Section B_CLIN Summary B.3 Supplies and/or Services to be Provided

Instructions to Offerors: Do NOT enter pricing into this tab. Pricing for the CLINs will roll up from tab "Vol IV - Table 2" and tab "Vol IV - Table 3."

Total Firm-Fixed Price
CLINS 001-012TOTAL AWARDED PRICE$ - 0
Total Firm-Fixed Price
CLINS 001-012TOTAL EVALUATED PRICE (If Offeror chooses to propose its own optional WBS 9.0 GDS Vendor solution)$ - 0
Total Firm-Fixed Price
CLINS 001-012 PLUS WBS 9.0 GDS NASA SOLUTIONTOTAL EVALUATED PRICE (If Offeror chooses to use the NASA provided WBS 9.0 GDS solution)$ - 0
QtyUnit of MeasureTotal Unit PriceTotal Firm-Fixed Price
CLIN 001Description: Spaceflight qualified 6U CubeSat spacecraft to be operated by NASA for its Pathfinder Technology Demonstrator (PTD) Project in accordance with the requirements identified in the Statement of Work. Total proposed firm fixed price for CLIN 001 is inclusive Tasks 1-5.1JOB$ - 0$ - 0
Summary of Tasks 1-5 Costs for CLIN 001QtyUnit of MeasureUnit PriceTotal Task Price
Task 1:Requirements Phase: ATP - SRR1EA$ - 0$ - 0
Task 2:Design Phase: Post SRR - PDR/CDR1EA$ - 0$ - 0
Task 3:Implementation Phase : Post PDR/CDR - SIR/PER1EA$ - 0$ - 0
Task 4:Integration and test Phase: Post SIR/PER - ORR/PSR1EA$ - 0$ - 0
Task 5:Engineering and Operations Support1EA$ - 0$ - 0
QtyUnit of MeasureUnit PriceTotal Firm-Fixed Price
CLIN 002Description: Option 1 - First Flight Payload Integration Assessment1JOB$ - 0$ - 0
Summary of Task 1 Costs for CLIN 002QtyUnit of MeasureUnit PriceTotal Task Price
ΔTask 1:Requirements Phase: ATP - SRR1EA$ - 0$ - 0
QtyUnit of MeasureUnit PriceTotal Firm-Fixed Price
CLIN 003Description: Option 2 - First Flight Payload Integration Activity1JOB$ - 0$ - 0
Summary of Tasks 2-4 Costs for CLIN 003QtyUnit of MeasureUnit PriceTotal Task Price
ΔTask 2:Design Phase: Post SRR - PDR/CDR1EA$ - 0$ - 0
ΔTask 3:Implementation Phase : Post PDR/CDR - SIR/PER1EA$ - 0$ - 0
ΔTask 4:Integration and test Phase: Post SIR/PER - ORR/PSR1EA$ - 0$ - 0
QtyUnit of MeasureUnit PriceTotal Firm-Fixed Price
CLIN 004Description: Option 3 - Second Flight Assessment: ATP – ΔSRR1JOB$ - 0$ - 0
Summary of Task 1 Costs for CLIN 004QtyUnit of MeasureUnit PriceTotal Task Price
Task 1:Requirements Phase: ATP - ΔSRR1EA$ - 0$ - 0
QtyUnit of MeasureUnit PriceTotal Firm-Fixed Price
CLIN 005Description: Option 4 - Second Flight Bus Delivery and Support1EA$ - 0$ - 0
Summary of Tasks 2-5 Costs for CLIN 005QtyUnit of MeasureUnit PriceTotal Task Price
Task 2:Design Phase: Post ΔSRR - ΔPDR/CDR1EA$ - 0$ - 0
Task 3:Implementation Phase : Post ΔPDR/CDR - SIR/PER1EA$ - 0$ - 0
Task 4:Integration and test Phase: Post SIR/PER - ORR/PSR1EA$ - 0$ - 0
Task 5:Engineering and Operations Support1EA$ - 0$ - 0
QtyUnit of MeasureUnit PriceTotal Firm-Fixed Price
