Title

Pathfinder Technology Demonstrator Project Requirements Document Level 1, DRAFT Level 2

December 18, 2015

NASA’s Pathfinder Technology Demonstrator project will test the operation of a variety of novel satellite technologies in low Earth orbit, providing significant enhancements to the performance of these small and effective spacecraft.

Requirements are grouped by WBS level and contained in separate tab sheets below. The Program Level 1 requirements are also provided in a separate tab for reference. Trac, allocation and V&V method is shown for each requirement. V&V methods are:

T=Test, D=Demonstration, A=Analysis, I=Inspection

&G

Program L1

RQMTREQUIREMENTTRACEABILITYALLOCATIONVerificationRationale/Comment
IDTDAI
1.0Pathfinder Technology Demonstrator MISSION OBJECTIVE
L1-PTD-01The purpose of the Pathfinder Technology Demonstrator (PTD) mission is to demonstrate novel satellite technologies in Low Earth Orbit (LEO).Project-wide

&"Arial,Bold"&14

&G &A

1. Project

RQMTREQUIREMENTTRACEABILITYALLOCATIONVerificationRationale/Comment
IDTDAI
1.0Project-Wide requirements
1.1.1The PTD Project shall produce flight-ready cubesat technology demonstration solutions capable of characterizing payloads in LEO orbit (maximum 800km).Project-wideXSince Launch manifest is unknown, requirement is to have flight solutions ready to be placed on available launch opportunities.
1.1.2The PTD flight-ready cubesats shall be developed to allow for a one year shelf-life prior to launch.Project-wideXLaunch opportunities may require being shelved until a launch is available
1.1.3The PTD flight-ready cubesats shall be developed to be compliant with USA cubesat launch providers.Project-wideXDo not want to create a solution requiring custom deployment solutions making it harder to find a launch opportunity
1.1.4The PTD mission shall be conducted in a manner compliant with a tailored NPR 7120.5C and 8705.4 Class D light, Category III mission.Project-wideXXFollow SSTP tailored Class D NASA standards
1.1.5The PTD shall follow NPR 8715.6 to limit orbital debris and document in an Orbital Debris Assessment Report (ODAR).Project-wideXFollow ODAR standard

&"Arial,Bold"&18&A

&"Arial,Bold"&18&A

&"Arial,Bold"&18

&G

SRR Version Page &P 30 June 2006

3. SS&MA

RQMTREQUIREMENTTRACEABILITYALLOCATIONVerificationRationale/Comment
IDTDAI
3.0Risk Management, System Safety & Mission Assurance
3.1Risk Management
3.1.1PTD shall conduct a continuous risk management (CRM) program in compliance with NPR 7120.5C and NPR 8000.4.ESMD RMP
NPR 7120.5C NPR 8000.4Project-wideXProject plan on using ePort. Vendor will have their own RM system.
3.2System Safety
3.2.1PTD hardware will be designed and operated to prevent damage to personnel and flight hardware in both nominal and off-nominal situations.Project-wideXFollow standard safety best practices for safety
3.2.2PTD shall comply with the applicable requirements of the following documents: Expendable Launch Vehicle Payload Safety Review Process Standard, NASA-STD-8719.8; Eastern and Western Range (EWR) 127-1, Range Safety Requirements, EWR 127-1; Range Safety Program, NPR 8715.5; NASA Safety Manual, NPR 8715.3NASA-STD-8719.8 NPR 8715.5 NPR 8715.3 EWR 127-1Project-wideXThese are the standards for a KSC launch, but may need to add some others, ISS standards SSP51700?
3.3Mission Assurance
3.3.1PTD shall comply with the requirements of NASA Quality Assurance Program Policy, NPD 8730.5, and NASA Policy for Safety and Mission Success, NPD 8700.1C, as tailored for a Category IV Tailored Class D secondary payloadNPD 8730.5 NPD 8700.1CProject-wideXTailoring of requirements will be captured in the SMA plan and the Mission Assurance Requirements documents
3.3.2PTD shall comply with the tailored requirements of NASA Quality Assurance Program Policy, NPR 7150.2 Software (flight code).NPR 7150.3Project-wideXTailoring of requirements will be captured in the SMA plan and the Mission Assurance Requirements documents
3.3.3PTD shall follow NASA EEE Parts Assurance Group (NEPAG) guidance for EEE part selection and meet a minimum Level 3 grade for parts in critical subsystems.Project-wideXLevel 3 is the lowest flight grade recognized by NASA and are those produced by reputable manufacturers under a recognized quality assurance system (QML, QPL, ISO 9000) or their equivalent.

&"Arial,Bold"&18&A

&"Arial,Bold"&18&A

&G

SRR Version Page &P 30 June 2006

4. Science

RQMTREQUIREMENTTRACEABILITYALLOCATIONVerificationRationale/Comment
IDTDAI
4.1Science Requirements
4.1.1The PTD project shall provide a PI to lead any required scientific analysis necessary for characterization of Payload system performanceProjectXThe PTD project PI is responsible for Prop system
4.1.2The PTD Payload PI shall be responsible for providing a daily H&S assessment of the Payload subsystem.PIX(Level 3 to perform look up table assessment of prop remaining?)
4.1.3The PTD PI shall be the final arbiter for decisions on nominal Payload operation.PIXDecisions about Payload operation are made by the Payload PI for operation of the payload. In the event of a health and safety issue with the spacecraft, the payload PI will be a participant/contributor in the decision process, but Flight Director will make final decisions.
4.1.4The Payload PI shall provide limits, task orders and command scripts to MOC/I&T necessary to operate the Payload.PIXThe Payload PI provides payload tasking and input to Operations for operation of the payload.
4.1.5PTD MOC shall provide simulator checkout of PI provided Payload tasking prior to upload and execution on-orbit.PI, MOCX
4.1.6PI shall provide a Payload system characterization report within 60 days of flight completion documenting compliance with mission success criteria.PIX

