NE FTFW FTNI Trail(1) Plans.pdf
PDF 25 MB Posted
- Attached to
- NE FTFW FTNI TRAIL (1) Fort Falls Trail
- Solicitation number
- 6982AF20Q000023
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Tabulation NE FTFW FTNI TRAIL(1).pdf | ||
| Bid Opening Summary - Fort Falls Trail.pdf | ||
| QnA 8.21.2020.pdf | ||
| A001.pdf | ||
| 6982AF20Q000023.pdf | ||
| FP-14.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
07/21/2020
WENDY M LONGLEY Digitally signed by WENDY M LONGLEY Date: 2020.07.24 09:03:27 -06'00'
Sheet 1 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
A2
ABBREVIATIONS DRAINAGE SYMBOLS
GEOLOGIC SYMBOLS
DI
FENCE & CATTLEGUARD SYMBOLS
Cattleguard (Existing, Proposed)
Fence w/ Gate (Existing, Proposed)
Fence (Existing, Proposed)
Material Source
Boring Location (Existing, Proposed)
Riprap Apron (Proposed)
Underdrain (Existing, Proposed)
With Drop Inlet (Existing, Proposed)
With Headwalls (Existing, Proposed)
With End Sections (Existing, Proposed)
Pipe Culvert (Existing, Proposed)
Box Culvert (Existing, Proposed)
Bridge (Existing, Proposed)
Spring
River
Wetland
Large Creek
Lake, Pond or Reservoir
Drainage or Small Creek
Flow Arrow
Ditch (Existing, Proposed)
SPRING
D jt.J int.
incr.
incl.
IDI
hwy.
HW
horiz.
hex.
HES
hdwl.H gdr.
galv.
ga.G ftg.
fin.
FES
Fed.
f.f.F ext.
exp. jt.
exc.
EW
et ux et al
ER
EQ or eq.
EOP
engr(s).
emb.
elev.
El. 94.066 e
EE
dwg(s).
DLC
Dist.
dist.
diaph.
diag.
dia. or D
DI
DHV
decr.D culv.
CTSM
ctrs.
CS
cr.
corr.
cont.
constr. jt.
constr.
conc.
col.
Co.
CMP
clr.
c-c
CBCC
brg.
br.
BP
BM
BK
beg.
b.f.B asph.
appr.
alt.
AH
aggr.
ADT
abut.A west vertical point of intersection vehicles per hour vertical design speed typical point of tangent to spiral transverse temporary construction easement temporary bench mark tangent township tangent length symmetrical structural straight stiffener standard station point of spiral to tangent street specification spacing, Spaces or Spaced shoulder section point of spiral to curve seasonal average daily traffic south route right reference hub retaining wall
Reservation reservoir required reinforcement reconstruction roadway road right-of-way range radius quantities pavement point of tangent pounds per square inch project point on tangent point on spiral point on curve plate point of intersection perforate point of compound curve point of curve outside diameter other face on centers number negative normal crown north mountain(s) monument minimum maximum material maintenance magnetic low water left lump sum longitudinal latitude lamination length of curve
WW
VPI
vph vert.
VV
typ.
TS
transv.
TCE
TBM
tan.
T.
TT
sym.
struc.
str.
stiff.
std.
sta.
ST
st.
spec.
spa.
shldr.
sec.
SC
SADT
SS
rte.
Rt. or RT
RH
ret. wall
Res.
res.
reqd.
reinf.
reconst.
rdwy.
rd.
R/W
R.
RR
quant., QtyQ pvmt.
PT
psi proj.
POT
POS
POC
pl.
PI
perf.
PCC
PCP
OD
o.f.
o.c.O
no. or # neg.
NC
NN
mtn(s).
mon.
min.
max.
matl.
maint.
mag.M
LW
Lt. or LT
LPSM
long.
lat.
lam.
LL
EROSION & SEDIMENT CONTROL SYMBOLS
joint interior increment inclusive,including inside diameter highway high water horizontal hexagon homestead entry survey headwall girder galvanized gage (gauge) footing finish flared end section federal fill face exterior expansion joint excavation edge of water and wife and others edge of road equation edge of pavement
Engineer(s) embankment elevation elevation with number superelevation rate east drawing(s) donation land claim district distance diaphragm diagonal diameter drop inlet design hour volume decrement culvert contingent sum centers point of curve to spiral creek corrugated continuous construction joint construction concrete column county corrugated metal pipe clear center to center concrete box culvert bearing bridge balance point bench mark back beginning,begin both faces asphalt approach alternate ahead aggregate average daily traffic abutment diameter curve delta centerline
Ø
Riprap
Rolled Erosion Control Product
Diversion Berm
Check Dam
Bonded Fiber Matrix Mulching
Fiber Roll (Slope Protection)
Temporary Inlet Protection
Silt Fence
Fiber Roll (Ditch and/or Cut Slope)
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d S
Y M T r a il F T
N I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NE
FORT FALLS TRAIL
NE FTFW FTNI TRAIL(1)
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
Sheet 2 of 2
A3
36 31
36 31
6 1
ˆ
Treeline
Tree
MAPPING SYMBOLS
LANDSCAPING & VEGETATION SYMBOLS PROJECT SPECIFIC SYMBOLS
RIGHT-OF-WAY SYMBOLS
ROADWAY SYMBOLS
SIGN SYMBOLS
UTILITY SYMBOLS
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
Guardwall (Existing, Proposed)
Guardrail (Existing, Proposed)
GUARDRAIL, BARRIER & WALL SYMBOLS
Post Mounted (Existing, Proposed)
Portable (Proposed)
Delineator (Existing, Proposed)
Commercial (Existing, Proposed)
Signs
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone
Sanitary Sewer
Power
Oil
Gas
Fiber Optic
CATV
Underground Utility (Existing, Proposed)
Telephone Pedestal (Existing, Proposed)
Telephone Booth (Existing, Proposed)
Street Light (Existing, Proposed)
Support Pole Anchor (Existing, Proposed)
Support Pole (Existing, Proposed)
Surface (Existing, Proposed)
Underground (Existing, Proposed)
Irrigation Ditch
999.9
Roadway Obliteration
Roadway Centerline (With Station ticks)
Proposed
Existing
Edge of Roadway
Toe of Fill
Transition
Top of Cut
Slope Stake Limits
Clearing/Construction Limits
Survey Control Point
Trail
Spot Elevation
Double Track
Single Track
Railroad
North Arrow
Coordinate Grid Tick
Building (Existing, Proposed)
Section Corner (Found)
Section Corner (Found, Projected)
Section Corner (Found, Projected)
Right-of-Way Line (Proposed)
Right-of-Way Line (Existing)
Property Line
Parcel Number
Monument (As described)
Temporary (Proposed)
Permanent (Proposed)
Permanent (Existing)
Easements
National Wildlife Refuge
National Park
National Forest
Bureau of Land Management
Bureau of Indian Affairs
Section
Section
Section
Township or Range Line
City
County
State
National
Boundaries
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d S
Y M T r a il F T
N I .d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NE
FORT FALLS TRAIL
SURVEY CONTROL
A4
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d S
U R T r a il F T
N I .d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NE
FORT FALLS TRAIL
NIOBRARA RIVER
400'200'0
Scale in Feet
A5
SITE MAP
4.6 MILES
TO VALENTINE, NE
F O
R T F
A L L S T
R A
IL
F O
R T F
A L L S R
O A
D
End Fort Falls Road
102+05.00
Begin Fort Falls Road
100+15.00
End Fort Falls Trail
12+70.00
Begin Fort Falls Trail
10+06.00
2+
1+
100+00
12+
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d S
T E T r a il F T
N I .d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NE
FORT FALLS TRAIL
TYPICAL SECTIONS
A6
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
Y P T r a il F T
N I .d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NE
FORT FALLS TRAIL
NE FTFW FTNI TRAIL(1)
Parking
Varies 0-18'
Traveled Way
Varies 12'-17'
4-6" approximate aggregate base
Existing ground
LC Fort Falls Road
LC Fort Falls Road
Traveled Way
12'
6" Roadway aggregate, method 2
100+15.00 to 102+05.00
FORT FALLS ROAD
EXISTING TYPICAL SECTION
Existing ground
LC Fort Falls Road
100+85.00 to 101+30.00
FORT FALLS ROAD
EXISTING TYPICAL SECTION
Parking pullout
Varies 0'-16'
1.5% max 2.
