during daytime, nighttime and weekend hours. The abutment construction will occur within the 2-year project duration and will occur only during the thirty-day closure period of each bridge, a total of ninety days over the duration of the entire project. The pier construction will occur during the 30-day bridge closure period at each bridge, and may also occur prior to and after the bridge closure period during hours allowed under the Community Noise Permit.

7. Description of immediate impact area Existing land use description along Haleakala Road at the three bridges and the staging area are as follows:

Zone Class Zone Description Alae Bridge AG Agricultural District RU-0.5 ½ Acre Rural Pohakuokala Bridge AG Agricultural District INT Interim P-1 Public/Quase-Public R-3 Residential RU-0.5 ½ Acre Rural Waiale Bridge AG Agricultural District

Attachment 3 Zoning Map provides zoning classifications for the affected surrounding area.

Within a 500-foot radius of the project area, including access road and staging areas, there are only residential properties and undeveloped agricultural land.

8. List of equipment to be utilized (attach list if necessary) Equipment proposed to be used and their respective noise levels are shown in Attachment 5 Equipment List.

9. Plans and procedures for the attenuation of noise emission emanating from the activity

Noise abatement measures will include:

The Contractor will be required to maintain all equipment in good working order. All equipment with an exhaust of gas or air will be equipped with mufflers. Any equipment found to be in poor repair or not in compliance with applicable regulations of the State of Hawaii or the County of Maui shall be corrected prior to any use.

Department of Transportation field personnel and the general contractor will monitor all equipment and construction activities on the job site to ensure the use of noise abatement measures. The Contractor will immediately correct any violations that occur.

Instructional meetings will be held for construction crews and truck drivers to discuss noise abatement procedures, including the use of engine brakes, loading and unloading cargo, shouting, use of signal callers, and other practices as required.

A job-site representative will be designated to whom immediate complaints can be forwarded for prompt response and who will have the general responsibility of monitoring quiet work procedures.

The Contractor will have a corrective action program in place that lays out steps and responsibilities to respond to complaints and correct deficiencies.

10. Identify specific provisions of statutes or rules for which the variance is requested (include specific sections)

The specified rules for which the variance is requested are:

Hawaii Administrative Rules (HAR), Title 11, Chapter 46, Section 7-(j)-(1), which states “No permit shall allow any construction activities which emit noise…before 7 a.m. and after 6 p.m. of the same day, Monday thru Friday,”;

HAR, Title 11, Chapter 46, Section 7-(j)-(2), which states “No permit shall allow any construction activities which emit noise…before 9 a.m. and after 6 p.m., on Saturday.”;

and

HAR, Title 11, Chapter 46, Section 7-(j)-(3), which states that “No permit shall allow any construction activities which emit noise…on Sundays and on Holidays.”

11. Description of alternatives to the proposed activity Alternatives to the proposed activity include either (1) no action, or (2) limit construction of the project to daytime hours only.

• No action (Alternative 1) was eliminated from consideration because it fails to address the project’s purpose and need to upgrade Alae Bridge, Pohakuokala Bridge and Waiale Bridge to current seismic standards.

• Limiting construction to daytime hours (Alternative 2) was also eliminated from consideration since performing the abutment construction only during daytime hours would lengthen the timeframe that the bridges would be closed.

12.Describe why the present or proposed activity cannot be altered to comply with applicable statutes or rules

See response for Alternative 2 in Question 11.

Altering the proposed night and weekend work hours to only daytime hours would lengthen the duration of days that the three bridges would be closed, thereby causing a great inconvenience to the motoring public.

13. Description of any adverse environmental effects which cannot be avoided No significant adverse environmental impacts are expected to be caused by the proposed night time and weekend construction of the Alae Bridge, Pohakuakala Bridge and Waiale Bridge abutments. The potential impacts are expected to be short-term and will only last up to thirty consecutive days to complete at each bridge.

14. Discuss the relationship between short-term (temporary) use of the environment, and the maintenance and enhancement of long-term productivity The proposed night and weekend work is intended to shorten the duration of full closure of the Alae Bridge, Pohakuakala Bridge and Waiale Bridge. The elevated noise emissions generated may be bothersome to some in the immediate area, but they will be temporary and short in duration.

The long-term project benefit will allow for continued operation of the three (3) bridges and avoid full bridge replacement along Haleakala Highway.

15. Discuss any irreversible and irretrievable commitments of resources which would be involved in the proposed activity.

The activities involved with this work effort will consume energy, concrete materials, and labor.

16. Discuss any possible impact from noise created by any proposed nighttime activity which may affect the immediate surrounding area The surrounding area is residential and agricultural and may experience some temporary inconvenience due to noise generated by nighttime construction.

The most common noise source during construction will be engine powered machinery. The loudest noise will be generated by the concrete saw, hoeram, jack hammer and pavement scarifier machine. Mobile equipment (e.g., trucks) operates in a cyclic manner, and stationary equipment (e.g., generators and compressors) generate noise at fairly constant levels.

17. Discuss any plans or procedures for notification of people in the surrounding area of any planned nighttime activity The following public notices and outreach will be conducted:

Notifications of the 30-Day Public Review Period

For this Noise Variance, HDOT proposes to publish a newspaper advertisement in the The Maui News regarding the proposed night work and invite the public to comment during the 30-day Public Review period. A draft of the proposed newspaper announcement is provided in Attachment 6 Newspaper Ad.

Residents and businesses within a 500-foot radius of the bridges including staging areas (see Attachment 4 Noise Map), will be sent notices informing them about the 30-day Public Review period and inviting them to comment on the proposed night and weekend work. See Attachment 7 Mailing List and Attachment 8 Notice to Residents and Businesses flyer.

The Maui County Council Upcountry, Hawaii State Senate District 5 Representative, Hawaii State District 12 Representative will be contacted to inform them about the Public Review Period and to solicit comments on the Community Noise Variance.

The public will be allowed 30 calendar days to submit written comments.

Notification and Updates Prior to and During Construction

• Residents in surrounding neighborhoods that may use the roadway and be impacted by the project will be given advanced notice in advance of work during Community Noise Variance hours.

• Residents and businesses within a 500-foot radius of the bridges including staging areas, will also be sent notices in advance of the start of night and weekend work and will be provided with the Department of Transportation’s website information and name and phone number of a contact person, as previously noted. The website will be regularly updated with times and locations of night work. Any complaints should be directed to the contact person for response. See Attachment 4 Noise Map which identifies the affected residences and businesses within a 500 foot radius of the project. See Attachment 7 Mailing List and Attachment 9 Notice to Motorist flyer which will be distributed prior to construction.

• The Maui County Council Upcountry Representative, Hawaii State Senate District 5 Representative, Hawaii State District 12 Representative will be contacted to inform them about the start of the proposed night work.

• Message boards will be located within the project limits, in both directions to notify motorists of night work several days prior to the start of construction in the area.

18. Describe the purpose of the project as relating to public interest The purpose of the proposed project is to rehabilitate and seismic retrofit three Maui bridges (Alae Bridge, Pohakuokala Bridge and Waiale Bridge). This requires night work to construct the bridge abutments. This work will improve the service life of the three bridges.

Maintaining HDOT’s Highways infrastructure will allow the highway to operate more efficiently, improve vehicular safety and motorist comfort, and achieve higher energy savings.

Additionally, regular maintenance such as this defers complete bridge replacement, which is a much costlier and time-consuming endeavor.

