NNA16574335R-000002 (Q A)

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

NNA16574335R

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ARC

Moffett Field CA 94035-0001 M/S 241-1 Acquisition Division NASA/Ames Research Center

NNA16574335R03/16/2016000002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/12/2016

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to:

A. Answer questions received in response to the RFP.

B. Make changes/revisions to the statement of work.

C. Make revisions to the PTD Spacecraft to Payload ICD

See Continuation Pages

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Umetria Y. Thomas

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

2016-Mar-16

Amendment 00002 – CONTINUATION PAGES...

A. Answer the following questions received in response to the RFP.

24. As a Federal space mission, we expect that spacecraft radio transmissions will be certified by the

NTIA. How shall we interface to NASA Spectrum Management on frequency certification tasks?

Direct interface with the NASA Spectrum Management office is only needed if a contractor provided

Ground Data System (GDS) solution is proposed. The PTD project will initiate the interface between the NASA spectrum management office and the successful offeror.

25. The EMI/EMC tests are very expensive so we would like the exact test to be identified.

Offerors shall refer to the NASA GEVS for the EMI/EMC testing recommendations. The offeror must select the requirements that fit the characteristics of the mission and the proposed solution.

26. For NASA Option 3 thru 10, CubeSat 6U Buses 2 thru 5, what CDRLs 1 thru 20 are required for Tasks 2 thru 5 that for each Bus Delivery shown in NASA Excel table to cost?

Statement of Work Section 5.0, Deliverables, has been amended to update the CDRL requirements.

27. SOW Table 5.2, Support to Project Deliverables. Which one of these is NASA writing versus the contractor and/or estimate percentage? We need to cost this NASA support and not sure our level of responsibility for these deliverable? What contractor LOE hour support for each project deliverable item identified?

The NASA PTD project is responsible for generating all project deliverables in Table 5‐2. The required support from the successful offeror is “input only”. It is the offeror’s responsibility to determine the LOE to dedicate to this effort. Statement of work Table 5.2, Contractor Support for

Project Deliverables, has been amended to provide additional details.

28. In the SOW Table 5‐2, Contractor Support for Project Deliverables there are additional deliverables and for CubeSat 6U Bus 2 thru 5, what ones will contractor be supporting?

The NASA PTD project is responsible for generating all project deliverables in Table 5‐2. Any updates to those documents (as applicable) will be required by the Contractor for CubeSat 6U Bus 2 thru 5.

Please reference the addition of highlighted information in the SOW CDRL tables. Statement of

Work Section 5.0, Deliverables has been amended to update the CDRL requirements.

29. Orbit average power, which requirement is valid?

o Req. 6.5.6 states “PTD shall supply the Payload at least 45 (TBR) Watts on‐orbit‐average power”.

o Req. 6.6.8 states “PTD shall supply the Payload power in accordance with the PDT to Payload ICD” PTD to payload ICD, paragraph 6.1.4, states 20W orbit average power

Requirement 6.5.6 is correct, the ICD has been corrected for consistency.

30. Peak power, which requirement is valid?

o PTD to payload ICD, paragraph 6.1.8, states 180W (TBD) as peak load. This equals 18.94A of current at the minimum bus voltage of 9.5V.

o PTD to payload ICD, paragraph 6.1.11, states that the payload shall be turned off if the current draw is above 5.5A for more than 250ms (TBR). This corresponds 52.25W at the minimum bus voltage of 9.5V.

o Please note that 180W of peak power would require large batteries to remain within the safe discharge range for Li‐Ion batteries

PTD to Payload ICD paragraph 6.1.8 stating 180W peak load is correct. Paragraph 6.1.11 and 6.1.12 in the ICD have been corrected for consistency. Concerning battery discharge rate, payloads >75W would not be active during eclipse periods and would be duty cycled to stay within the 45W on‐orbit average.

31. PTD to payload ICD, paragraph 6.1.6, states that a minimum of 5W (TBR) orbit average survival power shall be available at any given time to the payload. Is this power to be considered in addition to the payload orbit average power or will they never be used at the same time?

The 5W would be to supply survival heating power to the payload. When the Payload is powered, this 5W load would switch off when Payload temperatures exceed the survival thermostat temperature range. 180W peak power shall not be exceeded.

B. The following changes/revisions have been made to the statement of work.

1. Update the following items in Section 5.0 ‐ Deliverables:

i. Table 5‐2: Contractor Support for Project Deliverables

ii. Table 5‐3: Contractor Hardware Deliverables

iii. Paragraph 5.4 – Contractor Data Deliverables (items 01‐20)

C. The following revisions have been made to the PTD Spacecraft to Payload ICD:

1. Update Section 6.0 – Electrical Interfaces

i. Paragraph 6.1.8 – Peak Load

ii. Paragraph 6.1.11 – Over Current Circuit Limits

iii. Paragraph 6.1.12 – Inrush Currents

All other terms and conditions remain unchanged.

NNA16574335R-000002
Amendment 000002
2016-03-16T14:12:49-0700