&"Arial,Bold"&18&A

&"Arial,Bold"&18&A

&G

SRR Version Page &P 30 June 2006

5. Payload System (MEP)

RQMTREQUIREMENTTRACEABILITYALLOCATIONVerificationRationale/Comment
IDTDAI
5Payload System Requirements
5.1Pathfinder Payload Requirements
5.1.1The Payload shall not exceed the total volume defined in the Spacecraft to Payload ICD.PayloadXXThe exact volume and locations will be negotiated at formation of the ICD.
5.1.2The Payload developer shall document the measured thrust direction, variability, and location of thrust relative to reference system as documented in the Spacecraft to Payload ICD.PayloadXXDocument forces that will be produced by the Payload thrust.
5.1.3The Payload shall conform to CG and total mass limits specified in the Spacecraft to Payload ICD.PayloadXXPayload mass allocation and CG issues will be negotiated at ICD formation
5.1.4The Payload shall be capable of operating from spacecraft-supplied power as specified in the Spacecraft to Payload ICD.PayloadXXThe exact voltage and whether unregulated or regulated will be negotiated at formation of the ICD.
5.1.5The Payload shall be configured to communicate signals and data to the Flight System as specified in the Spacecraft to Payload ICD.PayloadXXMost likely RS-422 asynchronous
5.1.6The Payload shall support a 90 day mission lifetime on orbit.PayloadXOperation on orbit could be as long as 90 days. Not meant to infer a 90 day continuous firing capability, but that the payload could be utilized off and on during a 90 day period.
5.1.7The Payload shall be thermally controlled as specified in the Spacecraft to Payload ICD.PayloadXXThe intent of this requirement is to have the Flight system provide some thermal control support for the Payload.
5.1.8The Payload shall be designed to withstand the maximums allowed for the LV dynamics (vibration, shock, acoustics) as per GEVS (GSFC-STD-7000A) levelsPayloadXXThis standard encompasses all the potential launch vehicles we may be manifested on
5.1.9The Payload shall be capable of being powered off for launch and powered on by the Spacecraft at any time during the flight.PayloadXPower supply interface from Payload will be switched
5.1.10The Payload shall provide harnesses and cabling for the Payload System as specified in the Spacecraft to Payload ICD.PayloadXThe definition of the exact cable/harness interface, as well as cable routing, will be negotiated in the Spacecraft to Payload ICD
5.1.11The Payload shall be developed to allow for a one year shelf-life prior to launch.PayloadXWe could be shelved awaiting launch manifest. If fuels, seals, etc. may degrade in that time, then will need a plan to fuel/refuel at LV integration.
5.1.12The Payload shall be responsible for supplying mounting structures as specified in the Spacecraft to Payload ICD.PayloadXExact interface definition will be negotiated and documented in a Spacecraft to Payload ICD.
5.1.13The Payload shall provide a simulator of the Payload to support System Integration testing.PayloadXXSupport electrical, command and control interfaces to allow for integration testing .
5.1.14The Payload shall be able to acquire Health and Status information from its instruments.PayloadXNecessary to monitor status of subsystem and for diagnostics.
5.1.15The Payload shall be able to provide Health and Status information for the Payload to the Spacecraft as specified in the Spacecraft to Payload ICD.Payload, VendorXNecessary to send H&S information to the GDS for analysis and review.
5.1.16The Payload shall provide engineering telemetry sufficient for MOC to determine the quantity of propellant remaining to within 5% (TBR).Payload, Vendor, MOCXProvide data to determine propellant level, e.g. firing times that can be correlated with lookup tables on the ground.
5.1.17The Payload shall provide engineering telemetry sufficient for MOC to determine the thruster performance ISP within 5% (TBR).Payload, VendorXProvide data to model thruster performance to calculate future thrust command durations. The Spacecraft provides engineering telemetry to measure orbit change. Engineering telemetry may be combined with lookup tables or ground analysis to determine actual ISP, the requirement is to make sure whatever data is needed on thruster operation is provided.
5.1.18The Payload shall provide a safe plug to inhibit unsafe operation on the ground per the electrical interface in the Spacecraft to Payload ICD.Payload, VendorXXS&MA safety requirement (and probably also the LV) to physically prohibit a thruster being activated.
5.1.19Payload bus solution shall provide Payload electrical interfaces as specified in the Spacecraft to Payload ICD.Payload, VendorXX
5.1.20Payload bus solution shall provide Payload mechanical interfaces as specified in the Spacecraft to Payload ICD.Payload, VendorXX
5.1.21Payload bus solution shall provide Payload thermal interfaces as specified in the Spacecraft to Payload ICD.Payload, VendorXX
5.1.22Payload bus solution shall provide Payload communication interfaces as specified in the Spacecraft to Payload ICD.Payload, VendorXX
5.1.23Payload shall provide and EIDP upon delivery containing:

•Propulsion System Specs •Propulsion System Drawings (MICD/EICD) •Propulsion Assembly/Handling Procedures •Propulsion System Limits/Constraints •Propulsion System Test Data and Scripts •Propulsion System CMD/TLM Requirements

•Propulsion System Acceptance Test ProceduresPayloadX
5.1.24The Payload shall provide EMI/EMC test data and analysis (TBD).XXNeed to define specifics. Looking for self-compatible, measured output provided to SC vendor, and documenting any particular sensitivities that may disrupt thruster operation.
5.1.25The Payload shall be shipped to the spacecraft vendor appropriately packaged in a shipping container.PayloadX
5.1.26The Payload developer will provide any required GSE necessary for I&T and/or LV integration of the Payload.PayloadX