Existing Parking
Varies 0-18'
Existing Parking
Varies 0-18'
Traveled Way
12'
6" Roadway aggregate, method 2
Interpretive overlook
ABA Parking/
Varies 0'-16'
Existing ground
4" Roadway aggregate, method 2
LC Fort Falls Road
Traveled Way
12'
6" Roadway aggregate, method 2
Existing ground
101+56.00 to 101+81.00
FORT FALLS ROAD
TYPICAL SECTION
Parking
Varies 12-14'
Fence, split rail, 2 rail
Slope stake
2'
Clearing and construction limits
Fence, split rail, 2 rail
LC Fort Falls Road
Traveled Way
12'
6" Roadway aggregate, method 2
Existing ground construction limits
Clearing and
100+42.00 to 100+85.00
FORT FALLS ROAD
TYPICAL SECTION
101+81.00 to 102+05.00
101+30.00 to 101+56.00
100+15.00 to 100+42.00
FORT FALLS ROAD
TYPICAL SECTION
Existing Parking
Varies 0-18'
Station to Station Description
LENGTH OF PROJECT
Length (ft.)
TOTAL (mi.)
TOTAL (ft.)
Fort Falls Trail
Fort Falls Road
10+06.00 to 12+70.00
100+15.00 to 102+05.00
0.09
1.
Varies
NOTE:
Maximum slope in any direction.
Match existing cross slope and direction.
6" Minor concrete pavement, reinforced
2.
1.
seeding limits
Topsoil and seeding limits
Topsoil and
Slope stake concrete pad
Removal of
TYPICAL SECTIONS
A7
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
Y P T r a il F T
N I .d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NE
FORT FALLS TRAIL
NE FTFW FTNI TRAIL(1)
Existing cedar fence
Existing ground
Existing ground
Fence, split rail, 2 rail
LC Fort Falls Trail
1:
3 m ax 3% Varies
Trail
4'
1'
3-4'
Varies
2-3" approximate aggregate base
2-3" approximate asphalt pavement
10+06.00 to 12+70.00
FORT FALLS TRAIL
TYPICAL SECTION
10+06.00 to 12+70.00
FORT FALLS TRAIL
EXISTING TYPICAL SECTION
LC Fort Falls Trail
4" Roadway aggregate, method 2
NOTE:
stability.
adjusted by the CO to assure adequate drainage and
The excavation and embankment slope ratios maybe
See the cross sections for cut and fill slope ratios.
Removal of asphalt pavement seeding limits
Topsoil and
4" Sidewalk, concrete or Fixture, stairs
2.
1.
seeding limits
Topsoil and
Integral Wall
Integral Wall
Sheet and Description
B2 B2 B2 B2
Survey Summary Grading
Summary
Miscellaneous
Summary Signing Summary Allowance Bid Schedule
A0010 15101-0000 MOBILIZATION LPSM ALL
A0020 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE MILE 0.09 0.09
A0030 15215-7000 SURVEY AND STAKING, PARKING AREA EACH 2 2
A0040 15236-2000 SURVEY CONTROL, GRADE FINISHING MILE 0.18 0.18
A0050 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0060 15401-0000 CONTRACTOR TESTING LPSM ALL
A0070 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0080 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 402 28 430
A0090 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A0100 20103-0000 CLEARING AND GRUBBING SQYD 469 31 500
A0110 20301-2400 REMOVAL OF SIGN EACH 1 1
A0120 20302-0700 REMOVAL OF FENCE LNFT 158 12 170
A0130 20303-0300 REMOVAL OF CONCRETE SQYD 46 4 50
A0140 20303-1900 REMOVAL OF PAVEMENT, ASPHALT, 3-INCH DEPTH SQYD 127 13 140
A0150 20401-0000 ROADWAY EXCAVATION CUYD 93 7 100
A0160 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 146 14 160
A0170 50101-0600 MINOR CONCRETE PAVEMENT, REINFORCED, 6-INCH DEPTH SQYD 100 10 110
A0180 60915-1000 WHEELSTOP, CONCRETE EACH 1 1
A0190 61501-0100 SIDEWALK, CONCRETE SQYD 77 13 90
A0200 61901-2400 FENCE, SPLIT RAIL, 2 RAIL (WOOD) LNFT 375 25 400
A0210 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY HOUR 10
A0220 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH HOUR 10 10
A0230 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY HOUR 10
A0240 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY HOUR 10
A0250 62301-0000 GENERAL LABOR HOUR 40
A0260 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES HOUR 20
A0270 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 20
A0280 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH SQYD 386 24 410
A0290 62511-1000 SEEDING, DRY METHOD SQYD 386 24 410
A0300 63301-0000 SIGN SYSTEM EACH 2 2
A0310 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID LNFT 212 18 230
A0320 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL EACH 1 1
A0330 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
A0340 64603-2100 FIXTURE, STAIRWAY (REINFORCING STEEL) EACH 1 1
MileStone: 100% Submittal
Date Completed: 07/13/20
Report Date: 07/13/20
A
M
E
N
D
Line
Item
No.
