AD_NO.1_Bid_Schedule_Sette.pdf

PDF 144 KB Posted

Attached to
NOAA FY17 DOCKSIDE MATOC WAD
Solicitation number
NMAN7200-133M-17-RQ-0025
Issued by

About this file

Sette - Bid Schedule

View the file

Other files

File Type Posted
OS-123-001_2.TIF TIF image
OS-123-001_3.TIF TIF image
OS-123-001_1.TIF TIF image
Amendment_November_16_2016.docx DOCX document
Sette_512-6233799.pdf PDF
Sette_512-6233802_(1).pdf PDF
Sette_512-6233797.pdf PDF
Sette_512-6233800.pdf PDF
Sette_512-6233801.pdf PDF
AMENDMENT_NO_05.pdf PDF
FormSF30_AMENDMENT_NO_3.pdf PDF
Amendment_Number_02.docx DOCX document
AD_NO.1_05-2440_NEWPORT_OREGON.txt TXT text file
AD_NO.1_SE_SOW_FY17_Rev0.pdf PDF
AD_NO.1_15-2153_WD-HAWAII.txt TXT text file
Amendment_Number_01.docx DOCX document
AD_NO.1_Base_DOCKSIDE_IDIQ_SOW.pdf PDF
AD_NO.1_05-2017_ALASKA.txt TXT text file
AD_No._1_15-5636_WD_San_Diego_CA.txt TXT text file
BID_SCHEDULE_FAIRWEATHER.docx DOCX document
RAINIER_BID_SCHEDULE.docx DOCX document
RA_FY17_Dockside_RAINIER_SOW.pdf PDF
SOW_FA_FY17_DOCKSIDE_FAIRWEATHER_REV_2_(1).pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY 17 MATOC DOCKSIDE - NOAA Ship O.E. Sette

COMPANY NAME:

SE - FY17 DS Repairs Unit Work

Item Description Measure Item

Total

D-001 Fire Detection Control Panel; Renew JB -$

D-002 Exterior Ladders; Renew JB -$

D-003 Head Deck Covering( Interior Wet); Renew JB -$

D-004 Anchor Chain Roller Chocks; Remove, Inspect/Service & Reinstall JB -$

D-005 Hydraulic Line Pass-through(HPU Room Overhead); Overhaul JB -$

D-006 Tanks, Clean and Inspect JB -$

D-007 Sounding Tube (3-94-2); Unclog JB -$

D-008 MSD System; Inspect & Service JB -$

D-009 SSDG #3 & #4; 40K Hour Overhaul JB -$

D-010 Exhaust Hangars; Overhaul JB -$

D-011 Exhaust Insulation; Renew JB -$

D-012 Engine Room Supply Fans; Overhaul JB -$

D-013 Scientific Freezer Units; Renew and Relocate JB -$

D-014 O-2 Deck Crane Ditrobution Block; Inspect & Service JB -$

D-015 Fantail Crane; Service JB -$

D-016 Vent Pipes; Flange and Renew JB -$

D-017 MSD Holding Tank Sounding Tube Runs, Renew JB -$

O-018 Sea Water Piping, Renew per activation -$

D-019 Tank (MSD Holding); Preserve “100%” JB -$

O-020 Engine Room Ducting; Renew per activation -$

200 ADDITIONAL ITEMS REQUIREMENT(S)

Work Requirements:

(I). 3,200 man hours multiplied by the regular hour labor rate of

$________ per man hour equals the estimated additional work requirements labor cost for regular hours of $______________.

(II). 200 man hours multiplied by the overtime labor rate of $________ per man hour equals the estimated additional work requirements labor cost for overtime hours of $____________________.

(III). 100 man hours multiplied by the premium (Sunday / Holiday) labor rate of

$__________ per man hour equals the estimated additional work requirements labor cost for premium hours of

(I)+(II)+(III) = Total labor cost of:

Material/Subcontractor markup rate of _______% multiplied by $300,000.00 = Markup cost of

Total Estimated Cost =

Total labor cost + $300,000.00 + Markup cost =

200 ADDITIONAL ITEMS REQUIREMENT(S) LS -$

GRAND TOTAL

File details come from the government source that posted it. Updated .