NDERFP260303 - SolicitationAddendumQ&A.R3.docx

DOCX document 144 KB Posted

Attached to
Grants Management System
Solicitation number
NDERFP260303
Issued by
Lancaster County, Nebraska

About this file

This is a Solicitation Addendum Q&A document issued by the Nebraska Department of Education (NDE) Office of Budget and Grants Management for a Grants Management System (GMS) procurement. The solicitation (NDERFP260303) seeks proposals for a comprehensive web-based system to administer approximately 33 grant programs (updated from the original estimate of 20 programs) disbursing roughly $400 million annually through the entire grant lifecycle, including application management, reimbursement processing, fiscal monitoring, and programmatic monitoring. The system must support approximately 100 internal NDE users and approximately 2,600 external users across 300 subrecipient organizations. The solicitation opened June 24, 2026, with a proposal deadline of June 17, 2026, at 2:00 PM Central Time. Vendor demonstrations are scheduled for July 15, 2026, in a virtual format, and the intent to award is September 8, 2026, with contract execution on September 30, 2026. The vendor start date is between November 1, 2026, and July 1, 2027, with a go-live target of July 1, 2027. The contract term extends five years with potential continuation for up to eighteen months thereafter.

Pricing must be submitted on Attachment A as fixed costs across five contract years, including design and implementation, training and support, system operation, post-implementation maintenance and enhancements, and other associated costs; NDE does not disclose its approved budget and requires all third-party software licensing, infrastructure costs, and integration expenses to be included within prescribed cost categories or detailed under "Other Associated Costs." Evaluation criteria assign 40 points to Corporate Overview, 40 points to Technical Response, 20 points to Cost Sheet, and 20 points to Demonstrations (if conducted); cost evaluation will apply a best-value methodology considering both technical merit and total five-year cost. The current GMS is a custom-developed application running on Microsoft Windows Server 2022 and Microsoft SQL Server 2022; NDE is open to SaaS, cloud-hosted, or vendor-hosted solutions and does not require the solution to remain within the current Microsoft environment. No incumbent vendor has been identified. The system must integrate with NDE financial systems and existing state identity providers supporting SSO via SAML 2.0 or OAuth, achieve 99.5% minimum uptime (99.9% preferred), provide business-hours support (Monday-Friday, 7:00 AM–6:00 PM Central) with 24/7 coverage for production-down incidents, and comply with WCAG 2.1 Level AA accessibility standards and 2 CFR Part 200 (Uniform Guidance) compliance requirements. Data migration will include active and recent historical records (approximately 3–5 years) with additional historical data within a 5–10 year horizon, encompassing tens of thousands of grant records and hundreds of thousands of associated documents. Retainage of 10% from applicable contract deliverables will be negotiated at contract execution, and vendors must demonstrate security posture through industry-standard practices, with specific certifications (SOC 2, FedRAMP, StateRAMP) not mandated at proposal submission but potentially required during implementation.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS

SOLICITATION NUMBER: NDERFP260303

Grants Management System Opening Date: June 24th, 2026 Q&A Revised: June 15th, 2026

Questions and Answers

Following are the questions submitted and answers provided for the above-mentioned solicitation. The questions and answers are to be considered as part of the solicitation. It is the responsibility of bidders to check the State Purchasing Bureau website for all addenda or amendments.

Solicitation Section Reference
Solicitation Page Number
Questions
NDE Answer

Attachment A NDE Vendor Cost Sheet

39
If a vendor's standard commercial model is a tiered SaaS subscription that varies with the number of internal users, subrecipient users, or active grant programs, how should this be represented within the fixed-five-year cost categories on Attachment A?
Vendors should represent tiered SaaS subscriptions as a fixed annual cost for each of the five contract years in Attachment A, based on documented assumptions.

Glossary of Terms Responsible Bidder Definition

8
Does NDE require the bidder's board of directors and/or executive officers to be U.S. residents or U.S. citizens? Specifically, will NDE accept a Delaware-incorporated bidder whose directors and/or officers reside outside the United States, provided the entity is otherwise authorized to transact business in Nebraska and meets the Foreign Adversary Contracting Prohibition Act and U.S. Citizenship Attestation requirements?
NDE does not require directors or executive officers to be U.S. residents or U.S. citizens. A Delaware-incorporated bidder with non-U.S. directors/officers is acceptable provided the entity (i) is authorized to transact business in Nebraska pursuant to Section I.E, (ii) complies with the Foreign Adversary Contracting Prohibition Act certification in Section III.B, and (iii) complies with the U.S. Citizenship Attestation Form requirements (which apply to individuals receiving public benefits where applicable).

Section I.E & III.C Registration & Eligibility

13, 25
For an awarded vendor that is a Delaware corporation performing services entirely remotely from outside the State of Nebraska (with no employees physically performing services in Nebraska), can NDE clarify: (a) the timeline for Nebraska Secretary of State foreign-corporation qualification relative to the September 30, 2026 award date and the November 1, 2026 earliest vendor start date?; (b) whether E-Verify enrollment is required when no employees physically perform services in Nebraska?; and (c) whether any additional Nebraska-specific filings, attestations, or registrations apply to a Delaware corporation that does not maintain a physical office or staff in Nebraska?
a) Questions regarding Secretary of State timelines should be directed to the Secretary of State.

b) Please see Section III.C. within the RFP regarding E-Verify.

c) Please refer to the requirements of the Secretary of State website.