Pay Item
Number
SUMMARY OF QUANTITIES - Schedule A -J u l-
:3 P
M
Remarks and/or
Determination of
Estimated Quantity
Pay Item Description Unit
Estimated
Quantities c p w w o rk in g \c e n tr a l0
\d
N E F
T F W
F T N
I T R A
IL
(1
S O
Q .x ls m
]S h e e t
STATE PROJECT
B1FTFW FTNI TRAIL(1)NE
SHEET
NUMBER
SUMMARIES
MISCELLANEOUS
B2
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
A B T r a il F T
N I .d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NE
FORT FALLS TRAIL
10+00
PCC 10+23.18
P C C
.0
P C
C
.7
P T
.5
P I
.7
P I
.5
P C .0
P T
.8
PC 10+14.21
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d P
N P T r a il F T
N I .d g n
U
S E
R
NUMBER
SHEET
NE
FORT FALLS TRAIL
NE FTFW FTNI TRAIL(1)
Existing ground
Existing grade 20-25% in this area
V P I
E L
,4
.8
-4.000%
-11.500%
,4
.3
V P I
E L
,4
.2
V P I
E L
,4
.9
-5.000%
-10.000%
V P I
E L
,4
.9
-1 .6
V P I
E L
,4
.2
-10.000%
,4
.7
Profile grade
Erosion control (typ.)
Toe of fill (typ.)
Limits of disturbance (typ.)
Top of cut (typ.)
Curve = P_FTNI-1
PI 10+18.83
D
R = 15.00'
T = 4.62'
L = 8.97'
Curve = P_FTNI-2
PI 10+33.71
D
R = 60.00'
T = 10.54'
L = 20.86'
Curve = P_FTNI-3
PI 10+74.51
D
R = 300.00'
T = 30.47'
L = 60.74'
Curve = P_FTNI-4
PI 11+24.32
D
R = 60.00'
T = 19.54'
L = 37.78'
Curve = P_FTFA-1
PI 100+47.87
D
R = 65.00'
T = 32.87'
L = 60.87'
13+0012+0011+0010+00
PLAN AND PROFILE FORT FALLS ROAD 100+15 TO 102+05 AND FORT FALLS TRAIL 10+06 TO 12+70
100'50'0
Scale in Feet
Fort Fall s Ro ad
E: 1515388.30
N: 1117828.71
End Fort Falls Road
102+05.00
E: 1515464.09
N: 1117661.70
Begin Fort Falls Road
100+15.00
E: 1515581.62
N: 1117609.60
End Fort Falls Trail
12+70.00
E: 1515424.69
N: 1117783.15
Begin Fort Falls Trail
10+06.00
10+00.00 Fort Falls Trail
101+47.00 Fort Falls Road =
Curve = P_FTFA-1
Curve = P_FTNI-1
Curve = P_FTNI-2
Curve = P_FTNI-3
Curve = P_FTNI-4
C Fort Falls RoadL
C Fort Falls TrailL and ADA concrete pad (Remove)
Existing concrete sidewalk
(Remove by others)
Existing timber overlook
25'
20'
Fence, split rail
101+31.00, RT
100+42.00 to
Edge of trail (typ.)
Edge of traveled way (typ.)
Fence, split rail
12+70.00, LT
10+11.00 to
C1
Interpretive sign panels (Place by others behind concrete pad) behind concrete pad) panel (Remove and reset
Existing interpretive sign
See Special 634-A for signing and pavement marking details
100+85.00 to 101+10.00 ADA parking 16' x 25' concrete pad
Interpretive overlook 10' x 20' concrete pad
101+10.00 to 101+30.00
See Special 646-A for stairway details
End Fixture, stairway
12+65.00
Begin Fixture, stairway
11+75.00
NOTE:
12" min.
DETAIL APPROVED FOR USE 01/2011
FIBER ROLL
Maximum spacing (ft)
9" Ø Fiber Roll
Flow
12" min.
L im it
C le a r in g
S ta k e
S lo p e
INSTALLATION DETAIL
FIBER ROLL AS PERIMETER CONTROL
uphill side of fiber roll
Place excavated material on
AT CULVERT OUTLET
FIBER ROLL
flared end section
Culvert inlet with
AT CULVERT INLET
FIBER ROLL
flared end section
Culvert outlet with Flow
D ire c tio n o f ru n o ff
Flow
FIBER ROLL LAPPING DETAIL
Stagger joints (typ.)
FIBER ROLL JOINT DETAIL
FIBER ROLL SLOPE LAYOUT
spacing table See Fiber Roll along contours
Install fiber rollsWood stakes
Fiber Roll
Slope
Fiber Roll
Pay Limits
Pay Limits overlap 12" (min.)
Fill slope
C157-55 side of fiber roll material on uphill
Place excavated
Flow Flow
54" or larger
Culvert Size
24" or smaller
30" to 48"
9" Ø Fiber Roll length (ft)
FIBER ROLLS AT CULVERTS*
needed due to project-specific conditions.
top of the culvert inlet only. Adjust length as
*Approximate length shown for rolls across the
See note 6 control runoff culvert as needed to
Install fiber rolls below
6.
5.
4.
3.
2.
1.
disturbance.
and all water entering the culvert is crossing the disturbance is on both the road and around the culvert
Place fiber rolls all the way around the inlet when the under it.
water is forced to flow through fiber roll rather than against upstream side of fiber roll to ensure storm with trench bottom and sides. Tamp soil backfill to the contour. Place fiber rolls in continuous contact
For fiber rolls on bare soil, construct trenches parallel
Expose stakes 2" above top of fiber roll.
Drive stakes into undisturbed soil at least 12" deep.
from each end.
2' o.c. max. culverts. Stake fiber rolls 6-inches stakes. Space stakes 4' o.c. max. on slopes and
Stake fiber rolls in place with 1" x 1" or 1" Ø wood vary more than 5% from level.
section of fiber roll, do not allow the fiber roll to
Install fiber rolls along slope contours. For any 20' to installation.
Repair all rills or gullies and properly compact prior
A A
Trench 2" min.
See no te 3
See no te 3
2" min.
Trench table for length requirements
See Fiber Rolls at Culverts culvert inlet
Install fiber rolls around table for length requirements
See Fiber Rolls at Culverts culvert outlet
Install fiber rolls around
Flow
Fiber roll roll 2" min.
Trench fiber
SECTION A-A
REVISED: 12/2017
E1
Flow
NO SCALE
1V:4H or flatter
Slope Gradient
1V:2H or steeper
STAKE DETAIL
uphill side of fiber roll
Place excavated material on
Fill or cut slope
FIBER ROLL SPACING TABLE*
project-specific conditions.