CERTIFICATION OF INDIVIDUAL AUTHORIZED TO ACT FOR APPLICANT

I, Henry Kennedy , certify that I have

Print Name knowledge of the facts herein set forth and that the same are true and correct to the best of my knowledge and belief.

Signature______________________________________ Date _________________________________________

FOR DEPARTMENT OF HEALTH USE ONLY

Date received ___________________________ Variance Appl. Number ___________________________ Variance Docket Number ___________________________ Fee Paid ___________________________ Receipt No. _________________ Date Issued ___________________________ Exp. Date _________________

02/04/2026 https://stateofhawaii.na1.adobesign.com/verifier?tx=CBJCHBCAABAApZWVhKgEgOO_Nf_q-uN-ypKFLdqaocAC

Attachment 1 Location Map

0 0.5 10.25 Miles

Haiku

Hana

Kaupo

Kihei

Kaanapali

Legend

Project Area

Waiale Bridge

Pohakuokala Bridge

Kahului Attachment 1 Project Location Map

Seismic Retrofit, Haleakala Highway Route 377, Waiale Gulch, Alae

(Naalae Gulch), and Pulehu Gulch (Pohakuokala) Bridges Project

Alae Bridge

Attachment 2 Scope of Work

PLANS FOR

AND PULEHU GULCH (POHAKUOKALA) BRIDGES

DISTRICT OF MAKAWAO

ISLAND OF MAUI

WAIALE GULCH, ALAE (NAALAE GULCH),

PROJECT LOCATION

FEDERAL-AID PROJECT NO. STP-0377(008)

LAYOUT PLAN

NOT TO SCALE

PROJECT LIMITS

ALAE

(NAALAE GULCH)

BRIDGE

PROJECT LIMITS

WAIALE GULCH

BRIDGE

PROJECT LIMITS

POHAKUOKALA

(PULEHU GULCH)

BRIDGE

NET LENGTH OF PROJECT MILES0.10

GROSS LENGTH OF PROJECT MILES5.00

Attachment 3 Zoning Map

Resource Mapping Hawaii

AG

AG

RU-0.5

0 150 30075 US Feet

Road

Rural - 1/2 Acre-

RU-0.5

Agriculture- AG Zone

500 Foot Buffer

Project Area

Legend Haiku

Hana

Kaupo

Kihei

Kaanapali Kahului Attachment 3

Alae Zoning Map

Seismic Retrofit, Haleakala Highway Route 377, Waiale Gulch, Alae

(Naalae Gulch), and Pulehu Gulch (Pohakuokala) Bridges Project

McRae, Isabella (USIM095839) Callout

RU-0.5

R-3

R-3

INT

P-1

0 150 30075 US Feet

Legend

Project Area

500 Foot Buffer

Zone Agriculture- AG

Interim- INT

Public/Quasi-Public- P-1

Residential- R-3

Rural - 1/2 Acre- RU-0.5

Road

Haiku

Hana

Kaupo

Kihei

Kaanapali Kahului Attachment 3

Pohakuokala Zoning Map

Seismic Retrofit, Haleakala Highway Route 377, Waiale Gulch, Alae

(Naalae Gulch), and Pulehu Gulch (Pohakuokala) Bridges Project

McRae, Isabella (USIM095839)

Pohakuokala Bridge

AG

0 150 30075 US Feet

Agriculture- AG

Zone 500 Foot Buffer Project Area

Legend

Haiku

Hana

Kaupo

Kihei

Kaanapali Kahului Attachment 3

Waiale Zoning Map

Seismic Retrofit, Haleakala Highway Route 377, Waiale Gulch, Alae (Naalae

Gulch), and Pulehu Gulch (Pohakuokala) Bridges Project

McRae, Isabella (USIM095839)

Waiale Bridge

Attachment 4 Noise Map

0 150 30075 US Feet

Haiku

Hana

Kaupo

Kihei

Kaanapali

Legend

Project Area

500 foot buffer

TMK Parcels within 500 feet

Streams

TMK Parcels

Naalae Gulch

Kahului Attachment 4 Alae 500 Foot Buffer Map

Seismic Retrofit, Haleakala Highway Route 377, Waiale Gulch, Alae

(Naalae Gulch), and Pulehu Gulch (Pohakuokala) Bridges Project

McRae, Isabella (USIM095839)

0 150 30075 US Feet

Haiku

Hana

Kaupo

Kihei

Kaanapali

Legend

Streams

TMK Parcels

Project Area

500 foot buffer

TMK Parcels within 500 feet

Pulehu Gulch

Kahului Attachment 4 Pohakuokala 500 Foot Buffer Map

Seismic Retrofit, Haleakala Highway Route 377, Waiale Gulch, Alae

(Naalae Gulch), and Pulehu Gulch (Pohakuokala) Bridges Project

McRae, Isabella (USIM095839)

Pohakuokala Bridge

0 150 30075 US Feet

Haiku

Hana

Kaupo

Kihei

Kaanapali

Legend

Project Area

500 foot buffer

TMK Parcels within 500 feet

Streams

TMK Parcels

Waiale Gulch

Kahului Attachment 4 Waiale 500 Foot Buffer Map

Seismic Retrofit, Haleakala Highway Route 377, Waiale Gulch, Alae

(Naalae Gulch), and Pulehu Gulch (Pohakuokala) Bridges Project

McRae, Isabella (USIM095839)

Waiale Bridge

Attachment 5 Equipment List

The following table provides a list of equipment that is likely to be used along with the associated operational noise levels of that equipment.

Equipment Description Impact Device?

Spec. 721.560 Lmax @ 50 feet (dBA, slow)

Actual Measured Lmax @ 50 feet (dBA, slow) (Samples Averaged)

Auger Drill Rig No 85 84 Backhoe No 80 78 Compactor (ground) No 80 83 Compressor (air) No 80 78 Concrete Mixer Truck No 85 79 Concrete Pump Truck No 82 81 Concrete Saw No 90 90 Crane No 85 81 Drill Rig Truck No 84 79 Dump Truck No 84 76 Excavator No 85 81 Flat Bed Truck No 84 74 Front End Loader No 80 79 Generator No 82 81 Generator (<25KVA, VMS Signs) No 70 73 Grout Plant No Not Applicable 81 Hand Tools No Not Applicable 80 Hauling Truck No Not Applicable 78 Jackhammer Yes 85 89 Light Tower No Not Applicable 62 Man Lift No 85 75 Mounted Impact Hammer (hoe ram) Yes 90 90

Pavement Scarifier No 85 90 Paver No 85 77 Pickup Truck No 55 75 Pneumatic Tools No 85 85 Pumps No 77 81 Rivit Buster/Chipping Gun Yes 85 79 Rock Drill No 85 81

Equipment Description Impact Device?

Spec. 721.560 Lmax @ 50 feet (dBA, slow)

Actual Measured Lmax @ 50 feet (dBA, slow) (Samples Averaged)

Roller No 85 80 Scraper No 85 84 Shotcrete Pump No Not Applicable 85 Skidsteer No Not Applicable 85 Vacuum Excavator (Vac-Truck) No 85 85 Vacuum Street Sweeper No 80 82 Welder/Torch No 73 74

Source: Table 9.1, U.S. Department of Transportation, Construction Noise Handbook, FHWA- HEP-06-015, Final Report: August 2006.

