EXHIBITS_1-9_Core-IDIQ_Price_without_RTO_1.pdf
PDF 138 KB Posted
- Solicitation number
- NNG16557109R
About this file
Exhibits 1-9
View the file
Other files
Show 40 more
Latest 50 of 93 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP NNG16557109R
Proposing Entity:
Core Requirements Base Period Option 1 Option 2 Option 3 Option 4 GRAND Elements of Cost CY* 1 CY 2 CY 3 CY 4 CY 5 TOTAL
TOTAL FIRM FIXED PRICE
*Contract Year
This exhibit contains Source Selection Information. See FAR 3.104.
EXHIBIT 1
PRIME OFFEROR
CORE REQUIREMENTS
SUMMARY OF FIRM FIXED PRICE
Elements of Cost TOTAL
TOTAL FIRM FIXED PRICE
This exhibit contains Source Selection Information. See FAR 3.104.
EXHIBIT 2
PRIME OFFEROR
PHASE-IN PLAN PRICING
EXHIBIT 3
PRIME OFFEROR
REPRESENTATIVE TASK ORDER (RTO) NO. 2 AND ADMIN 1 PRICE SUMMARIES
RTO NO. 2
TOTAL FIRM FIXED
PRICE
ADMIN 1 PRE-PRICED WORK LINE ITEMS
Base Period Option 1 Option 2 Option 3 Option 4 GRAND
Contract Year 1 Contract Year 2 Contract Year 3 Contract Year 4 Contract Year 5 TOTAL
This exhibit contains Source Selection Information. See FAR 3.104.
TOTAL DIRECT LABOR HOURS
IDIQ Total Loaded Base Period Option 1 Option 2 Option 3 Option 4 GRAND SOW Direct Labor Pricing Contract Year 1 Contract Year 2 Contract Year 3 Contract Year 4 Contract Year 5 TOTAL
7.0A.3.a. TOTAL A-E SERVICES - DESIGN
SERVICES
7.0A.3.b. TOTAL A-E SERVICES - ENINGEERING
AND TECHNICAL SERVICES
7.0C.1. TOTAL PLANNING SERVICES - MASTER
PLANNING
7.0C.2. TOTAL PLANNING SERVICES - SPACE
SURVEY SERVICES
7.0C.3. TOTAL PLANNING SERVICES -
DIRECTORATE PLANNING SERVICES
7.0C.4. TOTAL PLANNING SERVICES -
SCHEDULING SERVICES
7.0D. TOTAL INFORMATION RESOURCES (IR)
SERVICES
7.0A, 7.0C, 7.0D OFFEROR-PROPOSED PROGRAM
MANAGEMENT AND ADMINISTRATIVE
GRAND TOTAL GPM ESTIMATED
DIRECT LABOR SERVICES PRICE
This exhibit contains Source Selection Information. See FAR 3.104.
GOVERNMENT PRICING MODEL (GPM) SERVICES DIRECT LABOR PRICE SUMMARY
RFP NNG16557109R
Proposing Entity:
EXHIBIT 3A
PRIME OFFEROR
EXHIBIT 4
PRIME OFFEROR
CONSTRUCTION/DESIGN-BUILD COEFFICIENTS
Construction Services Annual Estimated Grand Total Construction/Design-Build Coefficients Construction Costs Proposed Total Costs With Proposed Total Costs With Proposed Total Costs With Proposed Total Costs With Proposed Total Costs With Costs With
By Project Value Each Contract Year Coefficient Coefficient Coefficient Coefficient Coefficient Coefficient Coefficient Coefficient Coefficient Coefficient Coefficient Design-Build Minimum Design $0 to $15K $574,865 >$15K to $100K $353,542 >$100K $0 Total Design-Build Minimum Design $928,407
Design-Build Full Design $0 to $15K $33,819 >$15K to $100K $1,404,034 >$100K $2,405,038 Total Design-Build Full Design $3,842,891
Design-Bid-Build Construction Only $0 to $15K $823,649 >$15K to $100K $2,864,868 >$100K $5,091,651 Total Design-Bid-Build Construction Only $8,780,168
GRAND TOTALS $13,551,466
This exhibit contains Source Selection Information. See FAR 3.104.