&"Arial,Bold"&18&A

&"Arial,Bold"&18&A

&G

SRR Version Page &P 30 June 2006

6. Flight System

RQMTREQUIREMENTTRACEABILITYALLOCATIONVerificationRationale/Comment
IDTDAI
6Flight System Requirements
6.1Tracking, Telemetry, and Control (TT&C)
6.1.1Tracking
6.1.1.1PTD shall be capable of producing tracking and ephemeris solutions based on collected GPS telemetry from the spacecraft.MOCXXGPS captured on-board, tracking construction and ephemeris can be on-board or on the ground
6.1.1.2PTD shall collect GPS position solutions using an on-board GPS at a 1 Hz rate, with <100m (3 sigma) position (X,Y,Z) accuracy.VendorXXGPS captured on-board, tracking construction and ephemeris can be on-board or on the ground
6.1.1.3PTD shall collect GPS velocity solutions using an on-board GPS at a 1 Hz rate, with accuracies of <0.2 m/s (3 sigma).VendorXXGPS captured on-board, tracking construction and ephemeris can be on-board or on the ground
6.1.1.4PTD shall collect GPS measurements time-stamped with <10ms (3 sigma) accuracy.VendorXXGPS captured on-board, tracking construction and ephemeris can be on-board or on the ground
6.2.1Telemetry
6.2.1.1PTD shall store MOC-specified engineering and health telemetry generated by the Spacecraft during the last 6 days.Vendor/MOCXXTo enable reconstruction of spacecraft performance & trajectory, model spacecraft state, and to support anomaly analyses. Mission design will ensure three day maximum between Command passes. MOC-specified telemetry is specified by other requirements.
6.2.1.2PTD shall be capable of selectively transmitting stored telemetry upon command of the MOC.VendorXAllow for selective downlink of portions of the on-board telemetry buffer.
6.2.1.3PPS shall provide engineering telemetry to allow the MOC to reconstruct maneuver and attitude control events with at least a 10hz resolution.VendorXXS/C may change trajectory in a way that was not commanded (reconstruct errors or disturbances). Actual telemetry downlinked should be configurable for sampling/decimation rate.
6.2.1.4The Spacecraft shall be capable of radiating telemetry to the ground at a rate and duration able to downlink 250Mbits per day.VendorXXBased on number of available passes and data rates available, the RF solution needs to be able to achieve this much data per day. Data will be divided up between Payload and Spacecraft H&S data. For purposes of throughput analysis, NEN 11M ground stations (Wallops, McMurdo, Svalbard, Alaska) and a high inclination polar orbit should be assumed.
6.2.1.5The Spacecraft shall be capable of radiating telemetry to the ground with greater than 3db link margin.VendorXXFor purposes of data throughput analysis, Ground antenna elevations of >10deg and link margins of >3db should be considered
6.2.1.6PTD shall radiate telemetry on a specified S-band frequency.VendorXSpacecraft, MOC must use agreed upon frequency and receive certification to use. Note: if the vendor supplies the GDS, then RF solution is up to the vendor.
6.2.1.7PTD shall be capable of providing telemetry defining the state of any quantity or function monitored or capable of being updated by the FSW.VendorXto verify spacecraft state by MOC
6.2.1.8The Spacecraft shall be capable of maintaining TLM transmission while performing payload system characterization.VendorXMust simultaneously track target with instruments and transmit resulting high-rate data
6.2.1.9The Spacecraft shall be capable of operating PTD payload and transmitting data at full rate during orbital eclipses up to 35min.VendorXXBattery-size requirement
6.2.1.10PTD shall monitor SC elements necessary for the MOC to assess the state of the spacecraft.VendorXProvide data for health analysis and to determine spacecraft state.
6.2.1.11PTD shall be capable of transmitting any or all of its memory contents on command by MOC.VendorXXValidate state of the spacecraft memory. Memory may become corrupted or be in an off-nominal state.
6.2.1.12PTD shall provide engineering telemetry sufficient for MOC to determine the battery state-of-charge within 10%.VendorXBattery state is needed to calculate duration the s/c can operate with solar panel off sun.
6.2.1.13PTD shall indicate receipt and execution of all commands and command sequences in Telemetry.Vendor
6.3.1Commanding
6.3.1.1PTD shall be capable of performing its required functions through the use of on-board stored operating programs, stored command sequences, and real-time commands radiated by the MOC.VendorX
6.3.1.2PTD command sequences shall support absolute time and relative time commands.VendorXAbsolute time means execute at a specified time. Relative time means execute after a period of time (like a delay statement).
6.3.1.3PTD shall be capable of storing and deleting command sequences as commanded by the MOC.VendorXMemory management for on-board command sequences
6.3.1.4PTD shall execute commands radiated by the MOC on receipt.VendorXX
6.3.1.5The PTD shall be capable of executing specified command sequences only after confirmation by the MOC.VendorXX
6.3.1.6The PTD shall be capable of executing specified command sequences upon detection of a fault or limit exceedance.VendorXFor fault conditions or limits being exceeded, automatically run a stored sequence if configured to do so
6.3.1.7PTD shall ignore commands that are not sent by the MOC or improperly formatted.VendorXXThis is largely taken care of within CCSDS and COP1 support. Not meant to require encryption.
6.3.1.8PTD shall be capable of receiving commands radiated by the MOC using a specified S-band frequency.VendorXXSpacecraft, MOC must use agreed upon frequency and receive certification to use. Note: if the vendor supplies the GDS, then RF solution is up to the vendor.
6.3.1.9PTD primary receiver shall be continuously receptive to commands in case of a failure that disrupts nominal MOC to Spacecraft communications.VendorXXAfter initial ejection and power-up, the CMD receiver must be on at all times and able to receive commands.
6.3.1.10PTD shall receive commands at a minimum 4kbps.VendorXHigher rates are acceptable based on power margin in Link Budget. Command link should ensure >10dB in all conditions.
6.4GNC
6.4.1PTD shall be capable of controlling maneuver magnitude to within +/- 5%, of the magnitude commanded by the MOCVendorXXThruster payload specific requirement for Delta-V maneuvers.