Section I.P Evaluation of Responses

15
Can NDE confirm the numerical point weighting that will be applied across the evaluation categories (Corporate Overview, Technical Response, Cost Sheet, and any oral demonstration component), and whether demonstration scores are added to the written-proposal scores or used as a separate shortlisting filter?
Evaluation of proposals will be conducted in accordance with the criteria set forth in the RFP. The numerical point weighting is as follows: Corporate Overview – 40 points; Technical Response – 40 points; Cost Sheet – 20 points; Demonstration (if conducted) – 20 points. If conducted, vendor demonstrations will be evaluated as part of the overall evaluation process and considered along with the written proposal scores to inform final scoring and selection.

Section I.W Vendor Demonstrations

17
Will NDE publish a demonstration script, agenda, or prioritized list of use cases for the July 15, 2026 vendor demonstrations? Will demonstrations be conducted in person at NDE offices in Lincoln, virtually, or in a hybrid format? What is the expected duration of each demonstration?
Per Section I.W, demonstrations will be conducted for a subset of vendors as determined by NDE. The format will be virtual; the agenda and duration will be provided to invited vendors in advance. Vendors should be prepared to demonstrate core workflows aligned to Section V.C.

Section II.T Retainage Clauses

23
The RFP references a 10% retainage that may be withheld from each payment until successful project completion. Is the retainage applied only to one-time implementation, training, and migration fees, or is it also applied to recurring SaaS subscription, hosting, and ongoing support fees? At what specific project milestone is retainage released?
Retainage will be negotiated at the time of contracting.

Section III.A & VI.A.1.IX Personnel Requirements

24, 36
Section III.A provides that personnel assigned to the contract shall be employees of the Vendor. When the bidder is a U.S. subsidiary of a non-U.S. parent, may named project personnel be employees of the parent or of other affiliates within the same corporate group, made available to deliver the contract under the U.S. bidding entity's contractual responsibility and management, or must named personnel be direct employees of the U.S. bidding entity? Would a written intra-group services agreement and a secondment arrangement be acceptable mechanisms?
Per Section III.A, personnel assigned to the contract must be under the responsibility and control of the awarded Vendor.

Section III.A Independent Vendor Duties

24
Will NDE consider proposals that include one or more subcontractors (for example, a U.S.-based public-sector implementation or integration partner working alongside the prime vendor)? If so, what additional disclosures, certifications, or pricing breakouts are required for subcontractor effort?
Refer to Sections III.A. and VI.A.1.X. of the RFP for discussion of subcontractors and how to disclose them during the proposal process.

Section III.B Foreign Adversary Certification

25
The Foreign Adversary Contracting Prohibition Act certification addresses scrutinized companies and foreign-adversary ownership. When the bidder is a U.S. subsidiary of a non-U.S. parent based in an allied jurisdiction (for example, Canada), what level of beneficial-ownership disclosure does NDE expect — for example, disclosure of the immediate parent only, all entities and individuals owning 5% or more, or full ultimate beneficial ownership — for purposes of the certification? Are there particular jurisdictions of ownership that, while not on the foreign adversary list, would still require additional disclosure or review?
Section III.B. of the RFP requires certification that the Vendor is not a "scrutenized company" which is defined in Neb. Rev. Stat. 73-903. Refer to that section to determine if the ownership structure of your company meets the requirements.

Section III.I Ownership of Deliverables

26
The RFP provides that NDE shall own and hold exclusive title to any deliverable developed as a result of the contract. Will NDE accept a clarifying provision (in the form of a vendor-proposed deviation) that distinguishes NDE-owned deliverables — including NDE data, NDE-specific configurations, and agency-specific custom work product — from the vendor's pre-existing platform intellectual property, source code, generallyavailable product enhancements, and underlying software-as-a-service offering, with NDE receiving a perpetual license to use platform-resident outputs during and after the contract term?
The NDE retains ownership of all of its property, including data, tools, etc.

Section III.J Insurance Requirements

26
The required Cyber Liability coverage is $5,000,000. For purposes of meeting that requirement: (a) does NDE require the Cyber Liability policy to be written by a U.S.-admitted carrier, or is a non-admitted (surplus lines) or non-U.S.-domiciled insurer acceptable provided coverage limits and form are met?; (b) does the Cyber Liability policy need to extend coverage to subcontractors performing services under the contract, or is it sufficient that each subcontractor maintain equivalent independent coverage?; (c) is the Cyber Liability policy required to name the State of Nebraska as Additional Insured, or is the Additional-Insured requirement limited to Commercial General Liability and Commercial Automobile Liability?; and (d) are there minimum sublimit expectations for regulatory defense, breach notification, business interruption, or cyber extortion that NDE would like specified at proposal?
(a) The RFP does not specify, but NDE does require that all coverages are provided as outlined in the RFP.

(b) This question is addressed in Section III.J. (Insurance Requirements) of the RFP.

(c) The RFP only addresses "Additional-Insured" requirements in the section related to "Commercial General Liability Insurance"

(d) The RFP does not address any minimum sublimits, however, it is the expectation of NDE that the policy obtained by the vendor will be sufficient to cover each of these risks.

