This is a materials list and construction specification document for the City of Long Beach related to cathodic protection (CP) system upgrades. The project requires five primary upgrade components: installation of a new anode groundbed, relocation of an existing rectifier and cabinet, installation of an anode panel, extension of structure connections, and provision of new AC power infrastructure. The new anode groundbed requires 10 high-silicon cast iron anodes with HALAR cable, 10 anode centralizers, 180 bags of SC-3 backfill, 10 lengths of 2-inch PVC vent pipe, 8 lengths of 2-inch PVC solid pipe, and one flush traffic box with cast iron lid labeled "ANODE." The anode panel installation requires one 10-inch by 12-inch panel board with 10 circuits and 0.001 ohm shunts, plus 5 feet of #4 AWG THHN positive cable. The structure connection extension requires one flush traffic box labeled "CP TEST," 100 feet of #4 AWG HMWPE negative cable, one 3M splice kit with resin, and 4 lengths of 2-inch PVC solid pipe. New AC power installation requires 100 feet of AC power cable per city requirements and 6 lengths of 2-inch PVC solid pipe.
Prior to commencing work, contractors must obtain a City of Long Beach encroachment permit, well permit, temporary water hydrant permit, city electrical build permit, and must mark and call dig alerts at least 48 hours in advance. The rectifier and cabinet relocation requires materials as needed based on site-specific conditions. AC power cable specifications are to be determined by the electrical engineer and approved by both the City of Long Beach and the applicable power company, indicating that final power infrastructure requirements are subject to regulatory and utility approval.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 07.02.24 RFP Authorization Certification~1.pdf | ||
| NOI CP12.pdf | ||
| Mandatory Attachment B Equal Benefits Ordinance Form_Fillable~1.pdf | ||
| CP Deep Well RFP~1.docx | DOCX document | |
| CP12 Maps~1.pdf | ||
| CP12 TEST POINTS.pdf | ||
| Addendum 1 UD24-210 DR KV.pdf | ||
| Certification of Site Examination~1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CP 12 (SHEET 006)
MATERIALS LIST AND ITEMS NEEDED FOR CONSTRUCTION
The following permits will be required as a minimum to perform work:
City of Long Beach Encroachment Permit
Well Permit
Temporary Water Hydrant Permit
City of Long Beach Electrical Build Permit
Dig Alerts marked and called at least 48 hours in advance
The following provides a summary of materials needed for each upgrade step outlined in the previous section:
1. New Anode Groundbed
Quantity Item Notes
10 High-Silicon Cast Iron Anodes with #8 or #6 AWG HALAR Cable to be appropriate length
10 Anode Centralizer For 3-4” anodes
180 Bags of 50# SC-3 Backfill Loresco
10 2” PVC Vent Pipe 20-ft lengths each
8 2” PVC Solid Pipe 20-ft lengths each
1 Flush Traffic Box with Cast Iron Lid Lid labeled “ANODE”
2. Relocate Existing Rectifier and Cabinet
As needed
3. Anode Panel
1 10” x 12” panel board with (10) circuits 0.001 ohm shunts
5 Feet of #4 AWG THHN Positive Cable Colored Red
4. Extending Structure Connection
1 Flush Traffic Box with Cast Iron Lid Lid labeled “CP TEST”
100 Feet of #4 AWG HMWPE Negative Cable Colored Black
1 3M Splice Kit with Resin
4 2” PVC Solid Pipe 20-ft lengths each
5. New AC Power
100 AC Power Cable Per City Requirements for load*
6 2” PVC Solid Pipe 20-ft lengths each
*As specified by the electrical engineer, approved by the City and Power Company