6.4.2PTD shall be capable of maintaining an attitude of +/- 1 degree in all axes during nominal (cruise) operations.VendorXXReduce risk of trajectory changing that could cause loss of the spacecraft
6.4.3PTD shall be capable of changing the attitude pointing tolerance of the spacecraft by command from the MOC.VendorXDifferent ACS deadbands are suitable at different mission phases.
6.4.4PTD shall have a control mode that maintains one axis pointed Earth-nadir, while the payload is pointed in the velocity or anti-velocity direction, as commanded by the MOC.VendorXFor thrusting payload, nadir point is used to raise or lower orbit in a circularized manner by increasing or decreasing velocity.
6.4.5PTD shall provide a precision control mode that points payload to a fixed Earth surface location within +/- 0.1 degree while that location is in view.VendorXXFor Earth pointing payloads like optical comms, need to point payload to a ground station. This mode would be for one of the Option flights.
6.4.6During fixed Earth-point tracking mode, the S/C shall accept pointing error updates provided by the payload at 30 Hz (TBR) to implement attitude corrections.VendorXOptical payload will provide pointing corrections to be implemented by SC
6.4.7During fixed Earth-point tracking mode, S/C shall point (within 1 Hz (TBR) bandwidth), once tracked to Payload error updates, to < 10 microradians RMS.VendorXDrives wheels and update frequency/precision
6.4.8During fixed Earth-point tracking mode, S/C shall provide GPS time data to Payload at a a rate of 1Hz.VendorX
6.4.9PTD shall provide a stellar inertial control mode that holds spacecraft attitude to a fixed point in space relative to an Earth-Centered-Inertial Frame.VendorXXFor optical payloads to point to celestial objects, or to point solar arrays at sun for maximum efficiency.
6.4.10PTD attitude control shall be capable of being enabled/disabled by a MOC command or command sequenceVendorXXPayload may be a precision attitude control capability, so need to be able to turn off PTD ACS control.
6.4.11PTD shall support a torque-rod only attitude control modeVendorXX
6.4.12PTD shall support MOC commanded reaction wheel desaturation with magnetic torques or propulsive solution.VendorXXAllow commanded desaturation
6.4.13PTD shall provide a mode for automated reaction wheel desaturation with torque rods.VendorXXPerform desaturation when momentum exceeds some set limit
6.4.14PTD shall provide an attitude control detumble rate reduction mode to null rates up to 20 degs/sec (TBR) in each axis.VendorXXdetumble spacecraft after ejection from canister
6.4.15PTD shall provide a sun-safe mode that will orient SC to a power-positive attitude from any starting attitude and then maintain a power positive state.VendorXXSafe mode that ensures SC is power positive. Assumes post solar array deployment if power solution is a deployable solar array.
6.4.16PTD shall be capable of automatically entering a power-positive safe-mode in the event of a critical fault unless the fault keeps this mode from being entered.VendorXXEnter safe mode for critical faults
6.4.17PTD shall provide a reaction-wheel desaturation mode using a hybrid of torque rod(s) and thrusters for propulsion payloads.VendorXXThis is a MEP-specific control mode to allow off-axis torque from the thrusters to be used to desaturate wheels.
6.5Supply and Connectivity
6.5.1PTD shall be interface compliant with selected Cubesat launcher and launch vehicle.VendorXXCubeSat will need to be compatible with the LV and dispenser(s) supported.
6.5.2PTD FSW and avionics shall be configured to communicate signals and data to and from the Payload as specified in the PTD to Payload ICD.VendorXXPLS - Spacecraft interface will be RS-422, which will be more fully specified in an PTD to PLS ICD
6.5.3PTD shall be able to receive and packetize Payload transmitted data at a peak data rate of 32kbps (TBR).VendorXXThis is the planned data rate from the MEP Thruster payload that the Spacecraft will need to support. Other payloads could have significantly higher rate requirements
6.5.4PTD shall provide the payload with a 1PPS signal for clock synching purposes as specified in the PTD to Payload ICD.VendorXProvides a mechanism for avionics and payload clock synchronization.
6.5.5PTD shall be capable of supplying power during 35 minutes of eclipse operations.VendorXXPayload specific power to be called out in payload reqts.
6.5.6PTD shall supply the Payload at least 45 (TBR) Watts on-orbit-average power.VendorX
6.5.7PTD shall be powered off for launch and powered on after 45 minutes from launcher ejection.VendorXX
6.5.8The PTD shall reset its comms if a command has not been received from the ground for a MOC-configurable length of time.VendorXReset comms if the ground has not communicated in case the problem is with the spacecraft e.g., 4 days.
6.5.9The PTD shall begin periodic broadcast of a CW tone beacon if a command has not been received from the ground for a MOC-configurable length of time.VendorXAssume spacecraft is lost by the ground, transmit a tracking beacon to facilitate getting located.
6.6Spacecraft
6.6.1PTD shall be designed to support a 4 month mission lifetime in a 350km to 800km altitude LEO orbit.VendorX2 week commissioning + up to 76 days of propulsion characterization
6.6.2PTD shall provide a 6U Cubesat in a 2Ux3U form factor.VendorXFollow Cubesat design standards as managed by California Polytechnic State University definitions
6.6.3PTD shall not exceed 12 Kg total wet mass.VendorXStandard 6U Cubesat mass allocation and includes any Payload mass (up to 3kg).
6.6.4PTD shall use an error-correcting memory solution to help ensure memory integrity.VendorXX
6.6.5PTD shall maintain Payload components to thermal environments specified in the PTD to Payload ICD.VendorXDefines safe operating range for PLS components, this could be highly variable for different prop systems, so may not be a relevant requirement to constrain
6.6.6PTD shall be designed to withstand the maximums allowed for the LV dynamics (vibration, shock, acoustics) as per GEVS (GSFC-STD-7000A) levelsVendorXXConstrains SC components to be developed for the expected Launch vehicle characteristics
6.6.7PTD shall provide the Cubesat launcher assembly.NASAX
