AD_NO.1_Bid_Schedule_Sette.pdf
PDF 144 KB Posted
- Attached to
- NOAA FY17 DOCKSIDE MATOC WAD
- Solicitation number
- NMAN7200-133M-17-RQ-0025
About this file
Sette - Bid Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OS-123-001_2.TIF | TIF image | |
| OS-123-001_3.TIF | TIF image | |
| OS-123-001_1.TIF | TIF image | |
| Amendment_November_16_2016.docx | DOCX document | |
| Sette_512-6233799.pdf | ||
| Sette_512-6233802_(1).pdf | ||
| Sette_512-6233797.pdf | ||
| Sette_512-6233800.pdf | ||
| Sette_512-6233801.pdf | ||
| AMENDMENT_NO_05.pdf | ||
| FormSF30_AMENDMENT_NO_3.pdf | ||
| Amendment_Number_02.docx | DOCX document | |
| AD_NO.1_05-2440_NEWPORT_OREGON.txt | TXT text file | |
| AD_NO.1_SE_SOW_FY17_Rev0.pdf | ||
| AD_NO.1_15-2153_WD-HAWAII.txt | TXT text file | |
| Amendment_Number_01.docx | DOCX document | |
| AD_NO.1_Base_DOCKSIDE_IDIQ_SOW.pdf | ||
| AD_NO.1_05-2017_ALASKA.txt | TXT text file | |
| AD_No._1_15-5636_WD_San_Diego_CA.txt | TXT text file | |
| BID_SCHEDULE_FAIRWEATHER.docx | DOCX document | |
| RAINIER_BID_SCHEDULE.docx | DOCX document | |
| RA_FY17_Dockside_RAINIER_SOW.pdf | ||
| SOW_FA_FY17_DOCKSIDE_FAIRWEATHER_REV_2_(1).pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY 17 MATOC DOCKSIDE - NOAA Ship O.E. Sette
COMPANY NAME:
SE - FY17 DS Repairs Unit Work
Item Description Measure Item
Total
D-001 Fire Detection Control Panel; Renew JB -$
D-002 Exterior Ladders; Renew JB -$
D-003 Head Deck Covering( Interior Wet); Renew JB -$
D-004 Anchor Chain Roller Chocks; Remove, Inspect/Service & Reinstall JB -$
D-005 Hydraulic Line Pass-through(HPU Room Overhead); Overhaul JB -$
D-006 Tanks, Clean and Inspect JB -$
D-007 Sounding Tube (3-94-2); Unclog JB -$
D-008 MSD System; Inspect & Service JB -$
D-009 SSDG #3 & #4; 40K Hour Overhaul JB -$
D-010 Exhaust Hangars; Overhaul JB -$
D-011 Exhaust Insulation; Renew JB -$
D-012 Engine Room Supply Fans; Overhaul JB -$
D-013 Scientific Freezer Units; Renew and Relocate JB -$
D-014 O-2 Deck Crane Ditrobution Block; Inspect & Service JB -$
D-015 Fantail Crane; Service JB -$
D-016 Vent Pipes; Flange and Renew JB -$
D-017 MSD Holding Tank Sounding Tube Runs, Renew JB -$
O-018 Sea Water Piping, Renew per activation -$
D-019 Tank (MSD Holding); Preserve “100%” JB -$
O-020 Engine Room Ducting; Renew per activation -$
200 ADDITIONAL ITEMS REQUIREMENT(S)
Work Requirements:
(I). 3,200 man hours multiplied by the regular hour labor rate of
$________ per man hour equals the estimated additional work requirements labor cost for regular hours of $______________.
(II). 200 man hours multiplied by the overtime labor rate of $________ per man hour equals the estimated additional work requirements labor cost for overtime hours of $____________________.
(III). 100 man hours multiplied by the premium (Sunday / Holiday) labor rate of
$__________ per man hour equals the estimated additional work requirements labor cost for premium hours of
(I)+(II)+(III) = Total labor cost of:
Material/Subcontractor markup rate of _______% multiplied by $300,000.00 = Markup cost of
Total Estimated Cost =
Total labor cost + $300,000.00 + Markup cost =
200 ADDITIONAL ITEMS REQUIREMENT(S) LS -$
GRAND TOTAL
File details come from the government source that posted it. Updated .