NEPA ENVIRONMENTAL CHECKLIST – SUBASENLON
NEW FORM EFFECTIVE 07/10/2020. This NEPA Environmental Checklist (EC) is used to determine the environmental requirements associated with a proposed project. Complete the first 2 pages of the form, attach a site map and a SOW or 1391, and then submit to the PWD Environmental Division (EV). A complete EC with required attachments should be submitted a minimum of 15 days prior to project’s scheduled start date. If the project scope is modified or if project work has not been initiated within 1 year of the signature date, please contact EV for review/approval prior to initiating project activities.
GENERAL PROJECT INFORMATION
1 Activity Requesting: Naval Submarine Base New London
2 Activity POC / Phone / email: Lynne Kronk, lynne.m.kronk.civ@us.navy.mil
3 Name of Project: Railroad Crossing contract
4 Project Number (if any): n/a
5 Project Location: Naval Submarine Base New London, Groton, CT
6 Project Type: Railroad Crossing Maintenance
7 Description of the Project: Contract rewrite 8 Why is this project needed? Maintenance Contract for RR Crossing Gates
9 When project scheduled to begin? May 2022
PLANNING QUESTIONS
10a Total Project Area (sq. ft.) - (Include clear zones, soil disruption/disturbance area, lay down areas, etc) 1,000 sq feet
10b Percentage of Project Area - that is currently Impervious (asphalt, bldgs, etc.) 100%
10c Percentage of Project Area - that will be Impervious once project completed 100%
10d Percentage of Project Area - that will be disturbed (excavated, graded, etc) 0%
11 How will Stormwater be managed in the long-term (post-construction)? No change
12 How will Sanitary Sewage (wastewater) be managed in the long-term? No change
13 Will there be actions conducted in the water (dredging, new pilings, removal etc.)? If so indicate state what action(s). No
14 Will there be actions conducted in an area under an Agriculture outlease? No
DESIGN RELATED QUESTIONS YES NO UNSURE
15 Will trees be removed?
16 Will emission-generating equipment (e.g. bull dozer, back hoe, etc.) be utilized during construction?
17 Will the project remove, install or utilize a petroleum storage tank, that is >=55-gallons?
18 Will the project remove or install an Oil Water Separator?
19 Will the project relocate excavated material at the Installation? If yes where is it going?
Will the construction / repair actions generate by-products (power washing water, haz. waste, state regulated waste such as asbestos, PCB items, transformers, capacitors, switches, light ballasts, lead paint chips, florescent bulbs, waste oil, solvents, etc)? If so indicate what type of waste(s) will be generated.
21 Will the construction / repair actions require de-watering from excavations, trenches or manholes? If yes, circle where de-watering will occur?
DESIGN RELATED QUESTIONS YES NO UNSURE
22 Will there be new hard pipe connections or modifications to existing hard pipe connections using water from Groton Utilities, the Thames, or wells?
Will new hard pipe connections or modifications to existing hard pipe connections discharge wastewater to the sanitary sewer, storm sewer or the Thames River? If so circle discharge type.
24 Will there be UST or AST installation, modification, or removal? If so indicate which type of tank and which action.
25 Will there be installation, repair, modification or removal of any system containing refrigerants
(e. g. freon, halon)?
26 Will there be modifications, destruction, or disturbance of the shoreline, streams, groundwater tables, surface water bodies, or wetlands? If so, explain.
Will there be any excavation and/or dewatering with the potential to impact the designated CT Coastal Zone (i.e., 1,000 feet inland from the MHW line)? If so, what type of activity will occur that can potentially impact the coastal zone area?
28 New proposed use and/or application of pesticides, rodenticides and herbicides? If so, indicate which type.
29 Will the project require pile driving?
OPERATIONAL RELATED QUESTIONS YES NO UNSURE
30 Will emission-generating equipment be installed (ex. paint booth, emergency generators)? If so, what type of equipment will be installed?
31 Will there be any new processes or maintenance activities conducted? If so, describe what they are.
ADDITIONAL COMMENTS
Type here:
SAME 8/24/21
Checklist Preparer, phone number and e-mail Date
NEPA ENVIRONMENTAL CHECKLIST – SUBASENLON
SUMMARY OF ENVIRONMENTAL REQUIREMENTS
(To Be Completed by Environmental Division Only) PLEASE NOTE: The Environmental review provided is only valid for 1 year. If the project scope has been modified or checklist has expired, please contact the SUBASENLON PW Environmental Division to re-evaluate the project.