CLIN 006Description: Option 5 - Third Flight Assessment: ATP – ΔSRR1JOB$ - 0$ - 0
Summary of Task 1 Costs for CLIN 006QtyUnit of MeasureUnit PriceTotal Task Price
Task 1:Requirements Phase: ATP - ΔSRR1EA$ - 0$ - 0
QtyUnit of MeasureUnit PriceTotal Firm-Fixed Price
CLIN 007Description: Option 6 - Third Flight Bus Delivery and Support1EA$ - 0$ - 0
Summary of Tasks 2-5 Costs for CLIN 007QtyUnit of MeasureUnit PriceTotal Task Price
Task 2:Design Phase: Post ΔSRR - ΔPDR/CDR1EA$ - 0$ - 0
Task 3:Implementation Phase : Post ΔPDR/CDR - SIR/PER1EA$ - 0$ - 0
Task 4:Integration and test Phase: Post SIR/PER - ORR/PSR1EA$ - 0$ - 0
Task 5:Engineering and Operations Support1EA$ - 0$ - 0
QtyUnit of MeasureUnit PriceTotal Firm-Fixed Price
CLIN 008Description: Option 7 - Fourth Flight Assessment: ATP – ΔSRR1JOB$ - 0$ - 0
Summary of Task 1 Costs for CLIN 008QtyUnit of MeasureUnit PriceTotal Task Price
Task 1:Requirements Phase: ATP - ΔSRR1EA$ - 0$ - 0
QtyUnit of MeasureUnit PriceTotal Firm-Fixed Price
CLIN 009Description: Option 8 - Fourth Flight Bus Delivery and Support1EA$ - 0$ - 0
Summary of Tasks 2-5 Costs for CLIN 009QtyUnit of MeasureUnit PriceTotal Task Price
Task 2:Design Phase: Post ΔSRR - ΔPDR/CDR1EA$ - 0$ - 0
Task 3:Implementation Phase : Post ΔPDR/CDR - SIR/PER1EA$ - 0$ - 0
Task 4:Integration and test Phase: Post SIR/PER - ORR/PSR1EA$ - 0$ - 0
Task 5:Engineering and Operations Support1EA$ - 0$ - 0
QtyUnit of MeasureUnit PriceTotal Firm-Fixed Price
CLIN 010Description: Option 9 - Fifth Flight Assessment: ATP – ΔSRR1JOB$ - 0$ - 0
Summary of Task 1 Costs for CLIN 010QtyUnit of MeasureUnit PriceTotal Task Price
Task 1:Requirements Phase: ATP - ΔSRR1EA$ - 0$ - 0
QtyUnit of MeasureUnit PriceTotal Firm-Fixed Price
CLIN 011Description: Option 10 - Fifth Flight Bus Delivery and Support1EA$ - 0$ - 0
Summary of Tasks 2-5 Costs for CLIN 011QtyUnit of MeasureUnit PriceTotal Task Price
Task 2:Design Phase: Post ΔSRR - ΔPDR/CDR1EA$ - 0$ - 0
Task 3:Implementation Phase : Post ΔPDR/CDR - SIR/PER1EA$ - 0$ - 0
Task 4:Integration and test Phase: Post SIR/PER - ORR/PSR1EA$ - 0$ - 0
Task 5:Engineering and Operations Support1EA$ - 0$ - 0
QtyUnit of MeasureUnit PriceTotal Firm-Fixed Price
CLIN 012Description: Option 11 - Globalstar Technology Demonstration1JOB$ - 0$ - 0
Summary of Tasks 1-5 Costs for CLIN 012QtyUnit of MeasureUnit PriceTotal Task Price
ΔTask 1:Requirements Phase: ATP - SRR1EA$ - 0$ - 0
ΔTask 2:Design Phase: Post SRR - PDR/CDR1EA$ - 0$ - 0
ΔTask 3:Implementation Phase : Post PDR/CDR - SIR/PER1EA$ - 0$ - 0
ΔTask 4:Integration and test Phase: Post SIR/PER - ORR/PSR1EA$ - 0$ - 0
ΔTask 5:Engineering and Operations Support1EA$ - 0$ - 0
QtyUnit of MeasureUnit PriceTotal Firm-Fixed Price
Evaluation Purposes OnlyDescription: 9.0 Ground Data System1EA$ - 0$ - 0

