SOW NOAA Ship Rainier
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OS-123-001_2.TIF | TIF image | |
| OS-123-001_3.TIF | TIF image | |
| OS-123-001_1.TIF | TIF image | |
| Amendment_November_16_2016.docx | DOCX document | |
| Sette_512-6233799.pdf | ||
| Sette_512-6233802_(1).pdf | ||
| Sette_512-6233797.pdf | ||
| Sette_512-6233800.pdf | ||
| Sette_512-6233801.pdf | ||
| AMENDMENT_NO_05.pdf | ||
| FormSF30_AMENDMENT_NO_3.pdf | ||
| Amendment_Number_02.docx | DOCX document | |
| AD_NO.1_05-2440_NEWPORT_OREGON.txt | TXT text file | |
| AD_NO.1_SE_SOW_FY17_Rev0.pdf | ||
| AD_NO.1_15-2153_WD-HAWAII.txt | TXT text file | |
| AD_NO.1_Bid_Schedule_Sette.pdf | ||
| Amendment_Number_01.docx | DOCX document | |
| AD_NO.1_Base_DOCKSIDE_IDIQ_SOW.pdf | ||
| AD_NO.1_05-2017_ALASKA.txt | TXT text file | |
| AD_No._1_15-5636_WD_San_Diego_CA.txt | TXT text file | |
| BID_SCHEDULE_FAIRWEATHER.docx | DOCX document | |
| RAINIER_BID_SCHEDULE.docx | DOCX document | |
| SOW_FA_FY17_DOCKSIDE_FAIRWEATHER_REV_2_(1).pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOAA SHIP RAINIER
FY 2017 DOCKSIDE REPAIR PERIOD
Statement of Work (S-221)
Year Built: 1968 Designer: Maritime Administration Construction: Welded Steel/Ice Strengthened Builder: AEROJET – General Shipyards Jacksonville, Florida
Overall Length: 231 feet (70.4M) Beam: 42 feet (12.8M) Displacement: 1800 TONS Draft: 14.3 feet (4.36M)
SPECIFICATIONS FOR DOCKSIDE REPAIR
TABLE OF CONTENTS
BASIC WORK ITEMS CLASS "A"
101 GENERAL REQUIREMENTS
102 TEMPORARY BERTHING
103 ER VENT LOUVERS
104 ABS ANNUAL LOAD LINE SURVEY
105 AFT MSD INSTALLATION AND UPGRADES
106 MAIN ENGINE UPGRADES AND SERVICE
107 DECK NON-SKID RENEWAL
108 OILY WATER SEPARATOR REPLACEMENT
109 FWD GREY WATER TANK PUMP REPLACEMENT
110 BILGE PUMP REPLACEMENT
111 HYDRAULIC HOSE SURVEY AND REPLACE
112 MISCELLANEOUS PIPING REPAIR AND REPLACE
113 CERC ROOM FLOORING INSTALL
114 GALLEY STEAM TABLE DRAIN INSTALL
115 ELEVATOR INSPECTION
116 SUPERSTRUCTURE PRESERVATION
OPTIONAL WORK ITEMS CLASS “B”
201 ADDITIONAL REQUIREMENTS
202 ADDITIONAL DIESEL FUEL STORAGE
203 BILGE PUMPING
OPTIONAL ITEMS CLASS "C"
301 DIESEL GENERATOR SERVICING
302 HVAC SERVICING AND CLEANING
303 CPO BERTHING CARPET REPLACEMENT
304 VENTILATION SYSTEM CLEANING
305 MACS SYSTEM SERVICING
306 BOILER SERVICING
307 FIRE AND SAFETY EQUIPMENT
308 DAVIT AND CRANE SERVICING
ITEM 101: GENERAL REQUIREMENTS
1. INTENT
1.1 This specification contains the general requirements for work performed by the dockside repair contractor for the NOAA Ship RAINIER. These general requirements apply to all work items contained in this contract including care of the ship, sea trials, and services provided to the ship during the contract.
1.2 Work under this contract will be performed at NOAA’s Marine Operations Center –
Pacific (MOC-P). MOC-P is located at 2002 SE Marine Science Drive, Newport, Oregon 97365.
All Contractor Employees will be required to obtain temporary access badges through NOAA.
2. REFERENCES
2.1 NOAA Standard Specification S4800-2, Piping Systems
2.2 American Bureau of Shipping "Rules for Building and Classing Steel Vessels"
2.3 U. S. Coast Guard "Subchapter F - Marine Engineering", 46 CFR 50 through 46 CFR
64.
2.4 U. S. Coast Guard "Subchapter J - Electrical Engineering", 46 CFR 110 through 46
CFR 113.
2.5 IEEE Std 45-2002, "IEEE Recommended Practice for Electric Installations on
Shipboard"
2.6 NOAA Standard Spec S0100, Implementation and Conduct of Check Points
3. DEFINITIONS Wherever used in this specification and in all other work items in this contract, the following definitions of terms apply:
3.1 Inspect. Visually evaluate the specified surface, item, part, or component for evidence of contamination, damage excessive wear, scoring, and any other condition which could interfere with the proper operation or functioning of the surface, item, part or component.
3.2 Install. Place the specified item in position for service and make all connections needed to insure proper use, service, appearance, and operation. Except as may otherwise be specified, this shall include the following:
3.2.1. Provide new or modify existing foundations. Securely mount equipment and components using new fasteners. Align connected equipment and components to meet manufacturer’s specifications.
3.2.2. Make all electrical connections. Provide new electrical cable runs between controllers and motors of new equipment. Existing cables may be reused in other applications, except where the existing cables are too short to make connections. Renew cables which are too short and less than 20 feet long. Junction boxes may be used to increase the cable run length where the existing cable runs are longer than 20 feet.
