Amendment_2_A E_Page_2.docx

DOCX document 23 KB Posted

Attached to
Architect-Engineering Services (AES) Federal contract opportunity
Solicitation number
NNJ16571636R
Issued by
National Aeronautics and Space Administration Johnson Space Center

About this file

Question and Answers.

View the file

Other files for this federal contract opportunity

Other files attached to Architect-Engineering Services (AES), newest first.
File Type Posted
Amendment_3_Page_2.pdf PDF
SF_30-Amendment_3.pdf PDF
SF_30_-_A E_Amendment_2.pdf PDF
Attachment_3_-_SF_330.pdf PDF
SF_30_-_Amendment_1.pdf PDF
Amendment_1_Pages_2_-_5.pdf PDF
Request_for_Qualifications-Amendment_1.pdf PDF
A-E_Request_for_Qualifications.pdf PDF
ATTACHMENT_2_Past_Performance_Questionnaire_and_Cover_Letter.docx DOCX document
ATTACHMENT_1_-_NPR_8820.2G.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NNJ16571636R

Amendment 2 Architect-Engineering Services (AES) Request for Qualifications (RFQ) Questions and Answers

Note: The questions that are listed in this document were reproduced exactly as they were submitted.

Question 12: The amended solicitation states that items such as the final LEED construction application review received from the USGBC must have 1” margins and Arial 12 point font. The LEED documents received from the USGBC are in pdf format and thus cannot be edited. Is it acceptable to submit these documents as received from the USGBC?

Response 12: Yes, the format from USGBC is acceptable.

Question 13: Should the LEED construction application review document and LEED scorecards be included in Section F or in Section H, or should they be a separate attachment?

Response 13: In accordance with RFQ section C.2.1.1a.vi pages 5 & 6, both documents shall be in Section F along with the other LEED project information being submitted.

Question 14: Should the BIM execution plan and model progression matrix be included in Section H, or as a separate attachment?

Response 14: No, these documents shall be in Section F along with the other BIM project information being submitted.

Question 15: Is it required that tables, captions and graphics in Section H must have a font no less than 12 point type? This could be restrictive with the 20-page limit for Section H

Response 15: Tables, captions, and graphics are not necessary but if utilized 12 point type is required for Section H.