*Approximate spacing shown. Adjust spacing as needed due to
Between 1V:4H and 1V:3H
Between 1V:3H and 1V:2H
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d C F T
N I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
U.S. DEPARTMENT OF TRANSPORTATION
REVISED:
DETAIL
U.S. CUSTOMARY DETAIL
U
S E
R
NUMBER
SHEET
NE
NO SCALE
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d S td
F T
N I .d
FEDERAL LANDS HIGHWAY OFFICE
U.S. DEPARTMENT OF TRANSPORTATION
STANDARD
U.S. CUSTOMARY STANDARD
U
S E
R
NUMBER
SHEET
NE
FORT FALLS TRAIL
NE FTFW FTNI TRAIL(1)
501-1
STANDARD APPROVED FOR USE --/----
REVISED: 9/2016
MINOR CONCRETE PAVEMENT
R1
NOTE:
1.
2.
3.
PLAN PLAN
PROFILE PROFILE
REINFORCED MINOR CONCRETE PAVEMENTPLAIN MINOR CONCRETE PAVEMENT
Traffic Traffic
Transverse contraction joint
PAVEMENT
THICKNESS
TRANSVERSE
JOINT SPACING
See Note 2See Note 2
Provide the same type of dowel assemblies and tie bars for joints in plain portland cement concrete pavement as shown for joints in reinforced pavement.
Lap longitudinal and transverse reinforcement not
Transverse joint
Longitudinal joint
Tie bar
Dowel bar Dowel bar less than 15 inches.
(in) (ft)
6 = T <12
T < 6
(typ.)
24" ty p typ.
2" clear ty p c le a r ty p c le a r typ.
2" clear welded wire reinforcement or No. 4 bars
Slab reinforcement 4" x 4" - W6 x W6 reinforcement or No. 4 bars
W6 x W6 welded wire
Slab reinforcement 4" x 4" -
See Detail C501-50 for joint and joint sealing details.
#6
#5
#5
(inches) (inches)
10 < T = 12
8 < T = 10
T = 8
" typ.8 3" - 8
" typ.8 3" - 8
" typ.8 3" - 8
" typ.8 3" - 8
" typ.8 3" - 8
" typ.8 3" - 8
9"9"
9"9"
18"18"
" - 1" typ.2
9"9"
" - 1" typ.2
18"18"
Smooth dowel @ 12" c-c
Smooth dowel @ 12" c-c
Deformed tie bar @ 30" c-c
" (typ.)8 3" - 8
" (typ.)8 3" - 8
Do not place tie bars within 15" of transverse joints.
" - 1" typ.2
Deformed tie bar @ 30" c-c
Smooth dowel @ 12" c-c
07/2013
REVISED: 08/2014
DETAIL APPROVED FOR USE
C501-50
PAVEMENT JOINTS
MINOR CONCRETE
R2
NOTE:
T
T
T/2
T
T/2
T
T/2
T
T/2
T
T/3
T/3
Tie Bar Diameter
Dowel Bar
NO SCALE
T
Thickness (T)
Pavement
T
T/3
T/2
T/3
CONTRACTION JOINT
DOWELED - TRANSVERSE
CONTRACTION JOINT
TIED - LONGITUDINAL
CONTRACTION JOINT
DOWEL BUTT - TRANSVERSE
CONSTRUCTION JOINT
TIED BUTT - LONGITUDINAL
CONSTRUCTION JOINT
DOWELED - TRANSVERSE
ISOLATION JOINT
UNDOWELED - LONGITUDINAL
ISOLATION JOINT
UNTIED - LONGITUDINAL
UNDOWELED - TRANSVERSE and
ISOLATION JOINT
Pavement surface
See Note 7 Joint Sealant
See Note 7 Joint Sealant
2 x joint width) (Diameter = Backer rod
2 x joint width)
(Diameter =
Backer rod Fixture or structure
Expansion cap
See Note 7 Joint Sealant joint material
Expansion
SAWED OR FORMED JOINT
JOINT SEALING DETAILS
CONSTRUCTION JOINT
CONSTRUCTION JOINT
PLAIN - TRANSVERSE or LONGITUDINAL
7.
6.
5.
4.
3.
2.
1.
is 2:1 or as recommended by sealant manufacturer.
silicone sealant is used, the width to depth shape factor
Maintain joint sealant shape factor of 1:1 except when construction with epoxy resin.
the tie bars and dowels into the existing concrete set into concrete during placement, drill and anchor
For construction joints, if tie bars and dowels are not approval.
planned construction joint locations to the CO for and longitudinal construction joints sparingly. Submit not included in the joint layout plan. Use transverse
Transverse and longitudinal construction joints are and length of the concrete surface.
Use expansion joint material extending the full depth
Install isolation joints when abutting a fixed structure.
Use deformed reinforcing bars for tie bars.
pavement.
and other steel used in the construction of concrete
Use epoxy-coated material for all tie bars, dowels, STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d C F T
N I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
U
S E
R
NUMBER
SHEET
NE
6' - 7'
"R2
"R8
1" Grout
" Sealant 2
PLAN VIEW
SECTION B-B SECTION A-A
See Note 3
Steel rod
1" R
"4 surface
Pavement "
See Note 4
#4 Reinforcing steel (typ.)
1' (typ.)
" (typ.)16
72 A
A
BB
6' - 7'
1' 1'-6"1'1'-6"
1' 1'
" (typ.)2
" (typ.)2
PLAN VIEW
C
C
SECTION C-C
6' - 7'
1' (typ.)
Formed hole for pin (typ.)
Formed hole for pin (typ.)
Formed hole for pin (typ.)
" Sealant 2
1" Grout
See Note 3
Steel rod
"R8
1" R
1 surface
Pavement
"4
"2
"R2
2" "8
"4
"4
2"
"8
4"
See Note 4
#4 Reinforcing steel (typ.)
"8
6' - 7'
Wheelstop obstructions as directed by the CO.
* Increase distance for wall or other
"2
HEAD-ON PARKING
WHEELSTOP LAYOUT
CONCRETE WHEELSTOP WITH DRAIN
CONCRETE WHEELSTOP WITHOUT DRAIN
Stall lines
1' 1'1'-6" (typ.)
1 inch of ends of wheelstop.
Extend the reinforcing steel to within
Subsection 609.08.
-inch steel rods according to 4 3steel or
Pin the wheelstops with No. 6 reinforcing the approval of the CO.
to meet manufacturer's standards with
Variations in wheelstops will be allowed perpendicular to stall lines.
Center wheelstops between and
3.
2.
1.
4.
Edge of ABA parking pad
NO SCALE
CONCRETE WHEELSTOP
609-A
T1
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d s p A F T
N I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
SPECIAL
U.S. CUSTOMARY SPECIAL
U
S E
R
NUMBER
SHEET
NE
FORT FALLS TRAIL
NO SCALE
P
M c p w w o r k in g c e n tr a l0 d s p A F T
N I .d
U
S E
R
NUMBER
SHEET
NE
FORT FALLS TRAIL
NE FTFW FTNI TRAIL(1)
T2
615-A
SIDEWALK
REINFORCED CONCRETE
See Note 1
NOTE:
PLAN
PROFILE
REINFORCED MINOR CONCRETE PAVEMENT
1.