3.2.3. Modify new piping to suit the new equipment, including the rerouting of existing piping and adding of new piping as needed to properly connect equipment and components. Piping modifications greater than five feet from the equipment are not required.
New piping is required only to the extent necessary to accommodate modifications of existing piping.
3.3 Piping. A system of pipe, tube, elbows, tees, valves, couplings, and other pipe fittings.
Unless otherwise specified in the detailed item description, all piping systems and components shall comply with material and installation requirements of reference 2.1.
3.4 Rebuild. Disassemble, clean, inspect, repair (including renewal of all parts needed), reassemble, test, and calibrate the specified part, component, system, or machine to restore it to a condition of reliability equivalent to a new part, component, system, or machine. Components and parts shall meet the manufacturer's applicable rebuild specifications.
3.5 Reinstall. Return the same item which was previously removed to its previous configuration and location.
3.6 Renew. Provide and install a new item as replacement for an existing item previously removed or to be removed. The new item must be the same as or comparable in material, performance and configuration to the item removed.
3.7 Replace. Same as "renew", defined above.
3.8 Checkpoint. Instances that have the verbiage “***CHECKPOINT***” in the SOW require the contractor to verify, or inspect, the work performed with the COR. Any section that does not include “***CHECKPOINT***” does not preclude the contractor from obtaining COR approval, or verification, before proceeding work.
4. REQUIREMENTS
4.1 Condition Found Reports
4.1.1. A Condition Found Report (CFR) shall be prepared and submitted by the
Contractor to the Contracting Officer's Representative (COR) on all of the following occasions:
4.1.1.1. Whenever specifically required by this or other documents.
4.1.1.2. Whenever the Contractor determines or notes that additional work or material or other deviation is necessary in order to produce a reliable or complete repair.
4.1.1.3. Whenever defect or deficiencies are noted in Government-furnished
Property, or on government equipment or components.
4.1.1.4. Whenever measurements, tests or inspections are required by other specifications or procurement documents, the results and findings shall be documented on a
CFR.
4.1.2. Condition Found Reports shall contain, as a minimum, the following:
4.1.2.1. Name of the ship.
4.1.2.2. Contract number and related work item number.
4.1.2.3. Detailed description of conditions observed, including a record of all measurements taken and other supporting data.
4.1.2.4. Recommendations of additional work and materials deemed to be needed, if any, including the contractors proposed cost for time and material incidental to the recommendation.
4.1.2.5. Estimate of the impact on the completion of the contract, if any.
4.1.3. Submit Condition Reports to the COR within twenty-four hours after completing the measurements, inspections, or tests, or after the need for additional work or material is noted.
4.1.4. For work involving disassembling and inspection of equipment, machinery or systems and for work involving opening and inspection of tanks, the work must be completed and a Condition Report must be submitted during the first 25-percent of the work performance period.
4.2 Progress Meetings.
4.2.1. Weekly progress meetings shall be held at a time and place mutually agreeable to the COR and the Contractor. As a minimum, the meetings shall be attended by the COR and a Contractor's management official having authority to make binding commitments. Other interested parties may attend the meetings as appropriate.
4.2.2. Prior to the end of the work day preceding the progress meeting, the Contractor shall submit to the COR a preliminary progress report containing the following information:
4.2.2.1. Percentage completion of each contract item, including all additional work items authorized by the Contracting Officer.
4.2.2.2. Notation of any problems which could impact timely completion, including material delivery delays.
4.2.3. Meeting minutes will be recorded by Contractor and provided to COR in a
4.3 Personnel Information.
4.3.1. Provide to the COR a list of the Contractor's supervisors, including shop supervisors, and a list of telephone numbers where the supervisors can be reached during non-working hours in event of an emergency.
4.3.2. Provide to the COR a list of all Contractor’s and Subcontractor’s workers that will be performing work on Government equipment. Include in the list relevant certifications and certification expiry dates.
4.4 Protective Coverings.
4.4.1. Prior to starting work on interior spaces, protect the decks and deck coverings of spaces in which contract work is to be performed and spaces through which workers will traverse by covering the decks and deck coverings with a temporarily fitted heavy vinyl, plywood or particle board. Securely tape all edges and joints of the protective covering.
Maintain the protective covering in place during the entire contract period, renewing sections which are damaged during the contract period. For those decks over which equipment, valves, piping, or other materials must be handled, the temporary protective covering shall be plywood or particle board and shall be of sufficient thickness to protect the deck from damage in the event the equipment or materials are dropped.
4.4.2. Protect all compartments, machinery, equipment, deck coverings, furnishings, vent terminals, insulation, glass, cables, piping systems, coatings, structures, and other ship components from damage and from entry of dust, dirt, grit, sand, and other foreign particles.
Protect the ship’s bulkheads and flooring from shipyard temporary service hoses, cables and ventilation.
4.4.3. Whenever abrasive blasting or other operations which create atmospheric contamination are performed on or near the ship, or which could otherwise allow airborne contaminates to collect on or in the ship, the Contractor shall plug, wrap, blank, cover, or mask all openings to prevent entry of the contaminates into the ship. Install industrial foam filter material on the intake and exhaust end of ventilation systems which will be in use. Renew the filter materials when air flow becomes restricted. Whenever abrasive blasting is performed inside the ship, blast materials shall be confined to the compartment being blasted.
4.4.4. All damage and contamination resulting from failure to provide adequate protection shall be repaired and cleaned by the Contractor at the Contractor’s expense to re-establish the condition which existed at the start of the work.
4.4.5. After completion of all other work, remove and dispose of all protective coverings along with any adhesive residue used to hold coverings in place.