Attachment 6 Newspaper Ad

NOTICE OF APPLICATION FOR VARIANCE RECEIVED BY THE

DEPARTMENT OF HEALTH

STATE OF HAWAII

Seismic Retrofit, Haleakala Highway Route 377, Waiale Gulch, Alae (Naalae Gulch), and Pulehu Gulch (Pohakuokala) Bridges Project

Island of Maui Federal-Aid Project No. STP-0377(008)

Community Noise Control Variance Application No. V-XXXX

(Docket No. XX-XX-XX-XX)

Pursuant to Hawaii Revised Statutes, Chapter 342F-5, subsection (h), the State of Hawaii, Department of Transportation, Highways, seeks written comments from interested persons regarding the following Community Noise Variance Application.

The State of Hawaii, Department of Transportation, Highways, Design Branch, has applied to the Department of Health for a variance from Hawaii Administrative Rules, Chapter 11-46, Section 11-46- 6(a), which states, “General Prohibition. Without a permit or variance issued pursuant to section 11-46- 7 or 11-46-8, no person within the State shall operate, from any premises or land owned, rented, leased, occupied, or controlled by that person, any excessive noise source.”

The applicant proposes to perform the construction for the new bridge abutments and piers for the Alae Bridge, Pohakuokala Bridge and Waiale Bridge located on Haleakala Highway, Kula, on the Island of Maui. The construction of the bridge abutments and piers will require work during night and weekend hours. Work will be at Alae Bridge, Pohakuokala Bridge and Waiale Bridge shown in the Location Map.

The project is estimated to begin as early as November 1, 2026 with major construction activities expected to be completed by approximately October 31, 2028, and the night and weekend work will occur within this timeframe. The construction of the bridge abutments and piers will require night work and weekend work of up to 30 consecutive days at each of the three bridges, during which each bridge will be fully closed, one bridge at a time, totaling 90 days over the duration of the entire project.

HDOT is working with the Hawaii Department of Health (DOH) to obtain a Community Noise Variance to allow work during the following times:

Saturday 6:00 p.m. to Monday 7:00 a.m.

Monday 6:00 p.m. to Tuesday 7:00 a.m.

Tuesday 6:00 p.m. to Wednesday 7:00 a.m.

Wednesday 6:00 p.m. to Thursday 7:00 a.m.

Thursday 6:00 p.m. to Friday 7:00 a.m.

Friday 6:00 p.m. to Saturday 9:00 a.m.

The Hawaii Administrative Rules, Chapter 11-46 requires that a Community Noise Variance be requested regarding the noise limits and construction hours.

If the comments received by Month Day,Year warrant it, the Department of Health may hold a public hearing regarding the request for this Community Noise Variance at least thirty (30) days after public notice. The final decision will be made on the basis of the application, related documents, written comments and the public hearing, if any.

Written comments and requests for information or inspection of the variance application and related documents should be directed to: State of Hawaii, Department of Transportation, 601 Kamokila Boulevard, Room 609, Kapolei, Hawaii 96707, Attention: Jillian Chen.

Attachment 7 Mailing List

TMK Suffix First Last Attn/Organization Address City State Zipcode 222006026 Ms. Martha Watkins 321 Waipoli Road Kula Hawaii 96790

222006029 and 222006086 Paul and Barbara Seitz 734 Kekaulike Avenue Kula Hawaii 96790 222006031 Ms. Violet Medeiros 750 Kekaulike Avenue Kula Hawaii 96790 222006037 Mr. Clay Sutherland 477 Waipoli Road Kula Hawaii 96790 222006083 Kula Botanical Garden Inc. 638 Kekaulike Avenue Kula Hawaii 96790 222006084 Mr. Kevin Mccord 656 Kekaulike Avenue Kula Hawaii 96790 222006085 Mr. Charles Guard 688 Kekaulike Kula Hawaii 96790 222006087 Mr. Brian Haruguchi 738 Kekaulike Avenue Kula Hawaii 96790 222006088 Mr. Lawrence Shim 742 Kekaulike Avenue Kula Hawaii 96790 222006097 Warren Mccord Trust 638 Kekaulike Avenue Kula Hawaii 96790 222006112 Peter Hickman Trust 201 Waipoli Road Kula Hawaii 96790 222019001 Gerald Silva Trust 735 Kekaulike Avenue Kula Hawaii 96790 222019002 Elizabeth Seely Trust P.O. Box 867 Kula Hawaii 96790 222019003 Chris & Emi-Jo Mossman Famuly Trust 555 Kekaulike Avenue Kula Hawaii 96790 222019004 Ms. Christine Akins 501 Kekaulike Avenue Kula Hawaii 96790 222019048 Jody Ann Joaquin Trust 679 Kekaulike Avenue Kula Hawaii 96790 223001072 Mr. David Chevalier 640 Cross Road Kula Hawaii 96790

223004013 and 223004016 Haleakala Ranch Company 529 Kealaloa Avenue Makawao Hawaii 96768 223006014 G.R. Carter IV Carter Trust P.O. Box 338 Makawao Hawaii 96768 223007001 Pan Pacific Ventures P.O. Box 672 Kula Hawaii 96790 223020008 Haleakala Hui LLC P.O. Box 1764 Makawao Hawaii 96768 223020009 Mr. Michael Adams 167 Franklin Street Juneau Alaska 99801 223020010 Ms. Harriette Holt P.O. Box 367 Kula Hawaii 96790 223020011 Alberta Loui Trust 15427 Haleakala Highway Kula Hawaii 96790 223022001 County of Maui

223022002, 223022146, 223022147 Glenn Okazaki Trust P.O. Box 5018 Kahului Hawaii 96733 223022012 Ross and Gayle Hart Family Trust 382 Kulalani Drive Kula Hawaii 96790 223022013 Mr. Owen Shiroma 10054 River Oaks Drive Stockton California 95209 223022014 David Jr. and Barbara Kong Trust 15 One Malia Way Wailuku Hawaii 96793 223022015 Kim Renz Family Trust Horst Renze 162 Brooklawn Terrace Fairfield Connecticut 06825 223022016 Mr. Francis Unabia 223022057 Mr. Robert Luuwai 301 Kulalani Drive Kula Hawaii 96790 223022058 Mr. Lambert Hoopii P.O. Box 880653 Pukalani Hawaii 96788 223022059 Mr. Andre Fehlmann 367 Kulalani Drive Kula Hawaii 96790 223022060 Ms. Adele Suminda 280 Kaualani Drive Makawao Hawaii 96768 223022061 Joey & Johnnette Cremer Joint Trust 391 Kualani Drive Kula Hawaii 96790 223022062 Mr. Andrew Dunn 135 Kulalani Circle Kula Hawaii 96790 223022063 Donald McCann Trust 371 Kulalani Drive Kula Hawaii 96790 223022091 Oliver Ignacio Trust 339 Kulalani Drive Kula Hawaii 96790 223022095 Ms. Donna Roy 177 Kulalani Circle Kula Hawaii 96790 223022096 Mr. Lloyd Arisumi 2401 Placid Way Ann Arbbor Michigan 48105 223022097 Driveway

223059001, 223059004 Alan King Revocable Trust P.O. Box 400 Kalaheo Hawaii 96741 223059002 Ms. Karen McCarthy 40 Kualono Place Kula Hawaii 96790 223059003 Mark and Carol Ross Trust 355 Kaupea Street Makawao Hawaii 96768 223059005 Mr. John Haley 15601 Haleakala Highway Kula Hawaii 96790 223059006 Alan and Quinn Kaufman Trust P.O. Box 297 Kula Hawaii 96790 223059007 SOL Maui Trust Timothy S Lara 20 Kualono Place Kula Hawaii 96790 223059021 Paul Singleton Trust 15665 Haleakala Highway Kula Hawaii 96790

20250729_500ftMailingList.xls

Attachment 8 Notice to Residents and Businesses

NOTICE TO RESIDENTS AND BUSINESSES

SEISMIC RETROFIT, HALEAKALA HIGHWAY, ROUTE 377, WAIALE GULCH,

ALAE (NAALAE GULCH) AND PULEHU GULCH (POHAKUOKALA) BRIDGE

FEDERAL-AID PROJECT NO. STP-0377(008)

Community Noise Control, Variance Application No. V-XXXX, Docket No. 25-NR-VN-XX

The State of Hawaii Department of Transportation (HDOT) is undertaking the Seismic Retrofit, Haleakala Highway Route 377, Waiale Gulch, Alae (Naalae Gulch), and Pulehu Gulch (Pohakuokala) Bridges Project to upgrade the Alae Bridge, Pohakuokala Bridge and Waiale Bridge project, located along Haleakala Highway in Kula, Maui.