WBS 9.0 GDS - NASA Solution This line item is established for an Offeror NOT proposing its own Ground Data System (GDS) vendor solution. The total firm-fixed price for this line item is for evaluation purposes only and will not be included in the Offeror's overall total price for award purposes. For an Offeror NOT proposing its own GDS vendor solution, the GDS will be awarded as Government Furnished Property (GFP). 1 EA $ - 0 $ - 0

Vol IV - Table 1 TASKS 1-5 COSTS ($) $FY16 $FY17 $FY18 9.0 Ground Data System *

BROWN, CAROLINE J. (ARC-JA): BROWN, CAROLINE J. (ARC-JA):

If the Offeror chooses to use the NASA provided GDS solution, insert $836K for the initial spacecraft delivery into Cell O25 for 9.0 GDS. Do NOT enter any other costs for 9.0 GDS in Columns C through E, G through I, or K through M.TOTALS
WBSLABORPROCTRAVEL$FY16 TOTALLABORPROCTRAVEL$FY17 TOTALLABORPROCTRAVEL$FY18 TOTALNASA SOLUTION
6.0 Spacecraft- 0- 0- 0$ -- 0- 0- 0$ -- 0- 0- 0$ -$ -
6.1 Project Management$ -$ -$ -$ -
6.2 Systems Engineering$ -$ -$ -$ -
6.3 Safety & Mission Assurance$ -$ -$ -$ -
6.4 Structures and Mechanisms$ -$ -$ -$ -
6.5 Thermal Control System$ -$ -$ -$ -
6.6 Electrical Power System$ -$ -$ -$ -
6.7 GN&C$ -$ -$ -$ -
6.8 Propulsion$ -$ -$ -$ -
6.9 Communications$ -$ -$ -$ -
6.10 C&DH$ -$ -$ -$ -
6.11 FSW$ -$ -$ -$ -
6.12 Spacecraft I&T$ -$ -$ -$ -
7.0 Mission Operations and Support- 0- 0- 0$ -- 0- 0- 0$ -- 0- 0- 0$ -$ -
7.1 Subject Matter Expert Pre-Flight Support$ -$ -$ -$ -
7.2 Subject Matter Expert Flight and Post-Flight Support$ -$ -$ -$ -
8.0 Launch Accommodation Support- 0- 0- 0$ -- 0- 0- 0$ -- 0- 0- 0$ -$ -
8.1 Spacecraft Safety Approval Process Support for LV$ -$ -$ -$ -
8.2 Launch Vehicle Integration Support$ -$ -$ -$ -
9.0 Ground Data System *- 0- 0- 0$ -- 0- 0- 0$ -- 0- 0- 0$ -$ -$ -
9.1 GDS Management$ -$ -$ -$ -
9.2 GDS Systems Engineering$ -$ -$ -$ -
9.3 Mission Operations Center - Support$ -$ -$ -$ -
9.4 Ground Stations$ -$ -$ -$ -
9.5 Network Infrastructure$ -$ -$ -$ -
9.6 GDS Integration and Test (I&T)$ -$ -$ -$ -
10. System Integration and Test- 0- 0- 0$ -- 0- 0- 0$ -- 0- 0- 0$ -$ -
10.1 I&T Management$ -$ -$ -$ -
10.2 System Integration$ -$ -$ -$ -
10.3 System Testing$ -$ -$ -$ -
10.4 Test Facilities$ -$ -$ -$ -
10.5 Shipping$ -$ -$ -$ -
TOTALS $$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
* For WBS 9.0 Ground Data System, if Offeror chooses to propose its own optional GDS-Vendor solution, then enter proposed costs in Columns C through E, G through I, and K through M only. If Offeror chooses to use the NASA provided GDS solution, then enter $836,000 in Cell O25.

Vol IV - Table 2 TASKS 1-5 COSTS ($) $FY16 $FY17 $FY18 9.0 Ground Data System *

BROWN, CAROLINE J. (ARC-JA): BROWN, CAROLINE J. (ARC-JA):