Section V.D – Work Plan
33
The RFP indicates a vendor start date between November 1, 2026 and July 1, 2027, with a development/go-live target of July 1, 2027. Is a phased golive acceptable — for example, intake/review/award functionality live first, followed by monitoring, fiscal, and closeout in subsequent phases — or does NDE require all functional areas to go live concurrently on July 1, 2027?
Per Section V.D, a phased go-live is acceptable provided core capabilites required by July 1, 2027 are operational. This includes migration of existing grants to the new system. As new grant cycles occur following the execution of the contract with the vendor, strong proposals would incoporate onboarding of new grant cycles in the system prior to July 1, minimizng the migration of grants. Details of any phased go-live and migration will be negotiated during the contract drafting phase.
Section V.B – Project Environment
32
The RFP describes the current GMS environment as Microsoft Windows Server 2022 and SQL Server 2022. Is NDE open to a vendor-hosted SaaS/cloud-hosted GMS (for example, hosted on AWS or Azure infrastructure managed by the vendor), or is NDE expecting the awarded solution to run within an NDE-controlled Windows Server 2022 / SQL Server 2022 environment?
NDE is open to vendor-hosted SaaS, cloud-hosted, or other deployment models and and if so hosted and vendor supported, does not require the solution to run within the current Microsoft environment, which is provided for informational purposes only.

Section V.C Compliance & Audit Support

32
The RFP references 2 CFR Part 200 (Uniform Guidance) compliance. Beyond audit-trail, role-based access, and document-retention capabilities, does NDE require specific Uniform Guidance functionality such as singleaudit tracking, federally-negotiated indirect cost rate handling, time-andeffort certification, period-of-performance enforcement, or other named federal compliance constructs?
Per Section V.C, the GMS must support compliance with 2 CFR Part 200 (Uniform Guidance). The RFP does not prescribe a checklist of specific Uniform Guidance modules; however, vendors should describe how the proposed solution can support core compliance constructs, including:

Single audit tracking and FAC/SAM.gov status capture Period-of-performance enforcement Allowable/unallowable cost rules and budget-category controls Subrecipient risk assessment and monitoring Cash management Grant closeout procedures Audit trail and record retention sufficient for federal review

Best practice would be to share all additonal capabilities or functionalities that would benefit the NDE.

Section V.C Fiscal Management & Reimbursements

32
The RFP references electronic reimbursement requests/invoices, expenditure tracking against approved budgets, and fiscal review/approval workflows. Should the GMS support a line-item expense-reimbursement model (where subrecipients submit individual expenses or invoices against approved budget categories and NDE reviews and approves each line), a milestone-based or tranche-based disbursement model, or both? If both, what is the approximate proportion across NDE's existing 20 grant programs?
Existing grant portfolio within GMS does not include milestone/tranche-based disbursement. Only Reimbursement option is submission of a reimbursement request for expenses already incurred during the period of performance.

Section V.C Fiscal Management & Reimbursements

32
Is the awarded vendor expected to process direct payments to subrecipients (for example, via ACH origination from the GMS), or is the GMS expected only to manage the submission, review, approval, and historical record of reimbursement requests, with actual payment executed by NDE's existing financial system?
Per Section V.C, the GMS is expected to manage the submission, review, approval, and historical record of reimbursement requests and to integrate with NDE's existing financial system for payment execution. Actual payment processing (ACH, warrant issuance) will continue to be executed through NDE's financial systems of record; the GMS is not expected to originate ACH payments directly. The GMS should send approved payment requests to the financial system and receive payment-status/confirmation data back for reconciliation and subrecipient transparency. Best practice: describe the supported integration patterns (API, file exchange) and provide reference examples of similar integrations with state ERP/accounting systems.

Section V.C Fiscal Management & Reimbursements

32
Are budget structures (for example, budget categories, cost objects, allowable cost rules) standardized across NDE grant programs, or do each of the approximately 20 existing grants use program-specific budget

templates and revision rules? If program-specific, can NDE provide example structures from two or three representative grants?

Budget structures are not fully standardized across all ~33 NDE grant programs. Most federal formula programs follow common federal budget-category structures (e.g., Personnel, Fringe, Supplies, Travel, Contractual, Indirect), while certain state-funded and competitive/discretionary programs use program-specific templates and revision rules.

Vendors should propose a solution that supports configurable budget templates, allowable-cost rules, and amendment/revision workflows at the program level.

While NDE is interested in greater standardization over time, the system must accommodate variation across programs, including differing budget categories, levels of detail, and approval requirements.

Representative budget templates will be shared with the awarded vendor during implementation discovery to inform system configuration.

Best practice: Vendors should demonstrate template library functionality that enables program staff to clone, modify, and version budget templates and associated rules with minimal vendor intervention.

Section V.C General System Requirements

32
The RFP describes approximately 20 existing grants issuing $400 million

annually. Approximately how many distinct application forms, reimbursement workflows, programmatic reporting templates, and closeout workflows are expected to be configured in the GMS at go-live?

Section V.E of the RFP references “approximately 20 existing grants”; however, this figure is outdated. NDE currently administers approximately 33 grant programs disbursing roughly $400 million annually.

The number of active grants may fluctuate year to year based on funding availability, program changes, and legislative priorities. Additionally, some grant programs are currently managed outside of the GMS, with a long-term objective of consolidating all grants into a single system.

NDE’s grant portfolio includes a mix of:

Formula-funded grants Competitive grants Discretionary programs State-funded grants Federally funded grants

These funding types often carry different application structures, reimbursement rules, reporting requirements, and compliance obligations, which contributes to configuration variability within the system.