6.6.8PTD shall supply the Payload power in accordance with the PTD to Payload ICD.VendorXXStandard power from the spacecraft
6.6.9PTD shall provide structural/mechanical interface definitions for the payload as specified in the PTD to Payload ICD.VendorX
6.6.10CubeSats shall be passive and self-contained from the time they are loaded into the dispenser until after deployment from the dispenser. No charging of batteries, support services, and or support from the integration team is provided after final integration.VendorX
6.6.11CubeSats shall not contain pyrotechnics unless the design approach is pre-approved by NASA Ames. Electrically operated melt-wire systems for deployables that are necessary controls for hazard potentials are permitted.VendorX
6.6.12CubeSats must have a timer (set to a minimum of 30 minutes) before satellite operation or deployment of appendages. If deploy switches should be released causing the time to run, the timer must automatically re-set whenever the Remove Before Flight (RBF) feature is replaced and/or the deploy switches are returned to the open state.VendorX
6.6.13RBF pins must be capable of remaining in place during integration with dispenser. It shall not be necessary to remove the RBF to facilitate loading into the dispenser.VendorX
6.6.14CubeSats should not have detachable parts or create any space debris during launch or normal mission operations.VendorX
6.6.15CubeSats shall use secondary locking feature for fasteners external to the CubeSat chassis. An acceptable secondary locking compound is Loctite. Other secondary locking methods must be approved by NASA Ames.VendorX
6.6.16A description of the frangible materials (e.g. solar cells) must be provided to NASA Ames for approval.VendorX
6.6.17Deployable systems shall be designed such that there is no intentional contact with the inside walls of the dispenser.Vendor
6.6.18CubeSats are accessible only through the access panels when integrated with the dispenser.VendorX
6.6.19Mass limits are derived from the maximum ballistic number (BN) allowed for launch vehicle deployed payloads. Exceeding these values requires approval by NASA Ames.VendorX<May change depending on dispenser>
6.6.20The CubeSat center of gravity shall be within 2cm of its geometric center.VendorX
6.6.21No CubeSat components or structure, other than rails or rail roller/slider switch (if used), shall contact the dispenser interior.VendorX<May change depending on dispenser>
6.6.22CubeSat rail surfaces that contact the dispenser guide rails shall have a hardness equal to or greater than hard anodized aluminum (Rockwell C 65-70).VendorX<May change depending on dispenser>
6.6.23During deployment, the CubeSats must be compatible with deployment velocities between 0.5 m/s to 1.5 m/s and accelerations no greater than 2g’s in the +Z direction.Vendor<May change depending on dispenser>
6.6.24All electrical power shall be internal to CubeSat.VendorX
6.6.25The CubeSat powerup shall not begin until a minimum of 45 minutes (TBD) after deployment. Only an onboard timer system may be operable during this 30-minute post deploy time frame.VendorX<May change depending on dispenser>
6.6.26The CubeSat electrical system design shall incorporate a minimum of three (3) inhibit switches actuated by physical deployment switches.VendorX<May change depending on dispenser>
6.6.27The CubeSat electrical system design shall not permit the ground charge circuit to energize the satellite systems (load), including flight computer. This restriction applies to all charging methods.VendorX<May change depending on dispenser>
6.6.28The RBF pin shall preclude any power from any source operating any satellite functions with the exception of pre-integration battery charging.VendorXRBF (Remove Before Flight)
6.6.29All RBF pins, switches, or jumpers utilized as primary electrical system and RBF inhibits must be accessible from the access panels for removal at the completion of loading into the dispenserVendorX<May change depending on dispenser>
6.6.30CubeSats that utilize on-board batteries shall comply with NASA requirements for battery safety.VendorX
6.6.31CubeSats shall comply with NASA guidelines for hazardous materials as shown in MSFC-HDBK-527, Materials Selection List for Space Hardware Systems.VendorX
6.6.32CubeSat developers shall submit a Bill of Materials (BOM) to NASA Ames for assessment.VendorX
6.7Flight Software
6.7.1The s/c vendor shall participate in software reviews as specified in the SOW (e.g. SRR, PDR/CDR, SIR, ORR/FRR)VendorX
6.7.2The s/c vendor shall provide NASA with a test plan to verify software functionality and quality at an L2 level.Vendor
6.7.3The s/c vendor shall provide the results of any trade studies performed in the development of the flight software.Vendor
6.7.4The s/c bus vendor shall track software changes and non-conformances and provide the data to the customer for review.VendorX
6.7.5The s/c bus vendor shall maintain a documented software development process.Vendor
6.7.6The s/c vendor shall have a software configuration management process.Vendor
6.7.7The software development and configuration management processes shall be audited and approved by NASA.Vendor, NASA
6.7.8The s/c bus provider shall provide NASA with a software development schedule and maintain that schedule throughout the project lifecycle.VendorX
6.7.9The s/c bus vendor shall notify NASA as to whether or not open-source software will be used, and in what manner.VendorX
6.7.10The project manager shall establish, record, maintain, report, and utilize software management and technical
measurements.VendorXNote: IEEE Standard Adoption of ISO/IEC 15939 - Systems and Software Engineering - Measurement Process is a good generic model for developing a software measurement process for a project or Center. This international standard contains a set of activities and tasks that comprise a measurement process that meets the specific needs of organizations, enterprises, and projects. The NASA Chief Engineer may identify and document additional Center measurement objectives, software measurements, collection procedures and guidelines, and analysis procedures for selected software projects and software development organizations. This includes collecting software technical measurement data from the project's software supplier(s).