4.5 Restricted Access. Access by workers to the ship's compartments shall be restricted to those in which work is being performed or through which passage is necessary to reach the work site. All other compartments shall be considered off-limits to workers.
4.6 Daily Clean-up.
4.6.1. Clean-up and remove from the ship all dirt, debris, scrap, and other materials incident to Contractor's work at the end of each work day. The work site shall also be swept after each work day.
4.6.2. Whenever abrasive blasting or other operations on or near the ship causes collection of blasting residue or other foreign particles to collect on exterior decks of the ship, the Contractor shall vacuum or sweep the decks to remove the residue and particles prior to the end of the day on which the contamination occurred. Do not wash the residue or particles through the ship's deck drains.
4.7 Disruption of Ship's Systems.
4.7.1. The ship’s occupied quarters, galley, mess area and laundry are to remain functional and habitable throughout the repair period except that a maximum of a continuous six week disruption is allowed where the ship’s force would have to move off. The contractor shall identify in its original schedule all work that would disrupt the crew’s live aboard status and group this work to be completed within the one week time frame.
4.7.1.1. Systems that effect habitability of the ship include but are not limited to HVAC, refrigeration, potable water, grey water, sea water, hot water and sewage.
4.7.1.2. Habitability systems shall be in continuous operation after completion of repairs or modifications for minimum of 18 hours before the crew is requested to move back to the ship.
4.7.2. Except as necessary to perform work, none of the ship's fire main, electrical, steam, heating, potable water, drainage, or other systems which are vital to crew safety or comfort shall be shut off or disrupted. The COR must be provided advanced notice of a disruption at least 4 hours in advance.
4.7.3. Disruptions shall be limited to 4-hour intervals. If the required work will need a longer interval, temporary bypass hoses, blank flanges, or piping shall be installed to keep the system in operation.
4.7.4. For purposes of this specification, a "disruption" occurs whenever a large section of a system will be unusable. If the only section of the system affected is that on which
ITEM 101: GENERAL REQUIREMENTS
work is being performed and the remainder of the system can be operated, a "disruption" has not occurred and the requirements of this section do not apply.
4.8 Work Hours. At the beginning of the repair period, the Contractor shall advise the COR in writing of the planned regular work day schedule. In the event the Contractor desires to work at times other than those previously scheduled, notify the Port Engineer at least 4 hours prior to the end of the scheduled work day preceding the unscheduled work time. If previously unscheduled work is to be performed on a weekend or federal holiday, the Port Engineer must be notified prior to 9:00am on the last regular work day before the unscheduled work. While the ship is inhabited no work shall be conducted between the hours of 7:00pm and 7:00am on weekdays and 7:00pm and 10:00am on weekends without receiving permission from the Port Engineer 24hours prior to the desired unscheduled work time.
4.9 Local Policies and Directives. While Contractor personnel, including those of subcontractors, are on the ship or on other government facilities, they shall comply with all policies and directives issued by the Master, Commanding Officer, or Director of the ship or facility.
4.10 Safety Requirements.
4.10.1. Gas Free Certification.
4.10.1.1. The Contractor shall be responsible for certifying that a safe atmosphere exists in and about a compartment prior to the commencement of any work.
Whenever compartments must be gas free to meet state and federal regulations, the Contractor shall pump down, open, remove sludge, clean, wipe, ventilate and take all other action required to make the compartments safe for the work to be performed. When requested by the Contractor, and to the extent empty tank space is available, NOAA will shift fuel as required to facilitate gas free requirements. If off-loading of fuel oil and/or lube oil is necessary because of insufficient empty tank space, the Contractor shall submit a CFR to off-load the fuel and/or lube oil.
4.10.1.2. Copies of gas free certificates, issued by a Marine Chemist certified by the National Fire Protection Association, shall be issued by the Contractor and posted on the ship in two locations designated by the COR. Follow-up inspections by the Contractor's Competent Person shall also be documented at the same two locations.
4.10.1.3. The Contractor shall be responsible for identifying the compartments which require gas free certification. Specific requirements for gas free certification are not normally included in the detail specifications of any work item.
4.10.2. Fire Watch Standers.
4.10.2.1. Hot work is permitted only when fire watch standers are provided by the Contractor. A fire watch stander is required whenever welding, flame cutting or other hot
ITEM 101: GENERAL REQUIREMENTS
work is performed where combustible materials are present within 35 feet; or where wall or deck openings within a 35-feet radius expose combustible materials in adjacent areas; or when combustible materials are adjacent to the opposite side of metal partitions exposed to hot work, and could be ignited by conduction or radiation. In the latter case, a fire watch stander is required on both sides of the partition.
4.10.2.2. Each fire watch stander shall be outfitted by the Contractor with a fire extinguisher of a suitable size and type.
4.10.2.3. Prior to leaving the work site, the fire watch stander shall verify with the worker performing the hot work that no further hot work will be performed. Fire watch standers shall remain at the hot work location for a minimum of 30 minutes after cessation of hot work to ensure the work has cooled sufficiently prior to leaving.
4.10.2.4. Insulation, sheathing, or other materials which limit access to either side of a partition or structure on which hot work is being performed shall be considered to be an interference, and shall be removed and restored by the Contractor.
4.10.3. Written Hot Work Notice. Prior to starting hot work on any job or separate area of the ship, the Contractor shall provide a written notice to the OOD. The notice shall include the location of the work, the time hot work will commence and the current gas free status of the area if needed. Contractor shall receive a ship-issued hot work permit prior to the start of any hot work. This permit contains approval from the CO, Chief Engineer, and OOD.