For planning purposes, vendors should anticipate approximately:

100 internal NDE users 2,600 external users 300 subrecipient organizations

At go-live, NDE expects the GMS to support all in-scope programs, with shared/standardized configurations where feasible and program-specific configurations where required.

While a precise inventory of distinct application forms, reimbursement workflows, programmatic reporting templates, and closeout workflows will be finalized during implementation discovery, vendors should plan for a moderate-to-elevated level of configuration complexity aligned to the current portfolio (e.g., approximately 25–40 distinct application forms and corresponding workflow variants).

Best practice: Vendors should propose a reusable form and workflow library with strong cloning, inheritance, and versioning capabilities to efficiently support current programs, annual fluctuations, and future expansion—minimizing long-term configuration and maintenance effort.

Section V.C Integration & Data Exchange

32
What specific NDE financial system(s) and other agency systems must the GMS integrate with? For each, what is the preferred integration method (REST/SOAP API, SFTP file exchange, ETL/data warehouse, message bus, manual export-import, or other), and is documentation or a data dictionary available to vendors during the proposal period?
Specific NDE financial and other agency systems will be identified during implementation discovery. The GMS must support integration using standard methods, including APIs and file-based exchanges. Documentation and data dictionaries will be provided to the awarded vendor during implementation and are not available during the proposal period.

Section V.C Programmatic Monitoring

32
The RFP references monitoring findings, corrective action plans, and resolution status. Could NDE describe its current process at a high level — for example, the typical lifecycle of a finding from identification through corrective action plan submission, NDE review, and closeout — so vendors can size the workflow appropriately?
Per Section V.C, the GMS must support monitoring, corrective action plans (CAPs), and resolution tracking. NDE's typical finding lifecycle is: (1) finding identified through desk review, site visit, audit, or risk-based monitoring; (2) finding documented and communicated to the subrecipient with required response timeline; (3) subrecipient submits a CAP with root cause, corrective steps, responsible parties, and target dates; (4) NDE program/fiscal staff review and approve/return the CAP; (5) ongoing tracking of CAP milestones with supporting documentation uploads; (6) NDE validates completion and closes the finding; (7) full audit trail retained per record-retention rules. Specific timelines vary by program and federal regulation. Best practice: propose configurable workflows with status visibility, automated reminders, and a single source of for record for findings across programs.
Section V
Page 33
2. Phasing: Would NDE accept a phased go-live approach to meet the 7/1/27 date; if yes,

what functional areas/programs must be in Phase 1?

Per Section V.D, a phased go-live is acceptable provided core capabilites required by July 1, 2027 are operational. This includes migration of existing grants to the new system. As new grant cycles occur following the execution of the contract with the vendor, strong proposals would incoporate onboarding of new grant cycles in the system prior to July 1, minimizng the migration of grants. Details of any phased go-live and migration will be negotiated during the contract drafting phase.

N/A
N/A
Can NDE elaborate on the planned demonstration format, duration, and specific workflows the evaluation team wishes to see so vendors can tailor live configurations appropriately?
Per Section I.W, demonstrations will be conducted for a subset of vendors as determined by NDE. The format will be virtual; agenda, scenarios, and duration will be provided to invited vendors in advance. Vendors should be prepared to demonstrate core workflows aligned to Section V.C: grant intake/application/review/award; budget setup and reimbursement; monitoring and corrective action; subrecipient portal experience; reporting; and role-based security/SSO. NDE may include scripted scenarios using NDE-relevant sample data. Best practice: invited vendors should pre-stage a configured demo environment using sample formula-grant and competitive-grant scenarios and pre-built role-based personas.
Work Plan
33
Does NDE anticipate a phased implementation approach, or are all grant programs expected to be fully operational at initial go-live?
Per Section V.D, a phased go-live is acceptable provided core capabilites required by July 1, 2027 are operational. This includes migration of existing grants to the new system. As new grant cycles occur following the execution of the contract with the vendor, strong proposals would incoporate onboarding of new grant cycles in the system prior to July 1, minimizng the migration of grants. Details of any phased go-live and migration will be negotiated during the contract drafting phase.

Section V.C Subrecipient & Grantee Management

32
The RFP references UEI and SAM status data for subrecipients. Does NDE require live, system-to-system validation against SAM.gov on each transaction (for example, via the SAM.gov Entity Validation API), or is it acceptable for the GMS to capture and store UEI and SAM status as data fields, with periodic refresh on an agreed cadence?
Per Section V.C, the GMS must capture and support validation of UEI and SAM.gov registration status for subrecipients.

NDE’s current process relies on grantee-provided data with manual validation, and the RFP does not require a specific validation method. Vendors should describe how their solution can support both data capture and validation of entity eligibility throughout the grant lifecycle.

NDE is interested in solutions that can support:

Validation of active UEI registration during applicant onboarding (pre-award) Verification of SAM.gov status prior to award execution Verification of SAM.gov status of reimbursement/payment processing Identification and handling of inactive, expired, or excluded (suspended/debarred) entities Retention of timestamped validation history for audit purposes

System-to-system integration (e.g., SAM.gov APIs, including entity validation or status services) is a desirable capability but is not required. Vendors should describe:

Available API-based validation approaches (real-time or near-real-time) Options for scheduled/batch synchronization or periodic refresh How the system supports alerts, holds, or workflow controls when entity status is invalid or expired

At a minimum, vendors should demonstrate how the solution supports flexible validation approaches that can evolve from current manual processes to more automated controls over time.