HDOT has filed a Community Noise Variance Application with the State of Hawaii Department of Health to allow the construction of the abutments for the Alae Bridge, Pohakuokala Bridge and Waiale Bridge to occur during night and weekend hours. See Location Map on the next page.

The project is estimated to begin as early as November 1, 2026 with major construction activities expected to be completed by approximately October 31, 2028, and the night and weekend work will occur within this timeframe. The construction of the bridge abutments and piers will require night work and weekend work of up to 30 consecutive days at each of the three bridges, during which each bridge will be fully closed, one bridge at a time, totaling 90 days over the duration of the entire project.

HDOT is working with the Hawaii Department of Health (DOH) to obtain a Community Noise Variance to allow work during the following times:

Saturday 6:00 p.m. to Monday 7:00 a.m.

Monday 6:00 p.m. to Tuesday 7:00 a.m.

Tuesday 6:00 p.m. to Wednesday 7:00 a.m.

Wednesday 6:00 p.m. to Thursday 7:00 a.m.

Thursday 6:00 p.m. to Friday 7:00 a.m.

Friday 6:00 p.m. to Saturday 9:00 a.m.

HDOT is soliciting comments from the public on the proposed night and weekend work hours during a 30-day Public Comment period starting on February XX, 2026, and extending to March

XX, 2026.

If you would like to submit written comments on the proposed night and Sunday work, please contact our Project Manager, Ms. Jillian Chen, by email at jillian.m.chen@hawaii.gov or mail to:

State of Hawaii, Department of Transportation, 601 Kamokila Boulevard, Room 609, Kapolei, Hawaii 96707, Attention: Jillian Chen.

City and County of Honolulu

City and County of Honolulu Department of Design and Construction

Sato, Larissa (Sato) Stamp

Sato, Larissa (Sato) Text Box

Attachment 9 Notice to Motorists

NOTICE TO MOTORISTS OF NIGHTWORK

ALAE (NAALAE GULCH) AND PULEHU GULCH (POHAKUOKALA) BRIDGE

FEDERAL-AID PROJECT NO. STP-0377(008)

The State of Hawaii Department of Transportation (HDOT) is undertaking the Seismic Retrofit, Haleakala Highway Route 377, Waiale Gulch, Alae (Naalae Gulch), and Pulehu Gulch (Pohakuokala) Bridges Project to upgrade the Alae Bridge, Pohakuokala Bridge and Waiale Bridge to current design standards.

The construction of the abutments and piers at Alae Bridge will require night and weekend work of up to 30 consecutive nights during which the bridge will also be fully closed.

Construction is scheduled to begin on Month XX, 202X and is anticipated to be completed by the end of Month XX, 202X.

Nignttime and weekend construction hours are as follows:

Saturday 6:00 p.m. to Monday 7:00 a.m.

Monday 6:00 p.m. to Tuesday 7:00 a.m.

Tuesday 6:00 p.m. to Wednesday 7:00 a.m.

Wednesday 6:00 p.m. to Thursday 7:00 a.m.

Thursday 6:00 p.m. to Friday 7:00 a.m.

Friday 6:00 p.m. to Saturday 9:00 a.m.

Vehicular traffic will be detoured around the work zone during these hours and roadway users are reminded to observe and obey all traffic controls, posted signs, and Special Duty Officers.

Motorists are advised to proceed with caution through the construction area. For project updates, see the Department of Transportation website: https://hidot.hawaii.gov/highways/roadwork/maui/

Any comments or concerns regarding the project including noise emissions should be directed to the following on-site Project Manager:

Contractor Representative, Title, Phone No.: (808) XXX-XXXX or email at XXXXX.

ALAE (NAALAE GULCH) AND PULEHU GULCH (POHAKUOKALA) BRIDGE

FEDERAL-AID PROJECT NO. STP-0377(008)

The State of Hawaii Department of Transportation (HDOT) is undertaking the Seismic Retrofit, Haleakala Highway Route 377, Waiale Gulch, Alae (Naalae Gulch), and Pulehu Gulch (Pohakuokala) Bridges Project to upgrade the Alae Bridge, Pohakuokala Bridge and Waiale Bridge to current design standards.

The construction of the abutments and piers at Pohakuokala Bridge will require night and weekend work of up to 30 consecutive nights during which the bridge will also be fully closed.

Construction is scheduled to begin on Month XX, 202X and is anticipated to be completed by the end of Month XX, 202X

Nignttime and weekend construction hours are as follows:

Saturday 6:00 p.m. to Monday 7:00 a.m.

Monday 6:00 p.m. to Tuesday 7:00 a.m.

Tuesday 6:00 p.m. to Wednesday 7:00 a.m.

Wednesday 6:00 p.m. to Thursday 7:00 a.m.

Thursday 6:00 p.m. to Friday 7:00 a.m.

Friday 6:00 p.m. to Saturday 9:00 a.m.

Vehicular traffic will be detoured around the work zone during these hours and roadway users are reminded to observe and obey all traffic controls, posted signs, and Special Duty Officers.

Motorists are advised to proceed with caution through the construction area. For project updates, see the Department of Transportation website: https://hidot.hawaii.gov/highways/roadwork/maui/

Any comments or concerns regarding the project including noise emissions should be directed to the

ALAE (NAALAE GULCH) AND PULEHU GULCH (POHAKUOKALA) BRIDGE

FEDERAL-AID PROJECT NO. STP-0377(008)

The State of Hawaii Department of Transportation (HDOT) is undertaking the Seismic Retrofit, Haleakala Highway Route 377, Waiale Gulch, Alae (Naalae Gulch), and Pulehu Gulch (Pohakuokala) Bridges Project to upgrade the Alae Bridge, Pohakuokala Bridge and Waiale Bridge to current design standards.

The construction of the abutments and piers at Waiale Bridge will require night and weekend work of up to 30 consecutive nights during which the bridge will also be fully closed.

Construction is scheduled to begin on Month XX, 202X and is anticipated to be completed by the end of Month XX, 202X

Nignttime and weekend construction hours are as follows:

• Saturday 6:00 p.m. to Monday 7:00 a.m.

• Monday 6:00 p.m. to Tuesday 7:00 a.m.

• Tuesday 6:00 p.m. to Wednesday 7:00 a.m.

• Wednesday 6:00 p.m. to Thursday 7:00 a.m.

• Thursday 6:00 p.m. to Friday 7:00 a.m.

• Friday 6:00 p.m. to Saturday 9:00 a.m.

