Affidavit_of_Wages_Paid.pdf

PDF 111 KB Posted

Attached to
G-80 Well POD-1 and POD-2 Drilling and Testing
Solicitation number
2025-ITB-005
Issued by
Quay County, New Mexico

About this file

The Affidavit of Wages Paid is a document issued by the New Mexico Department of Workforce Solutions, Labor Relations Division, designed to ensure compliance with prevailing wage requirements for public works projects. This form must be completed by general contractors, subcontractors, and additional tier subcontractors after construction is finished, requiring detailed documentation of contractor and project information, including company details, project title, physical address, and completion date.

The document mandates that all workers on public works projects be paid no less than the prevailing wage rates determined by the Labor Relations Division. Contractors who violate prevailing wage laws are subject to debarment procedures and must pay any back wages owed to workers. The form specifically references the Labor Relations Division Public Works Minimum Wage Act Policy Manual and the Public Works Minimum Wage Act (13-4-11 through 13-4-18, NMSA 78), emphasizing strict adherence to wage regulations and potential penalties for non-compliance.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AFFIDAVIT OF WAGES PAID

To Be Completed After Construction Is Complete

All FIELDS ARE REQUIRED

FORM MUST BE SENT TO THE CONTRACTING AGENCY

General Contractor Information Company Name:

Address:

City: State: Zip:

Phone: Fax: E-Mail:

Estimated Completion Date: State Wage Decision Number:

Project Title:

Project Physical Address:

Print Name:

General Contractor Signature:

Sub Contractor Information

Date you completed work on this project:

Company Name:

Address:

City: State: Zip:

Phone: Fax: E-Mail:

Sub Contractor Signature:

2nd, 3rd, etc. Tier Sub Contractor Information

Date you completed work on this project:

Company Name:

Address:

City: State: Zip:

Phone: Fax: E-Mail:

Tier Signature:

I hereby certify that the above information is correct and that all workers I employ on this public works project were paid no less than the Prevailing Wage Rate(s) as determined by the Department of Workforce Solutions, Labor Relations Division for this project as identified by the State Wage Decision Number. I understand that contractors who violate Prevailing Wage Laws (i.e., incorrect job classification, improper payment of prevailing wages, and/or overtime, etc.), are subject to debarment procedures and shall be required to pay any back wages due to workers. (Ref. Labor Relations Division Public Works Minimum Wage Act Policy Manual (11.1.2 NMAC) & Public Works Minimum Wage Act (13-4-11 through 13-4-18, NMSA 78)).

Contractor’s Signature Date

(Revised 08/23/13)

INSTRUCTIONS FOR COMPLETING AFFIDAVIT OF WAGES PAID

GENERAL CONTRACTOR

1. Enter general contractor information and provide signature.

2. Enter State Wage Decision Number as listed in bid documents. (Example: BE 13-0123 B)

3. Enter project title - listed in bid documents.

4. Enter project physical address - exact location of project (job site).

5. Enter completion date of project.

6. All Affidavits’ must be sent to the Contracting Agency.

SUB CONTRACTOR

1. Enter general contractor information, but general contractor signature is not needed.

2. Enter sub contractor information as indicated and provide signature.

3. Enter sub contractor completion date.

NOTE: A separate signed form is needed for each contractor.

2ND, 3rd, etc TIER SUB CONTRACTOR

1. Enter sub contractor information, subcontractor signature is not needed.

2. Enter 2nd tier sub contractor information and provide signature.

3. Enter 2nd tier contract completion date.

(Revised 8/23/13)