4.10.4. Asbestos-Containing Materials (ACM). Existing panels, insulation, gaskets, and other materials on the vessel may contain asbestos. Asbestos shall be removed by a certified ACM removal contractor. All asbestos projects shall comply with all federal, state, and local regulations governing the removal of asbestos.
4.10.5. Miscellaneous Requirements.
4.10.5.1. Oxygen, acetylene, and gas supply manifold systems shall be located off the ship and have a shutoff valve to the gas supply located on the dock. The shutoff shall be in addition to the master shutoff valve at the inlet to each portable outlet header.
4.10.5.2. Material brought onto the ship shall be stored until used in areas which do not interfere with access to fire-fighting equipment or personnel access. Crating and packing shall be removed prior to bringing the equipment or material aboard the ship, unless needed to protect the equipment or material from damage during handling. In that case, the crating and packing shall be removed from the equipment or material, and shall be removed from the ship, immediately after being brought aboard.
4.10.5.3. Rigging of hoses, welding leads, and temporary lights shall be kept clear of the decks on temporary "trees" or brackets and be arranged so as to minimize tripping and other safety hazards. Passageways shall be kept as clear of obstructions as possible.
4.11 Interferences and Restorations.
4.11.1. Remove all interferences and obstructions necessary to complete the required work. This shall include the disassembly and removal of machinery, piping, ducts, cable, wiring, insulation, structures, and anything else which interferes with the proper accomplishment of work. Except as otherwise specified, this does not include relocations made necessary by new installations which physically prevent an interference from being returned to its existing location.
4.11.2. Whenever an interference to be removed involves a structural strength member, temporary supports shall be provided to compensate for the strength loss. Whenever watertight integrity is violated by a removed interference, provide a temporary means of maintaining watertight integrity, except when work is actually being performed or the space is otherwise manned.
4.11.3. Restore all interferences to their existing configuration and condition. Install new gaskets and fasteners. In place of material which is rendered unsuitable for reinstallation during removal or storage, provide and install new materials which are equal in composition, strength, design, type, and size as existed prior to removal. All insulation removed or damaged shall be renewed with new insulation.
4.11.4. Material containing asbestos which is removed as interference shall not be reinstalled. Instead, renew the asbestos-containing material with a new non-asbestos material which provides the same function and general appearance as that removed.
4.11.5. Align and conduct strength, tightness, and operational tests to ensure that the reinstalled interferences safely perform their normal functions.
4.11.6. The Contractor shall be responsible for identifying all interferences involved in accomplishing required work. Interferences are not normally identified in the detail specifications of the work item.
4.12 Shipboard Storage. No space or compartment on the ship shall be used for storage by the Contractor of materials or tools. The materials allowed at the work site shall be limited to those which will be installed, consumed, or otherwise used during the work shift in progress.
When needed or required, the Contractor shall provide a temporary dockside storage area to store materials and tools.
4.13 Watertight Integrity. The Contractor shall maintain or restore the watertight integrity of the ship's watertight bulkheads, decks, and hull by installing stuffing tubes, welded bulkhead
ITEM 101: GENERAL REQUIREMENTS
and deck penetrations, multi-cable transits, couplings, and kickpipes as appropriate. All materials and installation details shall be same as the nearest similar existing penetrations.
4.14 Removals.
4.14.1. Whenever removal of equipment or machinery is specified, but reinstallation is not specified, the Contractor shall remove all related electrical cables, brackets, foundations, and piping. Removal of cables shall be to the nearest circuit breaker or terminal not needed for operation of other equipment or machinery. Removal of piping shall include all related piping not used by other systems or equipment. Install pipe caps as needed to maintain remaining piping tight. Foundations or supports shall be cut close to the deck, bulkhead, or other support and ground smooth.
4.14.2. Whenever removal of piping or cables involve penetration through bulkheads, decks, hull plating or other watertight boundaries, the Contractor shall crop out the penetration and install an insert plate of same thickness as the adjacent plating. Insert plates shall be a minimum of 6-inch diameters.
4.15 Structural Access Openings.
4.15.1. The Contractor may, with prior approval, cut access openings in ship's structure if required to perform work. Such openings shall be limited to those which are essential for access to otherwise inaccessible areas or which greatly improve accessibility for removals or installations. Openings should not affect the structural integrity of load bearing structures.
4.15.2. Prior to making any access opening in ship's structure, the Contractor shall submit to the COR a sketch of the proposed opening, showing the location and dimensions of the proposed access cut, adjacent framing members, nearby penetrations, and scantlings of the structure. Generous radii shall be provided at all corners. Also include a description of the eventual restoration configuration, with material and welding details, and a narrative justification for cutting the opening. Submittal of the sketch does not insure that the COR will authorize the cut as proposed. The Contractor shall proceed with the access cut only after obtaining approval by the COR via a signed copy of the sketch.
4.16 Brackets and Supports. All pipe, cables, ducts, furniture, equipment, and machinery installed by the Contractor shall be bracketed, supported, and secured so as to carry the weight of the material, prevent vibration, and withstand inertia forces resulting from rolling and pitching of the ship.
4.17 Gaskets, Packing, and Seals. Whenever the Contractor performs work which disturbs existing gaskets, packing, or seals, new gaskets, packing, and seals of same material as existing shall be installed unless otherwise specified, except use 3/16-inch thick cork rubber impregnated
ITEM 101: GENERAL REQUIREMENTS
gasket material conforming to SAE-AMS-6183 for all fuel oil tank manhole covers and fuel oil service piping.
4.18 Welding and Allied Processes.
4.18.1. All welding, brazing, and allied processes shall be in accordance with the requirements and recommendations of references 2.2 and 2.3.