Vehicular traffic will be detoured around the work zone during these hours and roadway users are reminded to observe and obey all traffic controls, posted signs, and Special Duty Officers.

Motorists are advised to proceed with caution through the construction area. For project updates, see the Department of Transportation website: https://hidot.hawaii.gov/highways/roadwork/maui/

Any comments or concerns regarding the project including noise emissions should be directed to the

01 TT-01-Layout1
Sheets and Views
TT-01-Layout1
02 stdplsumrv8-Layout1
Sheets and Views
stdplsumrv8-Layout1
03 GN01-Layout1
Sheets and Views
GN01-Layout1
04 GN02-Layout1
Sheets and Views
GN02-Layout1
05 GN03-Layout1
Sheets and Views
GN03-Layout1
06 GN04-Layout1
Sheets and Views
GN04-Layout1
07 GN05-Layout1
Sheets and Views
GN05-Layout1
08 GN06-Layout1
Sheets and Views
GN06-Layout1
09 GN07-Layout1
Sheets and Views
GN07-Layout1
10 GN08-Layout1
Sheets and Views
GN08-Layout1
11 GN09-Layout1
Sheets and Views
GN09-Layout1
12 GP-01-Layout1
Sheets and Views
GP-01-Layout1
13 Water Pollution Control Notes 01 12-23-21 (1)-Layout1
Sheets and Views
Water Pollution Control Notes 01 12-23-21 (1)-Layout1
14 Water Pollution Control Notes 02 12-23-21 (1)-Layout1
Sheets and Views
Water Pollution Control Notes 02 12-23-21 (1)-Layout1
15 Water Pollution Control Notes 03 12-23-21 (1)-Layout1
Sheets and Views
Water Pollution Control Notes 03 12-23-21 (1)-Layout1
16 BMP-DET-Layout1
Sheets and Views
BMP-DET-Layout1
17 EC-01_AB-Layout1
Sheets and Views
EC-01_AB-Layout1
18 EC-02_PB-Layout1
Sheets and Views
EC-02_PB-Layout1
19 EC-03_WB-Layout1
Sheets and Views
EC-03_WB-Layout1
20 AL-01_AB-Layput1
Sheets and Views
AL-01_AB-Layput1
21 AL-02_PB-Layput1
Sheets and Views
AL-02_PB-Layput1
22 AL-03_WB-Layput1
Sheets and Views
AL-03_WB-Layput1
23 Striping-notes-Layout1
Sheets and Views
Striping-notes-Layout1
24 S-02_AB-Layout1
Sheets and Views
S-02_AB-Layout1
25 S-03_PB-Layout1
Sheets and Views
S-03_PB-Layout1
26 S-04_WB-Layout1
Sheets and Views
S-04_WB-Layout1
27 TCP-notes-Layout1
Sheets and Views
TCP-notes-Layout1
28 consignshwy2lnlsp-Layout1
Sheets and Views
consignshwy2lnlsp-Layout1
29 TC-03_1LNCL-Layout1
Sheets and Views
TC-03_1LNCL-Layout1
30 TC-04_AB-Layout1
Sheets and Views
TC-04_AB-Layout1
31 TC-05_AB_DETR-PLN-Layout1
Sheets and Views
TC-05_AB_DETR-PLN-Layout1
32 TC-06_AB_DETR-INT-Layout1
Sheets and Views
TC-06_AB_DETR-INT-Layout1
33 TC-07_AB_DETR-INT-Layout1
Sheets and Views
TC-07_AB_DETR-INT-Layout1
34 TC-08_PB-Layout1
Sheets and Views
TC-08_PB-Layout1
35 TC-09_PB_DETR-PLN-Layout1
Sheets and Views
TC-09_PB_DETR-PLN-Layout1
36 TC-10_PB_DETR-INT-Layout1
Sheets and Views
TC-10_PB_DETR-INT-Layout1
37 TC-11_PB_DETR-INT-Layout1
Sheets and Views
TC-11_PB_DETR-INT-Layout1
38 TC-12_WB-Layout1
Sheets and Views
TC-12_WB-Layout1
39 TC-13_WB_DETR-PLN-Layout1
Sheets and Views
TC-13_WB_DETR-PLN-Layout1
40 TC-14_WB_DETR-INT-Layout1
Sheets and Views
TC-14_WB_DETR-INT-Layout1
41 TC-15_WB_DETR-INT-Layout1
Sheets and Views
TC-15_WB_DETR-INT-Layout1
42 3MB - HS
3MB-S0001 INDEX-Layout1
Sheets and Views
Layout1
3MB-S0002 GENNOTES-Layout1
Sheets and Views
Layout1
3MB-S0003
Sheets and Views
Layout1
3MB-S0004
Sheets and Views
Layout1
3MB-S0005 SYMB-ABBRV-Layout1
Sheets and Views
Layout1
3MB-S0101-Layout1
Sheets and Views
Layout1
3MB-SA0101 ALAE-Layout1
Sheets and Views
Layout1
3MB-SA0201 ALAE ABUTS-Layout1
Sheets and Views
Layout1
3MB-SA0202
Sheets and Views
Layout1
3MB-SA0203
Sheets and Views
Layout1
3MB-SA0204
Sheets and Views
Layout1
3MB-SA0301 ALAE-Layout1
Sheets and Views
Layout1
3MB-SA0302
Sheets and Views
Layout1
3MB-SA0303
Sheets and Views
Layout1
3MB-SB0101 WAIA-Layout1
Sheets and Views
Layout1
3MB-SB0201 WAIA ABUTS-Layout1
Sheets and Views
Layout1
3MB-SB0202
Sheets and Views
Layout1
3MB-SB0203
Sheets and Views
Layout1
3MB-SB0204
Sheets and Views
Layout1
3MB-SB0301 WAIA DEMO-Layout1
Sheets and Views
Layout1
3MB-SB0302
Sheets and Views
Layout1
3MB-SB0401-Layout1
Sheets and Views
Layout1
3MB-SB0402
Sheets and Views
Layout1
3MB-SB0403
Sheets and Views
Layout1
3MB-SB0404
Sheets and Views
Layout1
3MB-SC0101 POHA-Layout1
Sheets and Views
Layout1
3MB-SC0201 POHA ABUTS-Layout1
Sheets and Views
Layout1
3MB-SC0202
Sheets and Views
Layout1
3MB-SC0203
Sheets and Views
Layout1
3MB-SC0204
Sheets and Views
Layout1
3MB-SC0301 POHA-Layout1
Sheets and Views
Layout1
3MB-SC0302
Sheets and Views
Layout1
01 TT-01-Layout1
Sheets and Views
TT-01-Layout1
02 stdplsumrv8-Layout1
Sheets and Views
stdplsumrv8-Layout1
03 GN01-Layout1
Sheets and Views
GN01-Layout1
04 GN02-Layout1
Sheets and Views
GN02-Layout1
05 GN03-Layout1
Sheets and Views
GN03-Layout1
06 GN04-Layout1
Sheets and Views
GN04-Layout1
07 GN05-Layout1
Sheets and Views
GN05-Layout1
08 GN06-Layout1
Sheets and Views
GN06-Layout1
09 GN07-Layout1