See Note 1 ty p c le a r ty p ty p c le a r reinforcement
W6 x W6 welded wire
Slab reinforcement 4" x 4" -welded wire reinforcement
Slab reinforcement 4" x 4" - W6 x W6
See Detail C501-50 for joint sealing details.
the CO for approval prior to ordering the material.
drawing/fabrication information from the manufacturer to
The contractor is responsible for providing detailed shop
This drawing for general size and configuration information only.
619-A
NO SCALE
NOTE:
8'-0"
6"
4"
A
A
Edge of Pavement
See Plans for details.
PLAN
SECTION A-A
2.
V a r ie s
Trail submittal for approval.
Round or square post acceptable. Include with shop drawing for
T3
FENCE DETAIL
Rail, 2 Rail (Wood).
Fence paid for as pay item 61901-2400 Fence, Split m in
4.
3.
2.
1.
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d s p A F T
N I .d
U.S. DEPARTMENT OF TRANSPORTATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U
S E
R
NUMBER
SHEET
NE
FORT FALLS TRAIL
H m in
6' (min.)
m in
STOP
SPEED
LIMIT
pavement
Edge of
6' (min.)
m in shoulder
Edge of
6' (min.)
m in
M PH
pavement
Edge of
POST TYPE
POST
SINGLE
POST SIZE TABLE
MAXIMUM SIGN AREA (SQFT)
4" x 4"
SIZE
POST
4" x 6"
6" x 6" m a x
H o r
SINGLE POST
(min.)
ROADSIDE SIGN IN RURAL DISTRICT
WITHOUT SHOULDER WITH SHOULDER
WITH ADVISORY SPEED PLAQUE
Wood m a x
W
W
W
633-A
Sheet 1 of 3
SIGN STRUCTURES
NO SCALE
NOTES:
additional information.
Refer to Section 2A.21 of the MUTCD, latest edition, for
(MUTCD), latest edition.
Uniform Traffic Control Devices for Streets and Highways"
Locate and set sign height according to the "Manual on
2.
1.
PEDESTRIANS ARE PRESENT
ROADSIDE SIGN WHEN
match design pavement, Edge of
T4
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d s p A F T
N I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U
S E
R
NUMBER
SHEET
NE
FORT FALLS TRAIL
Sign panel
4''
Traffic flow
WOOD POST
POST SIZE HOLE DIAMETER
4'' x 4''
4'' x 6''
6'' x 6''
Not Required
1.5''
2''
3'
4'
4'
D
Existing ground
(MIN.)
(D)
WOOD POST DATA TABLE
See Table
Holes (See Table)
Wood sign post
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
m a x latest edition, for additional information.
Refer to Section 2A.21 of the MUTCD, details.
Refer to Sheet 3 of 3 for sign bracing details.
Refer to Sheet 1 of 3 for sign mounting latest edition of the MUTCD.
Signs and Markings" as specified in the standards in the "Standard Highway
For sign punching details, see the blank position.
Maintain the post assembly in a plumb specified.
recommendations to accept the post size the anchor according to manufacturer's to manufacturer's recommendations. Size the anchor with a corner bolt according
Attach the square tubular steel post to per post.
line. Do not place more than one splice line and 18 inches above the ground steel posts entirely between the ground
Position splice overlap on U-channel non-breakaway signs.
barrier. Do not place holes in posts of the clear zone or shield with approved
Place non-breakaway signs outside apart.
cannot be spaced a minimum of 7 feet if multiple posts are required and posts posts are considered to be non-breakaway
Signs requiring 6-inch by 6-inch wood signs placed behind protective barriers.
Breakaway sign support is not required for
633-A
NO SCALE Sheet 2 of 3
WOOD AND STEEL POSTS
BREAKAWAY SIGN SUPPORT
NOTE:
T5
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d s p A F T
N I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U
S E
R
NUMBER
SHEET
NE
FORT FALLS TRAIL
WITH BATTEN WITHOUT BATTEN
1 (typ.)
1'' x 3'' Wood batten
Sign panel
WOOD POST
6.
5.
4.
3.
2.
1.
Wood sign post (typ.)
hex nut, and washer
" dia. galvanized round head bolt, 16
NOTE:
Sheet 3 of 3
633-A
SIGN BRACING
latest edition, for additional information.
Refer to Section 2A.21 of the MUTCD, details.
Refer to Sheet 1 of 3 for sign mounting and the steel washer.
the sign panel's retroreflective sheeting
Use neoprene or nylon washers between spacings not to exceed 30 inches.
Use wood battens bolted to post at vertical latest edition of the MUTCD.
Signs and Markings' as specified in the standards in the 'Standard Highway
For sign punching details, see the blank when specified or as directed by the CO.
braces on signs with widths of 36 inches of 48 inches or greater. Install sign
Install sign braces on signs with widths
NO SCALE
Sign panel
Sign post
Sign bracing
" to 2"2 t o
TOLERANCES
BRACING INSTALLATION
T6
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d s p A F T
N I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U
S E
R
NUMBER
SHEET
NE
FORT FALLS TRAIL
HEAD-ON PARKING WITH VAN ACCESSIBLE AISLE
(t yp
See Note 2
Wheelstop
NOTE:
4" solid white striping (typ.)
Sign post (typ.)
SIGN MOUNTING
Mounting view
See Sign
Van accessible aisle
634-A
PAVEMENT MARKINGS
SIGNING AND
6'-7'
5' walkway
5'11' additional sign mounting information.
Refer to Section 2A.18 of the MUTCD for of 7 feet.
are present, provide a minimum height sings installed in areas where pedestrians provide a minimum height of 5 feet. For details. For signs installed in rural areas, Refer to Special 633-A for sign mounting recommendations.
according to the manufacturer's plastic and other types of wheelstops
Section 609 and Special 609-A. Install
Install concrete wheelstops according to edition.
Streets and Highways" (MUTCD), current on Uniform Traffic Control Devices for markings in accordance with the "Manual
Install pavement markings and symbol
4.
3.
2.
1.
RESERVED
PARKING
VAN
ACCESSIBLE
R7-8P
R7-8
5'
VAN
ACCESSIBLE
RESERVED
PARKING
Top of proposed surface
H e ig h t
See Notes 3 and 4
45"
24" Minimum
M in im u m
3" Minimum
9" R
6" R
3" R
3" R
3" R
Blue background
White border
ACCESSIBILITY PARKING SPACE SYMBOL
NO SCALE
16'
Accessibility parking space symbol
T7
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d s p A F T
N I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U
S E
R
NUMBER
SHEET
NE
FORT FALLS TRAIL
400'200'0
Scale in Feet
Legend:
BARRICADE TYPE 3 (Min. 6' each)
NOTE:
1.