4.18.2. While the ship is water-borne, welding shall be permitted only when welding leads are properly grounded. Welding machines and other welding power sources shall have both cables connected only to the ship where welding is done. The return ground cable shall never be grounded to anything but the ship it is servicing. All welding cables shall be fully insulated and not be permitted to drop overboard into the water. The total cross-sectional areas of the return ground cable shall be at least one million circular mils per 1,000 amperes per 100 feet, but not less than 85,000 circular mils. The ground cable shall be securely fastened to grounding plates or to an integral part of the ship, with contact areas thoroughly cleaned to bare metal. When completed the attachment points (lugs) will be removed, prepped and painted in accordance with 4.19 Painting below.
4.18.3. When welding on equipment, machinery, pressure vessels, or piping, the return ground cable to the welding equipment shall be connected in the immediate vicinity (as close as practical) of the work to ensure that current does not flow through bearings, pipe hangers or other areas where arcing or high resistance paths exist.
4.19 Painting.
4.19.1. Prior to applying any paint or coatings, the Contractor shall verify that all surfaces have been properly prepared and that weather conditions are suitable for painting.
4.19.2. Paint shall be applied only when the following conditions exist and can be maintained until the paint has cured:
4.19.2.1. Apply paint only to dry surfaces and when there is no chance of precipitation until after the paint has cured. The temperature of the surface to be painted shall be at least 5 degrees Fahrenheit above the dew point. The dew point can be presumed to be satisfactory if a thin, clearly defined film of water applied to the cleaned surface with a damp cloth evaporates within 15 minutes. Otherwise, the dew point shall be measured prior to painting by taking the dry-bulb temperature of the surface and the wet-bulb temperature at the jobsite.
4.19.2.2. The air temperature and surface temperature must both be a minimum of 45 degrees Fahrenheit at all times, unless a lower temperature is specifically authorized by the paint manufacturer’s printed instructions.
4.19.2.3. Painting is permitted only when the humidity is less than 80 percent unless otherwise specified in the paint manufacturer’s written instructions. In the event the Contractor desires or must proceed with painting when the existing weather conditions do not meet the above specified conditions, the Contractor shall erect a cover over the surfaces to be painted and shall heat the surfaces and the surrounding air to establish the required conditions.
The conditions shall be maintained until the paint has fully cured in accordance with the paint manufacturers’ application instructions.
4.19.3. Restore all existing coating systems which are damaged during performance of work. The new coating system shall be same as existing.
4.19.4. Surface preparation and paint application shall be in accordance with applicable NOAA specifications and comply with the paint manufacturers' printed recommendations and instructions for all aspects of surface preparation, and handling, mixing, and application of paint materials.
4.19.5. Paint schedule: Paint systems used on the ship shall consist of a primer coat followed by a minimum of two top coats unless otherwise specified either in the detailed specification or by the manufacturer of the paint. It is the responsibility of the Contractor to ensure that paint used is compatible with existing paint on the ship. As a general guide, the paint used on the vessel is manufactured by AkzoNobel under the INTERNATIONAL brand name.
Interior paint on the ship is latex; exterior paint is epoxy. Painted surfaces below the walking flat in the engine room and inside tanks shall be epoxy. Bare steel shall be coated with a zinc rich primer before rust bloom is allowed to form unless otherwise specified by the paint manufacturer. Top coats shall be applied according to the manufacturer’s procedures.
4.20 Electrical. All requirements and recommendations of references 2.4 and 2.5 shall be followed in the selection and installation of electrical cables, equipment, and machinery.
4.21 Weight and Stability: Throughout the performance period of the repair contract, the contractor shall track the weight changes to the vessel resulting from the work items in the repair contract. The location and amount of the weight shall be recorded for both removals and additions including the differences between equipment being replaced with new equipment. The current record of weight changes shall be provided to the COR at each weekly progress meeting with the total itemized record to be provided at the contract completion date. The weight record shall be actual and not an estimate, utilizing certified weighing devices.
4.22 Sea Trials.
4.22.1. Approximately 3 days before the completion of the contract, conduct an 8 to 12 hour sea trials. The date and length for sea trials must be approved by the COR. The Contractor shall provide the services of the American Bureau of Shipping (ABS) as required to provide certification of completed work. The Contractor will, prior to sea trial departure, provide a thorough clean up of all work areas to be approved by the COR. The clean up shall restore all
ITEM 101: GENERAL REQUIREMENTS
work areas and associated passageways and access pathways to the same condition of cleanliness and serviceability as they were in upon the ships arrival. Clean up shall include, but not be limited to activities such as sweeping, vacuuming, wiping, washing, degreasing, waxing, painting and repairing/replacing as necessary to return the ship to the arrival condition of cleanliness and serviceability.
4.22.2. The contractor shall submit to the COR a schedule for testing all equipment the contractor has worked on one week before sea trials. The contractor must submit a list of the personnel who will ride the ship during sea trials prior to departure. The list must include Name, SSN, Citizenship, Address and person to be notified in case of emergency.
4.22.3. The contractor shall provide at least one supervisor for sea trials to coordinate testing, adjustment and repair of discrepancies.
4.22.4. All equipment will be operated by ship's force personnel.
4.22.5. An attempt will be made to do all testing during normal working hours;
however, it may be necessary to depart early and return late.
4.22.6. No contractor work will be allowed during trials except as approved by the
COR.
4.22.7. Sea trial discrepancies must be corrected before the completion of the contract.
4.22.8. At the COR’s discretion, sea trials may be replaced with either a fast cruise or dock trials.
4.23 Tests and Inspections.
4.23.1. At least four hours (during normal working hours), in advance of conducting each required test and inspection, notify the COR in order to allow the COR the opportunity to witness, or to arrange for another NOAA representative to witness, the tests and inspections. For non ABS related testing/inspection, the COR must be present unless the COR has authorized testing/inspection to proceed without his presence.
