NMDOT_A-066TrafficControlRoadwayWorkPermit.pdf

PDF 217 KB Posted

Attached to
G-80 Well POD-1 and POD-2 Drilling and Testing
Solicitation number
2025-ITB-005
Issued by
Quay County, New Mexico

About this file

The document is a Traffic Control/Roadway Work Permit form from the New Mexico Department of Transportation (NMDOT), designed to provide official authorization for roadway-related work activities. The form is a standardized template for contractors to outline specific details of proposed traffic control or roadway work, including the general scope of work, work zone location information, purpose of the permit, working duration, and road characteristics. Key sections require details about the contractor, traffic control firm, work location, road type, speed limits, and specific work purpose such as roadway construction, shoulder work, signal and lighting work, utility work, or other related activities.

The permit includes critical terms and conditions for contractors, notably requiring conformance with the Manual on Uniform Traffic Control Devices (MUTCD), contractor indemnification of NMDOT, insurance policy requirements, and mandatory submission of a Traffic Control Plan (TCP). The form must be approved by the NMDOT District Office's Traffic Section, with provisions for approval, amendment, or rejection. Contractors are required to contact the District Office to confirm actual start dates and adhere to any attached notes or additional conditions. The permit serves as an official authorization document ensuring proper safety protocols, insurance coverage, and regulatory compliance for roadway and traffic control work activities.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form No. A-66 New 03/13

NEW MEXICO DEPARTMENT OF TRANSPORTATION

(NMDOT)

TRAFFIC CONTROL/ROADWAY WORK PERMIT

NMDOT Project Number (If applicable): Control Number:

General Scope of work:

Contractor Name:

Contact Person:

Contact Telephone: ( ) - Fax: ( ) -

Traffic Control Firm:

Certified Traffic Control Supervisor:

Contact Telephone: ( ) - Fax: ( ) -

Work Zone Location Information:

Route:

Mile Post: From To:

Or Intersection: Intersection:

Direction (NB, SB, EB, WB, or both):

2 lane Road 4 lane Road 6 lane Road 8 Lane Road Divided Undivided Existing Speed limit in area: ___ MPH or Ranges from ___MPH to ___MPH Proposed Speed Limit reduction within work zone (If Applicable):______________ MPH

Working Duration:

Start Date: End Date :_______________________________ Daily Start Time End Time:

Purpose of Permit: Roadway Construction/Rehab. Shoulder Work Signal and Lighting Work Utility work Drainage/Excavation work Soil Testing Signing and Striping Placement

Other:

TCP Plan Enclosed ___ (TC Permit will not be processed without a TCP plan)

If no, describe why:

Approval is conditioned on the following terms that are deemed accepted by the Contractor upon submission of this Permit

1. Traffic Control for operations under this permit shall conform with the Manual on Uniform Traffic Control Devices (MUTCD).

2. The Contractor agrees to indemnify and hold harmless the NMDOT and its employees from liability, claims, damages losses or expenses due to any negligent act of the Contractor, the Contractor’s employees, any agent acting on the Contractor’s behalf, and anyone else engaged by the Contractor to work pursuant to this permit.

3. The Contractor shall provide the NMDOT a certified copy of the its insurance policy and certificate of insurance and shall include on the certificate of insurance the NMDOT as an additional-named insured, with notice that the coverage is primary over any other valid insurance.

4. Any additional conditions as attached and referenced below.

For Official Use:

Approved (see conditions below) Approved As Amended Not Approved

Contractor/TCP firm SHALL contact the District Office and confirm the actual start dates.

TCP Firm and Contractor must adhere to the attached notes.

Permit Number: - Approved By

NMDOT District Office – Traffic Section Submitted to the District Public Information Officer By:_____________________________ On:____/_____/_____

TRAFFIC CONTROL/ROADWAY WORK PERMIT
Or Intersection: Intersection:
NMDOT Project Number If applicable:
Control Number:
General Scope of work:
Contractor Name:
Contact Person:
Traffic Control Firm:
Certified Traffic Control Supervisor:
Mile Post From:
To:
Or Intersection:
Intersection:
Direction NB SB EB WB or both:
4 lane Road: Off
6 lane Road: Off
8 Lane Road: Off
Divided: Off
Undivided: Off
Proposed Speed Limit reduction within work zone If Applicable:
Start Date:
Daily Start Time:
End Time:
Other:
TCP Plan Enclosed 1:
TCP Plan Enclosed 2:
If no describe why:
Approved By:
Submitted to the District Public Information Officer By:
On:
undefined_7:
undefined_8:
Text1:
Text2:
Text3:
2 lane Road: Off
Text7:
Text8:
Text9:
Text10:
Text11:
Text12:
15: Off
16: Off
17: Off
18: Off
19: Off
20: Off
21: Off
22: Off
Check Box23: Off
Check Box24: Off
Check Box25: Off
Check Box26: Off
Check Box27: Off
Text85:
Text86:
Text87:
Text13:
Text563:
Text564:
Text566:
Text258:

File details come from the government source that posted it. Updated .