R11-2
ROAD
CLOSED
1 2
T8
CONTROL PLAN
TEMPORARY TRAFFIC
TRAIL
CLOSED
Special
F O
R T F
A L L S R
O A
D
F O
R T F
A L L S T
R A
IL
NIOBRARA RIVER
4.6 MILES
TO VALENTINE, NE
and storing of equipment and materials.
contractor may use the closed roadway for staging
Falls Trail for the duration of construction. The
The contractor may close Fort Falls Road and Fort
TRAIL
CLOSED
Special
P
M c p w w o r k in g c e n tr a l0 d T
T C T r a il F T
N I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NE
FORT FALLS TRAIL
NE FTFW FTNI TRAIL(1)
2+
1+
100+00
12+
646-A
T9
FIXTURE, STAIRWAY
13"
Integral Wall c le a r
9"
" Concrete
Sidewalk, 90'
Concrete
Sidewalk, Paid as Sidewalk, Concrete Paid as Fixture, Stairway (Reinforcing steel)
Doweled - Transverse
Isolation Joint
Doweled - Transverse
Isolation Joint
Finished grade #4 bar @ 18" o.c.
#4 bar @ 18" o.c.
6'-0" (typ.)
and Untied - Longitudinal
Undoweled - Transverse
Contraction Joint
3'-0" in intergral wall
#4 bar centered in intergral wall
#4 bar centered bottom mat
#4 bar @ 18" o.c.
Doweled - Transverse
Isolation Joint
Doweled - Transverse
Isolation Joint
PLAN
SECTION A-A
A A
S ta ir w id th s p a
Integral Wall (typ.)
aggregate (typ.)
Roadway
4-inch
#4 bar (typ.)
Treads
3'-0" (typ.)
R is e r s ty p
3'-0"
2% (typ.)
1/2" rounding (typ.)
NOSING DETAIL
NO SCALE
NO SCALE
NO SCALE
Reinforcing not shown, see Plan and Section A-A for reinforcing.
NOTE:
All transverse reinforcing not shown for clarity, see Section A-A for transverse reinforcing.
2.
3. 4.
All risers shall be of equal height and all treads shall be of equal depths unless shown otherwise.4.
3.
2.
1. See Detail C501-50 for joint and joint sealing details.
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d s p A F T
N I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U
S E
R
NUMBER
SHEET
NE
FORT FALLS TRAIL
00 2020 4040 6060
2440 2440
2450 2450
2460 2460
2470 2470
100+15.00
2440 2440
2450 2450
2460 2460
2470 2470
100+25.00
2440 2440
2450 2450
2460 2460
2470 2470
100+50.00
00 2020 4040 6060
2440 2440
2450 2450
2460 2460
2470 2470
100+75.00
2440 2440
2450 2450
2460 2460
2470 2470
101+00.00
2440 2440
2450 2450
2460 2460
2470 2470
101+25.00
NE
FORT FALLS TRAIL
NE FTFW FTNI TRAIL(1)
X1
NO.
SHEET
PROJECTSTATE
P
M c p w w o r k in g c e n tr a l0 d X
S S T r a il F T
N I .d
U
S E
R
FORT FALLS ROAD
Pvmt_ETW_LayerTop_R
Pvmt_CL_LayerTop
Sidewalk_Back_Layer1_R
Pvmt_ETW_Layer1_L
Sidewalk_Front_Layer1_R
Slope_Stake_Fill 1:10_R
Pvmt_ETW_LayerTop_L
Pvmt_ETW_Layer1_R
Shdr_EOP_LayerTop_R
CL
-1.72% +3.00% Pvmt_CL_Layer3
Sta. 100+15.00 R 1
Des. Grade = 2457.89
Subgrade = 2457.39
Orig. Grnd. = 2457.89
Pvmt_ETW_LayerTop_RSlope_Stake_Cut
Pvmt_CL_LayerTop
Sidewalk_Back_Layer1_R
Pvmt_ETW_Layer1_L
Sidewalk_Front_Layer1_R
Pvmt_ETW_LayerTop_L
Pvmt_ETW_Layer1_R
Shdr_EOP_LayerTop_R
Pvmt_CL_Layer3
CL
-3.30% +4.08%
Sta. 100+25.00 R 1
Des. Grade = 2457.85
Subgrade = 2457.35
Orig. Grnd. = 2457.85
Pvmt_ETW_LayerTop_R
Slope_Stake_Cut
Pvmt_CL_LayerTop
Sidewalk_Back_Layer1_R
Pvmt_ETW_Layer1_L
Sidewalk_Front_Layer1_RPvmt_ETW_LayerTop_L Pvmt_ETW_Layer1_R
Shdr_EOP_LayerTop_R
Pvmt_CL_Layer3
CL
-4.15% +4.20%
+1.33%
1:6
Sta. 100+50.00 R 1
Des. Grade = 2457.49
Subgrade = 2456.99
Orig. Grnd. = 2457.49
Pvmt_ETW_LayerTop_R
Slope_Stake_Cut
Pvmt_CL_LayerTop
Sidewalk_Back_Layer1_R
Pvmt_ETW_Layer1_L
Sidewalk_Front_Layer1_R
Pvmt_ETW_LayerTop_L
Pvmt_ETW_Layer1_R
Shdr_EOP_LayerTop_R
Pvmt_CL_Layer3
CL
-3.10%+2.90%+1.49%1:6
Sta. 100+75.00 R 1
Des. Grade = 2456.97
Subgrade = 2456.47
Orig. Grnd. = 2456.97
Pvmt_ETW_LayerTop_R
Slope_Stake_Cut
Pvmt_CL_LayerTop
Sidewalk_Back_Layer1_R
Sidewalk_Back_Layer2_R
Pvmt_ETW_Layer1_L
Sidewalk_Front_Layer1_R
Sidewalk_Front_Layer2_R
Pvmt_ETW_LayerTop_L
Pvmt_ETW_Layer1_R
Shdr_EOP_LayerTop_R
Pvmt_CL_Layer3
CL
-3.00% +1.77% +1.50% 1:6
Sta. 101+00.00 R 1
Des. Grade = 2456.59
Subgrade = 2456.09
Orig. Grnd. = 2456.59
Pvmt_ETW_LayerTop_R
Slope_Stake_Cut
Pvmt_CL_LayerTop
Sidewalk_Back_Layer1_R
Sidewalk_Back_Layer2_R
Pvmt_ETW_Layer1_L
Sidewalk_Front_Layer1_R
Sidewalk_Front_Layer2_R
Pvmt_ETW_LayerTop_L
Pvmt_ETW_Layer1_R
Shdr_EOP_LayerTop_R
Pvmt_CL_Layer3
CL
-2.90%+3.05%+1.50%1:6
Sta. 101+25.00 R 1
Des. Grade = 2456.26
Subgrade = 2455.76
Orig. Grnd. = 2456.26
2440 2440
2450 2450
2460 2460
2470 2470
101+50.00
2440 2440
2450 2450
2460 2460
2470 2470
101+75.00
2440 2440
2450 2450
2460 2460
2470 2470
102+00.00
00 2020 4040 6060
2440 2440
2450 2450
2460 2460
2470 2470
102+05.00
X2
FORT FALLS TRAIL
NE FTFW FTNI TRAIL(1)
NE
NO.