4.23.2. Any test or inspection requiring the attendance of an ABS Surveyor will require at least 24 hour notice be given to ABS, unless otherwise instructed by the Surveyor. If the COR or other NOAA representative is not present at the scheduled time of the test or inspection, and if the required 4-hour advance notification was furnished to the COR, the Contractor may proceed with the test or inspection.
4.23.3. Contractor shall provide for all American Bureau of Shipping (ABS) inspections and support services for these inspections. A completed ABS Inspection report shall be provided to the COR for all inspections.
4.23.4. All tests and inspections shall be witnessed by the Contractor's supervisor responsible for the work. A Condition Found Report (See 4.1) shall be prepared to document the results of all tests and inspections.
4.23.5. To the extent possible, all tests and inspections shall be scheduled during the normal weekday work shift. Tests and inspections may be scheduled for other times only when necessary to avoid a delay in the contract completion. When necessary to schedule a test or inspection after the normal day shift or on a weekend, the COR shall be notified of the test or inspection at least four hours before the end of the last preceding regular work shift.
4.23.6. The Contractor shall perform an operational test of all newly installed, overhauled, and repaired equipment to demonstrate proper operation. Shipboard equipment will be operated by the ship's crew.
4.23.7. Whenever a "hose test" is specified, conduct the test by directing a 50-psig stream of water from a 1-1/2 inch fire hose through an all purpose nozzle at a distance of not more than 10 feet from the surface being tested. Direct the stream of water in a manner most likely to disclose a leak and inspect the opposite side of the surface for leaks.
4.24 Fuel Oil and Lube Oil Offloading.
4.24.1. Whenever the Contractor is required to or elects to offload fuel oil or lube oil from the ship, the oil shall be pumped to and stored in clean moisture-free storage tanks. Meter the oils with a calibrated meter during offloading and during return. Take test samples during offloading and during return, and have the test samples analyzed by a lab for water and impurities to verify that the oils were not contaminated while in the Contractor's possession.
Provide copies of lab reports to the COR. For bidding purposes, assume the ship will require 35,000 gallons of fuel removed, stored, and reloaded. Additional fuel removal shall be addressed by CFR prior to removal of additional fuel.
4.24.2. After all work which necessitated the oil's removal has been completed, return the oil to the ship. In lieu of storing the oil, the Contractor may accept title and responsibility for disposal of the oil and provide an equal amount of new clean oil, same as that removed. Test samples are required, even if this option is exercised by the Contractor.
4.25 Disposal of Fluids. Whenever work requires that equipment, machinery, piping, or tanks be drained of fluids, the Contractor shall be responsible for draining and proper disposal of the fluid in accordance with local, state, and federal regulations. If the Contractor drains the fluid into the ship's bilges, the Contractor shall pump all fluid from the applicable bilges into dockside tanks and properly dispose of the fluid, including the fluid that existed prior to and the fluid that accumulates between the time the equipment, machinery, piping or tanks were drained and the time the bilges have been pumped dry by the Contractor. The cost of this should be included in the specific work items.
4.26 Disassembly and Inspections. Whenever equipment, machinery, systems, or other system components are required to be disassembled, opened or overhauled, the contractor shall complete all disassembling and inspections during the first 25-percent of the work performance period. All tanks required to be opened shall also be opened and gas-freed during the first 25-percent of the work performance period. No time extension of the work performance period will be granted for delays caused by the contractor's failure to comply with this 25-percent time requirement. The 25-percent time requirement is calculated by multiplying the total number of work days proposed in the Contractors schedule by 0.25 and rounding up to the next whole number then adding that number of days to the scheduled start date not counting weekends or holidays not worked.
5. NOTES
5.1 The requirements and provisions of this specification are additions to or amplification of the requirements and provisions set forth in other specifications, solicitation, or procurement documents. In the event a conflict should occur, the requirements of the other documents take precedence over those contained herein.
ITEM 102: TEMPORARY BERTHING AND HOTEL ACCOMMODATIONS
1. INTENT
1.1 Temporary berthing shall be provided during any of the following circumstances:
1.1.1 Any time when crew members residing in berthing spaces to which HVAC, space heating, hot water, electrical, or sanitary services are interrupted outside of normal working hours of 7:30 am to 4 pm.
1.1.2 Any time work is being performed on the ship between the hours of 8 pm to 7 am.
1. REFERENCES
2.1 Trip Advisor http://www.tripadvisor.com/
2.2 AAA/CAA http://www.aaanewsroom.net
2.3 http://www.usfa.fema.gov/applications/hotel/
3. GOVERNMENT FURNISHED MATERIAL (GFM)
3.1 None.
4. REFERENCES
4.1 General Requirements
4.1.1 For periods where the entire ship is uninhabitable, 30 rooms shall be provided per day for crew members. Contractor to determine the number of days that the ship will be uninhabitable, including weekends, based on the drydock “Basic Items” scope of work.
4.1.2 All work items which disrupt one or more of the habitability services shall be started in the first 30% of the project timeline and completed by the 90% of the time line.
4.1.3 The Contractor shall not request the ship’s crew to move into or out of the hotel during a weekend or on a federal holiday.
4.1.4 Systems involving habitability, including but not limited to HVAC, refrigeration, potable water, grey water and sewage shall be in continuous operation after completion of repairs or modifications for minimum of a12 hours before the crew is requested to move back from a hotel to the ship.