&"Arial,Bold"&18&A

&"Arial,Bold"&18&A

&G

SRR Version Page &P 30 June 2006

7. Mission Ops(NASA GDS)

RQMTREQUIREMENTTRACEABILITYALLOCATIONVerificationRationale/Comment
IDTDAI
7Mission Operation Requirements
7.1General Requirements
7.1.1The PTD shall develop a Mission Operations Center (MOC) compatible with existing MMOC GDS infrastructure.MOC,X
7.1.2The PTD MOC shall staff at least one command pass per weekday.MOCX
7.1.3The PTD GDS shall support up to 14 lights-out automated data downlink passes per day.MOCX
7.1.4The Vendor shall provide personnel on-site for Operational Readiness Testing (ORTs) and training activities for 2 weeks.VendorXTravel to NASA Ames and support MOC operations and training on-console in preparation for flight operations.
7.1.5The Vendor shall provide on-site MOC support for 1-week of on-orbit checkout of the spacecraft.VendorXTravel to NASA Ames and support MOC operations on-console
7.1.6The Vendor shall provide on-call MOC support for 1-month of on-orbit operation of the spacecraft.VendorXSupport questions or anomaly resolution on operation of the spacecraft
7.1.7The PTD MOC shall perform necessary NEN scheduling activities to support up to 14 passes per dayMOCX
7.1.8PTD shall develop ground systems to control and monitor the PTD Spacecraft in accordance with the PTD SC - GDS ICD.MOCX
7.1.9PTD shall conform to CCSDS Blue Book standards for communications between MOC and the Spacecraft.MOCCCSDS.org has latest standards. If the vendor supplies the GDS, then the CCSDS interface would be between the MOC and VGDS.
7.1.10The PTD MOC and GDS shall be designed to have an operational lifetime to achieve full mission success.MOCXReason:

The operational lifetime of the MOC cannot simply be bounded by the operational lifetime of S/C. The MOC must be able to operate in all phases of the mission from Pre-Launch through Post-Mission data delivery, i.e., whatever it takes to assure full mission success.

Assumptions:

* Budget allocates funds for keeping MOC fully operational (facilities, staffing) during all phases of the mission.

7.1.11The MOC shall be capable of determining the Spacecraft orbit using GPS.MOCX
7.1.12The MOC shall generate and deliver any necessary orbit data needed for scheduling and antenna pointing by NEN.MOCX
7.1.13The MOC shall use GPS data to determine the thruster force for thrusting payloads to within 10% (TBR) within a 24 hour (TBR) measurement period.MOC/PIX
7.1.14The MOC shall be capable of accommodating any LEO launch manifest assigned to PTD.MOC/VendorX40deg Lat or above inclination to be compatible with NEN, lower would require USN which is a cost and qualification increase.
7.1.15The Vendor shall provide a Spacecraft Operator's Handbook providing information on the configuration and operation of the spacecraft.VendorX
7.1.16The Vendor shall provide detailed rules, limits and constraints for operation of the spacecraftVendorXUsed by MOC to develop Flight Rules for operation of the spacecraft.
7.1.17The Vendor shall provide a detailed summary of the fault management capabilities of the Spacecraft, automated fault responses, fault monitor configuration, and responses.VendorX
7.2System Requirements
7.2.1The PTD MOC Ground Element shall be capable of radiating Spacecraft commands on a specified S-band frequency.MOCXSpacecraft, MOC must use agreed upon frequency and receive certification to use.
7.2.2The PTD MOC Ground Element shall be capable of receiving telemetry radiated by the SC on a specified S-band frequency.MOCXSpacecraft, MOC must use agreed upon frequency and receive certification to use.
7.3Measurement and Data Product Requirements
7.3.1The PTD MOC shall operate the SC and GDS to characterize the Payload in accordance with full mission success criteria.MOC/PIX
7.3.2The PTD MOC shall operate the Spacecraft to acquire Payload and sensor data necessary to characterize propulsion.MOCX
7.4Data Processing and Policy Requirements
7.4.1Processing of MOC Data Products
7.4.1.1The MOC shall provide the PI access to payload and spacecraft data transmitted by the Spacecraft and spacecraft trajectory data.MOC/PIX
7.4.1.2The MOC shall provide Payload and PTD telemetry to the PPS PI within 24 hours (TBR).MOCX
7.4.1.3The PTD MOC will incorporate Payload PI activity requests into daily command pass activitiesMOC, ARCX