Name of Project: Railroad Crossing contract
Project Number: n/a
PLANNING REQUIREMENTS (Issues That Can Effect the Project’s Timeline, Cost, or Site Location) Environmental Aspect YES NO Environmental Requirement Project Impacts
National Env Policy Act (NEPA) CATEX CATEX = 1 week; EA = 12 months; EIS = 24 months Can’t award till NEPA complete
Threatened or Endangered Species Consultation with USFWS and/or NMFS required. Process may take 6 months
Marine Mammal Protection Act IHA or LOA Consultation with NMFS May take 4 to 18 months
Wetland Impacts Permits and possibly mitigation required. May take 7 months after
NEPA
Navigable Water Impacts Permits required. Takes 2-7 months after
NEPA
Agriculture Outlease Consultations with NAVFAC Real Estate required. Process may take 1 to 3 months.
Tree Mitigation Compensation for tree loss or mitigation is required. This may add costs to project.
Coastal Zone Mgmt Act Refer to Requir 1. Process takes 90 days.
Cultural Resources Consultations with SHPO required Process may take 1 to 6 months
Major Air Emission Source Permit is required. Process takes 6 months
Construction Emissions Air Conformity Record of Non-Applicability is required. This process takes a week.
Installation Restoration Refer to Requir 2. Process may take 4 months
Petroleum Contamination Follow guidance in CNRMA POL SOP. This may add costs to project.
DESIGN REQUIREMENTS (Issues To Be Addressed In Design Phase) Storm Water Best Mgmt
Practices, Erosion & Sediment Control
Required for projects that include excavation or other land disturbance. Incorporate into the design.
CT Storm Water Mgmt Permit Required for projects that will disturb ≥ 1 acre of land. Obtain before construction.
De-watering, Wastewater Mgmt Protective measures required for managing excess waters. Incorporate into the design.
Beach & Dune Management Protective measures required for impact beaches & dunes Incorporate into the design.
Spill Preventative Measures Secondary containment required for tanks ≥ 55 gal Incorporate into the design.
OPERATIONAL REQUIREMENTS (Issues To Be Addressed Prior To Use)
New Industrial Process Environmental Department Site Inspection required. Required before operation.
New Waste Generating Activity Environmental Department Site Inspection required. Required before operation.
ADDITIONAL REQUIREMENTS or COMMENTS Comment 1 The proposed action is within the scope of CATEX #8: Routine repair and maintenance of buildings, facilities, vessels, aircraft, ranges, and equipment associated with existing operations and activities. None of the exclusions from reliance on a CATEX applies in this case; therefore, the proposed action does not require further NEPA analysis.
The applicability of this CATEX determination is based on the full implementation of all environmental requirements identified below.
Requir 1 Work occurs in the coastal zone; however, a Coastal Consistency Determination is not required provided that no deleterious material enters storm drains, manholes, or the Thames River.
Requir 2 Work occurs in or near an IR zone/site. However, no ground-disturbing activities are included in the scope of work. If ground-disturbing activities are planned, a dig permit shall be obtained prior to the initiation of such activity and soil management procedures detailed in the dig permit and the SUBASE Soil Management SOP shall be followed.
Requir 3 A list of HAZMAT scheduled for use or installation on the project and the approximate quantities/volumes of these materials shall be submitted to the PW NLON EV Division EPCRA Manager (x5140) prior to initiating project activities.
Requir 4 No wastewater shall be discharged to the storm drains or the ground surface. If wastewater discharges to the sanitary sewer are planned, the contractor shall obtain any required permits prior to discharging activity and shall coordinate in advance with the PW NLON EV Division Wastewater Program Manager (x2525).
Requir 5 If work activities require the use of pesticides or herbicides, the contractor shall coordinate in advance with the PW NLON Pesticide Program Manager (x5140).
Requir 6 Disposal of any regulated waste shall be coordinated in advance with the PW NLON Hazardous Waste Program Office (x4298).
- Non-regulated solid waste (i.e., general trash, construction debris, and recyclable items) shall be properly managed and disposed of in accordance with Federal, State, Navy, and local regulations.
- Any regulated waste generated under the scope of this project shall be managed, stored, and disposed of in accordance with the SUBASENLON Hazardous Waste Management Plan and SUBASENLON policies and instructions.
Requir 6 Use of exterior storage and laydown areas in support of this project shall be done in compliance with SUBASENLON instructions and policies. Site must be evident of good housekeeping practices consistent with proper storm water management and control.
CDR Christopher Sandmel; x4480;
christopher.sandmel@navy.mil
Environmental POC; phone number and email Signature and Date mailto:christopher.sandmel@navy.mil
| DESIGN RELATED QUESTIONS |
| DESIGN RELATED QUESTIONS |
| 2021-10-18T15:30:06-0400 | |
| SANDMEL.CHRISTOPHER.ADAM.1266626238 |