If the Offeror chooses to use the NASA provided GDS solution, insert $836K for the initial spacecraft delivery into Cell U25 for 9.0 GDS. Do NOT enter any other costs for 9.0 GDS in Columns C through G, I through M, or O through S.CLIN 001 TOTAL
WBSTASK1TASK2TASK3TASK4TASK5$FY16 TOTALTASK1TASK2TASK3TASK4TASK5$FY17 TOTALTASK1TASK2TASK3TASK4TASK5$FY18 TOTALNASA SOLUTION
6.0 Spacecraft- 0- 0- 0- 0- 0$ -- 0- 0- 0- 0- 0$ -- 0- 0- 0- 0- 0$ -$ -
6.1 Project Management$ -$ -$ -$ -
6.2 Systems Engineering$ -$ -$ -$ -
6.3 Safety & Mission Assurance$ -$ -$ -$ -
6.4 Structures and Mechanisms$ -$ -$ -$ -
6.5 Thermal Control System$ -$ -$ -$ -
6.6 Electrical Power System$ -$ -$ -$ -
6.7 GN&C$ -$ -$ -$ -
6.8 Propulsion$ -$ -$ -$ -
6.9 Communications$ -$ -$ -$ -
6.10 C&DH$ -$ -$ -$ -
6.11 FSW$ -$ -$ -$ -
6.12 Spacecraft I&T$ -$ -$ -$ -
7.0 Mission Operations and Support- 0- 0- 0- 0- 0$ -- 0- 0- 0- 0- 0$ -- 0- 0- 0- 0- 0$ -$ -
7.1 Subject Matter Expert Pre-Flight Support$ -$ -$ -$ -
7.2 Subject Matter Expert Flight and Post-Flight Support$ -$ -$ -$ -
8.0 Launch Accommodation Support- 0- 0- 0- 0- 0$ -- 0- 0- 0- 0- 0$ -- 0- 0- 0- 0- 0$ -$ -
8.1 Spacecraft Safety Approval Process Support for LV$ -$ -$ -$ -
8.2 Launch Vehicle Integration Support$ -$ -$ -$ -
9.0 Ground Data System *- 0- 0- 0- 0- 0$ -- 0- 0- 0- 0- 0$ -- 0- 0- 0- 0- 0$ -$ -$ -
9.1 GDS Management$ -$ -$ -$ -
9.2 GDS Systems Engineering$ -$ -$ -$ -
9.3 Mission Operations Center - Support$ -$ -$ -$ -
9.4 Ground Stations$ -$ -$ -$ -
9.5 Network Infrastructure$ -$ -$ -$ -
9.6 GDS Integration and Test (I&T)$ -$ -$ -$ -
10. System Integration and Test- 0- 0- 0- 0- 0$ -- 0- 0- 0- 0- 0$ -- 0- 0- 0- 0- 0$ -$ -
10.1 I&T Management$ -$ -$ -$ -
10.2 System Integration$ -$ -$ -$ -
10.3 System Testing$ -$ -$ -$ -
10.4 Test Facilities$ -$ -$ -$ -
10.5 Shipping$ -$ -$ -$ -
TOTALS $$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
* For WBS 9.0 Ground Data System, if Offeror chooses to propose its own optional GDS-Vendor solution, then enter proposed costs in Columns C through G, I through M, and O through S only. If Offeror chooses to use the NASA provided GDS solution, then enter $836,000 in Cell U25.

Vol IV - Table 3

1CLIN 002CLIN 003CLIN 004CLIN 005CLIN 006CLIN 007CLIN 008CLIN 009CLIN 010CLIN 011CLIN 012CLIN 005CLIN 007CLIN 009CLIN 011
OPTIONS 1-11 COSTS ($)$OPTION1

Marmie, John A. (ARC-PX): Marmie, John A. (ARC-PX):

Payload#1 assessment costs thru SRR $OPTION2 Marmie, John A. (ARC-PX): Marmie, John A. (ARC-PX):

Payload#1, that adheres to the SC-PL ICD, accommodation costs post SRR thru Delivery. $OPTION3 Marmie, John A. (ARC-PX): Marmie, John A. (ARC-PX):

Payload#2 assessment costs thru Delta SRR. $OPTION4 Marmie, John A. (ARC-PX): Marmie, John A. (ARC-PX):

Spacecraft#2 Tasks 2-5 Costs (duplicate of Spacecraft#1 with assumed efficiencies). It is assumed that the payload will meet the SC-PL ICD. $OPTION5 Marmie, John A. (ARC-PX): Marmie, John A. (ARC-PX):

Payload#3 assessment costs thru Delta SRR. $OPTION6 Marmie, John A. (ARC-PX): Marmie, John A. (ARC-PX):

Spacecraft#3 Tasks 2-5 Costs (duplicate of Spacecraft#1 with assumed efficiencies). It is assumed that the payload will meet the SC-PL ICD. $OPTION7 Marmie, John A. (ARC-PX): Marmie, John A. (ARC-PX):

Payload#4 assessment costs thru Delta SRR. $OPTION8 Marmie, John A. (ARC-PX): Marmie, John A. (ARC-PX):