4.2 Cost per room shall include the following amenities at no extra charge:
4.2.1 Each room shall be furnished with two beds.
http://www.aaanewsroom.net/
ITEM 102: TEMPORARY BERTHING AND HOTEL ACCOMMODATIONS
4.2.2 Each room includes one parking space. Individual parking spot must be included in the cost of the room.
4.2.3 Television with basic cable provided at no extra charge.
4.2.4 Microwave and mini fridge at no extra charge.
4.2.5 Unlimited wifi internet from each room at no extra charge.
4.3 Hotel amenities shall include the following requirements:
4.3.1 Free breakfast. Breakfast shall include a hot bar with all of the following:
• Fresh Fruit
• Fresh fruit juices
• Milk and cereals
• Eggs
• Pancakes, french toast or waffles
• Potatoes
• Bacon or another breakfast meat
• Toast or pastries
• Coffee and tea
• Butter, margarine, syrup and jelly or jam
4.3.2 Laundry room on site, available to hotel guests for personal use. Free use or coin operated machines are acceptable.
4.3.4 Business Center: Public office that includes a computer with internet access and a printer for hotel guests to use.
4.3.5 Fitness Center: Workout/Gym room available for hotel guests to use at no added cost.
4.4 Hotel shall be located within 10 miles of the Dockside location.
4.5 Guest Reviews: The hotel shall have a minimum 3.5 out of 5 circles darkened in on the rating/reviews on Tripadvisor.com (reference 2.1). Minimum reviews for the hotel shall be 20 reviews over a two year period.
4.6 Hotel Quality: The hotel shall have a minimum 3 diamond rating as rated by the AAA (reference 2.2). Hampton Inn & Suites, Residence Inn and Courtyard by Marriott, La Quinta Inn & Suites, Silver Cloud are all examples of hotels that may have a 3 diamond rating.
ITEM 102: TEMPORARY BERTHING AND HOTEL ACCOMMODATIONS
4.7 All lodging facilities provided shall meet the Hotel and Motel Fire Safety Act of 1990 (PL101-391) and be listed on the Hotel - Motel Master List (see 6.1 (Hotel and Motel Fire Safety Act of 1990 (PL101-391))). The Hotel - Motel Master List is located at the website listed in (reference 2.3)
4.8 Hotel rates cannot exceed the federal standard rate for the geographic region where the hotel is. ($97/day/room FY 17 GSA Rate for Lincoln County, Oregon)
4.9 All of the ship’s crew shall be located in the same hotel for the period of inhabitability if possible.
4.10 The hotel shall be the same hotel for the period of inhabitability and the crew members staying in the rooms will not have to change rooms during any period of their stay during the inhabitability.
5. QUALITY ASSURANCE
5.1 Contractor shall notify the ship’s Commanding Officer, Executive Officer, and Port Engineer, in writing or e-mail when a specific hotel has been selected or at the start of the performance period, whichever comes first. Final acceptance of specific hotel must be approved by the ship’s Executive Officer.
ITEM 103: ENGINE ROOM VENT LOUVERS
1.1 The contractor shall procure, install, and demonstrate for ABS a new Engine Room Vent Louver system on the G-Deck Stack.
2.1 Stack photographs of NOAA Ships RAINIER and FAIRWEATHER
2.2 ZAZZ Engineering drawing NOAA – Fairweather & Rainier Intake MRC/A60
Damper Combination.
2.3 NOAA Standard Specification 631 Coating Systems for Steel Surfaces
3.1 None
4.1 Background: There are six engine room vents located on the stack, three each on the port and starboard sides of the stack on the flying bridge deck. The vents are symmetrically placed and are mirror images of their counterparts on the opposite sides. The vents have traditionally had plasticized canvas tarps which can be placed over them during an emergency when engine room ventilation needs to be curtailed. In 2016 it was the determination of the NOAA Fleet inspection team that the plasticized canvas covers were no longer acceptable and had to be replaced with a fire safe boundary. This item replaces the existing fixed vent louvers with fire-safe and closable vent louvers and demisters in order to comply with USCG and ABS rules.
4.2 There is a significant, even likely, chance that Zinc Chromate paint and asbestos insulation is present in the areas to be worked. Contractor shall hire a certified HAZMAT sampling and abatement specialist. HAZMAT specialist shall take samples to determine the nature of any coating systems used in the area of prospective hotwork and remove any Zinc Chromate coating in way of hotwork using best abatement practices. Upon completion of daily work in way of Zinc Chromate, damp wipe all adjacent surfaces to remove potential Zinc Chromate contamination. HAZMAT specialist shall also sample any potentially friable asbestos in way of work and remove and dispose of asbestos in accordance with 29 CFR 1915.
4.3 To clarify which vents this item is discussing at any one time the following numbered naming convention shall be used: All vents on the starboard side shall have odd number designations, 1 being foremost, 3 being center most, and 5 being aft most. All vents on the port side shall have an even number designation, 2 being foremost, 4 being centermost, and 6 being aft most. See photo of starboard side below.
4.4 Contractor shall be responsible for procuring an A60 rated fire damper and demister system to cover the vents as described below. The demister system shall use a pull cord operating system and the Fire dampers shall have a 24VDC/AC actuator system. ZAZZ Engineering is a contractor that can provide a fire damper and demister system that is acceptable to the government. Alternative designs shall be approved by the Port Engineer before proceeding with an alternative design.
4.5 Contractor shall remove existing fixed louver panel from the vents 1-6. Contractor shall then create a mounting foundation proud to the stack to accommodate the mounting of the reference 2.2 MRC/A60 Damper Combo systems approximately 39”x 47” on vents 5 and 6.