Sheets and Views
GN07-Layout1
10 GN08-Layout1
Sheets and Views
GN08-Layout1
11 GN09-Layout1
Sheets and Views
GN09-Layout1
12 GP-01-Layout1
Sheets and Views
GP-01-Layout1
13 Water Pollution Control Notes 01 12-23-21 (1)-Layout1
Sheets and Views
Water Pollution Control Notes 01 12-23-21 (1)-Layout1
14 Water Pollution Control Notes 02 12-23-21 (1)-Layout1
Sheets and Views
Water Pollution Control Notes 02 12-23-21 (1)-Layout1
15 Water Pollution Control Notes 03 12-23-21 (1)-Layout1
Sheets and Views
Water Pollution Control Notes 03 12-23-21 (1)-Layout1
16 BMP-DET-Layout1
Sheets and Views
BMP-DET-Layout1
17 EC-01_AB-Layout1
Sheets and Views
EC-01_AB-Layout1
18 EC-02_PB-Layout1
Sheets and Views
EC-02_PB-Layout1
19 EC-03_WB-Layout1
Sheets and Views
EC-03_WB-Layout1
20 AL-01_AB-Layput1
Sheets and Views
AL-01_AB-Layput1
21 AL-02_PB-Layput1
Sheets and Views
AL-02_PB-Layput1
22 AL-03_WB-Layput1
Sheets and Views
AL-03_WB-Layput1
23 Striping-notes-Layout1
Sheets and Views
Striping-notes-Layout1
24 S-02_AB-Layout1
Sheets and Views
S-02_AB-Layout1
25 S-03_PB-Layout1
Sheets and Views
S-03_PB-Layout1
26 S-04_WB-Layout1
Sheets and Views
S-04_WB-Layout1
27 TCP-notes-Layout1
Sheets and Views
TCP-notes-Layout1
28 consignshwy2lnlsp-Layout1
Sheets and Views
consignshwy2lnlsp-Layout1
29 TC-03_1LNCL-Layout1
Sheets and Views
TC-03_1LNCL-Layout1
30 TC-04_AB-Layout1
Sheets and Views
TC-04_AB-Layout1
31 TC-05_AB_DETR-PLN-Layout1
Sheets and Views
TC-05_AB_DETR-PLN-Layout1
32 TC-06_AB_DETR-INT-Layout1
Sheets and Views
TC-06_AB_DETR-INT-Layout1
33 TC-07_AB_DETR-INT-Layout1
Sheets and Views
TC-07_AB_DETR-INT-Layout1
34 TC-08_PB-Layout1
Sheets and Views
TC-08_PB-Layout1
35 TC-09_PB_DETR-PLN-Layout1
Sheets and Views
TC-09_PB_DETR-PLN-Layout1
36 TC-10_PB_DETR-INT-Layout1
Sheets and Views
TC-10_PB_DETR-INT-Layout1
37 TC-11_PB_DETR-INT-Layout1
Sheets and Views
TC-11_PB_DETR-INT-Layout1
38 TC-12_WB-Layout1
Sheets and Views
TC-12_WB-Layout1
39 TC-13_WB_DETR-PLN-Layout1
Sheets and Views
TC-13_WB_DETR-PLN-Layout1
40 TC-14_WB_DETR-INT-Layout1
Sheets and Views
TC-14_WB_DETR-INT-Layout1
41 TC-15_WB_DETR-INT-Layout1
Sheets and Views
TC-15_WB_DETR-INT-Layout1
42 3MB - HS
3MB-S0001 INDEX-Layout1
Sheets and Views
Layout1
3MB-S0002 GENNOTES-Layout1
Sheets and Views
Layout1
3MB-S0003
Sheets and Views
Layout1
3MB-S0004
Sheets and Views
Layout1
3MB-S0005 SYMB-ABBRV-Layout1
Sheets and Views
Layout1
3MB-S0101-Layout1
Sheets and Views
Layout1
3MB-SA0101 ALAE-Layout1
Sheets and Views
Layout1
3MB-SA0201 ALAE ABUTS-Layout1
Sheets and Views
Layout1
3MB-SA0202
Sheets and Views
Layout1
3MB-SA0203
Sheets and Views
Layout1
3MB-SA0204
Sheets and Views
Layout1
3MB-SA0301 ALAE-Layout1
Sheets and Views
Layout1
3MB-SA0302
Sheets and Views
Layout1
3MB-SA0303
Sheets and Views
Layout1
3MB-SB0101 WAIA-Layout1
Sheets and Views
Layout1
3MB-SB0201 WAIA ABUTS-Layout1
Sheets and Views
Layout1
3MB-SB0202
Sheets and Views
Layout1
3MB-SB0203
Sheets and Views
Layout1
3MB-SB0204
Sheets and Views
Layout1
3MB-SB0301 WAIA DEMO-Layout1
Sheets and Views
Layout1
3MB-SB0302
Sheets and Views
Layout1
3MB-SB0401-Layout1
Sheets and Views
Layout1
3MB-SB0402
Sheets and Views
Layout1
3MB-SB0403
Sheets and Views
Layout1
3MB-SB0404
Sheets and Views
Layout1
3MB-SC0101 POHA-Layout1
Sheets and Views
Layout1
3MB-SC0201 POHA ABUTS-Layout1
Sheets and Views
Layout1
3MB-SC0202
Sheets and Views
Layout1
3MB-SC0203
Sheets and Views
Layout1
3MB-SC0204
Sheets and Views
Layout1
3MB-SC0301 POHA-Layout1
Sheets and Views
Layout1
3MB-SC0302
Sheets and Views
Layout1
01 TT-01-Layout1
Sheets and Views
TT-01-Layout1
02 stdplsumrv8-Layout1
Sheets and Views
stdplsumrv8-Layout1
03 GN01-Layout1
Sheets and Views
GN01-Layout1
04 GN02-Layout1
Sheets and Views
GN02-Layout1
05 GN03-Layout1
Sheets and Views
GN03-Layout1
06 GN04-Layout1
Sheets and Views
GN04-Layout1
07 GN05-Layout1
Sheets and Views
GN05-Layout1
08 GN06-Layout1
Sheets and Views
GN06-Layout1
09 GN07-Layout1
Sheets and Views
GN07-Layout1
10 GN08-Layout1
Sheets and Views
GN08-Layout1
11 GN09-Layout1
Sheets and Views
GN09-Layout1
12 GP-01-Layout1
Sheets and Views
GP-01-Layout1
13 Water Pollution Control Notes 01 12-23-21 (1)-Layout1
Sheets and Views
Water Pollution Control Notes 01 12-23-21 (1)-Layout1
14 Water Pollution Control Notes 02 12-23-21 (1)-Layout1
Sheets and Views
Water Pollution Control Notes 02 12-23-21 (1)-Layout1
15 Water Pollution Control Notes 03 12-23-21 (1)-Layout1
Sheets and Views
Water Pollution Control Notes 03 12-23-21 (1)-Layout1
16 BMP-DET-Layout1
Sheets and Views
BMP-DET-Layout1
17 EC-01_AB-Layout1
Sheets and Views
EC-01_AB-Layout1
18 EC-02_PB-Layout1
Sheets and Views
EC-02_PB-Layout1
19 EC-03_WB-Layout1
Sheets and Views
EC-03_WB-Layout1
20 AL-01_AB-Layput1
Sheets and Views
AL-01_AB-Layput1
21 AL-02_PB-Layput1
Sheets and Views
AL-02_PB-Layput1