Spacecraft#4 Tasks 2-5 Costs (duplicate of Spacecraft#1 with assumed efficiencies). It is assumed that the payload will meet the SC-PL ICD. $OPTION9 Marmie, John A. (ARC-PX): Marmie, John A. (ARC-PX):

Payload#5 assessment costs thru Delta SRR. $OPTION10 Marmie, John A. (ARC-PX): Marmie, John A. (ARC-PX):

Spacecraft#5 Tasks 2-5 Costs (duplicate of Spacecraft#1 with assumed efficiencies). It is assumed that the payload will meet the SC-PL ICD.

Marmie, John A. (ARC-PX): Marmie, John A. (ARC-PX):

Spacecraft#3 Tasks 2-5 Costs (duplicate of Spacecraft#1 with assumed efficiencies). It is assumed that the payload will meet the SC-PL ICD.

Marmie, John A. (ARC-PX): Marmie, John A. (ARC-PX):

Payload#1 assessment costs thru SRR Marmie, John A. (ARC-PX): Marmie, John A. (ARC-PX):

Payload#1, that adheres to the SC-PL ICD, accommodation costs post SRR thru Delivery. $OPTION11 Marmie, John A. (ARC-PX): Marmie, John A. (ARC-PX):

All project costs associated with accommodating the Globalstar system shall be recorded in WBS 5.0 (tasks 1-5).

Marmie, John A. (ARC-PX): Marmie, John A. (ARC-PX):

Payload#4 assessment costs thru Delta SRR.

Marmie, John A. (ARC-PX): Marmie, John A. (ARC-PX):

Payload#2 assessment costs thru Delta SRR.

Marmie, John A. (ARC-PX): Marmie, John A. (ARC-PX):

Spacecraft#4 Tasks 2-5 Costs (duplicate of Spacecraft#1 with assumed efficiencies). It is assumed that the payload will meet the SC-PL ICD.

Marmie, John A. (ARC-PX): Marmie, John A. (ARC-PX):

Spacecraft#2 Tasks 2-5 Costs (duplicate of Spacecraft#1 with assumed efficiencies). It is assumed that the payload will meet the SC-PL ICD. WBS 9.0 GDS - NASA SOLUTION *

BROWN, CAROLINE J. (ARC-JA): BROWN, CAROLINE J. (ARC-JA):

If the Offeror chooses to use the NASA provided GDS solution, insert $377K for each of the four follow-on spacecraft deliveries into Cells AQ28, AR28, AS28, and AT28 for 9.0 GDS. Do NOT enter any other costs for 9.0 GDS in Columns Columns C, E through G, I, K through N, P, R through U, W, Y through AB, AD, AF through AI, or AK through AO.

Marmie, John A. (ARC-PX): Marmie, John A. (ARC-PX):

Payload#5 assessment costs thru Delta SRR.TOTAL
WBSΔTASK1TOTAL $OPTION1ΔTASK2ΔTASK3ΔTASK4TOTAL $OPTION2TASK1TOTAL $OPTION3TASK2TASK3TASK4TASK5TOTAL $OPTION4TASK1TOTAL $OPTION5TASK2TASK3TASK4TASK5TOTAL $OPTION6TASK1TOTAL $OPTION7TASK2TASK3TASK4TASK5TOTAL $OPTION8TASK1TOTAL $OPTION9TASK2TASK3TASK4TASK5TOTAL $OPTION10ΔTASK1ΔTASK2ΔTASK3ΔTASK4ΔTASK5TOTAL $OPTION11$OPTION4$OPTION6$OPTION8$OPTION10
5.0 Globalstar Tech Demo$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
6.0 Spacecraft$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
6.1 Project Management$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
6.2 Systems Engineering$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
6.3 Safety & Mission Assurance$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
6.4 Structures and Mechanisms$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
6.5 Thermal Control System$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
6.6 Electrical Power System$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
6.7 GN&C$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
6.8 Propulsion$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
6.9 Communications$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
6.10 C&DH$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
6.11 FSW$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
6.12 Spacecraft I&T$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
7.0 Mission Operations and Support$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
7.1 Subject Matter Expert Pre-Flight Support$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
7.2 Subject Matter Expert Flight and Post-Flight Support$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
8.0 Launch Accommodation Support$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
8.1 Spacecraft Safety Approval Process Support for LV$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
8.2 Launch Vehicle Integration Support$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
9.0 Ground Data System *$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
9.1 GDS Management$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
9.2 GDS Systems Engineering$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
9.3 Mission Operations Center - Support$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
9.4 Ground Stations$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
9.5 Network Infrastructure$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
9.6 GDS Integration and Test (I&T)$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
10. System Integration and Test$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
10.1 I&T Management$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
10.2 System Integration$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
10.3 System Testing$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
10.4 Test Facilities$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
10.5 Shipping$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
TOTALS $$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
* For WBS 9.0 Ground Data System, if Offeror chooses to propose its own optional GDS-Vendor solution, then enter proposed costs in Columns C, E through G, I, K through N, P, R through U, W, Y through AB, AD, AF through AI, and AK through AO only. If Offeror chooses to use the NASA provided GDS solution, then enter $377,000 in Cells AQ28, AR28, AS28, and AT28.