Option 4 - Contract Year 5
CONSTRUCTION SERVICES
Base Period - Contract Year 1 Option 1 - Contract Year 2 Option 2 - Contract Year 3 Option 3 - Contract Year 4
EXHIBIT 5
PRIME OFFEROR
REPRESENTATIVE TASK ORDER (RTO) NO. 2 ELEMENTS OF COST SUMMARY
Contract Year _____
Elements of Cost Proposed Costs
TOTAL ONSITE DIRECT LABOR HOURS (Derived from Exhibit 5A )
TOTAL ONSITE DIRECT LABOR COSTS (Derived from Exhibit 5A )
Other Direct Costs (ODCs):
Subcontracts (list separately by company)* Other (Specify) Applicable Indirect Costs Applied Against ODCs
TOTAL ODCs
TOTAL COSTS
PROFIT (Applied Against ODCs only, if applicable)
TOTAL FIRM FIXED PRICE
*List each Subcontractor separately by company Offerors may adjust elements of cost to be consistent with your current accounting system.
This exhibit contains Source Selection Information. See FAR 3.104.
EXHIBIT 5A
PRIME OFFEROR
DIRECT LABOR HOURS, DIRECT LABOR RATES AND DIRECT LABOR COSTS DETAIL
Contract Year _____
Direct Labor Direct Labor Onsite Direct Labor Hours Fully Loaded Hourly Rates* Costs
(List by Individual DL Category)*
GRAND TOTAL ONSITE DIRECT LABOR HOURS AND COSTS
This exhibit contains Source Selection Information. See FAR 3.104.
REPRESENTATIVE TASK ORDER (RTO) NO. 2
DIRECT LABOR (DL) CATEGORIES:
*Insert the DL Categories and DL Onsite Fully-Loaded Hourly Rates proposed in the Contract Attachment entitled, "IDIQ Fixed Price Rates Matrix."
PRIME OFFEROR
ADMIN 1 PRE-PRICED WORK LINE ITEMS
(Based on Respective Discipline of Work: A = Architectural, E = Electrical, F - Fire Protection, and M = Mechanical)
ESTIMATED GRAND
ITEM QUANTITY TOTAL
NUMBER WORK LINE ITEM DESCRIPTION* EACH CY* UNIT** UNIT PRICE TOTAL
PRICE UNIT PRICE TOTAL
PRICE UNIT PRICE TOTAL
PRICE UNIT PRICE TOTAL
PRICE UNIT PRICE TOTAL
PRICE PRICE
A-1
Remove/Abate Vinyl-Asbestos Floor Tile (up to 200 SF) – includes removal of VAT and mastic and all other Construction Specifications SECTION 13285 and GPR 1840.1 requirements pertaining to VAT abatement, including containment. Price does not include carpet removal.
1000 SF
A-2
Remove/Abate Vinyl-Asbestos Floor Tile (over 200 SF) – includes removal of VAT and mastic and all other Construction Specifications SECTION 13285 and GPR 1840.1 requirements pertaining to VAT abatement, including containment. Price does not include carpet removal.
10000 SF
A-3
Remove/Abate Vinyl-Asbestos Floor Tile (up to 200 SF) – includes removal of VAT and mastic and all other Construction Specifications SECTION 13285 and GPR 1840.1 requirements pertaining to VAT abatement. Does not include containment. Price does not include carpet removal.
100 SF
A-4
Remove/Abate Vinyl-Asbestos Floor Tile (over 200 SF) – includes removal of VAT and mastic and all other Construction Specifications SECTION 13285 and GPR 1840.1 requirements pertaining to VAT abatement. Does not include containment. Price does not include carpet removal.
100 SF
A-5
Remove/Abate Vinyl-Asbestos Floor Tile and Carpet (up to 200 SF) – includes removal of VAT and mastic and all other Construction Specifications SECTION 13285 and GPR 1840.1 requirements pertaining to VAT abatement, including containment. Assumes carpet is adhered to tile.
1000 SF
A-6
Remove/Abate Vinyl-Asbestos Floor Tile and Carpet (over 200 SF) – includes removal of VAT and mastic and all other Construction Specifications SECTION 13285 and GPR 1840.1 requirements pertaining to VAT abatement, including containment. Assumes carpet is adhered to tile.
5400 SF
A-7
Remove/Abate Vinyl-Asbestos Floor Tile and Carpet (up to 200 SF) – includes removal of VAT and mastic and all other Construction Specifications SECTION 13285 and GPR 1840.1 requirements pertaining to VAT abatement. Does not include containment. Assumes carpet is adhered to tile.
