NFFN71102201330 SOW FIGURE 2 - Galveston Cold Room 22x31 Plan View (1).pdf
PDF 2 MB Posted
- Solicitation number
- NF-FN7110-22-01330MWH
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
1 100A, 240V, single phase, circuit breaker panel
2 4, 120V, 15A light switches
3 Two, 120V, 15A, 48” quad bulb, T5 LED fixtures
4 Two, 120V, 15A, 48” quad bulb, T5 LED fixtures
5 Two, 120V, 15A, 48” quad bulb, T5 LED fixtures
6 Two, 120V, 15A, 48” quad bulb, T5 LED fixtures
7 22
RO Storage Tank
Sink
PHASE 2
TANK SYSTEM
Seawater Storage
Tank
Consensus System
120V, 15A, wall outlet in splash proof cover each outlet on a separate GFIC breaker
MDBC CORAL PROPAGATION PILOT STUDY
GALVESTON COLD ROOM
Proposed Electrical Layout SchematicSCALE 1:45
3/3/2022 BEN HIGGINS
CAD
Figure 2