Vol IV - Table 4

TASKS 1-5 (WORKFORCE PROFILE-WYE EQUIVALENT )FY16FY17FY18TOTALS
WBSLOELOELOELOE
6.0 Spacecraft- 0- 0- 0- 0
6.1 Project Management- 0
6.2 Systems Engineering- 0
6.3 Safety & Mission Assurance- 0
6.4 Structures and Mechanisms- 0
6.5 Thermal Control System- 0
6.6 Electrical Power System- 0
6.7 GN&C- 0
6.8 Propulsion- 0
6.9 Communications- 0
6.10 C&DH- 0
6.11 FSW- 0
6.12 Spacecraft I&T- 0
7.0 Mission Operations and Support- 0- 0- 0- 0
7.1 Subject Matter Expert Pre-Flight Support- 0
7.2 Subject Matter Expert Flight and Post-Flight Support- 0
8.0 Launch Accommodation Support- 0- 0- 0- 0
8.1 Spacecraft Safety Approval Process Support for LV- 0
8.2 Launch Vehicle Integration Support- 0
9.0 Ground Data System (if optional GDS-Vendor solution bid)- 0- 0- 0- 0
9.1 GDS Management- 0
9.2 GDS Systems Engineering- 0
9.3 Mission Operations Center - Support- 0
9.4 Ground Stations- 0
9.5 Network Infrastructure- 0
9.6 GDS Integration and Test (I&T)- 0
10. System Integration and Test- 0- 0- 0- 0
10.1 I&T Management- 0
10.2 System Integration- 0
10.3 System Testing- 0
10.4 Test Facilities- 0
10.5 Shipping- 0
TOTALS- 0- 0- 0- 0

Vol IV - Table 5

OPTIONS 1-11 (WORKFORCE PROFILE-WYE EQUIVALENT)OPTION1OPTION2OPTION3OPTION4OPTION5OPTION6OPTION7OPTION8OPTION9OPTION10OPTION11TOTALS
WBSLOELOELOELOELOELOELOELOELOELOELOELOE
5.0 Globalstar Tech Demo- 0
6.0 Spacecraft- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
6.1 Project Management- 0
6.2 Systems Engineering- 0
6.3 Safety & Mission Assurance- 0
6.4 Structures and Mechanisms- 0
6.5 Thermal Control System- 0
6.6 Electrical Power System- 0
6.7 GN&C- 0
6.8 Propulsion- 0
6.9 Communications- 0
6.10 C&DH- 0
6.11 FSW- 0
6.12 Spacecraft I&T- 0
7.0 Mission Operations and Support- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
7.1 Subject Matter Expert Pre-Flight Support- 0
7.2 Subject Matter Expert Flight and Post-Flight Support- 0
8.0 Launch Accommodation Support- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
8.1 Spacecraft Safety Approval Process Support for LV- 0
8.2 Launch Vehicle Integration Support- 0
9.0 Ground Data System (If optional GDS-Vendor solution bid)- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
9.1 GDS Management- 0
9.2 GDS Systems Engineering- 0
9.3 Mission Operations Center - Support- 0
9.4 Ground Stations- 0
9.5 Network Infrastructure- 0
9.6 GDS Integration and Test (I&T)- 0
10. System Integration and Test- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
10.1 I&T Management- 0
10.2 System Integration- 0
10.3 System Testing- 0
10.4 Test Facilities- 0
10.5 Shipping- 0
TOTALS- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0