Existing vents 5 and 6 are not rectangular. Vent openings 5 and 6 shall be modified to be rectangular as is required by the ZAZZ MRC/A60 system. The mounting foundation shall be made of steel and,where possible, bolt into place using the bolt pattern of the original fixed louver panel. Vents 5 and 6 will require a new bolt pattern due to modification to a rectangular opening. Contractor shall then install procured MRC/Damper structure on the foundation and make all electrical and other connections as necessary.
4.6 Contractor shall enlargevents 1 and 2 and the intake plenum (shared with vents 3 and
4) such that the opening to vents 1 and 2 are large enough to build a mounting frame with dimensions that match the reference 2.2 MRC/A60 Damper Combo of 38.5”x72”. The contractor shall build the mounting frame proud to the stack and shall install the reference 2.2 MRC/Damper Combo. Contractor shall make all electrical, pneumatic and other connections necessary to complete the scope of work.
4.7 Contractor shall construct a steel plate to cover vents 3 and 4 completely.. The plates shall match the thickness and original bolt patter of the fixed louvers that were removed. The plates shall be primed and painted to match the surrounding stack in accordance with reference 2.3.
4.8 Contractor shall operationally test the MRC/Damper system in the presence of the
COR and a contractor-furnished ABS inspector to verify correct functionality.
4.9 As soon as possible after contract award the contractor shall order the equipment in Reference 2.2 and deliver a CFR to the COR reporting the cost, lead time of the materials and schedule impact for completion of this work item.
5. TESTS/REPORTS/INSPECTIONS
5.1 Deliver a CFR to the COR reporting the cost, lead time of the materials and impact on the schedule.
5.2 Provide the test results to the Port Engineer in .xls and .pdf formats.
ITEM 104: ABS ANNUAL LOAD LINE SURVEY 3
1.1 Contractor is to provide coordination and assistance to the American Bureau of Shipping (ABS) representative to conduct the ABS Annual Load Line Survey 3 for the renewal of the Load Line Certificate.
2.1 American Bureau of Shipping Annual Load Line Survey 3 for NOAA Ship
RAINIER
2.2 RAINIER Stability Booklet
2.3 RAINIER Loading Guidance Manual
3. GOVERNMENT FURNISHED EQUIPMENT (GFE)
4.1 The ABS Checklist (ref 2.1) for this survey is provided at the end of this work item for guidance only. The contractor shall verify with ABS that this checklist is accurate and up-to-date prior to the period of performance.
4.2 The Contractor shall supply all labor and material to accomplish the checklist items that ABS requires to complete this survey of the ship. All assistance in preparation of the vessel, special inspection services and labor to accomplish this shall be provided by the contractor.
Inspection work shall be coordinated by the contractor to avoid interference or duplication of work with other tasks under this contract.
4.3 Contractor shall schedule and pay for the Annual Load Line Survey of the RAINIER.
When the vessel is dockside in Newport. Inspection areas of the ship are to be cleaned, as necessary, and examined together with appendages, as applicable, and placed in satisfactory condition
4.4 Any and all inspections in this item are in support of the ABS Load Line certification process and must be carried out to the satisfaction of the ABS Surveyor.
4.5 Provide all assistance to the ABS Surveyor as required to conduct the survey. This assistance may include but is not limited to opening, cleaning and gas freeing spaces including tanks, tank hydrostatic tests, shell inspections and opening for inspection all Sea Water Pumps and various other equipment. Upon completion of the surveys, restore the ship to normal operating condition. The services in support of the ABS inspection are significant. The contractor is advised to consult ABS on what will be inspected and what they expect the contractor to do in support of the inspections. The ABS Surveyor inspects many areas of the
ITEM 104: ABS ANNUAL LOAD LINE SURVEY 3
vessel and the contractor is expected to make everything the Surveyor wants to look at available to him.
4.6 A survey planning meeting will be held prior to the commencement of the survey.
The Contractor, Port Engineer, Ship’s Force, and ABS Surveyor are to review the scope of the survey.
4.7 The Contractor shall conduct a joint completion meeting with the Port Engineer, Ship’s Force, and ABS Surveyor to discuss the results of the survey. At this meeting, Contractor is to provide the Port Engineer with a report listing all corrective actions which must be taken to prior to issuing the Load Line Certificate.
4.7.1 Contractor shall submit a CFR to include estimated time and cost to complete required corrective actions.
5.1 The Contractor shall provide the ship with a Provisional Load Line Certificate issued by ABS as a final deliverable of this Item. The Contractor shall make arrangements with ABS for the Final Load Line Certificate to be delivered directly to the Port Engineer.
ITEM 105: AFT MSD INSTALLATION AND UPGRADE
1.1 Replace the existing Aft MSD with two new Mariner Omnipure Series M55s as well as install a new aft black water collection tank.
2.1 Mariner Omnipure M55 Operation and Maintenance Manual
2.2 ABS Steel Vessel Rules 2013
3.1 Two (2) Mariner Omnipure M55 MSD Systems
4.1 Contractor will provide all labor and material to install a new Aft MSD System for the
NOAA Ship RAINIER. The MSD Units themselves are provided by the government.
4.1.1 Contractor will provide two (2) macerator pumps and two (2) sea water pumps sized for optimal operation of the GFM 3.1 materials.
4.1.2 Contractor will provide necessary Cu-Ni piping and fittings and necessary electrical connections to tie in and install the GFM 3.1 materials.
4.1.3 Contractor will provide all foundations and supports for Aft MSDs, pumps and tanks.
4.2 Contractor will construct a new black water collection tank as large as possible within the allotted space. The tank shall be stainless steel and conform with all requirements of reference 2.2. Tank level alarms and level indications as they currently exist on the RAINIER will need to be installed. Tank will be approximately 72” x 60” x 36”.
4.3 Provide necessary piping re-arrangements to…