SHEET
PROJECTSTATE
P
M c p w w o r k in g c e n tr a l0 d X
S S T r a il F T
N I .d
S E
R
FORT FALLS ROAD
Pvmt_ETW_LayerTop_RSlope_Stake_Cut
Pvmt_CL_LayerTop
Sidewalk_Back_Layer1_R
Pvmt_ETW_Layer1_L
Sidewalk_Front_Layer1_R
Pvmt_ETW_LayerTop_L
Pvmt_ETW_Layer1_R
Shdr_EOP_LayerTop_R
Pvmt_CL_Layer3
CL
-1.80%+1.27%
Sta. 101+50.00 R 1
Des. Grade = 2456.27
Subgrade = 2455.77
Orig. Grnd. = 2456.27
Pvmt_ETW_LayerTop_RSlope_Stake_Cut
Pvmt_CL_LayerTop
Sidewalk_Back_Layer1_R
Pvmt_ETW_Layer1_L
Sidewalk_Front_Layer1_R
Pvmt_ETW_LayerTop_L
Pvmt_ETW_Layer1_R
Shdr_EOP_LayerTop_R
Pvmt_CL_Layer3
CL
-1.75%+1.65%1:6 Shdr_EOP_LayerTop_L
Sidewalk_Back_Layer1_L
-1.47%
Sta. 101+75.00 R 1
Des. Grade = 2456.21
Subgrade = 2455.71
Orig. Grnd. = 2456.21
Pvmt_ETW_LayerTop_RSlope_Stake_Cut
Pvmt_CL_LayerTop
Sidewalk_Back_Layer1_R
Pvmt_ETW_Layer1_L
Sidewalk_Front_Layer1_R
Pvmt_ETW_LayerTop_L
Pvmt_ETW_Layer1_R
Shdr_EOP_LayerTop_R
Pvmt_CL_Layer3
CL
-2.27%+2.62%
Sta. 102+00.00 R 1
Des. Grade = 2456.13
Subgrade = 2455.63
Orig. Grnd. = 2456.13
Pvmt_ETW_LayerTop_RSlope_Stake_Cut
Pvmt_CL_LayerTop
Sidewalk_Back_Layer1_R
Pvmt_ETW_Layer1_L
Sidewalk_Front_Layer1_R
Pvmt_ETW_LayerTop_L
Pvmt_ETW_Layer1_R
Shdr_EOP_LayerTop_R
Pvmt_CL_Layer3
CL
-1.99%+2.63%
Sta. 102+05.00 R 1
Des. Grade = 2456.14
Subgrade = 2455.64
Orig. Grnd. = 2456.14
NO.
SHEET
PROJECTSTATE
P
M c p w w o r k in g c e n tr a l0 d X
S S T r a il F T
N I .d
S E
R
2440 2440
2450 2450
2460 2460
2470 2470
10+06.00
2440 2440
2450 2450
2460 2460
2470 2470
10+25.00
2440 2440
2450 2450
2460 2460
2470 2470
10+50.00
00 2020 4040 6060
2440 2440
2450 2450
2460 2460
10+75.00
2440 2440
2450 2450
2460 2460
11+00.00
2430 2430
2440 2440
2450 2450
2460 2460
11+25.00
X3
FORT FALLS TRAIL
NE FTFW FTNI TRAIL(1)
NE
FORT FALLS TRAIL
Sidewalk_Front_Layer1_L
Slope_Stake_Cut_L
Sidewalk_Front_Layer2_L
Sidewalk_Back_Layer1_R
Sidewalk_Back_Layer2_R
Slope_Stake_Cut_RParkway Back_L Sidewalk_Back_Top_RSidewalk_Front_Top_L Pvmt_CL_LayerTop
Pvmt_CL_Layer3
CL
Sta. 10+06.00 R 1
Des. Grade = 2456.36
Subgrade = 2455.70
Orig. Grnd. = 2456.36
+0.02%1:50
Sidewalk_Front_Layer1_L
Sidewalk_Front_Layer2_L
Sidewalk_Back_Layer1_R
Sidewalk_Back_Layer2_R
Slope_Stake_Fill_L
Slope_Stake_Cut_R
Parkway Back_L
Sidewalk_Back_Top_R
Sidewalk_Front_Top_L
Pvmt_CL_LayerTop
Pvmt_CL_Layer3
CL
Sta. 10+25.00 R 1
Des. Grade = 2455.23
Subgrade = 2454.56
Orig. Grnd. = 2454.82
+3.00%1:6 1:3 1:33
Sidewalk_Front_Layer1_L
Sidewalk_Front_Layer2_L
Sidewalk_Back_Layer1_R
Sidewalk_Back_Layer2_R
Slope_Stake_Fill_L
Slope_Stake_Cut_R
Parkway Back_L
Sidewalk_Back_Top_R
Sidewalk_Front_Top_L
Pvmt_CL_LayerTop
Pvmt_CL_Layer3
CL
Sta. 10+50.00 R 1
Des. Grade = 2452.35
Subgrade = 2451.69
Orig. Grnd. = 2451.65
+3.00%1:6 1:2
1:33
Sidewalk_Front_Layer1_L
Sidewalk_Front_Layer2_L
Sidewalk_Back_Layer1_R
Sidewalk_Back_Layer2_R
Slope_Stake_Fill_L
Slope_Stake_Cut_R
Parkway Back_L
Sidewalk_Back_Top_R
Sidewalk_Front_Top_L
Pvmt_CL_LayerTop
Pvmt_CL_Layer3
CL
Sta. 10+75.00 R 1
Des. Grade = 2450.45
Subgrade = 2449.79
Orig. Grnd. = 2450.32
+3.00%1:6 1:2 1:33
Sidewalk_Front_Layer1_L
Sidewalk_Front_Layer2_L
Sidewalk_Back_Layer1_R
Sidewalk_Back_Layer2_RSlope_Stake_Fill_L
Slope_Stake_Cut_R
Parkway Back_L
Sidewalk_Back_Top_R
Sidewalk_Front_Top_L
Pvmt_CL_LayerTop
Pvmt_CL_Layer3
CL
Sta. 11+00.00 R 1
Des. Grade = 2449.20
Subgrade = 2448.54
Orig. Grnd. = 2449.17
+3.00%1:61:6
1:33
Sidewalk_Front_Layer1_L
Sidewalk_Front_Layer2_L
Sidewalk_Back_Layer1_R
Sidewalk_Back_Layer2_R
Slope_Stake_Fill_L
Slope_Stake_Cut_R
Parkway Back_L
Shdr_EOP_LayerTop_R
Sidewalk_Front_Top_L
Pvmt_CL_LayerTop
Pvmt_CL_Layer3
CL
Sta. 11+25.00 R 1
Des. Grade = 2447.95
Subgrade = 2447.29
Orig. Grnd. = 2447.37
1:6 1:4
1:33
+3.00%
2430 2430
2440 2440
2450 2450
2460 2460
11+50.00
2430 2430
2440 2440
2450 2450
2460 2460
11+75.00
2420 2420
2430 2430
2440 2440
2450 2450
12+00.00
00 2020 4040 6060
2420 2420
2430 2430
2440 2440
2450 2450
12+25.00
2420 2420
2430 2430
2440 2440
12+50.00
2410 2410
2420 2420
2430 2430
2440 2440
12+70.00
X4
FORT FALLS TRAIL
NE FTFW FTNI TRAIL(1)
NE
FORT FALLS TRAIL
NO.