22 AL-03_WB-Layput1
Sheets and Views
AL-03_WB-Layput1
23 Striping-notes-Layout1
Sheets and Views
Striping-notes-Layout1
24 S-02_AB-Layout1
Sheets and Views
S-02_AB-Layout1
25 S-03_PB-Layout1
Sheets and Views
S-03_PB-Layout1
26 S-04_WB-Layout1
Sheets and Views
S-04_WB-Layout1
27 TCP-notes-Layout1
Sheets and Views
TCP-notes-Layout1
28 consignshwy2lnlsp-Layout1
Sheets and Views
consignshwy2lnlsp-Layout1
29 TC-03_1LNCL-Layout1
Sheets and Views
TC-03_1LNCL-Layout1
30 TC-04_AB-Layout1
Sheets and Views
TC-04_AB-Layout1
31 TC-05_AB_DETR-PLN-Layout1
Sheets and Views
TC-05_AB_DETR-PLN-Layout1
32 TC-06_AB_DETR-INT-Layout1
Sheets and Views
TC-06_AB_DETR-INT-Layout1
33 TC-07_AB_DETR-INT-Layout1
Sheets and Views
TC-07_AB_DETR-INT-Layout1
34 TC-08_PB-Layout1
Sheets and Views
TC-08_PB-Layout1
35 TC-09_PB_DETR-PLN-Layout1
Sheets and Views
TC-09_PB_DETR-PLN-Layout1
36 TC-10_PB_DETR-INT-Layout1
Sheets and Views
TC-10_PB_DETR-INT-Layout1
37 TC-11_PB_DETR-INT-Layout1
Sheets and Views
TC-11_PB_DETR-INT-Layout1
38 TC-12_WB-Layout1
Sheets and Views
TC-12_WB-Layout1
39 TC-13_WB_DETR-PLN-Layout1
Sheets and Views
TC-13_WB_DETR-PLN-Layout1
40 TC-14_WB_DETR-INT-Layout1
Sheets and Views
TC-14_WB_DETR-INT-Layout1
41 TC-15_WB_DETR-INT-Layout1
Sheets and Views
TC-15_WB_DETR-INT-Layout1
42 3MB - HS
3MB-S0001 INDEX-Layout1
Sheets and Views
Layout1
3MB-S0002 GENNOTES-Layout1
Sheets and Views
Layout1
3MB-S0003
Sheets and Views
Layout1
3MB-S0004
Sheets and Views
Layout1
3MB-S0005 SYMB-ABBRV-Layout1
Sheets and Views
Layout1
3MB-S0101-Layout1
Sheets and Views
Layout1
3MB-SA0101 ALAE-Layout1
Sheets and Views
Layout1
3MB-SA0201 ALAE ABUTS-Layout1
Sheets and Views
Layout1
3MB-SA0202
Sheets and Views
Layout1
3MB-SA0203
Sheets and Views
Layout1
3MB-SA0204
Sheets and Views
Layout1
3MB-SA0301 ALAE-Layout1
Sheets and Views
Layout1
3MB-SA0302
Sheets and Views
Layout1
3MB-SA0303
Sheets and Views
Layout1
3MB-SB0101 WAIA-Layout1
Sheets and Views
Layout1
3MB-SB0201 WAIA ABUTS-Layout1
Sheets and Views
Layout1
3MB-SB0202
Sheets and Views
Layout1
3MB-SB0203
Sheets and Views
Layout1
3MB-SB0204
Sheets and Views
Layout1
3MB-SB0301 WAIA DEMO-Layout1
Sheets and Views
Layout1
3MB-SB0302
Sheets and Views
Layout1
3MB-SB0401-Layout1
Sheets and Views
Layout1
3MB-SB0402
Sheets and Views
Layout1
3MB-SB0403
Sheets and Views
Layout1
3MB-SB0404
Sheets and Views
Layout1
3MB-SC0101 POHA-Layout1
Sheets and Views
Layout1
3MB-SC0201 POHA ABUTS-Layout1
Sheets and Views
Layout1
3MB-SC0202
Sheets and Views
Layout1
3MB-SC0203
Sheets and Views
Layout1
3MB-SC0204
Sheets and Views
Layout1
3MB-SC0301 POHA-Layout1
Sheets and Views
Layout1
3MB-SC0302
Sheets and Views
Layout1
01 TT-01-Layout1
Sheets and Views
TT-01-Layout1
02 stdplsumrv8-Layout1
Sheets and Views
stdplsumrv8-Layout1
03 GN01-Layout1
Sheets and Views
GN01-Layout1
04 GN02-Layout1
Sheets and Views
GN02-Layout1
05 GN03-Layout1
Sheets and Views
GN03-Layout1
06 GN04-Layout1
Sheets and Views
GN04-Layout1
07 GN05-Layout1
Sheets and Views
GN05-Layout1
08 GN06-Layout1
Sheets and Views
GN06-Layout1
09 GN07-Layout1
Sheets and Views
GN07-Layout1
10 GN08-Layout1
Sheets and Views
GN08-Layout1
11 GN09-Layout1
Sheets and Views
GN09-Layout1
12 GP-01-Layout1
Sheets and Views
GP-01-Layout1
13 Water Pollution Control Notes 01 12-23-21 (1)-Layout1
Sheets and Views
Water Pollution Control Notes 01 12-23-21 (1)-Layout1
14 Water Pollution Control Notes 02 12-23-21 (1)-Layout1
Sheets and Views
Water Pollution Control Notes 02 12-23-21 (1)-Layout1
15 Water Pollution Control Notes 03 12-23-21 (1)-Layout1
Sheets and Views
Water Pollution Control Notes 03 12-23-21 (1)-Layout1
16 BMP-DET-Layout1
Sheets and Views
BMP-DET-Layout1
17 EC-01_AB-Layout1
Sheets and Views
EC-01_AB-Layout1
18 EC-02_PB-Layout1
Sheets and Views
EC-02_PB-Layout1
19 EC-03_WB-Layout1
Sheets and Views
EC-03_WB-Layout1
20 AL-01_AB-Layput1
Sheets and Views
AL-01_AB-Layput1
21 AL-02_PB-Layput1
Sheets and Views
AL-02_PB-Layput1
22 AL-03_WB-Layput1
Sheets and Views
AL-03_WB-Layput1
23 Striping-notes-Layout1
Sheets and Views
Striping-notes-Layout1
24 S-02_AB-Layout1
Sheets and Views
S-02_AB-Layout1
25 S-03_PB-Layout1
Sheets and Views
S-03_PB-Layout1
26 S-04_WB-Layout1
Sheets and Views
S-04_WB-Layout1
27 TCP-notes-Layout1
Sheets and Views
TCP-notes-Layout1
28 consignshwy2lnlsp-Layout1
Sheets and Views
consignshwy2lnlsp-Layout1
29 TC-03_1LNCL-Layout1
Sheets and Views
TC-03_1LNCL-Layout1
30 TC-04_AB-Layout1
Sheets and Views
TC-04_AB-Layout1
31 TC-05_AB_DETR-PLN-Layout1
Sheets and Views
TC-05_AB_DETR-PLN-Layout1
32 TC-06_AB_DETR-INT-Layout1
Sheets and Views
TC-06_AB_DETR-INT-Layout1
33 TC-07_AB_DETR-INT-Layout1
Sheets and Views
TC-07_AB_DETR-INT-Layout1
34 TC-08_PB-Layout1
Sheets and Views
TC-08_PB-Layout1
35 TC-09_PB_DETR-PLN-Layout1
Sheets and Views
TC-09_PB_DETR-PLN-Layout1
36 TC-10_PB_DETR-INT-Layout1