Best practice: Clearly distinguish whether validation capabilities are native, configurable, or require integration, and describe how the solution balances compliance, performance, and external system dependencies.

Section V.C Training and Support

32
The RFP indicates support is required within 24 hours of a request. Does NDE require 24x7x365 support for critical incidents (Severity 1), or is business-hours support (for example, Monday–Friday, 7:00 AM – 6:00 PM Central) sufficient for the majority of issues, with after-hours escalation reserved for production-down events? Is a particular uptime service level (for example, 99.5% or 99.9%) expected?
Per Section V.C, support is required within 24 hours of a request. NDE expects business-hours support (Monday–Friday, 7:00 AM–6:00 PM Central) for routine issues, with 24x7x365 coverage for Severity 1 (production-down) incidents and after-hours escalation paths for critical issues affecting fiscal-cycle or compliance deadlines. The expected production uptime SLA is 99.5% minimum, with 99.9% preferred, measured monthly and excluding scheduled maintenance windows communicated in advance. Vendors should propose a tiered severity model with defined response and resolution targets per severity. Best practice: propose a service-level matrix specifying response time, restoration target, and credits/remedies for missed SLAs.

Section V.C Workflow & User Roles

32
Approximately how many internal NDE users (program staff, fiscal staff, administrators) and external subrecipient users does the GMS need to support at go-live and over the 5-year contract term? Are there expected step-function increases in user volume tied to specific programs or grant cycles?
Vendors should plan to support approximately 100 internal NDE users across roles including: program administrators, program staff, fiscal staff, monitoring staff, reviewers/approvers, reporting/read-only users, and system administrators. Final role-by-role counts will be confirmed during implementation. Best practice: propose role-based access with separation of duties out-of-the-box plus configurable custom roles.

Vendors should plan to support approximately 2,600 external users across approximately 300 subrecipient organizations. External roles typically include: authorized organizational representatives, program contacts, fiscal contacts, application preparers, internal reviewers/approvers within the subrecipient, and read-only stakeholders. Final counts will be confirmed during implementation. Best practice: support organization-level delegated user administration so subrecipients manage their own users with NDE oversight. Step-function increases may occur with new federal/state grant programs added during the contract term. Concurrent peaks typically align with application open/close windows, reimbursement cycle deadlines (often month-end and quarter-end), and federal reporting periods.

Operations
N/A
Is there an approved budget for this GMS Modernization? If so, please provide anticipated budget allocations for base plus all option years.
NDE does not disclose the budget for RFP's.
Can NDE provide additional detail regarding the current grants management system, including vendor/platform, data structure, and anticipated complexity of historical data migration?
No
N/A
N/A
Has the Nebraska Department of Education (NDE) previously entertained any system demonstrations and/or presentations from vendors?
No

Section VI.A.1 Corporate Overview Instructions

35
Will NDE accept a solicitation response submitted by a U.S. subsidiary of a non-U.S. parent company, where (i) the U.S. subsidiary (a Delaware corporation) is the contracting entity, holds the required insurance, is registered to transact business in Nebraska, and signs the Contractual Agreement Form; (ii) the U.S. subsidiary serves as prime contractor; and (iii) the non-U.S. parent provides the underlying software platform and certain technical resources to the U.S. subsidiary as an intra-group affiliate? If yes, can NDE confirm what corporate documentation it expects regarding the parent–subsidiary relationship at proposal stage and at contract execution?
NDE will accept responses from U.S. subsidiaries of non-U.S. companies under the conditions outlined in the question. At the proposal state, NDE expects that documentation will be provided showig the relationship between the subsidiary and all parent companies along with any required certification related to the Foreign Adversary Contracting Prohibition Act.

Section VI.A.1.II Financial Statements

35
When the bidder is a U.S. subsidiary whose financial substance is consolidated into a non-U.S. parent, will NDE accept the consolidated audited financial statements of the parent (together with the U.S. subsidiary's standalone disclosures and a banking reference) as satisfying the financial-statements requirement, or are standalone audited financial statements of the U.S. bidding entity required? If the latter, will unaudited management accounts of the U.S. subsidiary plus audited consolidated parent statements be acceptable?
The RFP requires publicly held companies to provide full audited financial statements. If the subsidiary is no publicly held, it will need to provide the financial statements required of a publicly held corporation. In lieu of those statements, the RFP states that the information that may be provided by the bidder must be sufficient for the proposal evaluators to determine the stability and financial strength of the bidder.
Section V.D – Training and Support
33
Approximately how many internal users and external grantees will require training, and what training delivery methods are preferred (e.g., virtual, in-person, self-paced)?
Vendors are expected to provide Nebraska-specific user guides, quick-reference materials, and training content tailored to NDE workflows, terminology, and program configurations. Standard vendor documentation alone is not sufficient.

Training Model: NDE anticipates a "train-the-trainer" approach, where the vendor trains NDE staff, who will then train external users (~2,600). However, a strong proposal would also include:

NDE-specific training materials reflecting actual configured workflows and screens Recorded training content for ongoing reference and onboarding Materials developed in collaboration with NDE program staff to ensure accuracy

Section III
Page 26
6. Pricing escalation: Given the 5-year term and ‘prices remain fixed,’ will NDE allow annual escalation for hosting/support, and if so, what index/cap?
The RFP provides for a fixed-cost over the term of the contract.
Section III
Page 26
7. IP boundaries: Confirm NDE ownership applies to NDE-specific configurations/work product and does not require transfer of vendor pre-existing IP/platform source code.
The RFP provides that NDE retains ownership over any deliverable developed in response to this contract.
Section V
Page 33
1. Programs in scope: Please list the ~20 existing grant programs referenced for migration/incorporation and identify which are in scope for go-live by 7/1/27.
Section V.E of the RFP references “approximately 20 existing grants”; however, this figure is outdated. NDE currently administers approximately 33 grant programs disbursing roughly $400 million annually.

The number of active grants may fluctuate year to year based on funding availability, program changes, and legislative priorities. Additionally, some grant programs are currently managed outside of the GMS, with a long-term objective of consolidating all grants into a single system.

NDE’s grant portfolio includes a mix of:

Formula-funded grants Competitive grants Discretionary programs State-funded grants Federally funded grants

These funding types often carry different application structures, reimbursement rules, reporting requirements, and compliance obligations, which contributes to configuration variability within the system.

For planning purposes, vendors should anticipate approximately:

100 internal NDE users 2,600 external users 300 subrecipient organizations

At go-live, NDE expects the GMS to support all in-scope programs, with shared/standardized configurations where feasible and program-specific configurations where required.

While a precise inventory of distinct application forms, reimbursement workflows, programmatic reporting templates, and closeout workflows will be finalized during implementation discovery, vendors should plan for a moderate-to-elevated level of configuration complexity aligned to the current portfolio (e.g., approximately 25–40 distinct application forms and corresponding workflow variants).

Best practice: Vendors should propose a reusable form and workflow library with strong cloning, inheritance, and versioning capabilities to efficiently support current programs, annual fluctuations, and future expansion—minimizing long-term configuration and maintenance effort.

Section III.N & V.C Technology Access Standards

28, 32
Does NDE require a Voluntary Product Accessibility Template (VPAT 2.x), an Accessibility Conformance Report (ACR), or other specific accessibility documentation as part of the proposal submission? If so, is a particular VPAT revision required (for example, VPAT 2.5 Rev WCAG)?
Vendors should provide accessibility conformance evidence, such as a VPAT or Accessibility Conformance Report (ACR), and describe their accessibility testing practices. Specific documentation and validation requirements will be confirmed during evaluation and implementation.

Section V.C Security, Privacy & Accessibility

32
Does NDE require single sign-on (SSO) integration with an existing identity provider (for example, Azure Active Directory, Okta, ADFS, or a State of Nebraska identity service)? Are protocols specified, such as SAML 2.0, OAuth 2.0, or OpenID Connect? Are different requirements applied to internal NDE users versus external subrecipient users?
NDE requires integration with an existing SSO system that is utilized by school districts in the State of Nebraska. This system compiles with SAML and OAuth, and details will be provided to the winning bidder.
Section V
Page 33
4. Integrations: Identify the financial system(s) and interface mechanisms required (API,

file exchange, SSO, etc.), and whether NDE can provide specs or sample files.

Specific financial system(s) and interface mechanisms will be confirmed during implementation discovery. The GMS should support standard integration methods, including APIs, file exchange, and SSO. Specifications and sample files will be provided to the awarded vendor during implementation and are not available during the proposal period.

Section V
Page 33
5. Availability/SLA: Confirm the expected uptime target, maintenance windows, and

whether ‘support within 24 hours’ means initial response or resolution.

Per Section V.C, support is required within 24 hours of a request. NDE expects business-hours support (Monday–Friday, 7:00 AM–6:00 PM Central) for routine issues, with 24x7x365 coverage for Severity 1 (production-down) incidents and after-hours escalation paths for critical issues affecting fiscal-cycle or compliance deadlines. The expected production uptime SLA is 99.5% minimum, with 99.9% preferred, measured monthly and excluding scheduled maintenance windows communicated in advance. Vendors should propose a tiered severity model with defined response and resolution targets per severity. Best practice: propose a service-level matrix specifying response time, restoration target, and credits/remedies for missed SLAs.

Section VI
Page 35
8. What vendor financial statements is NDE looking for? Income statements? Balance sheets? How many years of financial statements?
The RFP states that the most recent audited financial reports and statements must be provided.

Section V.C Security, Privacy & Accessibility

32
Does NDE require that the GMS, including all production data and backups, be hosted within the United States and operated only by U.S.-based personnel? Are there additional data-residency, FedRAMP, StateRAMP, or other public-sector cloud certification requirements that vendors must satisfy or commit to obtain?
The GMS, including production data and backups, must be hosted within the United States. The solution must comply with applicable security, privacy, and accessibility (WCAG 2.1 AA) requirements. Additional data residency and certification requirements will be confirmed during implementation discovery and contract finalization.
N/A
N/A
Please provide estimated numbers of internal NDE users, external sub-recipients/grantees, and concurrent users to size licensing and infrastructure.
Vendors should plan to support approximately 100 internal NDE users across roles including: program administrators, program staff, fiscal staff, monitoring staff, reviewers/approvers, reporting/read-only users, and system administrators. Final role-by-role counts will be confirmed during implementation. Best practice: propose role-based access with separation of duties out-of-the-box plus configurable custom roles.

Vendors should plan to support approximately 2,600 external users across approximately 300 subrecipient organizations. External roles typically include: authorized organizational representatives, program contacts, fiscal contacts, application preparers, internal reviewers/approvers within the subrecipient, and read-only stakeholders. Final counts will be confirmed during implementation. Best practice: support organization-level delegated user administration so subrecipients manage their own users with NDE oversight.

Section V.C Security, Privacy & Accessibility

32
Does NDE require evidence of specific third-party security certifications or attestations from the awarded vendor (for example, SOC 2 Type II, ISO/IEC 27001, FedRAMP, StateRAMP, HECVAT)? Are these required at proposal submission, at contract award, or at a later point during implementation?
NDE does not require *specific* third-party certifications as a condition of proposal submission or award. Vendors should provide evidence of their security posture, including any relevant certifications and documentation of security posture in line with industry best practices. Requirements and timing for submission of supporting documentation will be confirmed during evaluation and implementation.
N/A
N/A
Which financial/ERP system(s) (e.g., state accounting, Payroll & Financial Center) must the GMS interface with for payment processing and grant drawdowns, and what integration methods are preferred?
Specific financial or ERP systems will be identified during implementation discovery. The GMS must support integration with NDE financial systems for payment processing and grant drawdowns using standard methods. Preferred integration approaches and details will be confirmed during implementation.

Section V.D & V.E Work Plan & Current Env.

33
Can NDE provide approximate data volumes from the current GMS,

including: number of active and historical subrecipients; number of historical applications, awards, and amendments; number of reimbursement requests and payment records; number of documents and total storage size; number of programmatic reports; and the typical retention horizon of historical records that must be migrated to the new GMS?

NDE estimates approximately 300 subrecipient organizations; tens of thousands of applications, awards, and amendments; hundreds of thousands of reimbursement and payment records; tens of thousands of monitoring records; dozens of reports; and hundreds of thousands of document attachments. Historical data is expected to include recent records (approximately 3–5 years), with additional historical data within a 5–10 year horizon. Final volumes and retention scope will be confirmed during implementation discovery.

Section V.D & V.E Work Plan & Current Env.

33
In what formats can NDE export legacy GMS data for migration (for example, SQL Server backup, structured CSV or JSON exports, an existing data dictionary)? Will NDE provide vendor access to the current system or representative data samples during the implementation phase to support migration design?
NDE can provide data exports in formats suitable for migration, including database backups and flat files. Detailed data artifacts, such as data dictionaries, will be provided to the awarded vendor during implementation discovery. Access to representative data will be provided during implementation to support migration design.
General System Requirements
32–33
How many internal users and external users does NDE anticipate using the new system?
Vendors should plan to support approximately 100 internal NDE users across roles including: program administrators, program staff, fiscal staff, monitoring staff, reviewers/approvers, reporting/read-only users, and system administrators. Final role-by-role counts will be confirmed during implementation. Best practice: propose role-based access with separation of duties out-of-the-box plus configurable custom roles.

Vendors should plan to support approximately 2,600 external users across approximately 300 subrecipient organizations. External roles typically include: authorized organizational representatives, program contacts, fiscal contacts, application preparers, internal reviewers/approvers within the subrecipient, and read-only stakeholders. Final counts will be confirmed during implementation. Best practice: support organization-level delegated user administration so subrecipients manage their own users with NDE oversight.

Implementation and Data Exchange
33
What source systems will data need to be integrated with, and how many application/systems are involved?
Source systems will be identified during implementation discovery. Vendors should plan for integration with NDE financial systems and other relevant applications. The number of systems and integration requirements will be confirmed during implementation.

Section VI.A.1.VIII Corporate Experience

36
Section VI.A.1.VIII requires up to three similar-project narrative descriptions. When the bidder is a U.S. subsidiary of a non-U.S. parent, may projects performed by the parent or by other affiliates within the same corporate group be presented as bidder experience (clearly labeled as affiliate experience and identifying the performing entity), or must each cited project have been performed by the contracting entity itself?
Projects listed should provide the evaluators sufficient information to determine if the U.S. subsidiary can perform the project. If the non-U.S. parent projects are listed, then they should be clearly deliniated for evaluation purposes.
Section V
Page 32
3. Data volumes: Please provide estimated record counts and document storage volumes, plus the number of years of history required online vs archived.
NDE estimates tens of thousands of grant records, hundreds of thousands of reimbursement records, tens of thousands of monitoring records, and hundreds of thousands of document attachments. Approximately 3–5 years of recent data is expected to be maintained for active access, with additional historical data retained for a 5–10 year horizon. Final volumes and retention approach will be confirmed during implementation discovery.
N/A
N/A
What is the current system (commercial product, custom, or manual) supporting grant application, reimbursement, and monitoring, and is data migration into the new GMS in scope?
NDE’s current grants management system is a custom-developed application. Data migration into the new GMS is in scope.
N/A
N/A
Beyond standard role-based security, are there specific audit, FedRAMP, NIST, or State of Nebraska security control baselines the proposed SaaS must be certified against?
NDE does not require certification against a specific audit or security framework as a condition of award. Vendors should align with industry-standard security practices and may provide relevant certifications. Any additional requirements will be confirmed during implementation discovery and contract finalization.
Document Management
33
Are electronic signatures required? If so, is there a preferred e-signature provider?
Electronic signatures are required. NDE does not mandate a specific provider, though the provider should comply with the "signature dynamics" technology as per the Nebraska Digital Signatures Act: https://govdocs.nebraska.gov/epubs/S1000/R437-2005.pdf
Integration and Data Exchange
33
What financial/accounting system(s) must integrate with the GMS?
Specific financial or accounting systems will be identified during implementation discovery. The GMS must support integration with NDE financial systems for relevant data exchange.
Integration and Data Exchange
33
Does the financial system provide readily available APIs to facilitate data exchange between systems?
Availability of APIs within the financial system will be confirmed during implementation discovery. The GMS should support multiple integration methods to accommodate available capabilities.
Implementation and Data Exchange
33
What are the estimated data volumes for migration from existing systems, including the number of grants, applications, and associated documents?
NDE estimates tens of thousands of grant and application records and hundreds of thousands of associated records and document attachments. Final volumes will be confirmed during implementation discovery.
Project Environment
32
What are the top pain points in the current system?
Given the variability across federal, state, formula, and competitive programs, the current environment relies on program-specific processes and manual effort in certain areas. The future GMS should streamline workflows and enable greater standardization where appropriate while preserving program-level flexibility.