&"Arial,Bold"&16&A

&"Arial,Bold"&16&A

&"Arial,Bold"&16

&G

I - Inspection D - Demonstration,

SRR VersionT -Test
A - Analysis30 June 2006

&P

I - Inspection

D - Demonstration,T -Test
A - Analysis&P

I - Inspection

D - Demonstration,T -Test
A - Analysis&P

7. Mission Ops (Opt Vendor GDS)

This requirements tab is only applicable to Vendors that will be proposing to use a GDS solution other than the default NASA-provided NEN S-Band and supersedes the "Mission Ops (NASA GDS)" tab. This is an option available to allow for solutions where the vendor has access to their own facilities and/or wishes to use something other than a NEN-Compliant S-Band solution for RF. This Tab should be ignored for Vendors going with the NASA GDS default.
RQMTREQUIREMENTTRACEABILITYALLOCATIONVerificationRationale/Comment
IDTDAI
7Mission Operation Requirements
7.1General Requirements
7.1.1The Vendor shall develop a Ground Data System (GDS) compatible with existing NASA Ames Multi-Mission Operations Center (MMOC) infrastructure.Vendor/MOCXVendor GDS Solution must be able to tie into existing NASA ARC MMOC infrastructure via IONET, NISN, or secure Internet VPN and SFTP.
7.1.2The PTD MOC shall staff at least one command pass per week dayMOCXNASA will staff operations for one command pass per day. If vendor GDS requires support staffing for these periods, vendor support is implied.
7.1.3The Vendor shall provide personnel on-site for Operational Readiness Testing (ORTs) and training activities for 2 weeks.VendorXTravel to NASA Ames and support MOC operations and training on-console in preparation for flight operations.
7.1.4The Vendor shall provide on-site MOC support for 1-week of on-orbit checkout of the spacecraft.VendorXTravel to NASA Ames and support MOC operations on-console
7.1.5The Vendor shall provide on-call MOC support for 1-month of on-orbit operation of the spacecraft.VendorXSupport questions or anomaly resolution on operation of the spacecraft
7.1.6The Vendor GDS shall support up to 14 data downlink passes per day.VendorXExpected to be lights-out passes, but if vendor staffing is required, those costs should be included
7.1.7The PTD MOC shall perform necessary scheduling activities to support up to 14 passes per day.MOC/VendorXNASA will perform pass scheduling requests periodically according to the needs of the Vendor GDS, requirements of which must be stated by the Vendor.
7.1.8The Vendor shall document the SC to GDS ICD defining space to/from ground data interfaces.VendorXXVendor responsible for documenting data interfaces between Spacecraft and Ground
7.1.9The Vendor shall document the SC to GDS RF ICD defining space to/from ground RF interfaces.VendorXXVendor responsible for documenting RF interfaces between Spacecraft and Ground
7.1.10The Vendor shall document the GDS to MOC ICD defining GDS to/from MOC data interfaces.Vendor/MOCXXThe data interfaces will be CCSDS compliant.
7.1.11PTD shall develop ground systems to control and monitor the PTD Spacecraft in accordance with the PTD SC to GDS ICD and GDS to MOC ICD.MOC, ARCXThe vendor PTD SC to GDS ICD and GDS to MOC ICD.
7.1.12PTD shall conform to CCSDS Blue Book standards for communications between MOC and the Vendor GDS.Vendor/MOCXCCSDS.org has latest standards. Communication between the Vendor GDS and NASA MOC must be CCSDS format. The Vendor may use proprietary interfaces if desired, but they will be responsible for repackaging data into CCSDS format for transfer to MOC.
7.1.13The PTD MOC and Vendor GDS shall be designed to have an operational lifetime to support all phases of the mission and Optional flights.MOC/VendorXReason:

The operational lifetime of the MOC and Vendor cannot simply be bounded by the operational lifetime of S/C. The MOC must be able to operate in all phases of the mission from Pre-Launch through Post-Mission data delivery. Budget and staffing allocations must cover all flights and options.

7.1.14The MOC shall generate and deliver any necessary orbit data needed for scheduling and antenna pointing by Vendor GDS solution.MOCXVendor must specify antenna tracking data formats, antenna locations, horizon map and obstruction constraints (if any), elevation transmit restrictions, etc. So NASA can us this information in scheduling antenna(s).
7.1.15The MOC shall use GPS data to determine the thruster force for thrusting payloads to within 10% (TBR) within a 24 hour (TBR) measurement period.MOC/PIX
7.1.16The MOC shall be capable of accommodating any LEO launch manifest assigned to PTD.MOCX40deg Lat or above inclination to be compatible with NEN, lower would require USN which is a cost and qualification increase.
7.1.17The Vendor GDS shall support near real-time spacecraft telemetry to the MOC for active command passes.Vendor/MOCNASA MOC needs 'live' telemetry from the spacecraft before commanding it and to verify receipt and processing of commands
7.1.18The Vendor GDS shall support near real-time spacecraft Commanding from the MOC for active command passes.Vendor/MOCXNASA MOC needs near real-time transfer of commands sent from the ground to the spacecraft.
7.1.19The Vendor GDS solution shall ensure transfer of spacecraft data to the MOC within 1 hour of receipt on the ground for non-command passes.VendorXFor "lights-out" passes where the MOC is not actively monitoring, the spacecraft data can be processed and packaged into CCSDS parameterized files and SFTP transferred as long as it is within 1 hour.
7.1.15The Vendor shall provide a Spacecraft Operator's Handbook providing information on the configuration and operation of the spacecraft.VendorX
7.1.16The Vendor shall provide detailed rules, limits and constraints for operation of the spacecraftVendorXUsed by MOC to develop Flight Rules for operation of the spacecraft.
7.1.17The Vendor shall provide a detailed summary of the fault management capabilities of the Spacecraft, automated fault responses, fault monitor configuration, and responses.VendorXDetails how the Spacecraft will respond to fault events.
7.2System Requirements
7.2.1The Vendor shall be responsible for documentation and Spectrum access approvals necessary for Ground and Spacecraft RF transmitters.VendorXNASA will provide some support and access to appropriate organizations for this approval process.
7.2.2The Vendor shall be responsible for RF compatibility validation between the SC and Vendor.VendorXThe Vendor will need to perform live RF compatibility verification and validation tests to ensure RF links and configurations work in all communication modes/rates.
7.2.3The Vendor shall provide a GDS simulator to the MOC to allow for interface testing and verification of command, telemetry, and scheduling products..VendorXThe Vendor will need to provide a simulation of the interfaces the MOC will be working with so the MOC can test and verify interface compatibility.
7.24The Vendor GDS solution shall comply with Federal Information Security Management Act (FISMA) Implementation requirements for a FIPS 199 Moderate level.XNASA Mission Operations Facilities are certified to FISMA Moderate levels, in order for a Vendor GDS to be tied in, it will also have to be certified to this level.