SHEET
PROJECTSTATE
P
M c p w w o r k in g c e n tr a l0 d X
S S T r a il F T
N I .d
S E
R
Sidewalk_Front_Layer1_L
Sidewalk_Front_Layer2_L
Sidewalk_Back_Layer1_R
Sidewalk_Back_Layer2_R
Slope_Stake_Fill_L
Slope_Stake_Cut_R
Parkway Back_L
Sidewalk_Back_Top_R
Sidewalk_Front_Top_L
Pvmt_CL_LayerTop
Pvmt_CL_Layer3
CL
Sta. 11+50.00 R 1
Des. Grade = 2445.45
Subgrade = 2444.79
Orig. Grnd. = 2444.43
+3.00%1:6 1:3 1:33
Sidewalk_Front_Layer1_L
Sidewalk_Front_Layer2_L
Sidewalk_Back_Layer1_R
Sidewalk_Back_Layer2_R
Slope_Stake_Fill_L
Slope_Stake_Cut_R
Parkway Back_L
Sidewalk_Back_Top_R
Sidewalk_Front_Top_L
Pvmt_CL_LayerTop
Pvmt_CL_Layer3
CL
Sta. 11+75.00 R 1
Des. Grade = 2442.95
Subgrade = 2442.29
Orig. Grnd. = 2441.59
+3.00%1:6 1:2 1:33
Sidewalk_Front_Layer1_L
Sidewalk_Front_Layer2_L
Sidewalk_Back_Layer1_R
Sidewalk_Back_Layer2_R
Slope_Stake_Fill_L
Slope_Stake_Cut_R
Parkway Back_L
Sidewalk_Back_Top_R
Sidewalk_Front_Top_L
Pvmt_CL_LayerTop
Pvmt_CL_Layer3
CL
Sta. 12+00.00 R 1
Des. Grade = 2438.30
Subgrade = 2437.64
Orig. Grnd. = 2438.47
+3.00%1:41:6
1:33
Sidewalk_Front_Layer1_L
Sidewalk_Front_Layer2_L
Sidewalk_Back_Layer1_R
Sidewalk_Back_Layer2_R
Slope_Stake_Fill_L
Slope_Stake_Cut_R
Parkway Back_L
Sidewalk_Back_Top_R
Sidewalk_Front_Top_L
Pvmt_CL_LayerTop
Pvmt_CL_Layer3
CL
Sta. 12+25.00 R 1
Des. Grade = 2433.65
Subgrade = 2432.99
Orig. Grnd. = 2433.91
+3.00%1:41:6
1:33
Sidewalk_Front_Layer1_L
Sidewalk_Front_Layer2_L
Sidewalk_Back_Layer1_R
Sidewalk_Back_Layer2_R
Slope_Stake_Fill_L
Slope_Stake_Cut_R
Parkway Back_L
Sidewalk_Back_Top_R
Sidewalk_Front_Top_L
Pvmt_CL_LayerTop
Pvmt_CL_Layer3
CL
Sta. 12+50.00 R 1
Des. Grade = 2429.00
Subgrade = 2428.34
Orig. Grnd. = 2428.84
+3.00%1:61:6
1:33
Sidewalk_Front_Layer1_L
Sidewalk_Front_Layer2_L
Sidewalk_Back_Layer1_R
Sidewalk_Back_Layer2_R
Slope_Stake_Cut_R
Parkway Back_L
Sidewalk_Back_Top_R
Sidewalk_Front_Top_L
Pvmt_CL_LayerTop
Pvmt_CL_Layer3
CL
Sta. 12+70.00 R 1
Des. Grade = 2425.71
Subgrade = 2425.05
Orig. Grnd. = 2425.71
+3.00%
1:41:33
| TTL(Trail)_FTNI |
| SYM(Trail)_FTNI |
| SYM(Trail)_FTNI |
| SUR(Trail)_FTNI |
| STE(Trail)_FTNI |
| TYP(Trail)_FTNI_01 |
| TYP(Trail)_FTNI_02 |
| TAB(Trail)_FTNI_01 |
| TAB(Trail)_FTNI_02 |
| PNP(Trail)_FTNI_01 |
| C157-55_FTNI |
| Std501-1_FTNI |
| C501-50_FTNI |
| sp609-A_FTNI |
| sp615-A_FTNI |
| sp619-A_FTNI |
| sp633-A_01_FTNI |
| sp633-A_02_FTNI |
| sp633-A_03_FTNI |
| sp634-A_FTNI |
| TTC(Trail)_FTNI_01 |
| sp646-A_FTNI |
| XSS(Trail)_FTNI |
| XSS(Trail)_FTNI |
| XSS(Trail)_FTNI |
| XSS(Trail)_FTNI |
| Cover Page_NE FTFW FTNI Trail(1) S&S Plans 2020-07-21.pdf |
| TTL(Trail)_FTNI |
| SYM(Trail)_FTNI |
| SYM(Trail)_FTNI |
| SUR(Trail)_FTNI |
| STE(Trail)_FTNI |
| TYP(Trail)_FTNI_01 |
| TYP(Trail)_FTNI_02 |
| TAB(Trail)_FTNI_01 |
| TAB(Trail)_FTNI_02 |
| PNP(Trail)_FTNI_01 |
| C157-55_FTNI |
| Std501-1_FTNI |
| C501-50_FTNI |
| sp609-A_FTNI |
| sp615-A_FTNI |
| sp619-A_FTNI |
| sp633-A_01_FTNI |
| sp633-A_02_FTNI |
| sp633-A_03_FTNI |
| sp634-A_FTNI |
| TTC(Trail)_FTNI_01 |
| sp646-A_FTNI |
| XSS(Trail)_FTNI |
| XSS(Trail)_FTNI |
| XSS(Trail)_FTNI |
| XSS(Trail)_FTNI |
File details come from the government source that posted it. Updated .