1 100A, 240V, single phase, circuit breaker panel
2 4, 120V, 15A light switches
3 120V, 15A, 48” quad bulb, LED fixture
4 120V, 15A, 48” quad bulb, LED fixture
5 120V, 15A, 48” quad bulb, LED fixture
6 120V, 15A, 48” quad bulb, LED fixture
RO Storage Tank
Sink
PHASE 2
TANK SYSTEM
Seawater Storage
Tank
Consensus System
9 120V, 15A, wall outlet in splash proof cover each outlet on a separate GFIC breaker to
MDBC CORAL PROPAGATION PILOT STUDY
GALVESTON COLD ROOM
Electrical LayoutSCALE 1:45
2/8/2021 BEN HIGGINS
CAD
REVISED 8-13-2021
9 10 11 1312
4 5
IN
O
U T
PHASE 2
TANK SYSTEM
PHASE 2
TANK SYSTEM
PHASE 2
TANK SYSTEM