500 SF
A-8
Remove/Abate Vinyl-Asbestos Floor Tile and Carpet (over 200 SF) – includes removal of VAT and mastic and all other Construction Specifications SECTION 13285 and GPR 1840.1 requirements pertaining to VAT abatement. Does not include containment. Assumes carpet is adhered to tile.
500 SF
A-9 Industrial Hygienist, per day, IAW Construction Specifications SECTION 13285 and GPR 1840.1 requirements pertaining to VAT abatement.
20 DY
A-10 Certified Industrial Hygienist, per day, IAW Construction Specifications SECTION 13285 and GPR 1840.1 requirements pertaining to VAT abatement.
30 DY
A-11 Waste Disposal, per job, IAW Construction Specifications SECTION 13285 and GPR 1840.1 requirements pertaining to VAT abatement. 25 JB
A-12 Remove Vinyl Composition Tile – remove tile and adhesive. 10800 SF A-13 F/I VCT – includes subfloor preparation when required. 21600 SF
A-14 Flash Patch Floor – entails application of leveling grout and final cleaning for new VCT or carpet. Assumes project size of 400sf or larger, otherwise productivity adjustment.
2200 SF
A-15 Perform Testing of Concrete for Moisture Content – moisture testing is required before installing Carpet Floor Tile. SF
A-16 Remove Carpet – remove carpet and adhesive. 32300 SF A-17 F/I Carpet Floor Tile. 32300 SF
A-18 Remove and Reinstall Raised Access Floor Panels – entails one-time removal and replacement only. Light furniture relocation included. Heavy equipment and furniture by others.
2200 SF
A-19 Remove Cove Base. 4900 LF A-20 F/I Cove Base. 4900 LF
A-21 Remove Wall Shelf & Patch Wall – includes patching holes left by anchors. 230 SF
A-22 Demo Metal Partition cover plate. 1080 SF
A-23 Demo CMU Wall – not cut-out demo. No toothing. Assumes full wall sections at least 10’ long. Includes dust protection. 65 CY
A-24 Demo Stud Wall – includes saw cutting if necessary. 5380 SF
A-25 Stud/Drywall Partition – includes constructing stud wall, drywall, taping, spackling, and finishing; excludes insulation. 5380 SF
A-26 Skim Coat Patch Drywall – assumes entire wall needs refinishing.
Includes applying durabond and Lafarge compound skim coats. 3230 SF
A-27 Prepare and Paint Walls – includes repairing any minor imperfections, sanding, and painting with 1 coat primer and 2 coats latex. 32300 SF
A-28 F/I 1/4" drywall over existing wall - includes adhesive or mechanical fasteners and preparation for painting. 32300 SF
A-29 F/I Room Signs – includes Hermes #723-087 frame with header and 3-lines. Only room number tag is included. 150 EA
A-30 Wall Penetrations up to 4" in diameter – used for conduit or pipe wall penetrations through masonry or partition walls. Core drilling through concrete not included. Fire caulk not included.
100 EA
A-31 Fire Caulk Penetration up to 4" in diameter – fire caulk only. Does not include special fire penetration assemblies. 100 EA
A-32 Demo Door and Frame – as part of wall demo or part of door replacement. 100 EA
A-33 F/I Wood Door and Frame (3’x7’) – includes caulking, door stop, hinges, and lockset. 75 EA
A-34 F/I Wood Door & Frame (6’x7’) – no cut-out or jamb work included.
No finishing included. Not fire rated. Not an egress door. 25 EA
A-35 F/I Red Oak Door & Frame (3’x7’) – installed door with frame and hardware. 10 EA
A-36 F/I Metal Door and Frame (3’x7’) – includes caulking, door stop, hinges, and lockset. 20 EA
A-37 Paint Door and Frame – includes sanding and painting with 1 coat primer and 2 coats latex. 120 EA
A-38 Paint Door and Half-Leaf and Frame – includes sanding and painting with 1 coat primer and 2 coats latex. 8 EA
A-39 Paint Induction Units – prep surface, 1 coat primer and 2 finish coats. 200 EA
A-40 Prime and Paint Wiremold – prep surface, 1 coat primer and 2 finish coats. 670 LF
A-41 Remove and Reinstall Acoustic Ceiling Tile – removal and reinstallation of same tiles. Includes new tiles where breakage occurs. 10800 SF
A-42 Remove and Replace Ceiling Tile – includes 2’x2’ tile and 2’x4’ tile. 32300 SF
A-43 Demo Suspended Ceiling – removal of ceiling grid, suspension system and tiles. 10800 SF
A-44 F/I Ceiling Grid and Tile – includes support attachments, suspension system, grid and tiles (2’x2’ or 2’x4’). 10800 SF
A-45 F/I Handicapped Door Opener - per Construction Specifications SECTION 08 71 00 requirements - includes push buttons, door opening device, and provision of electrical power.