Sheets and Views
TC-10_PB_DETR-INT-Layout1
37 TC-11_PB_DETR-INT-Layout1
Sheets and Views
TC-11_PB_DETR-INT-Layout1
38 TC-12_WB-Layout1
Sheets and Views
TC-12_WB-Layout1
39 TC-13_WB_DETR-PLN-Layout1
Sheets and Views
TC-13_WB_DETR-PLN-Layout1
40 TC-14_WB_DETR-INT-Layout1
Sheets and Views
TC-14_WB_DETR-INT-Layout1
41 TC-15_WB_DETR-INT-Layout1
Sheets and Views
TC-15_WB_DETR-INT-Layout1
42 3MB - HS
3MB-S0001 INDEX-Layout1
Sheets and Views
Layout1
3MB-S0002 GENNOTES-Layout1
Sheets and Views
Layout1
3MB-S0003
Sheets and Views
Layout1
3MB-S0004
Sheets and Views
Layout1
3MB-S0005 SYMB-ABBRV-Layout1
Sheets and Views
Layout1
3MB-S0101-Layout1
Sheets and Views
Layout1
3MB-SA0101 ALAE-Layout1
Sheets and Views
Layout1
3MB-SA0201 ALAE ABUTS-Layout1
Sheets and Views
Layout1
3MB-SA0202
Sheets and Views
Layout1
3MB-SA0203
Sheets and Views
Layout1
3MB-SA0204
Sheets and Views
Layout1
3MB-SA0301 ALAE-Layout1
Sheets and Views
Layout1
3MB-SA0302
Sheets and Views
Layout1
3MB-SA0303
Sheets and Views
Layout1
3MB-SB0101 WAIA-Layout1
Sheets and Views
Layout1
3MB-SB0201 WAIA ABUTS-Layout1
Sheets and Views
Layout1
3MB-SB0202
Sheets and Views
Layout1
3MB-SB0203
Sheets and Views
Layout1
3MB-SB0204
Sheets and Views
Layout1
3MB-SB0301 WAIA DEMO-Layout1
Sheets and Views
Layout1
3MB-SB0302
Sheets and Views
Layout1
3MB-SB0401-Layout1
Sheets and Views
Layout1
3MB-SB0402
Sheets and Views
Layout1
3MB-SB0403
Sheets and Views
Layout1
3MB-SB0404
Sheets and Views
Layout1
3MB-SC0101 POHA-Layout1
Sheets and Views
Layout1
3MB-SC0201 POHA ABUTS-Layout1
Sheets and Views
Layout1
3MB-SC0202
Sheets and Views
Layout1
3MB-SC0203
Sheets and Views
Layout1
3MB-SC0204
Sheets and Views
Layout1
3MB-SC0301 POHA-Layout1
Sheets and Views
Layout1
3MB-SC0302
Sheets and Views
Layout1
01 TT-01-Layout1
Sheets and Views
TT-01-Layout1
02 stdplsumrv8-Layout1
Sheets and Views
stdplsumrv8-Layout1
03 GN01-Layout1
Sheets and Views
GN01-Layout1
04 GN02-Layout1
Sheets and Views
GN02-Layout1
05 GN03-Layout1
Sheets and Views
GN03-Layout1
06 GN04-Layout1
Sheets and Views
GN04-Layout1
07 GN05-Layout1
Sheets and Views
GN05-Layout1
08 GN06-Layout1
Sheets and Views
GN06-Layout1
09 GN07-Layout1
Sheets and Views
GN07-Layout1
10 GN08-Layout1
Sheets and Views
GN08-Layout1
11 GN09-Layout1
Sheets and Views
GN09-Layout1
12 GP-01-Layout1
Sheets and Views
GP-01-Layout1
13 Water Pollution Control Notes 01 12-23-21 (1)-Layout1
Sheets and Views
Water Pollution Control Notes 01 12-23-21 (1)-Layout1
14 Water Pollution Control Notes 02 12-23-21 (1)-Layout1
Sheets and Views
Water Pollution Control Notes 02 12-23-21 (1)-Layout1
15 Water Pollution Control Notes 03 12-23-21 (1)-Layout1
Sheets and Views
Water Pollution Control Notes 03 12-23-21 (1)-Layout1
16 BMP-DET-Layout1
Sheets and Views
BMP-DET-Layout1
17 EC-01_AB-Layout1
Sheets and Views
EC-01_AB-Layout1
18 EC-02_PB-Layout1
Sheets and Views
EC-02_PB-Layout1
19 EC-03_WB-Layout1
Sheets and Views
EC-03_WB-Layout1
20 AL-01_AB-Layput1
Sheets and Views
AL-01_AB-Layput1
21 AL-02_PB-Layput1
Sheets and Views
AL-02_PB-Layput1
22 AL-03_WB-Layput1
Sheets and Views
AL-03_WB-Layput1
23 Striping-notes-Layout1
Sheets and Views
Striping-notes-Layout1
24 S-02_AB-Layout1
Sheets and Views
S-02_AB-Layout1
25 S-03_PB-Layout1
Sheets and Views
S-03_PB-Layout1
26 S-04_WB-Layout1
Sheets and Views
S-04_WB-Layout1
27 TCP-notes-Layout1
Sheets and Views
TCP-notes-Layout1
28 consignshwy2lnlsp-Layout1
Sheets and Views
consignshwy2lnlsp-Layout1
29 TC-03_1LNCL-Layout1
Sheets and Views
TC-03_1LNCL-Layout1
30 TC-04_AB-Layout1
Sheets and Views
TC-04_AB-Layout1
31 TC-05_AB_DETR-PLN-Layout1
Sheets and Views
TC-05_AB_DETR-PLN-Layout1
32 TC-06_AB_DETR-INT-Layout1
Sheets and Views
TC-06_AB_DETR-INT-Layout1
33 TC-07_AB_DETR-INT-Layout1
Sheets and Views
TC-07_AB_DETR-INT-Layout1
34 TC-08_PB-Layout1
Sheets and Views
TC-08_PB-Layout1
35 TC-09_PB_DETR-PLN-Layout1
Sheets and Views
TC-09_PB_DETR-PLN-Layout1
36 TC-10_PB_DETR-INT-Layout1
Sheets and Views
TC-10_PB_DETR-INT-Layout1
37 TC-11_PB_DETR-INT-Layout1
Sheets and Views
TC-11_PB_DETR-INT-Layout1
38 TC-12_WB-Layout1
Sheets and Views
TC-12_WB-Layout1
39 TC-13_WB_DETR-PLN-Layout1
Sheets and Views
TC-13_WB_DETR-PLN-Layout1
40 TC-14_WB_DETR-INT-Layout1
Sheets and Views
TC-14_WB_DETR-INT-Layout1
41 TC-15_WB_DETR-INT-Layout1
Sheets and Views
TC-15_WB_DETR-INT-Layout1
42 3MB - HS
3MB-S0001 INDEX-Layout1
Sheets and Views
Layout1
3MB-S0002 GENNOTES-Layout1
Sheets and Views
Layout1
3MB-S0003
Sheets and Views
Layout1
3MB-S0004
Sheets and Views
Layout1
3MB-S0005 SYMB-ABBRV-Layout1
Sheets and Views
Layout1
3MB-S0101-Layout1
Sheets and Views
Layout1
3MB-SA0101 ALAE-Layout1
Sheets and Views
Layout1
3MB-SA0201 ALAE ABUTS-Layout1
Sheets and Views
Layout1
3MB-SA0202
Sheets and Views
Layout1
3MB-SA0203

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .