NEJC RFQ-240001 AE Final.pdf
PDF 235 KB Posted
- Solicitation number
- RFQ1 GJRA 2024000003 2
- Issued by
- Lincoln County, Colorado
About this file
This Request for Qualifications (RFQ) is issued by the State of Colorado Office of the State Architect on behalf of the Colorado Department of Higher Education and Northeastern Junior College for architectural and engineering services related to the Walker Hall HVAC Chiller Replacement and New Elevator Installation project. The project involves replacing an HVAC chiller installed in 1971 that serves the addition portion of Walker Hall, an existing building constructed in 1955 with a 1973 addition, and installing a new five-stop elevator with front and back opening doors providing access to basement, first, and second floors of both sections. The project delivery method is Design/Bid/Build. A mandatory pre-submittal conference and facility tour is scheduled for Monday, July 24, 2023, at 10:00 a.m. at Northeastern Junior College, Walker Hall, Room 101, Sterling, Colorado. Three copies of submittals must be received by Thursday, August 17, 2023, at 2:00 p.m. MST. A screening panel will evaluate submittals and short-list three to four firms for oral interviews anticipated during the week of August 28, 2023. Contract negotiations are projected to begin September 4, 2023, with anticipated A/E professional services start and construction services running from February 2024 through September 2024.
Qualifications will be evaluated based on project team composition and experience, firm and team capabilities, prior experience with similar projects, project approach including budget methodology and quality control procedures, and work location proximity and market knowledge. Evaluation criteria are weighted across preliminary selection and oral interview stages, with ratings assigned on a scale of 0 to 5. The evaluation process includes submission of an Acknowledgment and Attestation Form confirming the respondent's acceptance of contract terms and conditions. No pricing information, set-asides, or incumbent contractor details are included in this RFQ document, as this is a qualification-based selection process for professional services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SC5.1 AE 2023_1.docx | DOCX document | |
| Cancellation Notification.docx | DOCX document | |
| SC5.1 TC AE 2022 FINAL_0.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ-AE
Rev. 7/2022
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
REQUEST FOR QUALIFICATIONS
FOR
ARCHITECTURAL/ENGINEERING/CONSULTING SERVICES
For The
CDHE/Northeastern Junior College
For The
Walker Hall HVAC Chiller Replacement and New Elevator Installation
REQUEST FOR QUALIFICATIONS
FOR
ARCHITECTURAL/ENGINEERING/CONSULTING SERVICES
TABLE OF CONTENTS
I. INTRODUCTION
A. Project Description/Minimum Requirements/Project Delivery B. Selection Process
1. Mandatory Pre-Submittal Conference
2. Architect/Engineer/Consultant Submittals
3. Screening Panel/ Short List
4. Oral Interviews
C. Schedule
II. SUBMITTAL REQUIREMENTS
A. Project Team B. Firm Capabilities C. Prior Experience D. Project Approach E. Work Location
APPENDICES
Appendix A: Preliminary Selection/Evaluation Form Appendix A1: Interview Selection/Evaluation Form Appendix A2: Final Ranking Matrix Appendix B: Architect/Engineer/Consultant Contract (Standard or CM/GC Format) Appendix C: Acknowledgment and Attestation Form
Rev. 7/2022
ARCHITECTURAL/ENGINEERING/CONSULTING SERVICES
REQUEST FOR QUALIFICATIONS
DEPARTMENT OF HIGHER EDUCATION
Northeastern Junior College
I. INTRODUCTION
A. PROJECT DESCRIPTION
2024-064M23: Walker Hall HVAC Chiller Replacement & New Elevator Installation
Northeastern Junior College is Requesting Qualifications for the replacement of the HVAC chiller and the installation of a new elevator in Walker Hall. This is an existing building that was built in 1955 and the addition was built in 1973. The elevator will allow access to the first and second floor of the original building, and the basement, first and second floor of the addition. The elevator will have a total of 5 stops and doors will need to open front and back. The HVAC chiller was installed in 1971 and serves the addition portion of the building.
Project deliver method will be D/B/B.
B. SELECTION PROCESS
The selection of an architect/engineer/consultant will be conducted in accordance with the Colorado Revised Statutes, 24-30-1401 et. seq. The process will involve two stages:
submittals will be screened and scored. A limited number of firms will be short listed and invited to participate in oral interviews. The [agency/institution] will attempt to negotiate a contract with the highest ranked firm following the interview segment. Following is additional information relative to the selection process:
1. Mandatory Pre-submittal Conference: To ensure sufficient information is available to firms preparing submittals, a mandatory pre-submittal conference has been scheduled.
The intent of this conference is to tour the site and to have Northeastern Junior College staff available to discuss the project. Firms preparing submittals must attend and sign-in in order to have their submittals accepted. The pre-submittal conference will be held at:
Northeastern Junior College
Walker Hall, Room 101 100 College Ave.
Sterling, CO 80751 Monday, July 24, 2023, 10:00 a.m.
2. Architect/Engineer/Consultant’s Submittals: Specific requirements for submittals and scoring criteria are detailed in II. SUBMITTAL REQUIREMENTS. In order to facilitate review, three (3) copies of submittals must be provided. Submittals must be received at:
Rev. 7/2022
Northeastern Junior College Attn: Martha Gareis 100 College Ave.
Sterling, CO 80751
Deadline for receipt (whether mailed or hand delivered) is Thursday, August 17th, 2023, by 2:00 p.m. MST.
Late submittals will be rejected without consideration. Northeastern Junior College and the State of Colorado assume no responsibility for costs related to the preparation of submittals.
3. Screening Panel/Short List: Submittals will be evaluated by a panel of individuals selected in accordance with state policies. The panel will review and score the submittals. Firms ranked the highest will be invited to an oral interview. It is anticipated no fewer than three (3) or no more than four (4) will be interviewed.
4. Oral Interviews. It is anticipated that oral interviews will be conducted during the week of August 28, 2023. Interviews will be conducted at: Northeastern Junior College, Walker Hall 101, 100 College Ave., Sterling, CO. The time for interviews is to be determined.
Key personnel from the firm and major consultants who will be directly involved with the project should attend the interview. The interview panel will, in particular, be interested in knowing about the project approach proposed and in meeting the individuals who will act as the primary contacts with the [agency/institution].
C. SCHEDULE
Following is a detailed schedule of events for the RFQ process and an outline of the schedule for the balance of the project.
Advertisement Friday, July 14, 2023 Mandatory Pre-submittal Conference/ Tour Mon., July 24, 2023, 10 am MST Date Email Questions Due Mon., July 31, 2023, 4 pm MST Date Email Answers Issued Mon., Aug. 7, 2023, 4 pm MST RFQ Submittal Due Thur., Aug. 17, 2023, 2 pm MST Interview List Released Tuesday, August 22, 2023 Oral Interviews (as scheduled) Monday, August 28, 2023 Negotiation of A/E Contract Monday, Sept. 4, 2023 Contract Approval (projected) TBD Anticipated A/E professional Services - Start TBD Anticipated Construction Services – Start - Finish Feb 2024-Sept 2024
II. SUBMITTAL REQUIREMENTS
Firms will be judged not only on their past experience for the type of work involved, but also on their ability to address issues critical to the success of the project requirements outlined in this RFQ document. (Note that the primary focus of the prequalification evaluation will be the firm(s) capability and the primary focus of the oral interview will be the proposed Project Management Team member’s capabilities.) Following are elements that will be used to evaluate each firm's qualifications:
A. PROJECT TEAM
Identify the project principal, the project manager, key staff and sub-consultants. Present a brief discussion regarding how the team's qualifications and experience relate to the specific project.
❑ Qualifications and relevant individual experience.
❑ Unique knowledge of key team members relating to the project.
❑ Experience on projects as a team.
❑ Key staff involvement in project management and on-site presence.
❑ Time commitment of key staff.
❑ Qualifications and relevant sub-consultant experience.
B. FIRM/TEAM CAPABILITIES
❑ Are the lines of authority and coordination clearly identified?
❑ Are essential management functions identified?
❑ Are the functions effectively integrated? (e.g., sub-consultants’ role delineated)?
❑ Current and projected work load.
Note: Organization charts and graphs depicting your capacity may be included.
C. PRIOR EXPERIENCE
Use this portion of your submittal to describe relevant experiences with the project type described in this RFQ document and various services to be provided.
❑ Experience of the key staff and firm with projects of similar scope and complexity.
❑ Demonstrated success on past projects of similar scope and complexity.
❑ References.
Note: Include the name and current telephone number of the owner’s project manager for every project listed.
D. PROJECT APPROACH
For the project and services outlined in the RFQ document, describe how you plan to accomplish the following project control and management issues:
❑ Budget Methodology/Cost Control.
− Establish and maintain estimates of probable cost within owner's established budget.
− Control consultant contract costs − Coordinate value engineering activities
❑ Quality Control Methodology.
− Insure State procedures are followed − Improve energy efficiency through the use of an integrated design process, life cycle costing, the use of an energy standard (current OSA energy code) and the specification of energy efficient materials, systems, and equipment
− Insure the project is designed for durability and maintainability
Rev. 7/2022
❑ Schedule.
− Manage the required work to meet the established schedule
E. WORK LOCATION
Describe where the prime and sub-consultants will do the key work elements of this project.
❑ Proximity of firm’s office as it may affect coordination with the State's project manager and the potential project location.
❑ Firm's familiarity with the project area.
❑ Knowledge of the local labor and material markets.
Appendix A
PRELIMINARY SELECTION/EVALUATION FORM
ARCHITECT/ENGINEERING/CONSULTANT SERVICES
QUALIFICATION BASED SELECTION (This form is to be used in the first step, i.e. short listing, of an architectural/engineering/consulting services selection process.)
Evaluator #:_____________________________________ Date:_________________________ Name of Firm:_________________________________________________________________ Name of Project:_______________________________________________________________
RFQ REFERENCE
MINIMUM REQUIREMENTS Y ____ N ____
If the minimum requirements have not been met, specify the reason(s):
Acknowledgment and Attestation included: Y _____ N _____
SCORE (PROJECT SPECIFIC QUALIFICATIONS): Weight2 x Rating3 = Score
1. PROJECT TEAM1
❑ Qualifications and relevant individual experience. ___4__x_____=____ ❑ Unique knowledge of key team members relating to the project. ___4__x_____=____ ❑ Experience on projects as a team. ___3__x_____=____ ❑ Key staff involvement in project management and on-site presence. ___5__x_____=____ ❑ Time commitment of key staff. ___4__x_____=____ ❑ Qualifications and relevant sub-consultant experience. ___3_ x_____=____
2. FIRM CAPABILITIES1
❑ Are the lines of authority and coordination clearly identified ___3__x_____=____ ❑ Are essential management functions identified? ___4__x_____=____ ❑ Are the functions effectively integrated (e.g., sub-consultants’ roles delineated?) ___3__x_____=____ ❑ Current and projected work load. ___4__x_____=____
3. PRIOR EXPERIENCE1
❑ Experience of the key staff and firm with projects of similar scope and complexity. ___4__x_____=____
❑ Demonstrated success on past projects of similar scope and complexity. ___4__x_____=____
❑ References. ___2__x_____=____
4. PROJECT APPROACH1
❑ Budget methodology/cost control. ___3__x_____=____ ❑ Quality control methodology. ___4__x_____=____ ❑ Schedule maintenance methodology. ___3__x_____=____
5. WORK LOCATION1
❑ Proximity of firm’s office as it may affect coordination with the state's project manager and the potential project location. ___3___x____=_____ ❑ Firm's familiarity with the project area. ___3___x____=_____ ❑ Knowledge of the local labor and material markets. ___3___x____=_____
TOTAL SCORE: ________4
NOTES:
1. Criteria: Agencies/Institutions are encouraged to include additional criteria that reflect unique characteristics of the project under each category to help determine the submitter’s overall qualifications.
2. Weights: Agency/Institutions to assign weights, using whole numbers, to all criteria on evaluation forms for inclusion into RFQ document and prior to evaluations.
3. Ratings: Evaluator to assess the strength of each firms qualifications and assign a numerical rating of 1 to 5 with 5 being the highest rating 0 is missing information. (Use whole numbers)
4. Total Score: Includes the sum of all criteria. Note: a passing score (as a percentage of the total points available) is optional and should be assigned by the agency/institution prior to evaluation.
Appendix A1
ORAL INTERVIEW SELECTION/EVALUATION FORM
ARCHITECTURAL/ENGINEERING/CONSULTANT SERVICES
QUALIFICATION BASED SELECTION (This form is to be used in the second step, i.e. oral interview, of an architectural/engineering/consulting services selection process.)
Evaluator #:_________________________________________ Date:_____________________ Name of Firm:_________________________________________________________________ Name of Project:_______________________________________________________________
SCORE (OVERALL QUALIFICATIONS)1: Weight2 x Rating3 = Score
1. PROJECT TEAM1 ___4__ x _____ = _____
2. TEAM CAPABILITIES1 ___5__ x _____ = _____
3. PRIOR EXPERIENCE1 ___3__ x _____ = _____
4. PROJECT APPROACH1 ___4__ x _____ = _____
5. WORK LOCATION1 ___3__ x _____ = _____
TOTAL SCORE: ________4
1. Criteria: Agencies/Institutions are encouraged to include additional criteria that reflect unique characteristics of the project under each category to help determine the submitter’s overall qualifications.
2. Weights: Agency/Institutions to assign weights, using whole numbers, to all criteria on evaluation forms for inclusion into RFQ document and prior to evaluations.
3. Ratings: Evaluator to assess the strength of each firms qualifications and assign a numerical rating of 0 to 5 with 5 being the highest rating. (Use whole numbers), 0 is missing information.
4. Total Score: Includes the sum of all criteria. Note: a passing score (as a percentage of the total points available) is optional and should be assigned by the agency/institution prior to evaluation.
Appendix A2
STATE BUILDINGS PROGRAM
FINAL RANKING MATRIX
QUALIFICATION BASED SELECTION
(This form is to be used separately to rank and determine the most qualified architectural/engineering/consulting services firm for both the preliminary and interview evaluations.)
FIRM
QUALIFICATIONS SCORE1
CUMULATIVE2
TOTAL SCORE
RANK3
EVAL
#1
EVAL
#2
EVAL
#3
EVAL
#4
EVAL
#5
EVAL
#6
1. Insert total score from each evaluator's PRELIMINARY SELECTION AND INTERVIEW SELECTION/EVALUATION FORMS. DO NOT combine scores of the two evaluations.
2. Add all evaluators' total scores to determine the cumulative score. NOTE: Each firm's cumulative total score should be as a percentage of the total points available.
3. Rank all firms with the highest scoring firm being the most qualified.
Appendix B
ARCHITECT/ENGINEER/CONSULTANT CONTRACT
(STANDARD OR CM/GC FORMAT)
Appendix C
ACKNOWLEDGEMENT AND ATTESTATION FORM
By responding to these guidelines, the respondent(s) certify that he/she has reviewed the Agreement and its Exhibits contained herein, and is familiar with their terms and conditions and finds them expressly workable without change or modification.
I certify and declare that the foregoing is true and correct.
Subscribed on ________________________ at _________________________, Date City ____________________________, State of ____________________________, County State
Applicant or Corporate Officer Signature Date
Witness Date
NOTE: Use full corporate name and affix corporate seal (if available).
(Seal)
| REQUEST FOR QUALIFICATIONS |
| FOR |
FIRM
File details come from the government source that posted it. Updated .