30 EA
E-1 Remove/Blank Floor Stack – includes the removal of electrical/telephone floor stack and the installation of a blank cover plate.
Remove wire back to nearest junction box (50 LF).
30 EA
E-2 F/I Light Switch – including wiring, conduit (including fittings, connectors, hangers, offsets, bends, etc.), box, wall plate, and wall plate identification label. Includes up to 50 LF of wiring and conduit.
120 EA
E-3
F/I Receptacle – includes wiring, conduit (including fittings, connectors, hangers, offsets, bends, etc.), box, wall plate, and wall plate identification label. Includes up to 50 LF of wiring and conduit (to panelboard). Update panelboard schedule.
100 EA
E-4
F/I Receptacle – includes wiring, conduit (including fittings, connectors, hangers, offsets, bends, etc.), box, wall plate, and wall plate identification label. Includes up to 10 LF of wiring and conduit (to existing receptacle / junction box).
100 EA
E-5 F/I Wire/Conduit for Lighting and Receptacle Circuits (10 LF) – includes wire and conduit (including fittings, hangers, offsets, etc). Wire and conduit size - 3#12, ¾" EMT.
100 EA
E-6 F/I Wire/Conduit for Lighting and Receptacle Circuits (25 LF) – includes wire and conduit (including fittings, hangers, offsets, etc). Wire and conduit size - 3#12, ¾" EMT.
100 EA
E-7 F/I Wire/Conduit for Lighting and Receptacle Circuits (50 LF) – includes wire and conduit (including fittings, hangers, offsets, etc). Wire and conduit size - 3#12, ¾" EMT.
125 EA
E-8 Remove Existing Lights – includes the removal of interior 2’ x 4’ fluorescent fixtures, wiring, and conduit back to nearest JB (10 LF). 150 EA
E-9
F/I New Lights – includes 2’ x 4’, 2 lamp, parabolic, recessed fluorescent fixture (Lithonia catalog # 2PMO G B 232 27LS MVOLT GEB10IS or equal), fixture supports, wire and conduit (including fittings, hangers, offsets, bends, etc.). Includes up to 6 LF of MC cable for connection to nearest junction box. Update panelboard schedule.
30 EA
E-10 Same as E-9 except for light fixture type. Provide 2’ x 4’, 3 lamp, parabolic, recessed fluorescent fixture (Lithonia catalog # # 2PMO G B 332 27LS MVOLT 1/3 GEB10IS or equal).
30 EA
E-11 Same as E-9 except for light fixture type. Provide 2’ x 4’, 2 lamp, recessed fluorescent fixture (Lithonia catalog # 2SP G 232 A12125 MVOLT GEB10IS or equal).
30 EA
E-12 Same as E-9 except for light fixture type. Provide 2’ x 4’, 3 lamp, recessed fluorescent fixture (Lithonia catalog # 2SP G 332 A12125 MVOLT 1/3 GEB10IS or equal).
30 EA
E-13 Same as E-9 except for light fixture type. Provide 2’ x 4’, 2 lamp, recessed fluorescent fixture (Lithonia catalog # 2AV G 232 MDR MVOLT GEB10IS or equal).
30 EA
E-14 Same as E-9 except for light fixture type. Provide 2’ x 4’, 3 lamp, recessed fluorescent fixture (Lithonia catalog # 2AV G 332 MDR MVOLT GEB10IS or equal).
30 EA
E-15 Same as E-9 except for light fixture type. Provide 2’ x 4’, 7200 lumens LED recessed fixture (Lithonia catalog # 2GTL4 72L EZ1 LP40 or equal).