Specific pain points will be further validated with the awarded vendor during implementation discovery.

Project Environment
32
Does NDE prefer a SaaS/platform-based solution, a custom-developed solution?
NDE is open to SaaS, platform-based, or other solution approaches and does not mandate a specific solution type.
Implementation and Data Exchange
33
Is the data from these systems structured or unstructured?
The current system contains primarily structured data, with documents managed as unstructured files linked by metadata.
Implementation and Data Exchange
32–33
Is there a consistent unique identifier across all source systems that can be used to link applicant, grantee, and grant records?
A single consistent unique identifier across all source systems is not guaranteed.
Implementation and Data Exchange
33
What level of inbound and outbound integration is expected between the Grants Management System and NDE financial systems (e.g., real-time vs. batch, data elements, and update frequency)?
The GMS must support bidirectional integration with NDE financial systems for reimbursement and payment data exchange. Expected frequency and data elements (real-time vs. batch) will be confirmed during implementation, and vendors should support both integration patterns.
Section V.C.10.a-c
33
Please identify all existing systems requiring integration with the proposed solution and clarify whether APIs, interface specifications, or technical documentation currently exist and will be made available to the

selected vendor.

Specific systems requiring integration will be identified during implementation discovery. Interface specifications, APIs, and technical documentation will be provided to the awarded vendor during implementation and are not available during the proposal period.

Sections V.C.1.d-e
32
Please provide the anticipated

number of internal users by role type, including administrators, program staff, finance staff, reviewers, and auditors.

Vendors should plan to support approximately 100 internal NDE users across roles including: program administrators, program staff, fiscal staff, monitoring staff, reviewers/approvers, reporting/read-only users, and system administrators. Final role-by-role counts will be confirmed during implementation. Best practice: propose role-based access with separation of duties out-of-the-box plus configurable custom roles.

Sections V.C.1.d-e
32
Please provide the anticipated number of external users, including applicants, sub-grantees, reviewers, districts, and other participating organizations

expected to access the platform.

Vendors should plan to support approximately 2,600 external users across approximately 300 subrecipient organizations. External roles typically include: authorized organizational representatives, program contacts, fiscal contacts, application preparers, internal reviewers/approvers within the subrecipient, and read-only stakeholders. Final counts will be confirmed during implementation. Best practice: support organization-level delegated user administration so subrecipients manage their own users with NDE oversight.

Integration and Data Exchange
33
Will NDE or the awarded vendor be responsible for data cleansing, normalization, and deduplication activities related to system integrations and historical data migration?
The awarded vendor will lead data cleansing, normalization, and deduplication, with NDE providing business validation and approval.
Project Environment
32
What system does NDE currently use to manage the grant administration process?
The current grants management system will be disclosed to the awarded vendor during implementation discovery.
Project Environment
32
Does NDE currently have licenses for Dynamics 365, Power Platform, Azure, Power Automate, and/or Power BI?
NDE’s current software license inventory is not disclosed and will be confirmed during implementation discovery. Please provide costing specifics in the cost sheet.
Project Environment
32–33
What is NDE's posture, and is it open to leveraging AI as part of the implementation and/or the solution?
NDE is open to AI capabilities that comply with security, privacy, testability/repeatability, bias free, and accessibility requirements; final scope will be confirmed during implementation discovery.
Sections V.C.12.c and V.D.d
33
Please clarify the anticipated migration scope, including current source systems, approximate data and document volumes, and the primary data entities, field structures, and document types expected to be included if historical data migration is

required.

Migration scope will be confirmed during implementation discovery and will include data from the current GMS and related sources. Approximate data volumes and primary data entities will be provided for planning purposes, while detailed field structures and document types will be defined during implementation.

Accessibility
N/A
Please confirm the accessibility standards applicable to the GMS, including whether WCAG 2.1 AA is the required baseline for all internal, external, portal, document, reporting, and training components.
The GMS must comply with WCAG 2.1 Level AA and applicable Nebraska Technology Access Standards across all system components, including internal, external, portal, document, reporting, and training elements.
Current system
N/A