1502000 – Facility Investment Table of Content Spec Item Title 1 General Information

1.1 Concept of Operations

2 Management and Administration

2.1 Definitions and Acronyms

2.2 Personnel

2.2.1 Certification, Training and Licensing

2.3 Special Requirements

2.3.1 Workmanship and Material Standards

2.3.2 Historical Preservation

2.4 References and Technical Documents

3 Recurring Work

3.1 Preventive Maintenance (PM) Program

3.1.1 Railroad Crossing Gates

3.2 Inspection, Testing and Certification Program

3.2.1 Railroad Crossing Gates

4.0 Non-Recurring Work (N/A)

1502000 – Facility Investment Spec Item

Title Description

1 General Information

The Contractor shall provide all labor, management, supervision, tools, material, and equipment required to perform Facility Investment services for Naval Submarine Base New London, Groton, CT for Railroad Crossing Gates.

1.1 Concept of

Operations

The intent of 1502000 Facility Investment is to specify the requirements for Sustainment, Restoration, and Modernization (SRM) sub-functions only. The Facility Investment requirements within this sub-annex primarily consist of infrastructure sustainment and minimal restoration and modernization work. Sustainment is the maintenance and repair necessary to keep an inventory of facilities and other assets in good working order. Restoration and modernization normally consists of major rehabilitation and capital improvements that is accomplished through other Navy programs. Some major repair, minor construction and stand-alone demolition may be accomplished as part of Facility Investment.

The Contractor shall perform maintenance, repair, alteration, demolition and minor construction for the following:

-Railroads Crossing Gates

Item

Title Description

2 Management and Administration

2.1 Definitions and

Acronyms

Definitions and Acronyms are listed in J-1502000-01.

2.2 Personnel The Contractor shall provide personnel with the qualifications, technical knowledge, experience and skills required for efficient operations within the FI function.

2.2.1 Certification, Training, and Licensing

All maintenance and repair shall be performed by personnel trained and certified by the OEM.

Personnel maintaining, repairing, inspecting, testing, operating, or rigging WHE shall be qualified per NAVFAC P-307.

Personnel inspecting and testing crane and railroad trackage shall be qualified per

NAVFACINST 11230.1.

Personnel working on systems, equipment or components containing chlorofluorocarbons (CFCs) and/or hydro-chlorofluorocarbons (HCFCs) must be certified under an Environmental Protection Agency (EPA) approved technical certification program per OPNAVINST 5090.1 Chapter 6.

Personnel working with or on electrical or electronic equipment must be trained and certified per NAVFAC MO-200.

Personnel performing work in HAZMAT/HAZWASTE must complete the HAZMAT/HAZWASTE handling course or have a minimum of one year of experience working with HAZMAT/HAZWASTE.

All maintenance trade personnel certifying or inspecting repair or maintenance work that does not require an inspector certified by a governing directive shall be qualified at the journeyman level.

The Contractor shall submit proof of all certification, training, and licensing requirements per Section F.

2.3 Special

Requirements

2.3.1 Workmanship

and Material Standards

The Contractor shall be responsible for maintaining all facilities, systems, and equipment, identified in this technical sub-annex, to a standard that prevents deterioration beyond that which results from normal wear and tear and corrects deficiencies in a timely manner to assure full life expectancy of the facilities, systems, and equipment. Best commercial practices shall be applied in the performance of work. All work shall be completed per approved and accepted industry and equipment manufacturers’ standards and shall comply with building and safety codes, applicable activity, local, state, and federal regulations, and other technical requirements identified within this technical sub-annex.

Workmanship for maintenance and repair shall include all work necessary to complete facility and system restoration, including touch-up painting and operational checks.

Upon completion of work, the Contractor shall ensure all facilities, systems, and equipment are free of missing components or defects which would affect the safety, appearance, or habitability of the facilities and structures or would prevent any

Item

Title Description electrical, mechanical, plumbing or structural system from functioning in accordance with design intent. Repairs shall be made in accordance with the manufacturers’ specifications and guidelines, and standard building codes. The quality of repairs shall meet the applicable standards and shall prevent any malfunction reoccurrences caused by poor workmanship or other contractor inadequacies. The quality of the repaired areas shall be fully compatible with adjacent surfaces or equipment. Except where otherwise specified, replacements shall match existing in dimensions, finish, color, design, and functionality and shall have an appearance similar to the original finished appearance with only minor unobjectionable deterioration resulting from normal use.

The Contractor shall not allow debris to spread unnecessarily into adjacent areas nor accumulate in the work area. All such debris, excess material, and parts shall be cleaned up and removed at the completion of the job and at the end of each day work is in progress. Upon completion of work, any stains and other unsightly marks shall be removed.

2.3.2 Historical

Preservation

Buildings and facilities designated as historical sites shall be maintained in accordance with Federal, state and local historical policies and regulations.

2.4 References and

Technical Documents

References and Technical Documents are listed in J-1502000-02.

Item

Title Performance Objective

Related Information Performance Standard

3 Recurring Work The Contractor shall maintain, repair, and alter installed equipment and systems to ensure they are fully functional and in normal working condition.

The Contractor shall develop, implement, and execute a Maintenance Program, Inspection, Testing, and Certification Program to maintain and repair installed equipment and systems.

The Contractor shall maintain all maintenance, repair, and alteration data and warranty records in the technical library.

The Contractor shall provide all necessary test instruments, equipment, and tools required to perform maintenance and repair.

The Contractor shall submit Maintenance Summary Report within 24 hours of completion as per section F.

The current facility inventory for FI is provided in J-1502000- 03.

Site maps are provided in J- 1502000-04.

Installed equipment and systems are in normal working condition and function properly in accordance with specified standards.

3.1 Preventive

Maintenance (PM) Program

The Contractor shall develop and implement a PM program for installed equipment and systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.

The Contractor shall develop and submit a PM program per Section F.

The Contractor is fully responsible for and shall perform any repairs, including replacement, discovered during scheduled maintenance work up to a total of $500 per occurrence in direct material and labor cost under recurring work portion of the contract.

Incidental repairs work performed under maintenance are not considered a service order.

Notification of repair work exceeding the incidental repairs limit shall be submitted to the KO within two hours of

Maintenance is accomplished in accordance with the Contractor’s PM program and work schedule.

PM is performed in accordance with manufacturers’ recommended procedures and OEM standards.

Item

Title Performance Objective

Related Information Performance Standard identification. Service orders may be issued for repairs exceeding the incidental repairs limit.

The Contractor shall not use breakdown maintenance as part of the PM program.

The PM program shall provide an economical approach manufacturers’ recommended procedures, OEM standards, and maintenance required to satisfy equipment warranties and keep in normal working condition.

Excessive or repeated system or equipment breakdowns or deficiencies may indicate the need to adjust or modify the Contractor’s PM program.

These changes will be made at no additional cost to the Government.

The Contractor shall submit a monthly PM work schedule per Section F.

3.1.1 Railroad

Crossing Gates

The Contractor shall perform maintenance on railroad crossings to ensure safe, reliable, uninterrupted service.

The Contractor shall maintain railroad crossings in accordance with manufacturers’ recommended procedures, OEM standards and

NAVFACINST 11230.1.

Maintenance is performed in accordance with Contractor's PM program and work schedule.

3.2 Inspection, Testing, and Certification Program

The Contractor shall provide inspection, testing, and certification services to ensure they are safe, fully functional, and operational.

The Contractor shall develop an inspection, testing, and certification program

The Contractor shall submit an inspection, testing, and certification program summary report per Section F.

The Contractor shall submit an inspection, testing and certification schedule and a copy of all the equipment certifications per Section F.

All certifications are current.

Testing, inspection, and certification services performed and completed in accordance with the inspection, testing, and certification program and schedule.

Testing, inspection, and certification services performed in

Item

Title Performance Objective

Related Information Performance Standard

The Contractor is fully responsible for and shall perform any repairs, including replacement, discovered during inspection, testing, and certification work up to $500 per occurrence under PM program in direct material and labor cost under recurring work portion of the contract.

Incidental repairs work performed are not considered a service order.

accordance with applicable references.

3.2.1 Railroad

Crossing Gates

The Contractor shall inspect, test, and certify railroad crossing gates to ensure they are safe, fully functional, and operational.

The Contractor shall comply with NAVFACINST 11230.1 for the inspection, certification, and audit of railroad crossing gates.

The Contractor shall perform tests, inspections, and associated operations for certification in the presence of the certifying official.

Testing, inspection, and certification of railroad crossing gates is performed and completed in accordance with the inspection, testing, and certification program and schedule.

Crane and/or railroad trackage are inspected, tested, and certified in accordance with

NAVFACINST

11230.1.

4.0 Non-Recurring

Work

N/A N/A N/A

Title