50 EA
E-16 Same as E-9 except for light fixture type. Provide 2’ x 4’, 5000 lumens LED recessed fixture (Lithonia catalog # 2AVL4 50L MDR EZ1 LP40 or equal).
50 EA
E-17 Same as E-9 except for light fixture type. Provide 2’ x 4’, 7200 lumens LED recessed fixture (Lithonia catalog # 2RTL4 72L EZ1 LP40 or equal).
50 EA
E-18
F/I Ceiling Mounted Motion Sensors (Lighting Control) – includes motion sensor (WattStopper W500A or equal), power pack, and all required wire and conduit. Includes up to 10 LF of power wiring/conduit and up to 50 LF of control wiring (from power pack to sensor).
30 EA
E-19 F/I 700 Wiremold – includes wiremold (10 LF), box, wall plate, connector, and fittings. 30 EA
E-20 F/I New Receptacle using Wiremold – includes wire, and wall plate identification label. 50 EA
E-21 F/I New Light Switch using Wiremold – includes wire, and wall plate identification label. 50 EA
E-22 F/I Power/LAN Floor Box – entails a complete installation including core drill floor penetration, conduit, drilling, anchors, water control, etc. 20 EA
E-23 Remove Power/LAN Floor Box – entails a complete removal of box, conduit, wire and patching the floor. 20 EA
E-24 Remove Receptacle – entails complete removal back to nearest junction box. Not to exceed 10’. Trace circuit. 50 EA
E-25 Remove Wiremold (700) (per 10’) – includes demo of wire and receptacles. 100 EA
E-26 Remove 4000 Wiremold – entails removal of raceway, wire and receptacles to nearest wall or cut-off point, cap end.
60 LF
E-27 Remove 6000 Wiremold – entails removal of raceway, wire and receptacles to nearest wall. Cap end. 60 LF
E-28 Demo Wire/Conduit (per 10’) – includes hangers and straps. 300 EA
E-29 Remove Circuit Breakers 20-90A 1P – includes blank cover plate and re-label. Does not include lock out/tag out or R&R panel cover. 100 EA
E-30 Remove Circuit Breakers 20-100A 2P – includes blank cover plate and re-label. Does not include lock out/tag out or R&R panel cover. 50 EA
E-31 Remove Circuit Breakers 20-100A 3P – includes blank cover plate and re-label. Does not include lock out/tag out or R&R panel cover. 50 EA
E-32 Remove Underfloor Quads (30’ sealtite) – includes removal of conduit and wire from power source and relabeling. 20 EA
E-33 Remove/Blank-off Telephone Floor Stacks – includes removal of conduit and wire to nearest J-box. Blank off with floor inserts. 20 EA
E-34
F/I Underfloor Quads (30’ sealtite) – includes circuit breaker, ¾" sealtite, #12 wire from power source to underfloor location. Includes KO’s, connectors, terms, boxes, covers, receptacles. Does not include lock out/tag out or R&R panel cover.
25 EA
E-35
Add for Dimmable Ballast – additive price to Admin 1 items E-7, E-8, E- 9, E-10, E-11, E-12 if dimmable light specified. Does not apply to 4-lamp fixtures. Does not apply to refitting existing fixtures with dimmable ballasts.
25 EA
E-36 Demo Wall Switch – includes removal of conduit/wire back to J-box and wall patching. 100 EA
F-1 Drain/Refill Sprinkler System – includes submitting a sprinkler outage request. 120 EA
F-2 Demo Sprinkler Head – includes removal of head, pipe hangers and ceiling tile replace. 100 EA
F-3 Update Sprinkler Head – involves replacement with a new head at the same location. Includes pipe modifications, escutcheons, ceiling tile. 100 EA
F-4
Relocate Sprinkler Head – includes piping, anchoring, hangers, escutcheons, ceiling tile. Maximum distance is 5' -0" in one direction (left, right, straight, or down) from the original location of the sprinkler head elbow down turn.
100 EA
F-5 F/I New Sprinkler Head – includes tap, up to 15’ of pipe and a complete installation through painting of pipe and ceiling tile work. Up to 15 feet high.
100 EA
F-6 Demo Smoke Detector/TRI – includes removal of conduit/wire back to J-box. 40 EA
F-7 Demo Motion Sensor – includes removal of conduit/wire back to j-box. 20 EA
M-1 Demo Metal Pipe up to 2" – includes removal of hangers and capping of pipe. Bare non-insulated pipe only. 650 LF
M-2 Remove and Reinstall Ceiling Diffusers – includes disconnection, removal, storage, and reinstallation of diffusers. Up to 15’ height in its same location.
