QA_Final.pdf

PDF 160 KB Posted

Attached to
SAFETY AND MISSION ASSURANCE SERVICES SMAS II
Solicitation number
NNG16547352R
Issued by

About this file

Questions Answers

View the file

Other files

File Type Posted
Amendment_4.pdf PDF
Enclosure_4_-_GPM.pdf PDF
Enclosure_4_-_GPM.pdf PDF
Attachment_J_-_DD254.pdf PDF
Questions_ _Answers.pdf PDF
Exhibit_12_-_Past_Performance_Questionnaire.pdf PDF
Amendment__3.pdf PDF
Attachment_A_SOW.pdf PDF
Amendment_2.pdf PDF
SMAS_II_Amendment_1.pdf PDF
Attachment_A_SOW.pdf PDF
Enclosure_4_GPM.pdf PDF
Enclosure_1_Scenario.pdf PDF
Attachment_K_IT_Security_Applicable_Documents_List.pdf PDF
Questions_and_Answers.pdf PDF
Exhibit_2A_-_Prime SS_Non-Mgmt_DL_Con.pdf PDF
Attachment_L_Wage_Determination.pdf PDF
Exhibit_12_-_Past_Performance_Questionnaire.pdf PDF
Enclosure_2_Contract_Historical_Data.pdf PDF
Attachment_C_Financial_Management_Reporting.pdf PDF
Exhibit_2A_Sample.pdf PDF
Exhibit_11B_-_DCMA_Info.pdf PDF
Attachment_E_PIV.pdf PDF
Exhibit_10A_-_FB_Exempt.pdf PDF
Exhibit_2C_-_Non-SS_Non-Mgmt_DL_Con.pdf PDF
Exhibit_3_-_Prime_GPM_Summary.pdf PDF
RFP_-_NNG16547352R.pdf PDF
Attachment_G_-_Contract_Historical_Data.pdf PDF
Attachment_H.pdf PDF
Attachment_A_-_SOW.pdf PDF
Exhibit_4_-_Source_Personnel.pdf PDF
Exhibit_6B_-_G A_Pool.pdf PDF
Attachment_F.pdf PDF
Exhibit_2B_-_Prime_ _SS_Offsite_M A.pdf PDF
Exhibit_10B_-_FB_NonExempt.pdf PDF
Exhibit_8_-_Phase-In_Plan.pdf PDF
Exhibit_1A.pdf PDF
Exhibit_8A_-_Phase-In_DL.pdf PDF
Attachment_D-_Government_Furnished_Property.pdf PDF
Exhibit_5_-_Sum_Indirect_Rates.pdf PDF
Exhibit_2D_-_Non-SS_Offsite_M A.pdf PDF
Attachment_J_-_DD254.pdf PDF
Enclosure_4_GPM.pdf PDF
Exhibit_9_-_Prod_WY.pdf PDF
Exhibit_6A_-_Overhead_Pool(s).pdf PDF
Attachment_J.pdf PDF
Exhibit_1B.pdf PDF
Enclosure_3_Quality_Assurance_Surveillance_Plan.pdf PDF
Exhibit_11A_-_DCAA_Info.pdf PDF
Attachment_B_IDIQ_Direct_Labor_Rates.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

96. Section I & L, Since this services procurement is a small business set-aside requiring the prime to perform more than 50% of the cost of contract performance incurred for personnel, we respectfully request that 52.215-23 (Limitations on Pass-Through Charges), contained in

Section I.1, and 52.215-22 (Limitations on Pass-Through Charges – Identification of

Subcontract Effort), contained in Section L.1, be removed from the solicitation.

Response: The above clauses cannot be removed from the solicitation.

97. Section I, There is no Employee Class or Monetary Wage—Fringe Benefits information provided. Please clarify.

Response: I.11 Clause 52.222-42 is hereby removed and is RESERVED. It is not applicable to the SMAS II RFP.

98. Section L, Since adequate price competition is expected (in accordance with RFP Section

L.13, Page 79), and proposals are not required to be cost certified (in accordance with RFP

Section L.13(a)), we respectfully request that 52.215-20 (Requirements for Certified Cost or

Pricing Data and Data Other Than Certified Cost or Pricing Data (Oct 2010)) be removed from Section L.1 or Alternate IV be added to 52.215-20.

Response: Alternate IV added. See amendment 4.

99. The RFP instructions on p. 89 indicate that Exhibits 10A and 10B (to appear in the Cost

Volume) fulfill the Total Compensation Plan requirement for non-significant subcontractors.

We interpret this to mean that for the Mission Suitability Volume, the non-significant subcontractors do not need to replicate their Total Compensation Plan. Is this correct?

Response: Yes, that is correct.

100. The GPM states that the Metrology Quality Assurance Engineer or Sr. Product Engineer requires an associate degree in metrology or electronics, or equivalent technical training

(military or civilian). The GPM also states that the Metrologist requires Associate degree in

Metrology or Electronics, or equivalent technical training (military or civilian), Bachelor's degree in physics, metrology, mechanical or electrical engineering from an accredited college or university. Please confirm that the Metrologist requires an engineering degree and the Metrology Quality Assurance Engineer does not require an engineering degree.

Response: Reference revised Government Pricing Model.

101. The removal of SOW 4.0 was not addressed in the Government’s response to any question. Strategies were developed and teaming arrangements put in place to accommodate the consolidation of SOW 4.0 into the SMAS II contract. Please provide rationale for the Government’s decision. Also, please clarify the SOW risk section given the removal of SOW 4.0 which is integral to the Section L instructions and Section M evaluation criteria.

Response: The inclusion of the SOW 4.0 requirement was an error; therefore, it had to be removed from the SMAS II solicitation.

102. Section B, The links provided in Item 19 of B.1 and in G.11(b)

(https://nasachats.gsfc.nasa.gov/) do not work. Please clarify.

Response: This link is being updated and will not be accessible until after award of the contract. However, it should not impact proposal submission.

103. Section H, The link provided Section H.3(b)(2)

(https://gs279gdmsias.gsfc.nasa.gov/srv/GDMSNEWDatabaseObject?document_id=21144) does not work. Please clarify.

Response: The Workplace Violence Announcement has been uploaded to the SMAS eLibrary.

104. Section H, The first link provided in the last paragraph of Section H.3(b)

(http://gdms.gsfc.nasa.gov) does not work. Please clarify.

Response: This link is not available from outside the NASA Network.

https://nasachats.gsfc.nasa.gov/ https://gs279gdmsias.gsfc.nasa.gov/srv/GDMSNEWDatabaseObject?document_id=21144 http://gdms.gsfc.nasa.gov/

File details come from the government source that posted it. Updated .