NOI CP12.pdf
PDF 636 KB Posted
- Attached to
- Construction & Abandon Deep Well CP Groundbeds
- Solicitation number
- UD-24-210
- Issued by
- California
About this file
Summary of RFQ UD-24-210
This is a Request for Proposals (RFP) award recommendation document from the Long Beach Utilities Department regarding the Construction & Abandonment of Deep Well Cathodic Protection Groundbeds. The project involves abandoning existing shallow well groundbeds and installing a new deep well groundbed for steel natural gas pipeline cathodic protection at Del Amo Boulevard and Gardenia Avenue within the City of Long Beach. The RFP was released on September 18, 2024, with a deadline for proposal submissions on October 16, 2024. Four proposals were received by the deadline, of which two were deemed responsive to the mandatory minimum requirements. A Selection Committee comprised of representatives from the Long Beach Utilities Department evaluated the responsive proposals and unanimously selected Accurate Corrosion Control, Inc., of Glendale, Arizona for contract award.
The evaluation criteria consisted of five weighted categories totaling 100 points: Qualifications (25 points), Work Methodology (25 points), Staffing (20 points), References (20 points), and Reasonableness of Cost (10 points). Accurate Corrosion Control, Inc. achieved a final score of 88 points, while the competing firm, Exaro Technologies Corp., scored 71.5 points. The selection of Accurate Corrosion Control, Inc. was based on their extensive experience in cathodic protection, demonstrated understanding of industry standards and best practices, and their well-structured work plan layout that ensured efficient project execution and quality control. The document does not specify contract pricing, contract term, or funding sources.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 07.02.24 RFP Authorization Certification~1.pdf | ||
| Mandatory Attachment B Equal Benefits Ordinance Form_Fillable~1.pdf | ||
| CP12 TEST POINTS.pdf | ||
| Addendum 1 UD24-210 DR KV.pdf | ||
| Certification of Site Examination~1.pdf | ||
| CP Deep Well RFP~1.docx | DOCX document | |
| CP12 Maps~1.pdf | ||
| Material List~1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: March 31, 2025
To: B. Anatole Falagán, General Manager
From: Deanna Rubalcaba, Administrative Analyst III
Subject: RFQ UD-24-210 Construction & Abandon Deep Well CP Groundbeds
A Request for Proposals (RFP) was released on September 18, 2024, to solicit a firm to provide work hereunder consists of abandoning existing shallow well groundbeds and installing a new deep well groundbed for steel natural gas pipeline cathodic protection at Del Amo Blvd and Gardenia Ave within the City of Long Beach. Four proposals were received by the October 16, 2024 deadline.
Of the four submissions received, two were deemed responsive to meeting the mandatory minimum requirements of the RFP.
The proposals were further reviewed by a Selection Committee (Committee) comprised of key representatives from the Long Beach Utilities Department. The proposals were evaluated in accordance with the following evaluation criteria:
2 | Long Beach Utilities
After a comprehensive review and analysis of the proposals, the Committee unanimously selected Accurate Corrosion Control, Inc., of Glendale, AZ. This vendor was selected based on their extensive experience in cathodic protection, demonstrating a strong understanding of industry standards and best practices. Additionally, their well-structured work plan layout contributed to the decision, ensuring efficient project execution and quality control.
Averaged final scores for all evaluated proposals are shown in the table below:
Vendor Name Points Score (out of possible 100)
Accurate Corrosion Control Inc. 88
Exaro Technologies Corp. 71.5
Deanna Rubalcaba, Administrative Analyst III Date