100 EA
M-3 Relocate Ceiling Diffusers – same scope as item M-2 but reinstallation at a different location, and includes up to 5’ of flex duct. 50 EA
M-4 F/I 24"x24" Ceiling Diffusers – includes up to 5’ flex duct. Balancing not included. 100 EA
M-5 Demo Pneumatic T-Stat – includes line capping. 20 EA
M-6 F/I Pneumatic T-Stat – entails complete installation including cutting drywall through calibration. Maximum distance to main air is 20 linear feet.
50 EA
M-7 Relocate Pneumatic T-Stat – entails complete removal and reinstallation, including cutting drywall through calibration. Maximum relocation distance 20 linear feet.
10 EA
*Estimated Quantities for Evaluation Purposes Only **Acronyms and Abbreviations for the Admin 1 Work Line Items are in Contract Attachment A, Statement of Work.
This exhibit contains Source Selection Information. See FAR 3.104.
TOTAL PRICE
Contract Year 5
EXHIBIT 6
Contract Year 1 Contract Year 2 Contract Year 3 Contract Year 4 Base Period Option 1 Option 2 Option 3 Option 4
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
SOW 7.0A.3.a. A-E Services - Design Services:
Senior Architect 188 Architect 1354 Senior Civil Engineer 56 Civil Engineer 188 Senior Mechanical Engineer 188 Mechanical Engineer 1090 Plumbing Engineer 714 HVAC Engineer 714 Senior Electrical Engineer 188 Electrical Engineer 1805 Senior Structural Engineer 56 Structural Engineer 188 Fire Protection Engineer 451 Environmental Engineer 188 Estimator 263 Specification Writer 56 CADD/BIM Technician 226
SUBTOTAL A-E SERVICES - DESIGN
SERVICES 7913
SOW 7.0A.3.b. A-E Services - Engineering and Technical Services:
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Senior Architect 56 Architect 188 Senior Civil Engineer 56 Civil Engineer 451 Senior Mechanical Engineer 56 Mechanical Engineer 451 Plumbing Engineer 94 HVAC Engineer 357 Senior Electrical Engineer 56 Electrical Engineer 263 Senior Structural Engineer 56 Structural Engineer 357 Fire Protection Engineer 357 Environmental Engineer 451 Estimator 263 Specification Writer 94 CADD/BIM Technician 188
SUBTOTAL A-E SERVICES -
ENINGEERING AND TECHNICAL
SERVICES
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Senior Planner 1880
SUBTOTAL PLANNING SERVICES -
MASTER PLANNING 1880
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
CADD Technician 583 Senior Systems Analyst 395
SUBTOTAL PLANNING SERVICES -
SPACE SURVEY SERVICES 978
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Senior Planner 1880
SUBTOTAL PLANNING SERVICES -
DIRECTORATE PLANNING SERVICES 1880
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Scheduler 1880
SUBTOTAL PLANNING SERVICES -
SCHEDULING SERVICES 1880
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate**
Total GPM Estimated Services
Direct Labor Price
CADD/BIM Technician 1880 CADD Technician 1880 Senior Systems Analyst 1880 Senior Programmer Analyst 1880
SUBTOTAL INFORMATION
RESOURCES (IR) SERVICES 7520
Fully-Loaded Direct Labor Onsite Rate^
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate^
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate^
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate^
Total GPM Estimated Services
Direct Labor Price
Fully-Loaded Direct Labor Onsite Rate^
Total GPM Estimated Services
Direct Labor Price
SUBTOTAL OFFEROR-PROPOSED
PROGRAM MANAGEMENT AND
ADMINISTRATIVE
GRAND TOTAL GPM ESTIMATED
SERVICES DIRECT LABOR
HOURS AND PRICE
SOW 7.0C.4. Planning Services - Scheduling:
SOW 7.0D. Information Resources (IR) Services:
Option 2 - CY 3
^^Offeror-Proposed Annual Estimated Services Direct Labor Hours for Program Management and Administrative Direct Labor are for Price Evaluation Purposes Only
Grand Total GPM Estimated Services Direct
Labor Price
Grand Total GPM Estimated Services Direct
Labor Price
Grand Total GPM Estimated Services Direct
Labor Price
SOW 7.0C.2. Planning Services - Space Survey Services:
SOW 7.0C.3. Planning Services - Directorate Planning:
GPM-Specified Non-Management Services Direct Labor Category
Option 1 - CY 2 Option 2 - CY 3 Option 4 - CY 5GPM Annual Estimated Services
Direct Labor Hours*
Base Period - CY 1 Option 3 - CY 4
GPM Annual Estimated Services
Direct Labor Hours*
GPM-Specified Non-Management Services Direct Labor Category
Option 1 - CY 2 Option 2 - CY 3 Option 4 - CY 5Base Period - CY 1 Option 3 - CY 4
GOVERNMENT PRICING MODEL (GPM)
RFP NNG16557109R
Proposing Entity:
EXHIBIT 7
PRIME OFFEROR
Contract Year ____
GPM-Specified Non-Management Services Direct Labor Category
Option 1 - CY 2 Option 2 - CY 3 Option 4 - CY 5 Grand Total
GPM Estimated Services Direct
Labor Price
GPM Annual Estimated Services
Direct Labor Hours*
Base Period - CY 1 Option 3 - CY 4
Option 4 - CY 5
Grand Total GPM Estimated Services Direct
Labor Price
GPM-Specified Non-Management Services Direct Labor Category
Option 1 - CY 2 Option 2 - CY 3 Option 4 - CY 5GPM Annual Estimated Services
Direct Labor Hours*
GPM-Specified Non-Management Services Direct Labor Category
Option 1 - CY 2
Base Period - CY 1 Option 3 - CY 4
GPM Annual Estimated Services
Direct Labor Hours*
Base Period - CY 1 Option 3 - CY 4
Option 4 - CY 5
This exhibit contains Source Selection Information. See FAR 3.104.
Option 2 - CY 3
*GPM Annual Estimated Services Direct Labor Hours for Price Evaluation Purposes Only **Fully-Loaded Onsite Direct Labor Rate must match the Fully-Loaded Direct Labor Rate proposed in the Contract Attachment entitled "IDIQ Fixed Price Rates Matrix."
Offeror Annual
Estimated Services
Direct Labor Hours^^
Base Period - CY 1 Option 3 - CY 4
^Offeror-Proposed Program Management and Administrative Direct Labor Categories and Fully-Loaded Direct Labor Onsite Rates must match those proposed in the Contract Attachment entitled "IDIQ Fixed Price Rates Matrix."
Offeror-Proposed Program Management and Administrative
Direct Labor Category^
Option 4 - CY 5 Grand Total GPM Estimated Services Direct
Labor Price
Option 1 - CY 2
Grand Total GPM Estimated Services Direct
Labor Price
SOW 7.0A, 7.0C, and 7.0D Offeror-Proposed Program Management and Administrative:
GPM Annual Estimated Services
Direct Labor Hours*
Base Period - CY 1 Option 3 - CY 4
GPM Annual Estimated Services
Direct Labor Hours*
Base Period - CY 1 Option 3 - CY 4 SOW 7.0C.1. Planning Services - Master Planning:
Grand Total GPM Estimated Services Direct
Labor Price
GPM-Specified Non-Management Services Direct Labor Category
Option 1 - CY 2 Option 2 - CY 3
GPM-Specified Non-Management Services Direct Labor Category
Option 1 - CY 2 Option 2 - CY 3 Option 4 - CY 5
EXHIBIT 8A
PRIME OFFEROR
SMALL BUSINESS SUBCONTRACTING PLAN GOALS
BASE CONTRACT PERIOD ONLY
(Core Requirements Plus IDIQ Maximum Ordering Value)
Dollar Amount* Percentage Dollar Amount* Percentage
Small Disadvantaged Business Concerns
Women-Owned Small Business Concerns
Historically Black Colleges and Universities/Minority Serving Institutions
HUBZone Small Business Concerns
Veteran-Owned Small Business Concerns
Service-Disabled Veteran-Owned Small Business Concerns
Other Small Business Concerns
TOTAL SMALL BUSINESS SUBCONTRACTING
Large Business Concerns
TOTAL SUBCONTRACTING
(SMALL & LARGE BUSINESS CONCERNS)
*Dollar Amount should be the same
This exhibit contains Source Selection Information. See FAR 3.104.
SMALL BUSINESS CATEGORY
PROPOSED BASE PERIOD CONTRACT GOALS
(Core Proposed Value plus IDIQ Max)
$TBP
PROPOSED BASE PERIOD CONTRACT GOALS
BASED ON TOTAL PLANNED SUBCONTRACTS OF
$TBP
EXHIBIT 8B
PRIME OFFEROR
SMALL BUSINESS SUBCONTRACTING PLAN GOALS
OPTION PERIODS ONLY
(Core Requirements Plus IDIQ Maximum Ordering Value)
Dollar Amount* Percentage Dollar Amount* Percentage Dollar Amount** Percentage Dollar Amount** Percentage Dollar Amount** Percentage Dollar Amount** Percentage Dollar Amount** Percentage Dollar Amount** Percentage
Small Disadvantaged Business Concerns
Women-Owned Small Business Concerns
Historically Black Colleges and Universities/Minority Serving Institutions
HUBZone Small Business Concerns
Veteran-Owned Small Business Concerns
Service-Disabled Veteran-Owned Small Business Concerns
Other Small Business Concerns
TOTAL SMALL BUSINESS SUBCONTRACTING
Large Business Concerns
TOTAL SUBCONTRACTING
(SMALL & LARGE BUSINESS CONCERNS)
*Dollar Amount should be the same
This exhibit contains Source Selection Information. See FAR 3.104.
PROPOSED OPTION 3 GOALS
BASED ON OPTION 3 PLANNED
SUBCONTRACTS OF $TBP
PROPOSED OPTION 4 GOALS (Core Proposed Value plus IDIQ Max)
$TBP
PROPOSED OPTION 4 GOALS
BASED ON OPTION 4 PLANNED
SUBCONTRACTS OF $TBPSMALL BUSINESS CATEGORY
PROPOSED OPTION 1 GOALS (Core Proposed Value plus IDIQ Max)
$TBP
PROPOSED OPTION 1 GOALS
BASED ON OPTION 1 PLANNED
SUBCONTRACTS OF $TBP
PROPOSED OPTION 2 GOALS (Core Proposed Value plus IDIQ Max)
$TBP
PROPOSED OPTION 2 GOALS
BASED ON OPTION 2 PLANNED
SUBCONTRACTS OF $TBP
PROPOSED OPTION 3 GOALS (Core Proposed Value plus IDIQ Max)
EXHIBIT 8C
PRIME OFFEROR
SMALL BUSINESS SUBCONTRACTING PLAN GOALS
BASE CONTRACT PERIOD PLUS FOUR OPTION PERIODS
(Core Requirements Plus IDIQ Maximum Ordering Value)
Dollar Amount* Percentage Dollar Amount* Percentage
Small Disadvantaged Business Concerns
Women-Owned Small Business Concerns
Historically Black Colleges and Universities/Minority Serving Institutions
HUBZone Small Business Concerns
Veteran-Owned Small Business Concerns
Service-Disabled Veteran-Owned Small Business Concerns
Other Small Business Concerns
TOTAL SMALL BUSINESS SUBCONTRACTING
Large Business Concerns
TOTAL SUBCONTRACTING
(SMALL & LARGE BUSINESS CONCERNS)
*Dollar Amount should be the same
This exhibit contains Source Selection Information. See FAR 3.104.
SMALL BUSINESS CATEGORY
PROPOSED BASE PLUS 4 OPTION PERIODS
CONTRACT GOALS
(Core Proposed Value plus IDIQ Max)
$TBP
PROPOSED BASE PLUS 4 OPTION PERIODS
CONTRACT GOALS
BASED ON TOTAL PLANNED SUBCONTRACTS OF
| Exh 1 Prime CORE Summary by CY |
| Exh 2 Phase-in Plan |
| Exh 3 Prime Sum RTO2 & Admin 1 |
| Exh 3A Prime GPM Summary |
| Exh 4 Const Coefficients |
| Exh 5 Prime RTO 2 Pricing |
| Exh 5A RTO 2 DL Detail |
| Exh 6 Admin 1 Prepriced Items |
| Exh 7 Prime GPM Pricing |
| Exh 8A SB Sub Plan Base Only |
| Exh 8B SB Sub Plan Options |
| Exh 8C SB Sub Plan Base+Opts |
File details come from the government source that posted it. Updated .