http://csrc.nist.gov/groups/SMA/fisma/

7.3Measurement and Data Product Requirements
7.3.1The PTD MOC shall operate the SC and GDS to characterize the Payload in accordance with full mission success criteria.MOCXPayload characterization activities will vary with payload.
7.3.2The PTD MOC shall operate the Spacecraft to acquire Payload and sensor data necessary to characterize the Payload.MOCXPayload characterization activities will vary with payload, but require that necessary data is provided.
7.4Data Processing and Policy Requirements
7.4.1Processing of MOC Data Products
7.4.1.1The MOC shall provide the PI access to payload and spacecraft data transmitted by the Spacecraft and spacecraft trajectory data.MOC, ARCXSpacecraft telemetry and assessments will be forwarded to the PI for use in Payload performance analysis and operation.
7.4.1.2The MOC shall provide Payload and PTD telemetry to the PPS PI within 24 hours (TBR).MOCXThis will likely be much faster, but provides a worst case for non-nominal situations.
7.4.1.3The PTD MOC will incorporate Payload PI activity requests into daily command pass activitiesMOC, ARCXRequests and command scripts from the PI for operation of the Payload will be incorporated into the daily command products to upload to the spacecraft
7.4.1.4The MOC shall be capable of determining the Spacecraft orbit using GPS.MOCXMOC will process received GPS position data and produce necessary ephemeris products.

&"Arial,Bold"&16

&G

I - Inspection

D - Demonstration,T -Test
A - Analysis&P

8. Launch System

RQMTREQUIREMENTTRACEABILITYALLOCATIONVerificationRationale/Comment
IDTDAI
8Launch System Requirements
8.1Pre-Launch Phase
8.1.1The PTD project shall support any necessary documentation and analysis to get launch approval for potential safety hazards.Project-WideXe.g., hazardous propulsion chemicals, pressure vessels, etc. Likely required by primary, launch provider, ISS, etc.

&"Arial,Bold"&18&A

&"Arial,Bold"&18&A

&G

SRR Version Page &P 30 June 2006

10. Systems I&T

RQMTREQUIREMENTTRACEABILITYALLOCATIONVerificationRationale/Comment
IDTDAI
10Systems Integration and Test (I&T) Requirements
10.1Systems I&T Data and Documentation
10.1.1The Vendor shall provide the MOC electronic versions of the command and telemetry database used by Vendor for integration and test of the avionics and the spacecraft.VendorXReduce cost and risk for MOC.
10.1.2The Vendor shall provide the MOC electronic versions of the command sequences and sequence language documentation used for integration and test of the spacecraft and the associated telemetry it generates.VendorXReduce cost and risk for MOC.
10.1.3The Vendor shall provide the MOC electronic versions of the input, output, display pages, and configuration files developed by the Vendor and used for the avionics integration and test software system.VendorXReduce cost and risk for MOC.
10.1.4The Vendor shall provide the MOC any spacecraft dynamics models.Vendor/MOC/ PayloadXDynamics models coordinated between the Payload and Spacecraft Vendors must be made available to the MOC
10.2Launch System I&T
10.2.1The Vendor shall provide any required support to integrate and test launcher/dispenser with the manifested Launch System.VendorXX
10.2.2The Vendor shall provide any necessary GSE support of LV integration.VendorXVendor must provide any SC ground support equipment that might be required for LV integration
10.2.3The Vendor shall deliver a fully qualified spacecraft/payload system to the launch dispenser integration site in a shipping case monitored for shock.VendorXX
10.2.4PTD shall be delivered VC+UV (visibly clean+ultra-violet).VendorXContamination requirement. This could change for option flights depending on Payload needs.
10.3Payload Integration
10.3.1The Vendor shall integrate the payload with the spacecraft system per payload handling and checkout procedures.Vendor/PayloadXPayload developer ships to SC vendor, flies to vendor and supports integration. Also provides handling and checkout procedures.
10.3.2The Vendor shall support a payload fit check (on-site) with the spacecraft system.Vendor/PayloadX
10.3.3The Vendor shall integrate provided payload scripts into the flight software segment.Vendor/PayloadX
10.4System Integration and Test
10.4.1The Vendor shall perform a comprehensive performance test before and after environmental testing.VendorX
10.4.2The Vendor shall support Operational Readiness Tests (ORT) and mission simulations.MOC/VendorXFlight-like simulations and training for flight operations done in the MOC
10.4.3The Vendor shall provide MOC a spacecraft simulator for MOC testing and command validation during I&T and the flight phase of the mission.MOC/VendorX
10.4.4The Vendor shall perform an integrated end-to-end test of the spacecraft and MOC with the NEN compatibility van for NEN emulation to validate commanding and telemetry.MOC/VendorXXVerifies ground networking and SC RF interfaces between MOC, NEN and SC
10.4.5PTD shall be space qualified per GEVS (GSFC-STD-7000A) levels.VendorX
10.4.6The Vendor shall provide any necessary GSE support for environmental testing.VendorX
10.4.7The Vendor shall correlate environmental testing thermal results with thermal models.VendorX
10.4.8The Vendor shall provide support for flight controller collocation at spacecraft vendor facility for participation in FSW and spacecraft level testingVendorX
The Vendor shall provide I&T test scripts and procedures to the MOC.VendorOperations uses these to develop flight operations scripts and procedures.

&"Arial,Bold"&18&A

&"Arial,Bold"&18&A

&G

SRR Version Page &P 30 June 2006

11. Globalstar (Opt Tech Demo)

This requirements tab is only applicable to Vendors that will be proposing to perform a Globalstar Tech Demo (Optional), for a secondary communication solution. Use of NASA or Vendor provided primary communication and ground data system is still required. The requirements in this tab represent requirements for the Globalstar technology demonstration. These are NASA and Vendor requirements as stated in Allocation.
RQMTREQUIREMENTTRACEABILITYALLOCATIONVerificationRationale/Comment
IDTDAI
G1Globalstar Demonstration - Spacecraft
Project Level Requirements - Globalstar Demonstration

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .